Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Power system operational models”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Evaluating the Impacts of Coordination for Cascaded Hydropower Plants on the Mid-Columbia

The Mid-Columbia region in the U.S. Pacific Northwest includes seven large, cascaded hydropower plants with a combined nameplate capacity of nearly 14 GW. These plants have several different operators, and there is currently limited coordination among the operators. We develop a detailed model of the Mid-Columbia system that captures both river flow constraints and power system operations. We then place this detailed model within a production cost model of a 2030 system of the Western Interconnection to evaluate how coordination of the Mid-Columbia hydropower plants might impact operations throughout the interconnection. We find that coordination of the Mid-Columbia plants leads to more generation from the Mid-Columbia plants and increased revenues for the Mid-Columbia operators. This benefit is achieved primarily through better utilization of the storage reservoirs and decreased spill through the cascade. We also evaluate the impacts of look-ahead on production costs and find that longer look-ahead values result in lower system-wide production costs.

13 HYDRO ENERGY↗

Power market models for the clean energy transition: State of the art and future research needs

As power systems around the world are rapidly evolving to achieve decarbonization objectives, it is crucial that power system planners and operators use appropriate models and tools to analyze and address the associated challenges. This paper provides a detailed overview of the properties of power market models in the context of the clean energy transition. We review common power market model methodologies, their readiness for low- and zero-carbon grids, and new power market trends. Based on the review, we suggest model improvements and new designs to increase modeling capabilities for future grids. The paper highlights key modeling concepts related to power system flexibility, with a particular focus on hydropower and energy storage, as well as the representation of grid services, price formation, temporal structure, and the importance of uncertainty. We find that a changing resource mix, market restructuring, and growing price uncertainty require more precise modeling techniques to adequately capture the new technology constraints and the dynamics of future power markets. In particular, models must adequately represent resource opportunity costs, multi-horizon flexibility, and energy storage capabilities across the full range of grid services. Moreover, at the system level, it is increasingly important to consider sub-hourly time resolution, enhanced uncertainty representation, and introduce co-optimization for dual market clearing of energy and grid services. Likewise, models should capture interdependencies between multiple energy carriers and demand sectors.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Comparison of Electromagnetic Transient and Phasor Dynamic Simulations: Implications for Inverter Dominated Systems

The simulation of very high shares of inverter-based resources in power systems has begun to draw into question the validity of phasor domain tools in capturing relevant dynamics. Electromagnetic transient simulators can capture the dynamics of power electronics with substantially smaller time steps, but are computationally expensive. This work contrasts the results of phasor domain and electromagnetic transient tools for simulations on a validated model of the Maui power system operating at very high inverter-based resource shares with near zero voltage forming devices. The results show that the phasor domain tool predicts optimistic stability with fewer voltage forming elements on the network, and loses computational stability before the electromagnetic transient tool. As the electromagnet transient model is of the entire system, and system-wide discrepancies are observed, this case study of a physical power system highlights the potential need for system-wide detailed modeling during periods of very high shares of inverter-based resources and few voltage forming devices.

electromagnetic transient-domain↗

An ERCOT test system for market design studies

An open source test system is developed that permits the dynamic modeling of centrally-managed wholesale power markets operating over highvoltage transmission grids. In default mode, the test system models basic operations in the Electric Reliability Council of Texas (ERCOT): namely, centrally-managed day-ahead and real-time markets operating over successive days, with congestion handled by locational marginal pricing. These basic operational features characterize all seven U.S. energy regions organized as centrally-managed wholesale power markets. Modeled participants include dispatchable generators, load-serving entities, and non-dispatchable generation such as unrmed wind and solar power. Users can congure a broad variety of parameters to study basic market and grid features under alternative system conditions. Users can also easily extend the test system's Java/Python software classes to study modied or newly envisioned market and grid features. Finally, the test system is integrated with a high-level simulation framework that permits it to function as a software component within larger systems, such as multi-country systems or integrated transmission and distribution systems. Finally, detailed test cases with 8-bus and 200-bus transmission grids are reported to illustrate these test system capabilities.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Adaptive Stiffness Power Take-Off System for a Hydraulic Hose-Pump Point Absorber Wave Energy Converter

