Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Pilot”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Residual analysis of the water resonance signal in breast lesions imaged with high spectral and spatial resolution (HiSS) MRI: A pilot study

Purpose: High spectral and spatial resolution magnetic resonance imaging (HiSS MRI) yields information on the local environment of suspicious lesions. Previous work has demonstrated the advantages of HiSS (complete fat-suppression, improved image contrast, no required contrast agent, etc.), leading to initial investigations of water resonance lineshape for the purpose of breast lesion classification. The purpose of this study is to investigate a quantitative imaging biomarker, which characterizes non-Lorentzian components of the water resonance in HiSS MRI datasets, for computer-aided diagnosis (CADx). Methods: The inhomogeneous broadening and non-Lorentzian or “off-peak” components seen in the water resonance of proton spectra of breast HiSS images are analyzed by subtracting a Lorentzian fit from the water peak spectra and evaluating the difference spectrum or “residual.” The maxima of these residuals (referred to hereafter as “off-peak components”) tend to be larger in magnitude in malignant lesions, indicating increased broadening in malignant lesions. The authors considered only those voxels with the highest magnitude off-peak components in each lesion, with the number of selected voxels dependent on lesion size. Our voxel-based method compared the magnitudes and frequencies of off-peak components of all voxels from all lesions in a database that included 15 malignant and 8 benign lesions (yielding ∼3900 voxels) based on the lesions’ biopsy-confirmed diagnosis. Lesion classification was accomplished by comparing the average off-peak component magnitudes and frequencies in malignant and benign lesions. The area under the ROC curve (AUC) was used as a figure of merit for both the voxel-based and lesion-based methods. Results: In the voxel-based task of distinguishing voxels from malignant and benign lesions, off-peak magnitude yielded an AUC of 0.88 (95% confidence interval [0.84, 0.91]). In the lesion-based task of distinguishing malignant and benign lesions, average off-peak magnitude yielded an AUC 0.83 (95% confidence interval [0.61, 0.98]). Conclusions: These promising AUC values suggest that analysis of the water-resonance in each HiSS image voxel using “residual analysis” could have high diagnostic utility and could be used to enhance current CADx methods and allow detection of breast cancer without the need to inject contrast agents.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Pilot-Scale Testing of an Integrated Circuit for the Extraction of Rare Earth Minerals and Elements from Coal and Coal Byproducts Using Advanced Separation Technologies

