At least 55 records · Page 3

Design, Development and Testing Plan for Energy Efficiency Algorithms Related to Building-Integrated Cooling, Heating, and Power Systems

Building-integrated cooling, heating and power (CHP) systems are more efficient than conventional systems at providing local power and thermal energy, and favorable fuel prices are bound to spur their increased adoption. It is estimated that the total CHP technical potential in the commercial building sector is approximately 76 GW, but only a small fraction of it is actually deployed. Advanced control and monitoring systems that realize the full potential of these CHP systems can transform this capacity into an asset for both the owner and the grid and also accelerate the adoption of these systems in the building sector. However, to realize the full benefit of the CHP systems, we must ensure persistence of energy efficient operations. It has been demonstrated by several studies that as much as 30% of building energy use is wasted. Much of the waste results from the inability to anticipate load variations (design day vs. non-design day operations; diurnal variation of loads), identify improper operation, and efficiently operate, control and maintain building systems. Moreover, many buildings, even those with adequate control infrastructure, lack knowledgeable staff to operate and maintain energy systems. Operators of buildings with CHP systems will constantly need to make tradeoffs (economic dispatch) between onsite power generation and purchasing power, between onsite heat production from distributed generation versus heating/cooling from conventional systems, and different passive and active load management measures. Much of the inefficiency in the current building operations can be eliminated by use of automated performance monitoring (PM), real-time commissioning verification (CxV) and automated fault detection and diagnostic (AFDD) tools. Automation can help system operators make intelligent decisions. Remote and continuous monitoring of system conditions and performance will enable better management and integration of CHP with existing building systems. Continuous PM, real-time CxV and AFDD could alleviate burdens for operations staff, enhance operations and maintenance (O&M), and improve reliability of building and CHP systems. To address the O&M challenges and to provide a means to maximize the rate-of-return of building-integrated CHP systems, the Building Technologies Office (BTO) within the U.S. Department of Energy’s (DOE’s) Office of Energy Efficiency and Renewable Energy (EERE) initiated a project to design, develop, and field test a VOLTTRON™-based supervisory controller and associated open-source algorithms. These algorithms will ensure real-time optimal operation of a building-integrated CHP system, support electric grid reliability, and lead to achieving the goal of a clean, efficient, reliable and affordable next-generation integrated energy systems. This report lists the components for which PM, real-time CxV and AFDD algorithms will be developed, how the algorithms will be tested, and metrics that will be used to validate the algorithms and easy of deployment. Deployment of these algorithms in the field will result in savings reduction in energy consumption of between 10% and 20%.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Photographic Mitigation Documentation Related to the Engine Assembly and Disassembly Facility, Area 25, Nevada National Security Site, Nye County, Nevada

This letter report provides documentation in partial fulfillment of the mitigation of adverse effects to the Engine Maintenance Assembly and Disassembly (E-MAD) facility, a major component of the Nuclear Rocket Development Station (NRDS) Historic District located in Area 25 of the Nevada National Security Site (NNSS). Construction of the E-MAD facility began in 1962 for the purpose of disassembling and maintaining nuclear-powered rocket engines. Once the building was complete in 1967, the E-MAD facility remained in continuous operation until the nuclear rocket program was terminated in 1973. The mothballed facility was repurposed in 1977 for spent nuclear fuel handling and packaging activities. By the mid-1980s, all activities at the E-MAD facility had ceased (Reno et al. 2019). This submission is intended to comply with Stipulation III.D.1 of the Memorandum of Agreement DE-GM58-20NA25534 between the U.S. Department of Energy and the Nevada State Historic Preservation Officer Regarding Corrective Action Activities and Demolition of the Engine Maintenance Assembly and Disassembly Facility and the Test Cell C Historic District, Major Components of the Nuclear Rocket Development Station Historic District Located in Area 25 at the Nevada National Security Site Nye County (hereafter referred to as the MOA). Stipulation III.D.1 states the U.S. Department of Energy (DOE) will submit the existing supplementary collection of the large-format, black-and-white photographic prints taken during the 1996 Historic American Engineering Record (HAER) documentation of the E-MAD facility to the Nuclear Testing Archive (NTA), located on the second floor of the Rogers Building at Desert Research Institute (DRI) in Las Vegas, Nevada.