Two crucial challenges faced in the design of ocean wave energy converters (WECs) are maintaining high capacity factors and remaining robust in everchanging, harsh ocean environments. This study introduces a novel mechanism for achieving reactive WEC control with a soft hydraulic power take-off, thereby addressing both challenges. The device of interest involves a hydraulic pump, constructed from a fluidic flexible matrix composite (F2MC), which is cyclically stretched by driving waves and pressurizes working fluid through a turbine-generator. This class of fiber-reinforced stretch hoses is established for ocean use as robust moorings and shock absorbers. The dynamic properties of the F2MC pump depend on internal pressure, which can be controlled by a continuously variable transmission between the turbine and generator, allowing the system to be adapted for better performance over a wide range of wave conditions. This work presents a dynamic model for operation and adaptive behavior of this power take-off system, experimentally validates components of the model, and performs dynamic simulations of the system that show increases in power production and capacity factor compared to non-adaptive operation for a variety of driving wave conditions. This work develops the basis for future large-scale experimental testing and controller design of this system.

Wave energy conversion, fluidic flexible matrix co↗

Exploring Multidimensional Spatial-Temporal Hydropower Operational Flexibilities by Modeling and Optimizing Water-Constrained Cascading Hydroelectric Systems

Because of unique characteristics such as clean and cost-competitive electricity as well as fast-ramping and storage abilities, the power industry continues to evolve its operation strategies for cascading hydroelectric (CHE) systems for providing enhanced values to the grid, especially under the deeper renewable resource integration. However, existing operation practices of CHEs predate the integration of renewables, which could prohibit the effective utilization of their inherent flexibilities in delivering maximum financial benefits and providing valuable grid services to the power system and electricity market operations. Indeed, modeling and optimizing these resource-limited while flexible CHE assets with uncertainties and imperfect information across multiple spatial-temporal dimensions present significant challenges. To facilitate CHE facility operators in effectively coordinating water usage and hydropower plant operations across multiple timescales, this project aims to fill the existing gaps by developing a suite of accurate water inflow (WI) forecast models as well as enhanced CHE modeling and optimization approaches with proper consideration of their unique characteristics, which would help explore their multidimensional spatial-temporal operational flexibility potentials. The developed approaches could better align reservoir operation strategies with variability and uncertainty of future water availability. They can also promote more effective utilization of multidimensional spatial-temporal hydropower operational flexibility potentials by designing long-term evacuation plans of reservoirs and short-term operation of CHEs, along with their coordination with other types of renewables. The project leverages various resources to facilitate the research and development activities, including actual characteristics data of CHE systems and a library of current and future cases of Portland General Electric (PGE). These realistic data enable the project team to study how to maximize the value of CHEs under current and future portfolios and evaluate opportunities to improve operation practices.

13 HYDRO ENERGY↗

Transmission Operator Workflows for Real-Time Reliability Studies: A Review of Control Room Practices and Naturalistic Decision Making

