Energy use of piperazine with the advanced stripper from pilot plant testing

Here, piperazine with the Advanced Stripper (PZAS™) was tested at the National Carbon Capture Center (NCCC) at coal and NGCC conditions. Energy performance was measured with accounting for heat loss. The net heat duty was found to be identical at 2.45 GJ/tonne for both 4 and 12% CO 2 at 90% CO 2 removal. The average measured heat loss was 0.38 GJ/tonne and represented 30% of the gross heat rate. For PZAS, the warm rich piping before the control valve is the largest in surface area. Heat loss at this location increased heat duty by 80% of the heat loss value. Therefore, the total heat duty was decreased by 80% of the heat loss. The Independence™ model was validated using 112 steady-state pilot plant runs and predicted average net heat duty with an error of 9% and lean loading with an error of 10%. The model was used to simulate process impacts of heat loss for the PZAS and simple stripper configurations. For both strippers, heat loss was found to impact heat duty at locations other than just the steam heater. While heat loss in the steam heater was the most important for PZAS, heat loss in the column was the most important for the simple stripper due to a large top-side pinch and CO 2 reabsorption at the same location. CO 2 reabsorption in PZAS occurred only at high heat loss values (~0.14 GJ/hr), compared to low heat loss values (~ 0.03 GJ/hr) in the PZ-simple stripper. Excessive packing in the PZ-simple stripper caused a large top-side pinch at 0.23 mol/mol lean loading, making the column very sensitive to heat loss. Heat loss in the PZ-simple stripper increased heat duty by 120–150% at typical heat loss values and lean loading of 0.23 mol/mol. Heat loss in the MEA-simple stripper only increased heat duty by 1–13% in a typical lean loading range of 0.1–0.2 mol/mol. A large bottom side pinch at low lean loading for 7 m MEA made the effect of heat loss less pronounced.

42 ENGINEERING↗

Simulations of Criticality Control Overpack Container Compaction at the Waste Isolation Pilot Plant

Criticality Control Overpack (CCO) containers are being considered for the disposal of defense-related nuclear waste at the Waste Isolation Pilot Plant (WIPP). At WIPP, these containers would be placed in underground disposal rooms, which will naturally close and compact the containers closer to one another over several centuries. This report details simulations to predict the final container configuration as an input to nuclear criticality assessments. Each container was discretely modeled, including the plywood and stainless steel pipe inside the 55-gallon drum, in order to capture its complex mechanical behavior. Although these high-fidelity simulations were computationally intensive, several different material models were considered in an attempt to reasonably bound the horizontal and vertical compaction percentages. When exceptionally strong materials were used for the containers, the horizontal and vertical closure respectively stabilized at 43:9 % and 93:7 %. At the other extreme, when the containers completely degraded and the clay seams between the salt layers were glued, the horizontal and vertical closure reached respective final values of 48:6 % and 100 %.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Macroscopic trends of neoclassical tearing stability in high-field H-mode tokamak pilot plants

The neoclassical tearing mode (NTM) stability metric—minimum marginally stable island width $w$$^{*}_{m}$—was compared across 14651 inductive high-field tokamak pilot plant equilibria. Larger devices with reduced elongation and/or increased minor radius demonstrated an order-of-magnitude increase in $w$$^{*}_{m}$, primarily due to a reduction in bootstrap drive. This work is part of an ongoing effort to ensure passive NTM-stability in the ARC tokamak, in which the technology to achieve active tearing-suppression with localised electron cyclotron current drive does not yet exist. The equilibrium scenarios in the database were Monte Carlo generated and normalised to the same >400MW fusion power, minimum pressure scenario at a range of plasma currents, before tearing analysis using the modified Rutherford equation was applied for all resonant poloidal and toroidal m, n modes up to n = 4. Single-helicity toroidal Δ' calculations in resistive DCON set the minimum marginally stable island width, and a simple modal scaling proportional to –m 2 n –1 was identified for high-m Δ' values. The dominant correlates of $w$$^{*}_{m}$ and Δ' across the database were analysed using interpretable machine learning techniques.