54 ENVIRONMENTAL SCIENCES↗

Integrated Risk-Informed Condition Based Maintenance Capability and Automated Platform: Technical Report 3

This project is a collaborative research effort between PKMJ Technical Services LLC, Idaho National Laboratory, and Public Service Enterprise Group (PSEG) Nuclear, LLC. The collaboration, led by PKMJ Technical Services LLC, is part of the industry Funding Opportunity Announcement (FOA) award under Advanced Nuclear Technology Development FOA #DE-FOA-0001817. The pilot demonstration focuses on the Circulating Water System (CWS), an important non-safety-related system that impacts the power generation capability of the plant site. Achieving riskinformed condition-based Predictive Maintenance (PdM) on the CWS will result in significant economic benefits, and the developed methodologies can also be applied to other plant systems. This approach supports an industry goal of ensuring that nuclear power generation remains a viable, economically competitive option in the energy market. Operation and Maintenance (O&M) costs include labor-intensive Preventive Maintenance (PM) programs that involve manually performed inspection, calibration, testing, and maintenance of plant assets at periodic frequencies as well as time-based replacement of assets, irrespective of condition. This project offers an alternative by focusing on riskinformed condition-based maintenance to reduce O&M costs while still maintaining plant health and safety. This report summarizes the progress made toward achieving a risk-informed condition-based maintenance approach. The research and development (R&D) activities presented in this report are associated with development of a nuclear digital platform application, integration of fault signature models, and automated work management processes. The fault signatures and Machine Learning (ML) models are key components in predictive analytics and are heavily leveraged to improve the insights received by existing plant process data sources. Availability of the analysis results within a centralized digital platform enhances efficiency by enabling automation of activities otherwise performed manually. Personnel are presented with enhanced information that can be used to evaluate plant status and risks. Utilizing the enhancements to data analytics supports automated responses, (i.e. issuance of work orders) to address developing equipment faults and thus preventing forced, unplanned shutdowns of components or systems. The R&D activities described within this report lay the foundation for developing and demonstrating a digital automated platform to centralize the implementation of condition monitoring and response to equipment faults. The digital automated platform is cloud-based and designed to enable improved efficiency of plant processes. The digital platform includes content related to maintenance optimization, fault signature analysis, and plant records, which can all be used to support efficiencies when located within a centralized digital platform. These efficiencies could be further enhanced when deployed through industry-wide deployment of the technology to improve insights and processes based upon economies of scale.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Bridging Equipment Reliability Data and Risk Informed Decisions in a Plant Operation Context

Industry equipment reliability and asset management programs are essential elements that help ensure the safe and economical operation of nuclear power plants. The effectiveness of these programs is addressed in several industry-developed and regulatory programs. The Risk-Informed Asset Management (RIAM) project is tasked to develop tools in support of the equipment reliability and asset management programs at nuclear power plants. These tools are designed to create a direct bridge between component health/lifecycle data and decision making (e.g., maintenance scheduling and project prioritization). The goal of this article is to provide a guide for specific use cases that the RIAM project is targeting. We have grouped uses cases into three main areas. The first area focuses on the analysis of equipment reliability data with a particular emphasis on condition-based data, such as test/surveillance reports and component monitoring data. The second area focuses on the integration of equipment reliability into system/plant reliability models to determine system/plant health and identify the components that are critical to maintain an operational system. Lastly, the third area manages plant resources, such as maintenance activities and replacement scheduling using optimization methods. Here the primary focus is on supporting typical system engineer decisions regarding maintenance activity scheduling and component aging management. This is performed in a risk-informed context where the term “risk” is broadly constructed to include both plant reliability and economics. This framework combines data analytics tools to analyze equipment reliability data with risk-informed methods designed to support system engineer decisions (e.g., maintenance and replacement schedules, optimal maintenance posture) in a customizable workflow.

97 - MATHEMATICS AND COMPUTING↗

Electromechanical actuation for thrust vector control applications

At present, actuation systems for the Thrust Vector Control (TVC) for launch vehicles are hydraulic systems. The Advanced Launch System (ALS), a joint initiative between NASA and the Air Force, is a launch vehicle that is designed to be cost effective, highly reliable and operationally efficient with a goal of reducing the cost per pound to orbit. As part of this initiative, an electromechanical actuation system is being developed as an attractive alternative to the hydraulic systems used today. NASA-Lewis is developing and demonstrating an Induction Motor Controller Actuation System with a 40 hp peak rating. The controller will integrate 20 kHz resonant link Power Management and Distribution (PMAD) technology and Pulse Population Modulation (PPM) techniques to implement Field Oriented Vector Control (FOVC) of a new advanced induction motor. Through PPM, multiphase variable frequency, variable voltage waveforms can be synthesized from the 20 kHz source. FOVC shows that varying both the voltage and frequency and their ratio (V/F), permits independent control of both torque and speed while operating at maximum efficiency at any point on the torque-speed curve. The driver and the FOVC will be microprocessor controlled. For increased system reliability, a Built-in Test (BITE) capability will be included. This involves introducing testability into the design of a system such that testing is calibrated and exercised during the design, manufacturing, maintenance and prelaunch activities. An actuator will be integrated with the motor controller for performance testing of the EMA TVC system. The design and fabrication of the motor controller is being done by General Dynamics Space Systems Division. The University of Wisconsin-Madison will assist in the design of the advanced induction motor and in the implementation of the FOVC theory. A 75 hp electronically controlled dynamometer will be used to test the motor controller in all four quadrants of operation using flight type control algorithms. Integrated testing of the controller and actuator will be conducted at a facility yet to be named. The EMA system described above is discussed in detail.