This report provides an overview of real-time reliability study tools and their use by power system operators in the control room environment. After introducing some of the nuances of the control room environment and the differences in perspectives between power system engineers and operators, the roles and responsibilities of key entities involved in RTCA workflows are introduced. These are specifically the transmission system operator (TOP) and reliability coordinator (RC), which are required to run tools such as real-time contingency analysis (RTCA) as part of a real-time reliability assessment every 30 minutes, as dictated by a series of standards issued by the North American Electric Reliability Corporation (NERC). The process by which power systems operators operate the grid is discussed in terms of naturalistic decision making (NDM) and the recognition-primed decision-making (RPD) model. This cognitive model describe how experts working in high-risk, high-stress environments make safety-critical decisions under uncertainty and time pressure. For power system operators, the mental simulations involved in the traditional RPD model are supplemented by physics-based simulations using numerical tools, such as RTCA, to improve situational awareness and effectiveness of control actions. Next, a generic workflow is introduced to describe operator decision making for running RTCA tools and responding to system violations on a pre-contingent basis. The types of analysis performed and control actions chosen by power system operators are described in detail. The overall high-level workflow is then expanded in subsequent sections, with special attention given to high-voltage violations, low-voltage violations, and thermal overloads. Each type of violation is described in detail, with explanations of common causes, impacts on equipment and customers, and mitigation strategies. An additional workflow diagram is provided for each type of violation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Physics-Informed Evolutionary Strategy Based Control for Mitigating Delayed Voltage Recovery

Here, in this work we propose a novel data-driven, real-time power system voltage stability control method based on the physics-informed guided meta evolutionary strategy (ES). The main objective is to quickly provide an adaptive control strategy to secure system voltage stability. The problem is challenging due to the high-dimensional feature of the power system model and the fast-changing and uncertain nature of power system operation scenarios. To this end, a model-free and derivative-free guided ES method is applied. The method is further combined with a meta-learning strategy to make the learnt control policy automatically adapted to unseen operation conditions and fault scenarios, which is highly desired for real-time emergency control. Last but not least, physical knowledge is embedded in the above method through a trainable action mask technique to rule out unnecessary load shedding actions for better learning and control performance. Case studies on the IEEE 300-bus system and comparisons with other state-of-the-art benchmark methods verify the superiority of the proposed physics-informed guided meta ES method in realizing fast and adaptive power system voltage stability control.

42 ENGINEERING↗

Projecting Future Colorado River Basin Water and Hydropower Operations

Drought, variable renewable energy (VRE) resources (primarily wind and photovoltaic technologies), and power markets can all impact hydropower plant operations. We analyze how these three factors collectively may potentially change the future operation and economics of federal dams and hydropower plants located in the Colorado River Basin (CRB). Federal CRB energy and capacity resources, including 4,200 MW of hydropower capacity, are marketed by Western Area Power Administration (WAPA) and sold through long-term Firm Electric Service (FES) contracts to entities located in 15 western and central States that serve millions of electricity consumers. The parameters of FES contracts allow a wide range of scheduling flexibility for FES customers. The FES customers will adjust the timing of energy delivery according to the changing water, power market, and VRE contribution level to the power grid. We simulate and project water and hydropower operations with two models: 1) reservoir operation and 2) power system operation (production cost) with various temporal granularity. We consider two sets of grid scenarios (one representing today's infrastructure, and one representing higher VRE contributions in 2036) and two sets of water scenarios (drought and normal hydrology). We modeled scenarios to understand the power market-energy price levels and patterns, FES customer scheduling, hydropower economics, WAPA finances and hydropower operation for various hydrologic conditions, and VRE contribution level to the power grid. The detailed modeling framework includes: (1) creating ensembles of CRB hydrologic and hydropower futures, (2) selecting representative futures, (3) simulation of FES customer contracts, (4) simulating western U.S. power grid economic scheduling and dispatch under two VRE contribution levels, utilizing information from modeling steps (1)-(4), (5) assessment of reservoir water and hydropower operation, and (6) comparing scenario operations and economics. Our study team comprising WAPA, and an interdisciplinary team of national labs will gain insight into how WAPA can prepare for and adapt its practices in response to an evolving U.S. power grid.