The primary objective of this project was to develop and demonstrate an integrated pilot-scale circuitry for recovering high-value rare earth elements (REEs) from coal and coal byproducts. The target performance was to produce a mixed REE product with content of at least two percent by weight on a dry mass basis in a cost-effective and environmentally benign manner. During the first nine months of the project period (Phase 2 Budget Period 2), pilot plant construction was completed including all field site startup activities such as permitting, engineering design, procurement/bidding, unit fabrication, site construction, equipment installation, module assembly, safety training, and circuit shakedown. During the remaining 21 months of project period (Phase 2 Budget Period 3), detailed field-testing activities were performed including feedstock sample collection and preparation, exploratory testing, circuit modification, detailed parametric study, and performance optimization. A detailed techno-economic analysis was performed based on the pilot plant testing findings which provided various scenarios for REE production. The project successfully accomplished the proposed target performance by producing mixed rare earth oxide (REO) with greater than 90% purity by weight in a continuous pilot scale operation from two distinctly different coarse refuse materials (i.e., West Kentucky No. 13 and Fire Clay coal seams), and at least three secondary sources (i.e., heap leach process and naturally formed acid mine drainage system). Project partners included the University of Kentucky, Virginia Tech, West Virginia University, Alliance Coal, Blackhawk Mining, Mineral Refining Company, and Mineral Separation Technologies. The pilot scale test facility was constructed at a former mining complex owned by Alliance Natural Resource Partners (Alliance Coal). The site was rehabilitated to accommodate the equipment installation, construction and fabrication, electrical power requirement, water line management and containment. The process units constructed and installed included X-ray sorting unit, crushing and grinding unit, physical separation unit, acid leaching unit, solvent extraction unit, and wastewater management unit. A rare earth mineral concentration unit was constructed as a standalone unit for flexible operation. A detailed environmental assessment and control plan was carried out to identify and quantify any potential impacts of the pilot-scale processing circuitry on the human and eco-system health and well-being. Corresponding mitigation strategies and control measures were provided. A conceptual flowsheet was developed to effectively remove thorium and uranium from high purity rare earth oxide mix or any potential radionuclide enriched stream. The two distinct feedstock materials were secured from the Blackhawk Mining Complex in eastern Kentucky where the Fire Clay (Hazard No. 4) seam is processed. The West Kentucky No. 13 (Baker) coarse refuse material was collected from an active process stream at an Alliance coal preparation plant located in western Kentucky. Characterization analysis indicated that both of feed materials generated from the two sources contained >300 ppm of TREEs on a dry whole mass basis which met the requirements for a qualified feed stock. The two feedstocks were further upgraded using a dual x-ray sorter to prepare the feed material for hydrometallurgical circuit. Thermal treatment on feed material prior to leaching was found to: 1) improve the leaching recovery of REEs, 2) increase the leaching kinetics, and 3) allow the leaching reaction to occur at lower acidity. Roasting at 600°C was selected as the pre-treatment condition for both West Kentucky No. 13 and Fire Clay coarse refuse material. Over 40% of leaching recovery was achieved by roasting West Kentucky No. 13 material having a top particle size of 3 mm in the pilot scale operation using 1.2M sulfuric acid leaching at 75OC. Initial pilot scale testing involved continuous operation of the pilot plant for 94 hours. The leaching unit was operated at solid-to-liquid ratio of 1 to 10 (w/v) using 0.5M sulfuric acid solution at a temperature of 75°C. The continuous solvent extraction circuit utilized rougher and cleaner units with DEHPA and TBP as the extractants. An innovative stripping circuit was developed to accumulate the REE concentration in the stripping solution to a level above 600 ppm. A bleed stream from the recycled strip solution was treated using oxalic acid precipitation which produced a high grade rare earth oxalate. The oxalate product was roasted to remove the oxalate which produced a rare earth oxide product having a purity greater 90%. Due to high concentrations of contaminant ions in the pregnant leach solution (PLS), a modified flowsheet was developed that involved pre-concentration of the REEs using multiple stages of precipitation and redissolution. The advantage of this process was improved removal of contamination before the downstream purification process and a significant cost reduction relative to the circuit that utilized the solvent extraction process. The modified circuitry included processes involving leaching, multistage precipitation, redissolution, and oxalate precipitation followed by roasting of the oxalate product. The circuit produced a mixed REO that was 92.96% pure from the initial test. A detailed parametric test plan was carried out which involved varying key parameters including solids feed rate, acid flowrate, acid concentration, multistage precipitation pH, redissolution pH, oxalate precipitation dosage and pH. The response variables included REE recovery, contaminant recovery, REO product grade and overall chemical consumption. Test results indicated that the acid-to-solid ratio is the key parameter to leaching efficiency as performance deteriorated with an increase in solids concentration. The optimal pH determined for REE precipitation and redissolution was 6.5 and 2.5, respectively. Additional tests were conducted to further improve the flowsheet. Recirculating a portion of the PLS to the feed of the leach tanks improved the leaching performance by lowering the pH of the leaching system and reducing the contamination recovery by shortening the residence time. Moreover, the removal of Al prior to REE precipitation significantly reduced the oxalic acid consumption in the oxalate precipitation circuit. The modified circuit produced over 90% grade REO by weight from both West Kentucky No. 13 and Fire Clay coarse refuse material in pilot scale continuous test programs. A case analysis model was developed to project the REE and major contaminants concentration in each PLS stream based on the leaching condition, pH cut point, and oxalic acid dosage. A correlation was established using empirical and semi-empirical models. Using the models, chemical consumption required for each stage was predicted based on the projected performance of the hydrometallurgy circuit. After identifying the optimum conditions, validation tests were carried out for the treatment of both West Kentucky No. 13 and Fire Clay coarse refuse materials in the pilot plant. The actual circuit performance and chemical consumptions were very close to the model predictions. Other than the two coarse refuse sources, several secondary feedstocks were also tested in the pilot plant facility. A “heap leach” system was constructed using the coarse refuse material generated from cleaning the West Kentucky No. 13 seam coal. Using the two stage SX rougher and cleaner circuit, a concentrate with a grade >90% REO was produced while recovering >97% of the REEs from the heap leach PLS. Naturally generated acid mine drainage (AMD) from West Kentucky No.13 mine was processed using the multistage precipitation circuit in the pilot plant in a test conducted for a period of 32 hours. The final grade of the mix RE oxide produced from the AMD was 90.84% with an overall circuit recovery of 64%. The primary source of REE was the selective precipitation steps involving iron and aluminum rejection. The hydrophobic-hydrophilic separation (HHS) process was proven to effectively recover coal from fine waste materials. For REM recovery, the HHS process was able to produce concentrates at grades of approximately 1.8% REE on an ash basis; however, recovery values were typically low, <10%, under the optimal conditions determined in the laboratory-scale testing. Staged testing of the pilot-scale HHS process for coal recovery and semi-continuous laboratory testing for REM testing showed that a total concentration ratio of more than 15x was observed for the REM recovery process. A circuit simulation package was developed for REE extraction and purification using a spreadsheet-based platform (Microsoft Excel). The REESim circuit simulation package is configured to track the mass and volume flows of components passing through a series of unit operations specified and configured by the user. The mass rates can then be utilized by the user to determine important performance indicators such as product mass yields, concentrate purity levels, element-by-element recoveries, and so forth. The techno-economic analysis showed that the roasting and leaching operations were the most expensive capital items, each contributing approximately 30% to the total capital cost. One notable contributor to the high production costs was the low REE recovery observed in the pilot scale trials. The product basket price was shown to have a strong influence on the economic viability of the scenarios, with the scandium price being the most significant influencer. Operating cost was shown to be extremely sensitive to REE recovery, REE feed grade, and leaching acid consumption. An analysis of ten different scenarios for a 500 t/h commercial operation revealed that three were economically favorable, producing internal rates of return varying from 27.7% to 33.1% and payback periods of 4 to 5 years. The project successfully developed and demonstrated a process to recover REEs from coal and coal byproducts in a pilot-plant operation which consistently produced over 90% grade REO mix from varies types of feedstocks. Commercialization analysis showed that the technology readiness level successfully achieved TRL 6 at the end of the project and demonstrated the need and the potential for scaling the process to further advance the technologies toward the goal of providing a domestic supply of REEs at a commercial scale.