Roth, Mary Ellen↗

Modernizing the Nuclear Industry and New Ways of Working

Nuclear energy is recognized as the most feasible energy source towards achieving nation-wide net-zero goals (COP 208, MIT). Additionally, the demand for reliable, consistent energy supply is soaring with the construction of energy hungry data centers and AI tools. This means the construction of new nuclear and the continuation of current nuclear are a high national priority. However, this leaves the nuclear industry with a workforce challenge. The rising demand for nuclear power is threatened by an underpopulated workforce. There exist a few contributors to the decreased workforce such as skewed workforce demographics resulting in large-scale workforce retirement. Also, some plants have observed difficulty hiring and retaining skill sets that typically comprise the nuclear power workforce – specifically skilled craftsman. Those who are graduating with desirable skills are seeking employment in sectors that are more modern and culturally more aligned with younger generational values. Lastly, within the nuclear sector, skilled employees will be a competitive commodity as advanced plants come online offering work environments that incorporate modern technologies, skill sets, and opportunities for career advancement. These factors emphasize the need for legacy plants to modernize with a focus on the workplace environment and culture that meets younger generations’ skills, cultural expectations, and desire for advancement opportunities. Nuclear plants are actively engaged in deploying advancements that improve the management of systems, structures, and components as well as process improvements and technologies that can reduce the costs of operation and maintenance. However, the advancements must also be analyzed, reviewed and deployed in a manner that considers the impact on how people within the organization collaborate, communicate, make decisions, and solve problems. Neglecting to consider the cultural impact of modernization risks poor adoption, unrealized opportunities, or insignificant change toward helping attract new employees. The traditional way of working is not necessarily the way new generations want to engage with their employer. For instance, in a survey performed by North American Young Generation in Nuclear the top three reasons for younger nuclear employees to seek other job opportunities was seeking better work-life balance, a lack of advancement opportunities, and work culture and leadership style differences (Smyth et al. 2022). Integrated Operations for Nuclear (ION) is an approach for the nuclear industry to create long-term strategic modernization plans and analyze each advancement for the impact on people and processes and measure how those impacts flow up to support high-level, long-term plant goals and requirements. One principle of ION is to replace the current labor-centric operation style in legacy nuclear plants with data-centric collaborative operation styles. This paper will explain how transitioning operations to leverage centralized skills and responsibility, multi-skilled teams, and collaborative decision making can flatten the hierarchical structure in plants, enable greater individual efficacy while also offering more experiences and advancement opportunities to staff. Adopting the ION way of working shifts the industry mind-set towards more networked, collaborative, and modern way of working that will attract skilled, next-generation workers to operate the legacy nuclear fleet.

99 - GENERAL AND MISCELLANEOUS↗

Performance Evaluation of a Vapor-compression-cycle Based Heat Pump System for a Lunar Habitat under the Impact of Dust Deposits on the Coupled Radiators

Space exploration gains new momentum. A near goal is set by NASA to return humans to the Moon andestablish a sustainable presence on the lunar surface for more repeatable and affordable expeditions.The lunar dust is one of the dangerous environment hazard causing serious problems for explorationactivities. In this paper, in order to study the impact of lunar dust on the performance of a thermalmanagement system for a lunar habitat, a dynamical model of an active thermal control system that iscomprised of a vapor-compression cycle heat pump and a radiator loop is developed. A heat pump to liftthe heat rejection temperature is required due to high lunar daytime surface temperature. Parametricstudies on radiator size, percentage of dust coverage on the radiator, and lunar habitat location arecarried out. The results show that lunar deposits can significantly increase the power consumption ofthe thermal management system. A dust covered radiator panel results in net heat input to the heattransfer fluid during the period of strong solar irradiance, causing deteriorated performance of theradiator loop. The lunar dust contamination problem raises the requirement of redundancy design of asystem for fault tolerance. A synergetic design of a thermal management system, a power generationsystem and robotic maintenance system is proposed to achieve maximal mass cut for a whole lunarhabitat system.

Chunjian Pan↗

Space Station Module Power Management and Distribution System (SSM/PMAD)

This report provides an overview of the Space Station Module Power Management and Distribution (SSM/PMAD) testbed system and describes recent enhancements to that system. Four tasks made up the original contract: (1) common module power management and distribution system automation plan definition; (2) definition of hardware and software elements of automation; (3) design, implementation and delivery of the hardware and software making up the SSM/PMAD system; and (4) definition and development of the host breadboard computer environment. Additions and/or enhancements to the SSM/PMAD test bed that have occurred since July 1990 are reported. These include: (1) rehosting the MAESTRO scheduler; (2) reorganization of the automation software internals; (3) a more robust communications package; (4) the activity editor to the MAESTRO scheduler; (5) rehosting the LPLMS to execute under KNOMAD; implementation of intermediate levels of autonomy; (6) completion of the KNOMAD knowledge management facility; (7) significant improvement of the user interface; (8) soft and incipient fault handling design; (9) intermediate levels of autonomy, and (10) switch maintenance.

