Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Planning Package”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

INL Site ARG-US Implementation – FY22 Activities and FY23 Plans

The Packaging Certification and Life Cycle Management program at Argonne National Laboratory (ANL) developed a suite of monitoring systems collectively referred to here as ARG-US. ARG-US provides necessary data for nuclear facility and system operation and maintenance, and has been previously demonstrated in hot cells, radioactive material (RAM) storage areas, and RAM shipment trucks. It has also been installed directly on RAM storage and shipment containers. ARG-US offers some unique advantages over other commercially available systems by using wireless data connections, battery power supplies, and customizable monitoring methods. Idaho National Laboratory (INL) has been tasked with investigating applications for ARG-US at INL site facilities, which are operated by several different contractors. The initial investigation scope centered on CPP-603 Irradiated Fuel Storage Facility in relation to the upcoming Department of Energy (DOE) Spent Nuclear Fuel (SNF) Packaging Demonstration. The investigation has been led by the Used Fuel Management Department in INL’s Nuclear Science and Technology (NS&T) directorate. This investigation is expected to recommend INL site processes or facilities in which to implement ARG-US systems. INL has engaged local site technical and oversight representatives, security, nuclear safeguards, and program management personnel to identify good candidates for ARG-US test implementations. INL has identified the following high-level goals for any INL site implementation of ARG-US: provide unique testing environments, prompt development of new monitoring methods/techniques for the ARG-US suite, and acquire useful monitoring for the user facility. As a result, INL suggests three program areas for further investigation: CPP-603 Fuel Handling Cave (FHC), legacy mixed waste storage systems at Idaho Nuclear Technology & Engineering Center (INTEC) known as the “Tank Farm,” and periodic and emergency environmental monitoring. This progress report relates activities undertaken in this investigation, describes the preliminary areas of interest for limited scope ARG-US testing or implementation, and relays expected actions for completing the task scope. This report offers an opportunity to the program sponsor, technical leads at ANL, and INL site representatives to give feedback on the initial assessment and make recommendations on the forthcoming activities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SU-F-T-231: Improving the Efficiency of a Radiotherapy Peer-Review System for Quality Assurance

Purpose: To improve the efficiency of a radiotherapy peer-review system using a commercially available software application for plan quality evaluation and documentation. Methods: A commercial application, FullAccess (Radialogica LLC, Version 1.4.4), was implemented in a Citrix platform for peer-review process and patient documentation. This application can display images, isodose lines, and dose-volume histograms and create plan reports for peer-review process. Dose metrics in the report can also be benchmarked for plan quality evaluation. Site-specific templates were generated based on departmental treatment planning policies and procedures for each disease site, which generally follow RTOG protocols as well as published prospective clinical trial data, including both conventional fractionation and hypo-fractionation schema. Once a plan is ready for review, the planner exports the plan to FullAccess, applies the site-specific template, and presents the report for plan review. The plan is still reviewed in the treatment planning system, as that is the legal record. Upon physician’s approval of a plan, the plan is packaged for peer review with the plan report and dose metrics are saved to the database. Results: The reports show dose metrics of PTVs and critical organs for the plans and also indicate whether or not the metrics are within tolerance. Graphical results with green, yellow, and red lights are displayed of whether planning objectives have been met. In addition, benchmarking statistics are collected to see where the current plan falls compared to all historical plans on each metric. All physicians in peer review can easily verify constraints by these reports. Conclusion: We have demonstrated the improvement in a radiotherapy peer-review system, which allows physicians to easily verify planning constraints for different disease sites and fractionation schema, allows for standardization in the clinic to ensure that departmental policies are maintained, and builds a comprehensive database for potential clinical outcome evaluation.

60 APPLIED LIFE SCIENCES↗

IDAES GTEP 0.1 Release

The Institute for the Design of Advanced Energy Systems (IDAES) Generation and Transmission Expansion Planning (GTEP) package provides a Pyomo-based implementation of a modular, flexible, Generalized Disjunctive Programming (GDP) formulation for power infrastructure planning problems. This package is designed with the following goals in mind: - Abstract GTEP modeling away from any particular case study or fixed modeling assumptions (e.g., technologies, temporal resolution, spatial resolution, policy implications, etc.) - Admit flexible decision sets and heterogeneous parameterization - Allow high-level modeling options to be understood easily, chosen modularly, and changed rapidly