Colorado River↗

Assessing the performance of global thermostat adjustment in commercial buildings for load shifting demand response

Abstract Efficiently leveraging new sources of flexibility is critical to mitigating load balancing challenges posed by variable renewable resources. The thermal inertia of commercial buildings allows us to shift their power consumption on minute to hourly timescales to provide demand response to the grid while maintaining occupant comfort. Global thermostat adjustment (GTA) provides a readily available and scalable approach for implementing load shifting demand response using commercial heating, ventilation, and air conditioning (HVAC) systems, since it leverages the inherent sophistication of modern building automation systems. However, there is an incomplete understanding of GTA’s performance for this purpose and its impact on building systems and occupant comfort. In this paper, we explore the performance of GTA by analyzing results from nearly nine hundred experiments on eight university campus buildings in Michigan and North Carolina. Using GTA, we manipulate each building’s thermostat setpoints causing the building to shift its power consumption with respect to its baseline. We quantify the magnitude of HVAC power response, energy use of HVAC subsystems, and impact on occupant comfort. Finally, we connect our experimental results with power system operation using an optimization model that coordinates GTA actions across a large collection of grid-interactive efficient buildings (GEBs) to reduce high ramp rates on the grid and mitigate renewable energy curtailment. Overall, our work finds that the impacts on HVAC subsystems are often complex, and may result in additional energy being consumed by fans and terminal reheat. These effects must be considered when using GTA for load shifting. Additionally, we demonstrate that occupant comfort, as assessed by indoor temperature and humidity, can be maintained during GTA events. From a societal perspective, our modeling work finds that the additional renewable energy that can be integrated through the use of GTA strategies eclipses any additional energy consumed by buildings.

Keskar, Aditya (ORCID:0000000244617980)↗

Electric Vehicle Managed Charging: Estimating the Potential Bulk Power System Value

With more and more electric vehicles (EVs) on the road, the grid of the future can greatly benefit from EV managed charging, which coordinates charging based on people's travel needs, electricity supply, and grid conditions. The added flexibility could be especially valuable for the bulk power system as it transitions to high shares of variable renewable generation, like wind and solar. Numerous studies have estimated the potential value of EV managed charging. In this study, NREL leveraged more detailed modeling of EV adoption, use, charging, and bulk power system operations to understand the potential value. Unique to this study, NREL modeled different charging flexibility types and dispatch mechanisms - as well as participation rates among drivers in having their EV charging managed - starting from vehicle-specific descriptions of charging flexibility. The study is based on a passenger light-duty vehicle adoption scenario with 100% EV sales by 2035 and a New England power system in 2038 with 84% clean generation and 26% of the electric load met by net imports. The 2038 New England light-duty vehicle feet is modeled as 45% electric.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Disjunctive optimization model and algorithm for long-term capacity expansion planning of reliable power generation systems

This paper proposes a new optimization model and algorithm for long-term capacity expansion planning of reliable power generation systems. The model optimizes both investment decisions (e.g., size, location, and time to install, retire and decommission facilities) and operation decisions (e.g., on/off status, operating capacity, and expected power output). It is also able to optimize reserve systems (or backup systems), as well as the main systems, to improve power systems reliability. An impact of operational strategies of generators (i.e., participating in electricity production vs. remaining as idle units during operation) on power systems reliability is considered. Probability of equipment failures and capacity failure states are used to rigorously estimate the power systems reliability depending on design and operation strategies. The optimization model is formulated with Generalized Disjunctive Programming (GDP), which is reformulated as a mixed-integer linear programming (MILP) model using the Hull relaxation. Two reliability-related penalties, such as downtime penalty and unmet demand penalty, are included in the objective function to maximize reliability while minimizing the total net present cost. Furthermore, a bilevel decomposition with tailored cuts is developed to reduce computational times of the multi-scale optimization model. The effectiveness of the proposed model is shown by comparing the results with the results obtained from the expansion planning models that do not explicitly consider reliability. In conclusion, we also show that the proposed bilevel decomposition is computationally efficient for solving large scale problems through 5-years and 10-years planning case studies.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Open-Source High-Fidelity Aggregate Composite Load Models of Emerging Load Behaviors for Large-Sale Analysis