01 COAL, LIGNITE, AND PEAT↗

Understanding the interplay between pilot fuel mixing and auto-ignition chemistry in hydrogen-enriched environment

The diesel-piloted dual-fuel compression ignition combustion strategy is well-suited to accelerate the decarbonization of transportation by adopting hydrogen as a renewable energy carrier into the existing internal combustion engine with minimal engine modifications. Despite the simplicity of engine modification, many questions remain unanswered regarding the optimal pilot injection strategy for reliable ignition with minimum pilot fuel consumption. The present study uses a single-cylinder heavy-duty optical engine to explore the phenomenology and underlying mechanisms governing the pilot fuel ignition and the subsequent combustion of a premixed hydrogen-air charge. The engine is operated in a dual-fuel mode with hydrogen premixed into the engine intake charge with a direct pilot injection of n-heptane as a diesel pilot fuel surrogate. Optical diagnostics used to visualize in-cylinder combustion phenomena include high-speed IR imaging of the pilot fuel spray evolution as well as high-speed HCHO* and OH* chemiluminescence as indicators of low-temperature and high-temperature heat release, respectively. Three pilot injection strategies are compared to explore the effects of pilot fuel mass, injection pressure, and injection duration on the probability and repeatability of successful ignition. The thermodynamic and imaging data analysis supported by zero-dimensional chemical kinetics simulations revealed a complex interplay between the physical and chemical processes governing the pilot fuel ignition process in a hydrogen containing charge. Hydrogen strongly inhibits the ignition of pilot fuel mixtures and therefore requires longer injection duration to create zones with sufficiently high pilot fuel concentration for successful ignition. Results show that ignition typically tends to rely on stochastic pockets with high pilot fuel concentration, which results in poor repeatability of combustion and frequent misfiring. In conclusion, this work has improved the understanding on how the unique chemical properties of hydrogen pose a challenge for maximization of hydrogen’s energy share in hydrogen dual-fuel engines and highlights a potential mitigation pathway.