NTM seeding↗

Improbability of Nuclear Criticality in Compacted Criticality Control Overpacks after Room Closure by Salt Creep at Waste Isolation Pilot Plant

Based on the rationale presented, nuclear criticality is improbable after salt creep causes compaction of criticality control overpacks (CCOs) disposed at the Waste Isolation Pilot Plant, an operating repository in bedded salt for the disposal of transuranic (TRU) waste from atomic energy defense activities. For most TRU waste, the possibility of post-closure criticality is exceedingly small either because the salt neutronically isolates TRU waste canisters or because closure of a disposal room from salt creep does not sufficiently compact the low mass of fissile material. The criticality potential has been updated here because of the introduction of CCOs, which may dispose up to 380 fissile gram equivalent plutonium-239 in each container. The criticality potential is evaluated through high-fidelity geomechanical modeling of a disposal room filled with CCOs during two representative conditions: (1) large salt block fall, and (2) gradual salt compaction (without brine seepage and subsequent gas generation to permit maximum room closure). Geomechanical models of rock fall demonstrate three tiers of CCOs are not greatly disrupted. Geomechanical models of gradual room closure from salt creep predict irregular arrays of closely packed CCOs after 1000 years, when room closure has asymptotically approached maximum compaction. Criticality models of spheres and cylinders of 380 fissile gram equivalent of plutonium (as oxide) at the predicted irregular spacing demonstrate that an array of CCOs is not critical when surrounded by salt and magnesium oxide, provided the amount of hydrogenous material shipped in the CCO (usually water and plastics) is controlled or boron carbide (a neutron poison) is mixed with the fissile contents.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Biomass and salt-dependent effects of Bacillus spores on radionuclide migration from the Waste Isolation Pilot Plant

Spores of a Bacillus sp., isolated from radioactive waste, were tested for their ability to influence the fate and transport of neodymium (Nd3+) under high salt conditions expected at the Waste Isolation Pilot Plant (WIPP) nuclear waste repository. Spores were suspended in neodymium-spiked saline solutions up to 4 M NaCl, and concentrations of Nd and the complexing agent dipicolinic acid (DPA), a component of spores, were monitored along with optical densities and spore numbers. Overall, results support neodymium bioassociation that is dependent upon biomass, with more apparent adsorption occurring at higher spore concentrations. However, probable spore lysis in 2 and 4 M NaCl solutions and possible germination at 0.15 M NaCl appear to drive the release of DPA and subsequent return of Nd to solution. The implications of this work for the WIPP will depend on actual biomass levels and the ionic strength of the repository brines.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Update to Transportation Analysis for the Waste Isolation Pilot Plant

The goal of this transportation analysis (TA) is to update the 2008 TA in order to evaluate the impacts associated with the transportation of transuranic (TRU) waste from waste generator sites to the Waste Isolation Pilot Plant (WIPP) facility and from waste generator sites to the Idaho National Laboratory (INL).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Reconstruction of the Room D, B, G, and Q Closure Histories at the Waste Isolation Pilot Plant

Experimental measurements of room closure in salt repositories are valuable for understanding the evolution of the underground and for validating geomechanical models. Room closure was measured during a number of experiments at the Waste Isolation Pilot Plant (WIPP) during the 1980's and 1990's. Most rooms were excavated using a multi-pass mining sequence, where each pass necessarily destroyed some of the mining sequence closure measurement points. These destroyed points were promptly reinstalled to capture the closure after the mining pass. After the room was complete, the mining sequence closure measurement stations were supplemented with remotely read closure measurement stations. Although many aspects of these experiments were thoroughly documented, the digital copies of the closure data were inadvertently destroyed, the non-trivial process of zeroing and shifting the raw closure measurements after each mining pass was not precisely described, the various closure measurements within a given room were not directly compared on the same plot, and the measurements were collected for several years longer than previously reported. Consequently, the hand-written mining sequence closure measurements for Rooms D, B, G, and Q were located in the WIPP archives, digitized, and reanalyzed for this report. The process of reconstructing the mining sequence closure histories was documented in detail and the raw data can be found in the appendices. Within the mid-section of a given room, the reconstructed closure histories were largely consistent with other mining sequence and remotely read closure histories, which builds confidence in the experiments and suggests that plane strain is an appropriate modeling assumption. The reconstructed closure histories were also reasonably consistent with previously published results, except in one notable case: the reconstructed Room Q closure histories 30 days after excavation were about 45 % less than the corresponding closures reported in Munson's 1997 capstone paper.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Geochemical Modeling Using OLI Systems Mixed Solvent Electrolyte Model in Support of the Waste Isolation Pilot Plant