Miller, William↗

Physics-Guided Deep Learning for Complex System Health Management and Decision Making

The landscape of complex engineered systems is rapidly evolving, from smart manufacturing facilities to next-generation transportation vehicles. As these systems become increasingly sophisticated and interconnected, the need for advanced health management systems grows ever more critical. These systems must go beyond simple monitoring, actively predicting potential failures before they occur. This paradigm shift from fixed maintenance schedules to condition-based predictions is key to optimizing system performance, enhancing safety, and paving the way for autonomous decision-making across various industries. Whether in industrial processes, energy systems, or advanced transportation, the ability to anticipate and prevent failures is becoming a cornerstone of operational excellence. To accurately predict the future health of any complex system, knowledge of its current health state and future operational conditions is essential. Recent advancements in data-driven algorithms have generated growing interest in artificial intelligence for industrial applications. However, the limitations of pure data-driven methods, particularly in industries where data acquisition is costly and limited, have become apparent. This has led to a focus on blending physics with data-driven algorithms, mitigating the drawbacks of both approaches while emphasizing their respective advantages. This research proposes a novel framework for integrating physics-based performance models with deep learning algorithms for the prognostics of complex safety-critical systems. In this approach, physics-based models serve as a blueprint, capturing fundamental system behaviors, while deep learning algorithms, leveraging real-world sensor data, fill in gaps and identify subtle patterns indicative of potential problems. This hybrid methodology, utilizing techniques such as Physics-Informed Neural Networks (PINNs), offers a powerful solution for predicting system health. By fusing domain knowledge with data-driven insights, this approach promises more accurate, adaptable, and reliable models for health prediction. The resulting framework is versatile, applicable across various sectors including aerospace, manufacturing, and energy systems, ultimately contributing to safer, more efficient operations in our increasingly complex technological landscape.

Diagnostics↗

Innovating the next generation of commercial smart building software

Nearly 30% of commercial building energy use is wasted due to equipment faults and HVAC controls problems. The result is increased emissions, compromised comfort and productivity, and less reliable coordination of building power needs with a clean grid. The energy impact alone represents $17 billion in potential savings. Today’s smart building software provides a robust solution to address these operational deficiencies. Energy management and information systems (EMIS) are saving up to 9% on average, with two-year paybacks. They are being incorporated into energy management processes, commissioning services, and utility programs. As effective as they are, two barriers prevent even deeper benefits; limited personnel to fix problems once they are identified, and the expense and time to manually implement changes in control systems. In partnership with the research community, the EMIS industry is developing new capabilities to overcome these barriers. Moving beyond siloed products for either fault detection and diagnostics, or optimal control, these new capabilities empower users to not only automatically identify faults, but also to push corrective action, and control improvements to their buildings. In this paper, several areas for enhancements are documented: ‘one-time’ correction of faults such as setpoints, schedules, and economizer lockouts; short-term active testing for automated proportional integral derivative (PID) loop tuning and functional testing; and continuous supervisory control for demand flexibility and year-round efficiency. Results are presented from a pair of partner implementations out of a dozen providers integrating these enhancements into their products, including field tests from across the country, and insights into operator acceptance and integration into operations and maintenance practices.

Casillas, Armando↗

U.S. Efforts in Support of Examinations at Fukushima Daiichi- November 2020 Meeting Notes with Updated Information Requests

Much is still not known about the end-state of core materials in each unit that was operating on March 11, 2011 at the Fukushima Daiichi Nuclear Power Station (Daiichi). Information obtained from Daiichi is required to inform Decontamination and Decommissioning (D&D) activities, improving the ability of the Tokyo Electric Power Company Holdings, Incorporated (TEPCO Holdings) to characterize potential hazards and to ensure the safety of workers involved with cleanup activities. This information also has important implications for the safety and operation of U.S. commercial nuclear power plants. This document summarizes results from the Fiscal Year 2021 (FY2021) U.S. effort to review Daiichi information and extract insights to enhance the safety of existing and future nuclear power plant designs. This U.S. effort, which was initiated in 2014 by the Department of Energy Office of Nuclear Energy (DOE-NE), is completed by a group of experts in reactor safety and plant operations that identify examination needs and evaluate recent Daiichi examination data to address these needs. Since its inception, annual reports were issued that document significant safety insights being obtained in areas of special emphasis: system and component performance, radionuclide surveys and sampling, debris end-state location, combustible gas effects, and plant operations and maintenance. In addition to reducing uncertainties related to severe accident modeling progression, these insights have and continue to be used to update guidance for severe accident prevention, mitigation, and emergency planning. Reduced uncertainties in modeling the events at Daiichi improve the realism of reactor safety evaluations that inform future D&D activities. A key aspect of prior U.S. efforts, the updated list of information requests, is included in this FY2021 report to ensure that they are transmitted to organizations within Japan. This report also continues to emphasize how information obtained from the affected reactors at Daiichi has been and will continue to be used to update severe accident management strategies and reduce uncertainties in systems analysis code models. In addition, recommendations are included that would expand the use of this information to provide insights regarding maintenance, radiation protection, design, and siting activities for existing and new reactors.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The OpenSE Cookbook: A Practical, Recipe Based Collection of Patterns, Procedures, and Best Practices for Executable Systems Engineering for the Thirty Meter Telescope