The goal of this project is to accurately model the dynamic loads for power system planning and operation and to address the challenges inherent in such modeling. Existing load models are inadequate to handle the increasing proliferation of residential air conditioner loads and distributed energy resources, the emerging trends of price-responsive demand, and the growing importance of protective devices in equipment and buildings. A need has emerged to develop a fundamentally new class of load models and next-generation data tools. This work proposes to develop a set of regional–level, scalable open source load models and tools, including large-scale aggregate load protection, concept of price responsive demand, advanced load composition data, next-generation load model data tools, and advanced composite load model calibration and validation frameworks to address new challenges in the representation of next-generation load models.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Climate-Induced Tradeoffs in Planning and Operating Costs of a Regional Electricity System

Electricity grid planners design the system in order to supply electricity to end users reliably and affordably. Climate change threatens both objectives through potentially compounding supply- and demand-side climate-induced impacts. Uncertainty surrounds each of these future potential impacts. Given long planning horizons, system planners must weigh investment costs against operational costs under this uncertainty. Here, we developed a comprehensive and coherent integrated modeling framework combining physically-based models with cost-minimizing optimization models in the power system. We applied this modeling framework to analyze potential tradeoffs in planning and operating costs in the power grid due to climate change in the Southeast U.S. in 2050. We find that planning decisions that do not account for climate-induced impacts would result in a substantial increase in social costs associated with loss of load. These social costs are a result of under-investment in new capacity and capacity deratings of thermal generators when we included climate change impacts in the operation stage. Finally, these results highlight the importance of including climate change effects in the planning process.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Equity‐aware power distribution system restoration

Abstract The efficient, reliable, and resilient supply of electricity has become essential for social and economic well‐being of the modern society. However, more frequent occurrence of extreme weather events has exposed inequity in the planning and operation practices of power distribution systems, evidenced in higher vulnerability and longer power interruptions for some parts of the grid as compared to others. This paper proposes an equity‐aware power distribution system restoration model in an effort to ensure a more equitable yet resilient power distribution operation after outages. To this end, the proposed equity‐aware distribution system restoration model balances the efficiency of the restoration operation and the equitable allocation of distributed energy resources among affected customers after an outage, while prioritizing the critical infrastructure (e.g. hospitals). The results demonstrate the effectiveness of the proposed framework to ensure a more equitable restoration process as measured by the proposed fairness and restoration performance indices.

Engineering↗

Validation of Power Distribution Models using Load Flow Analysis in an ADMS Environment

Electric utilities are facing the need for better monitoring, analysis, and control of their distribution systems. An accurate mathematical model is a key to both the development of cutting-edge, scalable model-based algorithms and the assessment of emerging technologies such as distributed energy resources (DER) for grid planning and operation. However, the constantly evolving nature of power distribution systems poses challenges to maintaining accurate models. In this paper, we propose a novel load flow based approach to validate power distribution models. Networked equipment models described according to the Common Information Model (CIM) standard and a measurement model are used to formulate the distribution load flow problem. First, a system admittance matrix (Ybus) is derived from device-level CIM parameters. Next, the operational parameters (dynamic Ybus and nodal injections) are extracted from the measurement model using sensor configuration and equipment state. An iterative power flow method is then used to compute nodal voltages and branch flows that are compared against the measurement data to find any inconsistencies in the networked equipment model. This approach is implemented within GridAPPS-D, an open-source standards-based platform for advanced distribution management system (ADMS) application development, and demonstrated on the IEEE 13-bus, 123-bus, and 8500-node test feeders.

Common information model, model validation, power ↗

Sensor enabled data-driven predictive analytics for modeling and control with high penetration of DERs in distribution systems