AS↗

ORNL Package Testing Program Software Quality Assurance Plan

The Oak Ridge National Laboratory (ORNL) Package Testing Program (PTP) uses commercial off-the-shelf (COTS) software in performing data collection of thermal test results for package designs that contain radioactive materials. Specifically, this software is used to collect temperature data from the furnace, packages, and ambient air to prepare and execute the thermal test specified in 10 CFR 71.73, “Thermal Test.” This software quality assurance (SQA) plan sets forth the guidelines, standards, and procedures that shall be used to provide SQA for PTP software applications. This is a living document that will be maintained for the lifecycle of the PTP program. The SQA plan follows the requirements set forth in ORNL Standards Based Management System (SBMS): Information Technology; Subject Area: Software Quality Assurance. When applicable to the requirements as described in ORNL SBMS, Software Quality Assurance, the software shall be listed in the ORNL Software Registration System (SRS). Exemptions to this SBMS are COTS and firmware that are not modified; spreadsheet applications and personal productivity tools that do not have a utility or safety application, research applications, legacy software, system software, vendor-supplied software used to interface with the vendor’s services, software used within the organization to facilitate processing or management of information, and software developed for applications not specific to the US Department of Energy (DOE).

97 MATHEMATICS AND COMPUTING↗

Development Unit Configuration and Current Status of the MIP/MTERC Experiment

The Mars In-Situ Propellant Production (ISPP) Precursor (MIP) experiment package is planned for inclusion on the Mars 2001 Lander. This experiment package consists of five experiments whose purpose is to demonstrate the performance of various ISPP processes in-situ on Mars. The demonstrated ability to produce propellant for Mars Return Vehicles (MRV) is considered to be a necessary precursor to any future manned mission to Mars. The Mars Thermal Environment/Radiator Characterization (MTERC) experiment is part of the MIP package and is intended to determine the Mars night sky temperature as well as to characterize the performance degradation of radiators caused by environmental exposure on Mars over time. Radiators are needed as part of the ISPP process to remove heat from the Mars Atmosphere Acquisition and Compression (MAAC) CO2 sorption compressor. MTERC will provide the data needed to optimize the design of radiators for ISPP and other processes. A MTERC Development Unit (DU) has been fabricated and tested at JPL. The MTERC DU consists of 1) a radiator subassembly, 2) a motor/cover subassembly, 3) a differential temperature control circuit and motor control electronics circuit board, and 4) a command and data handling electronics circuit board. This paper will describe the operational theory and the configuration of the MTERC DU and will discuss the current status of the MTERC experiment development including some selected results of performance testing that has been completed prior to the ISRU III meeting.

Juanero, K. J.↗

Development Unit Configuration and Current Status of the MIP/MAAC Experiment

The Mars In-Situ Propellant Production (ISPP) Precursor (MIP) experiment package is planned for inclusion on the Mars 2001 Lander. This experiment package consists of five experiments whose purpose is to demonstrate the performance of various ISPP processes in-situ on Mars. The demonstrated ability to produce propellant for Mars Return Vehicles (MRV) is considered to be a necessary precursor to any future manned mission to Mars. The Mars Atmosphere Acquisition and Compression (MAAC) experiment is part of the MIP package and is intended to demonstrate that, by using a sorption compressor, CO2 can be preferentially adsorbed at about 6 torr from the Mars atmosphere during the night when the bed is cold then subsequently compressed to about 800 torr by heating the bed and desorbing CO2 during the day. The compressed CO2 produced by MAAC is to be fed to the Oxygen Generator Subsystem (OGS) where pure oxygen is to be produced. Pure oxygen is considered to be one of the primary constituents of a future manned MRV propellant system. A MAAC Development Unit (DU) has been fabricated and tested at JPL. The MAAC DU consists of 1) a sorption bed filled with a CO2 selective sorbent material, 2) a purge system to be used to periodically backflush non-CO2 gases from the sorbent bed during adsorption, 3) a JPL-developed gas-gap heat switch that allows heat transfer to a radiator for heat removal from the bed during the night time adsorption period and that impedes heat transfer during the day time desorption period, 4) a radiator to radiate heat to the night sky during the adsorption period, 5) a set of three isolation valves and connecting tubing. 6) two pressure transducers and several thermocouples for monitoring the MAAC operating conditions, and command and data handling electronics. This paper will describe the operational theory and the configuration of the MAAC DU and will discuss the current status of the MAAC experiment development including some selected results of performance testing that has been completed prior to the ISRU III meeting.