Aqueous electrolyte thermodynamic models were developed for synthetic Salado (GWB) and Castile (ERDA-6) brines to inform the experimental design and to facilitate laboratory data interpretation in geochemical studies supporting disposal in the Waste Isolation Pilot Plant (WIPP). The thermodynamic models, which include the relevant vapor-liquid-solid equilibria for the oxidation-reduction conditions of interest, enable computation of system parameters such as activity-based pH, E h [vs. standard hydrogen electrode (SHE)], ionic strength, total dissolved solids, and solution density; the chemical speciation of all phases; saturation tendencies for thermodynamically feasible solids; and changes in brine chemistry because of the addition of H 2 (g), argon, MgO, Fe(0), and other waste form components. The impacts of oxidation-reduction potential (ORP) and pH on aqueous speciation and dominant solid phases were also assessed with the aid of real-solution Pourbaix diagrams for key elements of interest. In addition to the OLI modeling results, limited measurement data for pH and ORP standards are provided, analyzed, and discussed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Developing solid-surface plasma facing components for pilot plants and reactors with replenishable wall claddings and continuous surface conditioning. Part B: required research in present tokamaks

Abstract The companion part A paper (Stangeby et al 2022) reports a number of independent estimates indicating that high-duty-cycle DT tokamaks starting with pilot plants will likely experience rates of net erosion and deposition of solid PFC, plasma facing component, material in the range of 10 3 to 10 4 kg yr −1 , regardless of the material used. The subsequent redeposition of such large quantities of material has the potential for major interference with tokamak operation. Similar levels and issues will be involved if ∼continuous low-Z powder dropping is used for surface conditioning of DT tokamaks, independent of the material used for the PFC armor. In Stangeby et al (2022) (part A) it is proposed that for high-duty-cycle DT tokamaks, non-metallic low-Z refractory materials such as ceramics (graphite, SiC, etc) used as in situ replenishable, relatively thin—of order mm—claddings on a substrate which is resistant to neutron damage could provide a potential solution for protecting the main walls, while reducing the risk of degrading the confined plasma. Assessment of whether such an approach is viable will require information, much of which is not available today. Section 6 of part A identifies a partial list of major physics questions that will need to be answered in order to make an informed assessment. This part B report describes R&D needed to be done in present tokamaks in order to answer many of these questions. Most of the required R&D is to establish better understanding of low-Z slag generation and to identify means to safely manage it. Powder droppers provide a unique opportunity to carry out controlled studies on the management of low-Z slag in current tokamaks, independent of whether their protection tiles use low-Z or high-Z material.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Gen 3 Particle Pilot Plant (G3P3) Life Cycle Management Plan (SAND report)

The National Solar Thermal Test Facility (NSTTF) at Sandia National Laboratories New Mexico (SNL/NM) developed this Life Cycle Management Plan (LCMP) to document its process for executing, monitoring, controlling and closing-out Phase 3 of the Gen 3 Particle Pilot Plant (G3P3). This plan serves as a resource for stakeholders who wish to be knowledgeable of project objectives and how they will be accomplished.