33 ADVANCED PROPULSION SYSTEMS↗

Verification of diesel spray ignition phenomenon in dual-fuel diesel-piloted premixed natural gas engine

Dual-fuel (DF) engines, in which premixed natural gas and air in an open-type combustion chamber is ignited by diesel-fuel pilot sprays, have been more popular for marine use than pre-chamber spark ignition (PCSI) engines because of their superior durability. However, control of ignition and combustion in DF engines is more difficult than in PCSI engines. In this context, here we focus on the ignition stability of n-heptane pilot-fuel jets injected into a compressed premixed charge of natural gas and air at low-load conditions. To aid understanding of the experimental data, chemical-kinetics simulations were carried out in a simplified engine-environment that provided insight into the chemical effects of methane (CH4) on pilot-fuel ignition. The simulations reveal that CH4 has an effect on both stages of n-heptane autoignition: the small, first-stage, cool-flame-type, low-temperature ignition (LTI) and the larger, second-stage, high-temperature ignition (HTI). As the ratio of pilot-fuel to CH4 entrained into the spray decreases, the initial oxidization of CH4 consumes the OH radicals produced by pilot-fuel decomposition during LTI, thereby inhibiting its progression to HTI. Using imaging diagnostics, the spatial and temporal progression of LTI and HTI in DF combustion are measured in a heavy-duty optical engine, and the imaging data are analyzed to understand the cause of severe fluctuations in ignition timing and combustion completeness at low-load conditions. Images of cool-flame and hydroxyl radical (OH*) chemiluminescence serve as indicators of LTI and HTI, respectively. The cycle-to-cycle and spatial variation in ignition extracted from the imaging data are used as key metrics of comparison. The imaging data indicate that the local concentration of the pilot-fuel and the richness of the surrounding natural-gas air mixture are important for LTI and HTI, but in different ways. In particular, higher injection pressures and shorter injection durations increase the mixing rate, leading to lower concentrations of pilot-fuel more quickly, which can inhibit HTI even as LTI remains relatively robust. Decreasing the injection pressure from 80 MPa to 40 MPa and increasing the injection duration from 500 µs to 760 µs maintained constant pilot-fuel mass, while promoting robust transition from LTI to HTI by effectively slowing the mixing rate. This allows enough residence time for the OH radicals, produced by the two-stage ignition chemistry of the pilot-fuel, to accelerate the transition from LTI to HTI before being consumed by CH4 oxidation. Thus from a practical perspective, for a premixed natural gas fuel–air equivalence-ratio, it is possible to improve the “stability” of the combustion process by solely manipulating the pilot-fuel injection parameters while maintaining constant mass of injected pilot-fuel. This allows for tailoring mixing trajectories to offset changes in fuel ignition chemistry, so as to promote a robust transition from LTI to HTI by changing the balance between the local concentration of the pilot-fuel and richness of the premixed natural gas and air. This could prove to be a valuable tool for combustion design to improve fuel efficiency or reduce noise or perhaps even reduce heat-transfer losses by locating early combustion away from in-cylinder walls.

42 ENGINEERING↗

Advanced Instrumentation, Information and Control (II&C) Research and Development Facility Buildout and Project Execution of LWRS II&C Pilot Projects 1 and 3

The U.S. Department of Energy (DOE) is sponsoring research, development, and deployment on light water reactor sustainability (LWRS), in which the Idaho National Laboratory (INL) is working closely with nuclear utilities to develop technologies and solutions to help ensure the safe operational life extension of current reactors. As technologies are introduced that change the operation of the plant, the LWRS pilot projects can help identify their best-advanced uses and help demonstrate the safety of these technologies. In early testing of operator performance given these emerging technologies will ensure the safety and usability of systems prior to large-scale deployment and costly verification and validation at the plant. The aim of these collaborations, demonstrations, and approaches are intended to lessen the inertia that sustains the current status quo of today's II&C systems technology, and to motivate transformational change and a shift in strategy to a long-term approach to II&C modernization that is more sustainable. Research being conducted under Pilot Project 1 regards understanding the conditions and behaviors that can be modified, either through process improvements and/or technology deployment, to improve the overall safety and efficiency of outage control at nuclear facilities. The key component of the research in this pilot project is accessing the delivery of information that will allow researchers to simulate the control room, outage control center (OCC) information, and plant status data. The simulation also allows researchers to identify areas of opportunity where plant operating status and outage activities can be analyzed to increase overall plant efficiency. For Pilot Project 3 the desire is to demonstrate the ability of technology deployment and the subsequent impact on maximizing the 'Collective Situational Awareness' of the various stakeholders in a commercial nuclear power plant. Specifically, the desire is to show positive results in plant status control, information management, knowledge management, and 'Real-Time-Truth' as it relates to the current plant conditions. The following report includes two attachments; each attachment represents Pilot Project 1 and 3. The two attachments also provide a report on two distinct milestones that were completed and are described below: M3L11IN06030307 - Complete initiation of two pilot projects. Complete initiation of pilot projects on real-time configuration management and control to overcome limitations with existing permanent instrumentation and real-time awareness of plant configurations; two candidate projects that consider low-cost wireless technology for in situ configuration monitoring and candidate technologies and an information architecture for outage management and control will be initiated with utilities. M3L11IN06030309 - Complete data collection, R&D plans, and agreements needed to conduct the two pilot projects. Complete data collection conducted at pilot project utilities to support real-time configuration management and outage control center pilot studies conducted; R&D plan for pilot projects produced and needed agreements established to support R&D activities.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Slipstream pilot-scale demonstration of a novel amine-based post-combustion technology for carbon dioxide capture from coal-fired power plant flue gas