Karlmann, P. B.↗

Development Unit Configuration and Current Status of the MIP/MTERC Experiment

The Mars In-Situ Propellant Production (ISPP) Precursor (MIP) experiment package is planned for inclusion on the Mars 2001 Lander. This experiment package consists of five experiments whose purpose is to demonstrate the performance of various ISPP processes in-situ on Mars. The demonstrated ability to produce propellant for Mars Return Vehicles (MRV) is considered to be a necessary precursor to any future manned mission to Mars. The Mars Thermal Environment/Radiator Characterization (MTERC) experiment is part of the MIP package and is intended to determine the Mars night sky temperature as well as to characterize the performance degradation of radiators caused by environmental exposure on Mars over time. Radiators are needed as part of the ISPP process to remove heat from the Mars Atmosphere Acquisition and Compression (MAAC) C02 sorption compressor. MTERC will provide the data needed to optimize the design of radiators for ISPP and other processes. A MTERC Development Unit (DU) has been fabricated and tested at JPL. The MTERC DU consists of: (1) a radiator subassembly, (2) a motor/cover subassembly, (3) a differential temperature control circuit and motor control electronics circuit board, and (4) a command and data handling electronics circuit board. This paper will describe the operational theory and the configuration of the MTERC DU and will discuss the current status of the MTERC experiment development including some selected results of performance testing that has been completed prior to the ISRU III meeting.

Juanero, K. J.↗

Development Unit Configuration Status of the MIP/MAAC Experiment

The Mars In-Situ Propellant Production (ISPP) Precursor (MIP) experiment package is planned for inclusion on the Mars 2001 Lander. This experiment package consists of five experiments whose purpose is to demonstrate the performance of various ISPP processes in-situ on Mars. The demonstrated ability to produce propellant for Mars Return Vehicles (MRV) is considered to be a necessary precursor to any future manned mission to Mars. The Mars Atmosphere Acquisition and Compression (MAAC) experiment is part of the MIP package and is intended to demonstrate that, by using a sorption compressor, CO2 can be preferentially adsorbed at about 6 torr from the Mars atmosphere during the night when the bed is cold then subsequently compressed to about 800 torr by heating the bed and desorbing C02 during the day. The compressed CO2 produced by MAAC is to be fed to the Oxygen Generator Subsystem (OGS) where pure oxygen is to be produced. Pure oxygen is considered to be one of the primary constituents of a future manned MRV propellant system. A MAAC Development Unit (DU) has been fabricated and tested at JPL. The MAAC DU consists of: (1) a sorption bed filled with a CO2 selective sorbent material; (2) a purge system to be used to periodically backflush non-CO2 gases from the sorbent bed during adsorption; (3) a JPL-developed gas-gap heat switch that allows heat transfer to a radiator for heat removal from the bed during the night time adsorption period and that impedes heat transfer during the day time desorption period; (4) a radiator to radiate heat to the night sky during the adsorption period; (5) a set of three isolation valves and connecting tubing; (6) two pressure transducers and several thermocouples for monitoring the MAAC operating conditions, and command and data handling electronics. This paper will describe the operational theory and the configuration of the MAAC DU and will discuss the current status of the MAAC experiment development including some selected results of performance testing that has been completed prior to the ISRU III meeting.

Karlmann, P. B.↗

Expanding the Trilinos developer community.

The Trilinos Project started approximately nine years ago as a small effort to enable research, development and ongoing support of small, related solver software efforts. The 'Tri' in Trilinos was intended to indicate the eventual three packages we planned to develop. In 2007 the project expanded its scope to include any package that was an enabling technology for technical computing. Presently the Trilinos repository contains over 55 packages covering a broad spectrum of reusable tools for constructing full-featured scalable scientific and engineering applications. Trilinos usage is now worldwide, and many applications have an explicit dependence on Trilinos for essential capabilities. Users come from other US laboratories, universities, industry and international research groups. Awareness and use of Trilinos is growing rapidly outside of Sandia. Members of the external research community are becoming more familiar with Trilinos, its design and collaborative nature. As a result, the Trilinos project is receiving an increasing number of requests from external community members who want to contribute to Trilinos as developers. To-date we have worked with external developers in an ad hoc fashion. Going forward, we want to develop a set of policies, procedures, tools and infrastructure to simplify interactions with external developers. As we go forward with multi-laboratory efforts such as CASL and X-Stack, and international projects such as IESP, we will need a more streamlined and explicit process for making external developers 'first-class citizens' in the Trilinos development community. This document is intended to frame the discussion for expanding the Trilinos community to all strategically important external members, while at the same time preserving Sandia's primary leadership role in the project.