14 SOLAR ENERGY↗

LACSD BNR Pilot Plant Metagenomes

In this study, we aimed to evaluate Biological Nutrient Removal (BNR) and investigate microbial community changes when the DO is reduced in the aerated portions of wastewater treatment trains. We present a dataset of metagenomes obtained from activated sludge collected from the Los Angeles Sanitary District BNR pilot plant at the beginning of operation, when the DO was high, and at the end of operation, when the DO was low.

metagenome↗

An integrated data management and informatics framework for continuous drug product manufacturing processes: A case study on two pilot plants

The pharmaceutical industry continuously looks for ways to improve its development and manufacturing efficiency. In recent years, such efforts have been driven by the transition from batch to continuous manufacturing and digitalization in process development. To facilitate this transition, integrated data management and informatics tools need to be developed and implemented within the framework of Industry 4.0 technology. Here, in this regard, the work aims to guide the data integration development of continuous pharmaceutical manufacturing processes under the Industry 4.0 framework, improving digital maturity and enabling the development of digital twins. This paper demonstrates two instances where a data integration framework has been successfully employed in academic continuous pharmaceutical manufacturing pilot plants. Details of the integration structure and information flows are comprehensively showcased. Approaches to mitigate concerns in incorporating complex data streams, including integrating multiple process analytical technology tools and legacy equipment, connecting cloud data and simulation models, and safeguarding cyber-physical security, are discussed. Critical challenges and opportunities for practical considerations are highlighted.

59 BASIC BIOLOGICAL SCIENCES↗

Gen 3 Particle Pilot Plant (G3P3) -- High-Temperature Particle System for Concentrating Solar Power (Phases 1 and 2)

The U.S. Department of Energy Solar Energy Technologies Office initiated the Generation 3 Concentrating Solar Power (CSP) program to achieve higher operating temperatures (>700 °C) to enable next-generation CSP high-temperature power cycles such as the supercritical CO 2 (sCO2) Brayton Cycle. Three teams were selected to pursue high-temperature gas, liquid, and solid pathways for the heat-transfer media. Phases 1 and 2, which lasted from 2018 – 2020, consisted of design, modeling, and testing activities to further de-risk each of the technologies and develop a design for construction, commissioning, and operation of a pilot-scale facility in Phase 3 (2021 – 2024). This report summarizes the activities in Phases 1 and 2 for the solid-particle pathway led by Sandia National Laboratories. In Phases 1 and 2, Sandia successfully de-risked key elements of the proposed Gen 3 Particle Pilot Plant (G3P3) by improving the design, operation, and performance of key particle component technologies including the receiver, storage bins, particle-to-sCO2 heat exchanger, particle lift, and data acquisition and controls. Modeling and testing of critical components have led to optimized designs that meet desired performance metrics. Detailed drawings, piping and instrumentation diagrams, and process flow diagrams were generated for the integrated system, and structural analyses of the assembled tower structure were performed to demonstrate compliance with relevant codes and standards. Instrumentation and control systems of key subsystems were also demonstrated. Together with Bridgers & Paxton, Bohannan Huston, and Sandia Facilities, we have completed a 100% G3P3 tower design package with stamped engineering drawings suitable for construction bid in Phase 3.

14 SOLAR ENERGY↗

Computer vision-based rock bolt detection in orthomosaic imagery obtained in the Waste Isolation Pilot Plant underground facility

Assessing structural integrity of large underground tunnel facilities is often a time consuming and human-labor intensive task. Thus, research using various modes of sensing and automated detection of key structural components in mines is posed to aid in safety assessments and establishing overall structural health. We propose an approach utilizing off-the-shelf camera and lidar technology fixed to a custom sensing platform, image stitching techniques, fine-tuned object detection models, and specialized model-inference methods to automatically detect, count, and map roof bolts for assessment of structural safety in man-made underground tunnels. Results show a novel workflow for effective object counting in orthomosaic tunnel ceiling images generated from collections in GPS-denied mining environments. Additionally, we demonstrate effective fine-tuning of EfficientDet object detectors utilizing state-of-the-art image augmentation techniques known as the mosaic and mixup transformations. Our work is demonstrated on sensed data and imagery collected from the Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) where miles of tunnel ceiling must be assessed for structural integrity.