The OpenSE Cookbook is an open-sourced collection of patterns, procedures, and best practices targeted for systems engineers who seek guidance on applying model-based and executable systems engineering (MBSE) using SysML. Its content has emerged from the system level modeling effort on the European Framework Program 6 (FP6) and the Thirty Meter Telescope (TMT). The TMT MBSE approach applied the Executable Systems Engineering Method (ESEM) and the open-source Engineering Environment (OpenMBEE) to specify, analyze, and verify requirements of TMT’s Alignment and Phasing System (APS) and the Narrow Field Infrared Adaptive Optics System (NFIRAOS). In these applications, implicit dependencies are made explicit in a formal model through the use of ESEM, OpenMBEE, and SysML modeling constructs. The value proposition for applying this MBSE approach was to establish precise requirements and fine-grained traceability to system designs, and to verify key requirements beginning early in development. The integration of ESEM and the OpenMBEE tooling infrastructure (providing linked-data and web-operability) is a significant added value for the MBSE approach. The APS is responsible for the overall pre-adaptive optics wavefront quality, using starlight to measure wavefront errors and align the TMT optics. In the formally integrated and executable SysML model, simulations are performed to analyze the impact of changed requirements and verify specified constraints for various operational scenarios. The APS team used several modeling patterns to capture information such as the requirements, the operational scenarios, involved subsystems and their interaction points, the estimated or required time durations, and the mass and power consumption. Adaptive optics systems are designed to sense real-time atmospheric turbulence and correct the telescope’s optical beam to remove its effect. The system model for the adaptive optics operational modes was developed to capture sequence behaviors and operational scenarios to run Monte-Carlo simulations for verifying acquisition time, observing efficiency, and operational behavior requirements. The model is particularly useful for investigating the effect of parallelization, identifying interface issues, and re-ordering sequence acquisition tasks. A former version of the Cookbook (which is now updated to MBSE challenges, goals, and lessons learned) included modeling guidelines and conventions for all system aspects, hierarchy levels, and views, which were developed during for the Active Phasing Experiment (APE), an opto-mechatronical system technology demonstrator for the Extremely Large Telescope (ELT). The Cookbook utilizes the above mentioned system models as real-world case-studies to demonstrate and document the applications of the recipes, providing also instructional examples and addressing the available tooling support. The Cookbook is accompanied by a number of SysML models and aodel libraries which facilitate model authoring and maintenance. The Cookbook covers the different aspects of Systems Engineering such as management of Requirements, Design (behavior and structure), Interfaces, Interdisciplinary Integration, Analysis, Trade Studies, and Technical Resources. This paper presents the background, motivation, architecture, and highlights some key content of the Cookbook. For example, interface management, error budget management, requirements verification, Monte Carlo driven analysis, and timing analysis of operational scenarios. The paper discusses how the capabilities of OpenMBEE contributed significantly to the adoption of executable systems engineering.

Brower, Eric↗

Optimizing Information Automation Using a New Method Based on System-Theoretic Process Analysis: Tool Development and Method Evaluation