99 GENERAL AND MISCELLANEOUS↗

Modular Design of Processing and Storage Facilities for Small Volumes of Low and Intermediate Level Radioactive Waste including Disused Sealed Sources - 12372

There are a number of IAEA Member States generating relatively small quantities of radioactive waste and/or disused sealed sources in application of nuclear techniques in medicine, industry and research and in nuclear research centres having small research reactors. At present many of these Member States do not have facilities for processing and storing their radioactive wastes; notably in those countries with small quantities of generated radioactive wastes. In other Member States the existing waste processing and storage facilities (WPSF) are in need of varying degrees of upgrading in order to address new waste streams, incorporate new waste processing technologies, or expand interim storage capacities. The IAEA has developed a modular design approach for a WPSF that is based on a variety of modules for different waste stream treatment and conditioning processes. The modular WPSF design is elaborated in a substantial Design Engineering Package that will be published by IAEA as a technical report. The Design Engineering Package enables users to select the optimum waste processing and storage modules to meet their needs, and to specify the requirements for procurement of individual modules and their integration into a waste processing and storage facility. The Design Engineering Package is planned for publication by the IAEA in 2012 and is presented as: - A Design Engineering Package Summary document. - A supporting CD that contains: - Process module general specifications. - Process module interface specifications. - Design Engineering Package for process modules. - Sample technical specifications for design and construction of modular processing facility. - Design Engineering Package for storage modules. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrated Resource Planning Model (IRPM)

The Integrated Resource Planning Model (IRPM) is a decision-support software product for resource-and-capacity planning. Users can evaluate changing constraints on schedule performance, projected cost, and resource use. IRPM is a unique software tool that can analyze complex business situations from a basic supply chain to an integrated production facility to a distributed manufacturing complex. IRPM can be efficiently configured through a user-friendly graphical interface to rapidly provide charts, graphs, tables, and/or written results to summarize postulated business scenarios. There is not a similar integrated resource planning software package presently available. Many different businesses (from government to large corporations as well as medium-to-small manufacturing concerns) could save thousands of dollars and hundreds of labor hours in resource and schedule planning costs. Those businesses also could avoid millions of dollars of revenue lost from fear of overcommitting or from penalties and lost future business for failing to meet promised delivery by using IRPM to perform what-if business-case evaluations. Tough production planning questions that previously were left unanswered can now be answered with a high degree of certainty. Businesses can anticipate production problems and have solutions in hand to deal with those problems. IRPM allows companies to make better plans, decisions, and investments.

99 GENERAL AND MISCELLANEOUS↗

The Application of Advanced Electric Propulsion on the NASA Power and Propulsion Element (PPE)

NASA is charged with landing the first American woman and next American man on the South Pole of the Moon by 2024. To meet this challenge, NASA's Gateway will develop and deploy critical infrastructure required for operations on the lunar surface and that enables a sustained presence on and around the moon. NASA's Power and Propulsion Element (PPE), the first planned element of NASA's cis-lunar Gateway, leverages prior and ongoing NASA and U.S. industry investments in high-power, long-life solar electric propulsion technology investments. NASA awarded a PPE contract to Maxar Technologies to demonstrate a 2,500 kg xenon capacity, 50 kW-class SEP spacecraft that meets Gateway's needs, aligns with industry's heritage spacecraft buses, and allows extensibility for NASA's Mars exploration goals. Maxar's PPE concept design, is based directly on their high heritage, modular, highly reliable 1300-series bus architecture. The electric propulsion system features two 13 kW Advanced Electric Propulsion (AEPS) strings from Aerojet Rocketdyne and a Maxar-developed system comprised of four Busek 6 kW Hall-effect thrusters mounted in pairs on large range of motion pointing arms with four 6 kW-class, SPT-140-based PPUs. NASA is continuing to develop the 13 kW AEPS system through a contract with Aerojet Rocketdyne. In addition to the flight demonstration of an advanced electric propulsion system on PPE, a government-furnished plasma diagnostics package is planned to assess on-orbit performance characteristics and vehicle interactions. The paper will present overviews of NASA's Gateway and the PPE Project, the Maxar ion propulsion subsystem, the status of the two electric propulsion system developments, and the implementation of the plasma diagnostics package on the Maxar PPE spacecraft. The project is currently heading into SRR, with the propulsion build scheduled for 2021, and launch in 2022.