Post-combustion CO 2 capture (PCC) technology offers flexibility to treat the flue gas from both existing and new coal-fired power plants and can be applied to treat all or a portion of the flue gas. Solvent-based technologies are today the leading option for PCC from commercial coal-fired power plants as they have been applied in large-scale in other applications. Linde and BASF have been working together to develop and further improve a PCC process incorporating BASF’s novel aqueous amine-based solvent technology. This technology offers significant benefits compared to other solvent-based processes as it aims to reduce the regeneration energy requirements using novel solvents that are very stable under the coal-fired power plant feed gas conditions. BASF has developed the desired solvent based on the evaluation of a large number of candidates. In addition, long-term small pilot-scale testing of the BASF solvent has been performed on a lignite-fired flue gas. In coordination with BASF, Linde has evaluated a number of options for capital cost reduction in large engineered systems for solvent-based PCC technology. This report provides a summary of the work performed and results from a project supported by the US DOE (DE-FE0007453) for the pilot-scale demonstration of a Linde-BASF PCC technology using coal-fired power plant flue gas at a 1-1.5 MWe scale in Wilsonville, AL at the National Carbon Capture Center (NCCC). Following a project kick-off meeting in November 2011 and the conclusion of pilot plant design and engineering in February 2013, mechanical completion of the pilot plant was achieved in July 2014, and final commissioning activities were completed to enable start-up of operations in January 2015. Parametric tests were performed from January to December 2015 to determine optimal test conditions and evaluate process performance over a variety of operation parameters. A long-duration 1500-hour continuous test campaign was performed from May to August 2016 at a selected process condition to evaluate process performance and solvent stability over a longer period similar to how the process would operate as a continuously running large-scale PCC plant. The pilot plant integrated a number of unique features of the Linde-BASF technology aimed at lowering overall energy consumption and capital costs. During the overall test period including startup, parametric testing and long-duration testing, the pilot plant was operated for a total of 6,764 hours out of which testing with flue gas was performed for 4,109 hours. The pilot plant testing demonstrated all of the performance targets including CO 2 capture rate exceeding 90%, CO 2 purity exceeding 99.9 mol% (dry), flue gas processing capacity up to 15,500 lbs/hr (equivalent to 1.5 MWe capacity slipstream), regeneration energy as low as 2.7 GJ/tonne CO 2 , and regenerator operating pressure up to 3.4 bara. Excellent solvent stability performance data was measured and verified by Linde and BASF during both test campaigns. In addition to process data, significant operational learnings were gained from pilot tests that will contribute greatly to the commercial success of PCC. Based on a thorough techno-economic assessment (TEA) of the Linde-BASF PCC process integrated with a 550 MWe supercritical coal-fired power plant, the net efficiency of the integrated power plant with CO 2 capture is increased from 28.4% with the DOE/NETL Case 12 reference to 30.9% with the Linde-BASF PCC plant previously presented utilizing the BASF OASE® blue solvent [Ref. 4], and is further increased to 31.4% using a Linde-BASF PCC plant with BASF OASE® blue solvent and an advanced stripper interstage heater (SIH) configuration. The Linde-BASF PCC plant incorporating the BASF OASE® blue solvent also results in significantly lower overall capital costs, thereby reducing the cost of electricity (COE) and cost of CO 2 captured from $147.25/MWh and $56.49/MT CO 2 , respectively, for the reference DOE/NETL Case 12 plant, to $128.49/MWh and $41.85/MT CO2 for process case LB1, respectively, and $126.65/MWh and $40.66/MT CO 2 for process case SIH, respectively. With additional innovative Linde-BASF PCC process configuration improvements, the COE and cost of CO 2 captured can be further reduced to $125.51/MWh and $39.90/MT CO 2 for a further optimized PCC process defined as LB1-CREB. Most notably, the Linde-BASF process options assessed have already demonstrated the potential to lower the cost of CO 2 captured below the DOE target of $40/MT CO 2 at the 550 MWe scale for second generation PCC technologies. Project organization, structure, goals, tasks, accomplishments, process criteria and milestones will be presented in this report along with highlights and key results from parametric and long-duration testing of the Linde-BASF PCC pilot. The parametric and long-duration testing campaigns were aimed at validating the performance of the PCC technology against targets determined from a preliminary techno-economic assessment. The stability of the solvent with extended operation in a realistic power plant setting was measured with performance verified. Additionally, general solvent classification information, process operating conditions, normalized solvent performance data, solvent stability test results, flue gas conditions data, CO 2 purity data in the gaseous product stream, steam requirements and process flow diagrams, and updated process economic data for a scaled-up 550 MWe supercritical power plant with CO 2 capture are presented and discussed in this report.