This report is an update to a prior report that describes progress and findings for a program of research supporting the design and optimization of information automation systems for nuclear power plants. Much of the domestic nuclear fleet is currently focused on modernizing technologies and processes, including transitioning toward digitalization in the control room and throughout the plant, along with a greater interest in the use of automation, artificial intelligence, robotics, and other emerging technologies. While there are significant opportunities to apply these technologies toward greater plant safety, efficiency, and overall cost-effectiveness, optimizing their design and avoiding potential safety and performance risks depends on ensuring that human performance-related organizational and technical design issues are identified and addressed early in the design process. This report describes modeling tools and techniques, based on sociotechnical systems theory, to support these design goals and their application in the current research effort. The report is primarily intended for senior nuclear energy stakeholders, including regulators, corporate management, and senior plant management. We have developed and employed a method to design an optimized information automation ecosystem (IAE) based on the systems-theoretic constructs underlying sociotechnical systems theory in general and the Systems-Theoretic Accident Modeling and Processes (STAMP) approach in particular. We argue that an IAE can be modeled as an interactive information control system whose behavior can be understood in terms of dynamic control, feedback, and communication relationships amongst the system’s technical and organizational components. We have employed two STAMP-based tools in this effort. The first is Causal Analysis based on STAMP (CAST), an accident and incident analysis technique that was used to examine a performance- and safety-related incident at an industry partner’s plant involving the unintentional activation of an emergency diesel generator. This analysis provided insight into the behavior of the plant’s current information control structure within the context of a specific, significant event. The second tool is Systems Theoretic Process Analysis (STPA) which is a proactive risk analysis tool used to examine existing and potential, planned sociotechnical systems. STPA was used to identify risk factors in the current design of a generic nuclear power plant (NPP) preventive maintenance system. Our analyses focused on identifying near-term system improvements and longer-term design requirements for an optimized IAE system. CAST analysis findings indicate an important underlying contributor to the incident under investigation, and a significant risk to information automation system performance, was perceived time and schedule pressure, which exposed weaknesses in interdepartmental coordination between and within responsible plant organizations and challenged the resilience of established plant processes, until a human caused the eventual event. These findings are discussed in terms of their risk to overall system performance and their implications for information automation system resilience and brittleness. STPA findings exposed several areas of concern in the design of current preventive maintenance systems. We also present two preliminary information automation models. The proactive issue resolution (PIR) model is a test case of an information automation concept with significant near-term potential for application and subsequent reduction in significant plant events. The IAE model is a more general representation of a broader, plantwide information automation system and represents an end-state vision for our work. From our results, we have generated an initial set of preliminary system-level requirements and safety constraints for these models. We have also focused on early development of easy to learn, easy to use “transportable” tools for sociotechnical systems analysis. We intend these to be used by NPP personnel as a means of gaining reliable and relatively quick insight into (1) sociotechnical systems factors impacting incidents and accidents, (2) potential sociotechnical risk factors in existing or planned system designs, and (3) potential weaknesses in a system’s safety and/or information control structure. We conclude the report with a set of summary recommendations, a discussion of planned and potential follow-on research and development, and a draft list of system-level requirements and safety constraints for optimized information automation systems.

99 GENERAL AND MISCELLANEOUS↗

NASA's Spaceliner Investment Area Technology Activities

NASA's has established long term goals for access-to-space. The third generation launch systems are to be fully reusable and operational around 2025. The goals for the third generation launch system are to significantly reduce cost and improve safety over current conditions. The Advanced Space Transportation Program Office (ASTP) at the NASA's Marshall Space Flight Center in Huntsville, AL has the agency lead to develop space transportation technologies. Within ASTP, under the Spaceliner Investment Area, third generation technologies are being pursued in the areas of propulsion, airframes, integrated vehicle health management (IVHM), avionics, power, operations, and range. The ASTP program will mature these technologies through both ground and flight system testing. The Spaceliner Investment Area plans to mature vehicle technologies to reduce the implementation risks for future commercially developed reusable launch vehicles (RLV). The plan is to substantially increase the design and operating margins of the third generation RLV (the Space Shuttle is the first generation) by incorporating advanced technologies in propulsion, materials, structures, thermal protection systems, avionics, and power. Advancements in design tools and better characterization of the operational environment will allow improvements in design margins. Improvements in operational efficiencies will be provided through use of advanced integrated health management, operations, and range technologies. The increase in margins will allow components to operate well below their design points resulting in improved component operating life, reliability, and safety which in turn reduces both maintenance and refurbishment costs. These technologies have the potential of enabling horizontal takeoff by reducing the takeoff weight and achieving the goal of airline-like operation. These factors in conjunction with increased flight rates from an expanding market will result in significant improvements in safety and reductions in operational costs of future vehicles. The paper describes current status, future plans and technologies that are being matured by the Spaceliner Investment Area under the Advanced Space Transportation Program Office.

Hueter, Uwe↗

Launch Complex 34, SWMU Cc054 2021 DNAPL Source Zone Operations, Maintenance, and Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ) and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 12 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. Site-wide biennial LTM sampling was not conducted during this reporting period and is scheduled to be conducted in December 2022. The timeframe for activities documented in this PMR extends from April 1, 2021 to March 31, 2022. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the DSZ and deep dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to re-characterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS to more adequately capture residual contaminant mass. The operational period for Year 12 of the HCS was from April 1, 2021 to March 31, 2022. Operational runtime for the system was 94 percent during Year 12, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2022, a total of 285,712,801 gallons of groundwater containing 84,933 pounds of VOCs have been removed by the HCS. Influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 12,000 µg/L (March 2022). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2021 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events in 2017, 2018, 2019, and 2020. Full vertical profile sampling was completed at each DPT from 8 to 98 ft bls, at 5 foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations at depths ranging from 8 to 98 ft bls. An overall increasing trend of TCE concentrations was observed in DPT samples during this reporting period, which may be due to several recovery wells that were turned off during the AS Pilot Study in the DSZ that operated from July 2021 to February 2022 (documented separately from this report). The maximum TCE concentration in 2021 was 15,400,000 µg/L in the 58 ft bls depth interval at DPT597 (previous maximum result in 2020 was 1,690,000 at 48 ft bls at DPT596). During the 2021 DPT event, the overall majority of TCE contamination was identified in the 58 ft bls interval (below Layer 4), where in the previous year the majority of mass was observed in Layer 4. This trend appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, monitoring well samples were collected from deep wells in the DSZ area (Layers 7 and 8) to verify vertical delineation. All monitoring well results were non-detect or below cleanup levels, with exception of one well (IW0162, screened 105 to 115 ft bls, which is below the existing recovery well capture zone) where TCE was identified above cleanup target levels. The HS 6 AS system remained operational during the reporting period covered under this report. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual prior to this operational period. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2021 show concentrations of contaminants of concern (cis-1,2-dichloroethene, trans-1,2- dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. Overall, the tasks associated with Year 12 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with the recommendations of the 2020 LC34 (Year 11) Operations, Maintenance, and Monitoring Report for DNAPL Source Zone, Site Wide LongTerm Monitoring, and Hot Spot 6 Air Sparging System PMR (NASA, 2021c). Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