Herman, Daniel A.↗

The use of subchondral bone topography to approximate the center of rotation of the elbow joint in dogs

Abstract Objectives The aim of this study was to compare the approximate center of rotation in normal and diseased elbows in dogs. Study design Cross‐sectional study Sample population Computer tomography scans of nine dogs with unilateral fragmented medial coronoid process (FMCP). Methods A board certified radiologist confirmed that each dog had unilateral FMCP, and a normal contralateral elbow. Digital 3D models of all elbow joints were uploaded into a surgical planning software package. Four axes approximating the center of rotation (COR) of elbow joints were generated using five geometric shapes based on subchondral topography of the humeral condyle radius and ulna. Images showing the locations where axes exited the medial and lateral cortex of the humeral condyle were captured and imported into a second software package, for measurement of distances between exit points and the origin of a system of axes. Results In normal joints 20/27 (74%) axes exited the medial cortex, and 25/27 (93%) axes exited the lateral cortex cranial and distal to the medial and lateral epicondyles, respectively. In diseased joints 22/27 (81%) axes exited medial cortex and 19/27 (70%) axes exited the lateral cortex, caudal and distal to the medial and lateral epicondyles, respectively. Conclusion Based on CT‐ derived geometry, the COR of elbow affected with FMCP was generally more caudal than normal. Clinical significance External landmarks approximating the location of the elbow COR are provided, and while not validated, may assist in planning, creation, and assessment of procedures for FMCP.

Berger, Chen↗

Packing Optimization for Dismantled Parts of Nuclear Facilities - 18625

When dismantling nuclear facilities, the removed large components must be segmented into smaller pieces and then be stored in the containers. With good cutting and packing plans, the required quantity of the containers can be decreased, and the cost spent in preparing, handling, and disposing these containers can also be reduced significantly. To accomplish this, this article developed a methodology which integrates voxelization and metaheuristic to discretize the irregular shape of various components and put them into the containers with greatest efficiency. The proposed methodology is not limited to certain component types or shapes and can be used for all types of containers. This makes the proposed methodology useful and practical in the nuclear facility dismantling applications. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Digital bead modeling for wire-arc directed energy deposition

Prediction of 2D cross-section and full 3D geometry for stacked weld beads is critical for the outcome of wire-arc directed energy deposition (DED) parts; however, most additive path planning software packages model beads as extrusions of a rectangle. Weld beads are not rectangular, and the resulting shape is dependent upon physics effects at the moment of deposition. Physics phenomena such as the geometry of the underlying surface, the heat input of the welding mode, and the direction of gravity contribute to bead shape. Here, this paper presents a novel implicit modeling method that discretizes a 2D area or 3D volume of space into pixels or voxels and constructs fields based on these physics phenomena. The fields are combined using a weighting scheme trained on 3D scan measurements of welds and wire-arc DED prints. Pixels or voxels are added until the known amount of deposited volume has been achieved. Thereby, a strong conservation of mass principle is applied to the process. Utilizing machine learning techniques, the present model can be trained on a database of scans allowing for the representation of a wide variety of prints. Results show that this method can produce predictions with realistic bead morphology and sub-millimeter form error.

Bead geometry modeling↗

EcoVillage: A Net Zero Energy Ready Community

CARB is working with the EcoVillage co-housing community in Ithaca, New York, on their third neighborhood called the Third Residential EcoVillage Experience (TREE). This community scale project consists of 40 housing units --15 apartments and 25 single family residences. The community is pursuing certifications for DOE Zero Energy Ready Home, U.S. Green Building Council Leadership in Energy and Environmental Design Gold, and ENERGY STAR for the entire project. Additionally, seven of the 25 homes, along with the four-story apartment building and community center, are being constructed to the Passive House (PH) design standard.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

EcoVillage: A Net Zero Energy Ready Community

CARB is working with the EcoVillage co-housing community in Ithaca, New York, on their third neighborhood called the Third Residential EcoVillage Experience (TREE). This community scale project consists of 40 housing units --15 apartments and 25 single family residences. The community is pursuing certifications for DOE Zero Energy Ready Home, U.S. Green Building Council Leadership in Energy and Environmental Design Gold, and ENERGY STAR for the entire project. Additionally, seven of the 25 homes, along with the four-story apartment building and community center, are being constructed to the Passive House (PH) design standard.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