20 FOSSIL-FUELED POWER PLANTS↗

Pre-Project Planning for a Flameless Pressurized Oxy-Combustion Pilot Plant (Final Technical Report)

The team of Southwest Research Institute® (SwRI®), ITEA, Electric Power Research Institute, Inc. (EPRI), GE Global Research (GE), Jacobs Engineering (Jacobs), and Peter Reineck Associates (PRA) are advancing Flameless Pressurized Oxy-Combustion (FPO), a novel coal technology. This effort seeks to complete the preliminary engineering and planning of a 50-MWth Pilot Plant that produces electricity and steam for district heating. The technology, pioneered by ITEA at the 5-MWth scale, must be brought to a higher technology readiness level (TRL) to be viable at the commercial scale. This project builds upon extensive evaluation of the techno-economic performance of the FPO technology already performed by ITEA. This includes system improvements, such as the addition of a turbo-expander to the flue gas stream. Some of the performance-enhancing components are not as well defined as others. The primary goal of this project was to bring all of the core cycle components to the same level of design maturity. Extensive cycle modeling and evaluation explored various configurations of the process. Different coals, operating conditions, and heat recovery devices were considered and modeled using Aspen Plus. The results of the cycle modeling informed the pilot plant configuration and the planned configuration at the commercial scale. The system pressurization is maintained in the flue gas clean-up and water removal. This allows for efficient and cost-effective carbon dioxide compression and sequestration package. Once the cycle was optimized, preliminary drawings, layouts, and plans defined the pilot facility. Process flow diagrams (PFD) were used to describe the pilot configuration in greater detail. A heat and mass balance with stream data was created. A master equipment list specified the operating conditions for major pieces of equipment within the pilot using this heat and mass balance. A detailed cost estimate for the planned configuration was completed with an Association for the Advancement of Cost Engineering (AACE) Class IV level of cost analysis. A site selection effort evaluated a variety of potential candidate sites. The selection effort focused on three sites for an in-depth evaluation of the merits and viability of hosting a pilot demonstration. The ability of the host site to support the project with cost sharing was also assessed. The selection process chose the University of Wyoming (UW) as the host site, and cost estimates for the pilot capital estimate were made using local data. A preliminary test plan and operation plan, which creates figures of merit, control, and instrumentation was produced. An effort that outlines methods of pilot cost reduction was completed near the end of the project. A techno-economic assessment (TEA) evaluated the FPO technology at the commercial scale in comparison to the NETL baseline cases. The reference plants were used in combination with proprietary equipment estimates to build a plant capital cost and cost of electricity evaluation. FPO performed better than the sub-bituminous post-combustion capture cases. Further preliminary estimates of improvements to the FPO cycle show even further gains when compared to conventional carbon capture methods.