trichloroethene↗

An Architectural Survey of the REECo Maintenance Compound, Area 6, Nevada National Security Site, Nye County, Nevada

The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) plans to install a 26.45-mile-long 138-kilovolt (kV) transmission line on the Nevada National Security Site (NNSS) in Nye County, Nevada. This new transmission line will upgrade the electrical transmission system and provide reliable power between Mercury Switching Station in Area 23 and the U1a Facility in Area 1. The proposed upgrade to the power transmission system constitutes an undertaking subject to review under Section 106 of the National Historic Preservation Act (NHPA) (54 United States Code [USC] § 306101) and its implementing regulations, 36 Code of Federal Regulations (CFR) Part 800. A portion of this new transmission line will cross the western perimeter of the Reynolds Electrical and Engineering Company (REECo) Maintenance Compound located in Area 6 of the NNSS. This compound with its trade shops, storage sheds, and yards served as a general construction facility that supported nuclear testing activities on the NNSS from 1967 to 1992. Although three architectural resources in the compound have previously been recorded and evaluated for the National Register of Historic Places (NRHP), other resources within it have not, nor has the compound been recorded and evaluated as a potential district. The State Historic Preservation Officer (SHPO) concurred with NNSA/NFO’s determination that the unevaluated REECo Maintenance Compound will be adversely affected by the proposed undertaking (Reed 2021). The NNSA/NFO, in consultation with the SHPO, then developed the Memorandum of Agreement DE-GM58-22NA25553 between the U.S. Department of Energy and the Nevada State Historic Preservation Officer Regarding Installation of a 138-kilovolt Transmission Line from the Mercury Switching Station to the U1a Facility and the Removal of the Historic 138-kilovolt Transmission Line from the Mercury Switching Station to the U1a Facility in Areas 1, 3, 5, 6, and 23 of the Nevada National Security Site, Nye County, hereafter referred to as the MOA. This architectural survey report was prepared in accordance with MOA Stipulation III.B. It describes the origins, history, layout, and functions of the REECo Maintenance Compound during the Cold War and identifies contributing and noncontributing resources. The report defines a district boundary based on archival research and the field survey and concludes with an appendix that presents digital color images of the compound with descriptions and a map key showing image viewpoints and directions. Although none of the architectural resources are recommended individually eligible, the district evaluation concludes the REECo Maintenance Compound is eligible as a historic district for listing in the NRHP under the Secretary of the Interior’s Significance Criteria A and C at the local level. The historic district retains all seven aspects of integrity and conveys its significance under the abovementioned criteria.

138 kV↗

Multiple aspects maintenance ontology-based intelligent maintenance optimization framework for safety-critical systems

Abstract Maintenance optimization is a process for improving the efficiency of maintenance strategies and activities, considering various aspects of the target system and components, such as the probabilities of system failures and the cost of repair and replacement of a failed component. The improvement of maintenance optimization algorithms generally requires information from various data sources. For example, it may require the system risk information derived from risk analysis tools or the residual lifetime of a component from fault prognosis tools. The requirements of data acquisition (DAQ) and aggregation pose new challenges for maintenance management systems (MMSs) that implement and use these maintenance optimization algorithms. This paper proposes a multiple aspects maintenance ontology-based framework to facilitate DAQ from MMSs, online monitoring systems, fault detection and discrimination tools, risk assessment tools, decision-making tools, and component identification tools, and accelerate the implementation and verification of contemporary maintenance optimization models and algorithms. The proposed framework consists of a multi-aspect maintenance ontology with critical information for maintenance optimization and application interfaces for collecting information from various data sources, such as fault prognosis tools, online monitoring tools, risk assessment tools, and decision-making algorithms. In addition, this paper proposes a heuristic method for integrating concepts and properties from other existing ontologies into the proposed framework when the existing ontology is not fully compatible with the ontology under construction. Finally, the paper verifies the proposed ontology framework using a feedwater system designed for nuclear power plants with valves and filters as the components under maintenance.