42 ENGINEERING↗

Virtual Power Plants: Pilots, Challenges, and Innovations Shaping Future Development

Virtual Power Plants (VPPs) aggregate distributed energy resources (DERs) to provide grid services traditionally delivered by centralized power plants. This article reviews the current state of VPP deployment, highlighting business models, compensation mechanisms, and global pilot projects. While VPPs offer benefits such as grid flexibility, resilience, and cost savings, challenges remain in communication infrastructure, regulatory frameworks, market access, and customer engagement. To address these, we propose a scalable, privacy-preserving hierarchical VPP architecture that coordinates with distribution utilities and preserves customer data. We also present the Integrated T&D Control Room of the Future as a key test bed for validating and accelerating VPP adoption. These innovations can help transition VPPs from pilot programs to integral components of a modern, reliable power grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Reply to Comment on ‘The advanced tokamak path to a compact net electric fusion pilot plant’

Abstract The Comment by Manheimer (submitted to Nucl. Fusion with this response) on our recent paper Buttery et al (2021 Nucl. Fusion 61 046028), has mischaracterized our paper with a series of misleading statements about its content, which it then seeks to refute. It also offers a series of assertions that are unsupported by refereed publication or scientific data—and sometimes in contradiction to the published record and well-established points in the scientific community. In this response we address the main thrusts and themes of the comment, while providing a point-by-point response in the appendix.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Liquid Salt Combined-Cycle Pilot Plant Design