01 COAL, LIGNITE, AND PEAT↗

Pilot Testing of Mercury Oxidation Catalysts for Upstream of Wet FGD Systems

This document is the final technical report for Cooperative Agreement DE-FC26-04NT41992, 'Pilot Testing of Mercury Oxidation Catalysts for Upstream of Wet FGD Systems,' which was conducted over the time-period January 1, 2004 through December 31, 2010. The objective of this project has been to demonstrate at pilot scale the use of solid catalysts and/or fixed-structure mercury sorbents to promote the removal of total mercury and oxidation of elemental mercury in flue gas from coal combustion, followed by wet flue gas desulfurization (FGD) to remove the oxidized mercury at high efficiency. The project was co-funded by the U.S. DOE National Energy Technology Laboratory (DOE-NETL), EPRI, Great River Energy (GRE), TXU Energy (now called Luminant), Southern Company, Salt River Project (SRP) and Duke Energy. URS Group was the prime contractor. The mercury control process under development uses fixed-structure sorbents and/or catalysts to promote the removal of total mercury and/or oxidation of elemental mercury in the flue gas from coal-fired power plants that have wet lime or limestone FGD systems. Oxidized mercury not adsorbed is removed in the wet FGD absorbers and leaves with the byproducts from the FGD system. The project has tested candidate materials at pilot scale and in a commercial form, to provide engineering data for future full-scale designs. Pilot-scale catalytic oxidation tests have been completed for periods of approximately 14 to19 months at three sites, with an additional round of pilot-scale fixed-structure sorbent tests being conducted at one of those sites. Additionally, pilot-scale wet FGD tests have been conducted downstream of mercury oxidation catalysts at a total of four sites. The sites include the two of three sites from this project and two sites where catalytic oxidation pilot testing was conducted as part of a previous DOE-NETL project. Pilot-scale wet FGD tests were also conducted at a fifth site, but with no catalyst or fixed-structure mercury sorbent upstream. This final report presents and discusses detailed results from all of these efforts, and makes a number of conclusions about what was learned through these efforts.

01 COAL, LIGNITE, AND PEAT↗

Industrial Gas Turbine Engine Catalytic Pilot Combustor-Prototype Testing

PCI has developed and demonstrated its Rich Catalytic Lean-burn (RCL®) technology for industrial and utility gas turbines to meet DOE's goals of low single digit emissions. The technology offers stable combustion with extended turndown allowing ultra-low emissions without the cost of exhaust after-treatment and further increasing overall efficiency (avoidance of after-treatment losses). The objective of the work was to develop and demonstrate emission benefits of the catalytic technology to meet strict emissions regulations. Two different applications of the RCL® concept were demonstrated: RCL® catalytic pilot and Full RCL®. The RCL® catalytic pilot was designed to replace the existing pilot (a typical source of high NOx production) in the existing Dry Low NOx (DLN) injector, providing benefit of catalytic combustion while minimizing engine modification. This report discusses the development and single injector and engine testing of a set of T70 injectors equipped with RCL® pilots for natural gas applications. The overall (catalytic pilot plus main injector) program NOx target of less than 5 ppm (corrected to 15% oxygen) was achieved in the T70 engine for the complete set of conditions with engine CO emissions less than 10 ppm. Combustor acoustics were low (at or below 0.1 psi RMS) during testing. The RCL® catalytic pilot supported engine startup and shutdown process without major modification of existing engine controls. During high pressure testing, the catalytic pilot showed no incidence of flashback or autoignition while operating over a wide range of flame temperatures. In applications where lower NOx production is required (i.e. less than 3 ppm), in parallel, a Full RCL® combustor was developed that replaces the existing DLN injector providing potential for maximum emissions reduction. This concept was tested at industrial gas turbine conditions in a Solar Turbines, Incorporated high-pressure (17 atm.) combustion rig and in a modified Solar Turbines, Incorporated Saturn engine rig. High pressure single-injector rig and modified engine rig tests demonstrated NOx less than 2 ppm and CO less than 10 ppm over a wide flame temperature operating regime with low combustion noise (<0.15% peak-to-peak). Minimum NOx for the optimized engine retrofit Full RCL® designs was less than 1 ppm with CO emissions less than 10 ppm. Durability testing of the substrate and catalyst material was successfully demonstrated at pressure and temperature showing long term stable performance of the catalytic reactor element. Stable performance of the reactor element was achieved when subjected to durability tests (>5000 hours) at simulated engine conditions (P=15 atm, Tin=400C/750F.). Cyclic tests simulating engine trips was also demonstrated for catalyst reliability. In addition to catalyst tests, substrate oxidation testing was also performed for downselected substrate candidates for over 25,000 hours. At the end of the program, an RCL® catalytic pilot system has been developed and demonstrated to produce NOx emissions of less than 3 ppm (corrected to 15% O2) for 100% and 50% load operation in a production engine operating on natural gas. In addition, a Full RCL® combustor has been designed and demonstrated less than 2 ppm NOx (with potential to achieve 1 ppm) in single injector and modified engine testing. The catalyst/substrate combination has been shown to be stable up to 5500 hrs in simulated engine conditions.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Intermittent Renewable Management Pilot Phase 2