The electric power grid is undergoing a tremendous transformation due to the increasing penetration of renewable energy resources beginning with wind and more recently with the distributed energy resources (DERs) such as solar and battery storage. DERs have dramatically changed the role of the distribution systems in the overall power grid, and they are expected to contribute a significant portion of power generation in the future. If current trends for DERs continue, system operation and control will need to change dramatically for improved grid reliability and resiliency. As renewable resources increase in penetration, new and challenging operational, planning, and design problems are expected to emerge. Some of the key challenges that arise in the planning and operation of the future grid are: 1) Quantifying the impact of high DER penetration in distribution systems on bulk grid behavior over multiple time scales. 2) Identifying whether a particular DER configuration/settings have a large impact on the overall grid behavior. These challenges can be addressed in an offline manner using detailed T&D grid models and they can also be addressed in an online manner using sensor measurements. In particular, the advancement and planned growth in sensor technology in power grid over various voltage levels provide us with a unique opportunity to tackle these challenges from a data analytic perspective without needing detailed T&D grid models. A few questions that naturally arise when addressing the challenges from DERs using sensor data are: 1) How can we use limited sensor measurements to monitor & control voltage stability and small signal stability of the bulk system? 2) How can we ensure that the developed data analytic methods are robust to data availability and quality issues? 3) How can we compute the developed analytics in a scalable manner using streaming measurements? In this project, we addressed the aforementioned challenges arising from DERs and answered the questions raised above on how to effectively use the sensor measurements to enhance the reliability and performance of the electric grid. Thus, the overarching goal of this project is to develop effective reduced/representative system models from data that make the computational complexity sufficiently manageable so as to be useful to simulate, analyze, and even control complex non-linear power systems dynamics with large penetrations of DERs. In order to achieve the objective, the project team established a four-fold technical approach 1) Formulated a combined transmission-distribution co-simulation framework for data generation and validation, 2) Derived reduced/representative models of power systems based on data-driven methods for efficient computation and appropriate representation of system behavior, 3) Developed data driven characterization of power system behavior based on transfer operator theory, machine learning and optimization for model estimation, 4) Incorporated a scalable data management and processing architecture using distributed Kafka streaming applications that coordinate input data streams to the developed data analytics. The key accomplishments of the project are: 1) Development of a scalable multi-timescale T&D co-simulation framework (both for steady state and for dynamic co-simulation) using commercial solvers (PSSE and GridLAB-D). The steady-state T&D co-simulation interface is shared with our industry partner (PJM). 2) A structured reduced order dynamic model of distribution systems that can represent partial motor stalling along with a systematic procedure to derive the model parameters. 3) A PMU based online method to monitor, localize and mitigate fault-induced delayed voltage recovery using DER reactive support and load control in distribution systems. 4) Development of linear operator based robust methodologies for dynamic state estimation, uncertainty quantification, system identification and trajectory prediction for power system dynamics. 5) An adaptive damping control for utilizing wind energy resources to provide oscillation damping and system stability. 6) Implementation of Kafka-based framework for efficient processing of streaming data using Linux-based local virtual environment.

DER integration↗

Achieving an 80% Renewable Portfolio in Alaska's Railbelt: Cost Analysis

This study examines the system-level costs and benefits of increased renewable energy deployment in the Railbelt grid, in the context of a proposed 80% renewable portfolio standard (RPS). This work studies the period from 2024 to 2040 and uses a model that simulates the planning, evolution, and operation of the power system to identify the mix of resources that maintains system reliability at the lowest electricity system cost over the period of analysis. The model tracks several reliability metrics, including the ability to serve demand during all hours of the year, even when normal power system failures occur. The model includes several measures (and associated costs) to address the variable output of renewable resources, including additional operating reserves, fuel storage, cycling of fossil plants, and additional equipment needed to maintain system stability. The Reference (least-cost) scenario results in substantial deployment of renewable energy and cost savings, reaching about 76% of Railbelt generation derived from renewables in 2040. Annual savings average about $105 M/year from 2030 to 2040. About 50% of this generation is from wind by 2040. Enforcing an 80% RPS results in about a 2% cumulative reduction in net savings. Demand is met in all scenarios, relying heavily on use of existing hydropower and fossil-fueled generators during periods of low renewable output. Meeting the increase in variability will require substantial changes in how the system is operated, with inverter-based resources providing nearly 100% of electricity during some periods.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