The work described in this report is responsive to the Office of Fossil Energy program ‘Energy Storage for Fossil Power Generation.’ This Phase I report has been prepared by Pintail Power LLC, with support from Nexant ECA, Electric Power Research Institute (EPRI) and Southern Company Services as a deliverable for the U.S. Department of Energy for NETL Award DE-FE-00320016. The Liquid Salt Combined Cycle™ (LSCC™) technology provides large-scale energy storage integrated with Fossil Electric Generating Units (FEGUs) to meet critical needs in the energy transition by providing: • the lowest cost large-scale storage for time-shifting of renewable energy, • superior fuel efficiency to reduce GHGs from dispatchable resources, • flexible capacity and ramping to balance variability of wind and solar resources, • essential grid stability services to assure reliability of a low-carbon grid. The LSCC approach: • employs equipment that has already been proven in utility service, • uses safe, non-toxic, non-degrading, perpetual-life storage medium, • leverages and repurposes existing FEGU assets, • expands the value stack of energy storage to reduce market, financing, and commodity risks. Pintail Power has developed the LSCC technology to meet the need for reliable, efficient, and cost-effective integration of Variable Renewable Energy (VRE) into a low-carbon electric grid by coupling proven thermal energy storage with proven gas turbines, steam turbines, and heat transfer equipment. This novel approach is intended to address the key issues facing the grid and operators of renewable and fossil generating units including: • Overgeneration and curtailment of renewables, • Need for fast ramping dispatchable resources, • Improved efficiency and flexibility of fossil units, • Additional peaking capacity to support electrification of transportation and heating, • Provision of reliability services to support high penetration of VRE, especially synchronous inertia and fast frequency response. A Technology Readiness assessment by EPRI confirmed that LSCC technology consists of commercially proven hardware used in industrial and utility applications. Although the novel LSCC approach has not yet been demonstrated as a complete system, interfaces between major components have been conservatively specified. A Phase III pilot is planned to demonstrate equipment integration and operation. The patented innovation is removal of the evaporator section from the exhaust heat recovery system, with the evaporation performed by stored energy in a separate steam generator. This arrangement couples renewable and fossil power generation via long-duration energy storage to deliver cost, performance, and operational synergies, including superior charging and discharging flexibility, reduced fuel consumption and lower CO 2 emissions compared to conventional Combined Cycle Power Plants, and low-cost, large-scale energy storage. The LSCC technology is composed of proven equipment integrated with gas turbine exhaust heat in a novel system. During charging, electric heaters raise the salt temperature as it flows from the Cold Salt Tank to the Hot Salt Tank. During discharging, hot salt produces steam from feedwater that is heated with gas turbine exhaust, which also superheats steam to drive a steam turbine. LSCC technology can be added to any combustion-turbine to integrate renewable energy, provide needed grid services, and increase the value of fossil electric generating units based on the technology’s following attributes: • Long-duration storage enables time-shifting of VRE to avoid curtailment and impairment of renewable assets. • Long storage duration combined with fast-charging capability increases arbitrage opportunities by storing more energy when the price is low and discharging more hours when the price is high. • Long storage duration allows resource adequacy to be supplied across multiple days to increase reliability and reduce risk. • The stored energy reduces fuel heat rate and GHG emissions, and increases merit, so the LSCC dispatches earlier and longer to increase the plant’s capacity factor and asset value. • The stored energy enables pre-heating and startup of the steam cycle, without operating the gas turbine, to enable fast startup and ramping when dispatched for discharge. • The steam turbine can operate without the gas turbine so it can provide valuable synchronous inertia during charging without consuming fuel. • Fast frequency response and regulation services can be provided during charging using solid-state heater and pump controls to vary the charge power input in response to grid signals. • The LSCC system can be configured for resilience including black start, islanded/micro-grid operation, and even self-recharging of storage using either gas turbine power or gas turbine exhaust heat. The commercialization plan is to add LSCC technology to existing simple cycle gas turbine power plants with the 50MW GE LM6000 aero-derivative gas turbine as the reference design basis. A Techno-economic assessment of the reference design evaluated the benefits (Levelized Avoided Cost of Energy) and costs (Levelized Cost of Energy). The plant definition included all major systems and budgetary vendor quotes. Pintail Power and NexantECA developed the overall cost estimate for the LSCC plant up to the total plant cost level, following the DOE-NETL cost estimate guidelines at AACE Class 3 (-20%/+30%). This includes the equipment cost, bulk material, direct and indirect labor costs to arrive at the bare erected cost. Engineering costs are factored from the BEC and added to it to arrive at the EPC cost. Process and project contingencies were then factored from the EPC cost and rolled-up to yield the total plant cost of $\$$184 million for 1746 MWh of discharge electricity. • At $\$$105/kWh, the reference plant costs less than any of the Energy Storage Systems evaluated by PNNL in 2020 for the Energy Storage Grand Challenge. Operations and Maintenance cost estimates were scaled from combined cycle practice, assuming that the LSCC unit was co-located with and sharing some labor expense with other units, to arrive at $\$$2.2 million per year. Plant economics were evaluated using prices from the ERCOT Day-Ahead Market for calendar year 2019 (excluding the market disruptions from the COVID pandemic and the February 2020 deep freeze event). Assuming economic dispatch in the ERCOT Day-Ahead market, the reference plant capacity factor would have discharged for 2777 hours at 91.9 MW, a 31.66% capacity factor, with a marginal cost of $\$$25.59/MWh, and a LACE of $\$$82.41/MWh. Fixed charges were calculated according to EIA guidelines to arrive at an LCOE of $\$$83.48. The benefit-to-cost ratio of 0.99 suggests that the reference plant would have been cost-effective and competitive in the market. EPRI interviewed selected utilities to gauge the need for, applicability of and interest in the LSCC system. Several utilities are currently managing increased load growth along with the inclusion of increasing levels of renewable generation, putting pressure on conventional generation by requiring increased turndown requirements and ultimately lower capacity factors. All of the utilities interviewed have CO 2 reduction targets in the 2030-2050 timeframe that will severely limit the participation of fossil generation and require better utilization of carbon free generation. While there is limited opportunity for storage in the current markets, the utilities interviewed stated that there will be a substantial need for long duration energy storage in the future given the expected trends. Utilizing an energy storage system will generally be preferred over new gas capacity in some cases, with the capabilities of the LSCC system being a potential option for retrofit to existing simple cycle gas turbine units, allowing them to deliver greater participation in the market with lower carbon intensity. A technology gap assessment and technology maturation plan identified a pilot-scale demonstration as the final step before commercialization. Key gaps to be addressed during the Phase II FEED (Front-End Engineering Design) are component selection and design, commissioning procedures, and operational procedures and the control system for LSCC charging and discharging. The project team has been expanded to include Wood Group PLC as EPC. The proposed Phase II work leads to a pilot-scale engineering demonstration (TRL 6) to be conducted at Southern Company’s Plant Rowan, where the prototype system will perform “all the functions that will be required of the operational system.” The proposed pilot will facilitate commercialization (TRL-9) by scale-up to utility-scale systems integrated with peaking GTs or directly to facility scale systems using industrial GTs. The conceptual design for the pilot plant focuses on the novel integration aspects of LSCC technology. A slipstream of gas turbine exhaust will feed a waste heat recovery unit coupled to a molten salt steam generator heated by stored energy. The pilot is intended to demonstrate all key operating modes of the LSCC technology during charging, discharging and standby. The pilot equipment will be approximately one-seventh scale of the LM6000 commercial target and is expected to have commercial off-ramp potential for facility-scale applications.