Diao, Xiaoxu (ORCID:0000000346726352)↗

Launch Complex 34, SWMU CC054 2023 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring and Phase Two Expansion Construction Completion Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 14 operations and performance monitoring of the hydraulic containment (HC) Interim Measure (IM), details associated with construction and implementation of the HS 6 AS system expansion (Phase Two), and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. The timeframe for activities documented in this PMR extends from April 1, 2023 to March 31, 2024. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the shallow and deep DSZ and surrounding dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to recharacterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS and install additional recovery wells in Layer 7 to more adequately capture residual contaminant mass. The operational period for Year 14 of the HCS was from April 1, 2023 to March 31, 2024. Operational runtime for the system was 94 percent during Year 14, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2024, a total of 344,849,634 cumulative gallons of groundwater containing 94,656 pounds of chlorinated volatile organic compounds (CVOCs) have been removed by the HCS. During the reporting period covered under this report, the HCS recovered 31,176,393 gallons and approximately 6,319 pounds of CVOC mass. Total combined influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 25,000 µg/L (March 2024). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in January 2024 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2022. Full vertical profile sampling was completed at each DPT from 8 to 98 feet below land surface (bls), at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 28 to 98 feet bls. An overall decreasing trend of TCE concentrations was observed in DPT samples during this reporting period, which is a reduction from the previous event (December 2022) and the peak event in December 2021, where TCE percentages appeared to increase in all depth zones because several recovery wells were turned off during the AS pilot study in the DSZ. The maximum TCE concentration in January 2024 was 1,600,000 µg/L in the 53 feet bls depth interval at DPT594 (previous maximum result in 2022 was 1,800,000 µg/L in the 48 feet bls depth interval at DPT599). This maximum concentration in the 53 feet bls depth interval is in the deep capture zone. During the January 2024 DPT event, the largest portion of TCE mass was observed in the 48 feet bls interval above/within Layer 4. This trend remains consistent with previous years and appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, annual groundwater samples were collected from 11 deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2023 to verify vertical and horizontal delineation. Three of the wells were also sampled biweekly to evaluate operations of recovery well RW21D (screened 86 to 106 feet bls), which was installed in January 2023. Of the Layer 7/8 monitoring sampled only annually, results were non-detect or less than groundwater cleanup target levels GCTLs in December 2023, with the exception of one well, IW45D2, which had a cis-1,2-dichloroethene (cDCE), detection greater than the GCTL. Of the three wells sampled biweekly during the operational period, the well located closest to Layer 7 recovery well RW21D (IW44D2, screened 105 to 115 feet bls) had concentrations of TCE, cDCE and vinyl chloride (VC) greater than GCTLs throughout the operational period, but displayed a decreasing trend since the peak concentrations in September 2023. The maximum TCE concentration during this operational period was 190,000 µg/L at IW44D2 in September 2023, but reduced to 700 µg/L in March 2024, indicating the HCS is still effectively removing mass from the source area. Expansion of the HCS and addition of new recovery wells is ongoing and will continue to be evaluated as the groundwater recovery scheme is optimized. Details of the expansion and optimization will be provided in a future PMR. The HS 6 AS IM was initiated in 2018 with 160 AS wells and expanded in 2019 with another 140 AS wells. An additional expansion of the HS 6 AS IM was completed during the reporting period covered under this report and details of the construction implementation and startup of the expansion are detailed in Section III of this report. The new expansion, referred to as Phase Two, was implemented between August 17, 2022 and August 28, 2023, and included the installation of 190 air sparge wells to treat an additional 11.2 acres. The original configuration (referred to as Phase One) operated until Phase Two came online, then all but 52 AS wells were turned off so the components could be moved and utilized in the Phase Two area. The 52 AS wells that remain on are in a barrier configuration preventing contaminated groundwater from impacting the treated area. The HS 6 AS system (both Phase One and Two) operated normally during the reporting period covered under this report. Semi-annual performance monitoring of the Phase One configuration was conducted in April and November 2023, consistent with previous years. For the Phase Two configuration, 21 new monitoring wells were installed and sampled quarterly, with a baseline event in July 2023, and quarterly events in November 2023 and February 2024 summarized in this report. Semi-annual monitoring results collected in April and October 2023 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and VC) have decreased to less than GCTLs in nearly all wells and not impacting the surface water drainage canal, indicating the HS 6 IM continues to meet objectives. The baseline and quarterly sampling for the Phase Two configuration indicate generally decreasing concentrations in wells within and around the perimeter of the treatment area. At least two more quarters of monitoring will be conducted and once those results are evaluated a reduced the sampling frequency may be considered. Overall, the tasks associated with Year 14 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with recommendations included in the previous 2022 LC34 (Year 13) PMR. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

groundwater remediation↗