01 COAL, LIGNITE, AND PEAT↗

Supercritical Carbon Dioxide Primary Power Large-Scale Pilot Plant

The United States electrical power generation fleet encompasses a wide range of technologies, ranging from traditional combustion-based power generation, to nuclear power, to renewable energy. While the distribution of these assets continues to shift due to economic and regulatory influences, coal combustion continues to be a key part of the US energy portfolio. Despite the relative maturity of coal combustion technology, improvements in overall fuel-to-power efficiency and generation flexibility are still possible and will improve both the economic and environmental factors of coal combustion. Echogen Power Systems proposes to lead a world-class team including the University of Missouri, Electric Power Research Institute and Louis Perry Associates in the design, construction and operation of a 10MWe coal-fired supercritical carbon dioxide (sCO 2 ) large-scale pilot. This transformational technology uses sCO 2 as a working fluid instead of water to achieve high thermodynamic efficiencies that can significantly exceed advanced steam-Rankine cycles. Further, the compact nature of sCO 2 turbomachinery offers capital cost and footprint advantages, and the low maintenance of a water-free power cycle can significantly reduce operation and maintenance (O&M) costs over conventional steam-Rankine systems. Recent integration studies of sCO 2 with coal combustion power plants highlight the significant improvements in plant efficiency that sCO 2 can offer relative to even advanced steam Rankine cycles. At commercial scales, coal-sCO 2 plant net efficiency is predicted to be 39-44.0% (HHV), or 10-20% higher output than conventional steam-Rankine systems, which will significantly improve the competitiveness of coal-fired generation. This proposal builds upon projects previously funded by the Department of Energy, including DE-FE0025959 (High-Efficiency Thermal Integration of Closed Supercritical CO 2 Brayton Power Cycles with Oxy-Fired Heaters) and DE-NE0008470 (Conceptual Design for sCO 2 Power Cycle Test Facility). An appropriately-scaled and properly designed and operated pilot project is essential to overcome the natural risk-aversion of the power generation industry and project financing community. The 10 MWe coal-fired sCO 2 pilot power plant proposed herein will reduce the technical and economic risk of this transformational technology, enabling commercial deployment at the conclusion of the project. For the second phase of this project, Echogen lead a team that completed and refined the pilot system conceptual system and key component designs resulting in the completion of a front-end-engineering-design (FEED) study, completed the NEPA review process, completed the permitting process for construction and operation, refined the techno-economic analysis of the proposed system at commercial scale and received commitments for Phase III cost share. The end result of the program will be to demonstrate the technical and economic superiority of the sCO 2 power cycle for coal-fired operation. Major risk elements will have been retired with sufficient operation at high power to enable the power generation industry to move forward with the first commercial deployment of this transformational system.

01 COAL, LIGNITE, AND PEAT↗