The Intermittent Renewable Management Pilot - Phase 2 (IRM2) was designed to study the feasibility of demand-side resources to participate into the California Independent System Operator (CAISO) wholesale market as proxy demand resources (PDR). The pilot study focused on understanding the issues related with direct participation of third-parties and customers including customer acceptance; market transformation challenges (wholesale market, technology); technical and operational feasibility; and value to the rate payers, DR resource owners and the utility on providing an enabling mechanism for DR resources into the wholesale markets. The customer had the option of committing to either three contiguous hour blocks for 24 days or six contiguous hours for 12 days a month with day-ahead notification that aligned with the CAISO integrated forward market. As a result of their being available, the customer was paid $10/ kilowatt (kW)-month for capacity in addition to CAISO energy settlements. The participants were limited to no more than a 2 megawatt (MW) capacity with a six-month commitment. Four participants successfully engaged in the pilot. In this report, we provide the description of the pilot, participant performance results, costs and value to participants as well as outline some of the issues encountered through the pilot. Results show that participants chose to participate with storage and the value of CAISO settlements were significantly lower than the capacity payments provided by the utility as incentive payments. In addition, this pilot revealed issues both on the participant side and system operations side. These issues are summarized in the report.The Intermittent Renewable Management Pilot - Phase 2 (IRM2) was designed to study the feasibility of demand-side resources to participate into the California Independent System Operator (CAISO) wholesale market as proxy demand resources (PDR). The pilot study focused on understanding the issues related with direct participation of third-parties and customers including customer acceptance; market transformation challenges (wholesale market, technology); technical and operational feasibility; and value to the rate payers, DR resource owners and the utility on providing an enabling mechanism for DR resources into the wholesale markets.

99 GENERAL AND MISCELLANEOUS↗

A Handbook for Designing, Implementing, and Evaluating Successful Electric Utility Pilots

Since at least the late 1970s, electric utilities and their regulators have recognized the value of experimentation to motivate innovation. The industry has a long history of using pilots to help inform future decision making about electric utility rates, customer technology adoption and integration, and even changes to the utility’s regulatory or business model. Although utility pilots have become almost ubiquitous proving grounds for new rates, technologies, and alterations to the traditional utility regulatory and business model, some regulators are beginning to raise questions about what constitutes a “good” pilot. Much has been written about utility pilots over the years; however, what is missing from the literature is the identification of a comprehensive process for not only designing and evaluating a pilot, but also implementing, successful utility pilots that provide actionable outcomes upon which more informed decisions can be made. This report provides a step-by-step process that regulators, policymakers, and utilities can follow to help promote a more successful pilot, even if whatever is being tested fails to produce the intended or expected result(s). It is worth noting that this report is not intended to serve as a technical resource for those designing, implementing, and evaluating pilots. However, there are myriad references provided for those wishing to delve deeper into the technical details.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Savannah River National Laboratory Collaborative Innovation Pilot Team - 17560

The Collaborative Innovation (COIN) program was established by the Savannah River National Laboratory (SRNL) in March 2016. The goal of the SRNL COIN program is to identify innovative options to significantly reduce program and project risks (improve safety, reduce schedule and cost) of high priority Department of Energy Environmental Management, National Nuclear Security Administration, and Nuclear Energy missions. The COIN Advisory Board selected as the target outcome of the first COIN effort a 50% improvement to the Savannah River Site (SRS) H-Canyon spent nuclear fuel (SNF) processing 'baseline,' or current plan, as defined in the SRS Nuclear Materials Planning Roadmap. A small team of SRNL and Savannah River Nuclear Solutions personnel with pertinent experience and expertise was co-located and largely sequestered for eight weeks to identify improvements to H-Canyon processing of SNF. Following the process defined in the SRNL COIN Charter, the COIN Pilot Team analyzed the baseline for processing SNF through H Canyon; generated alternative ideas; tested seemingly viable ideas by reaching out to other subject-matter experts; and identified options for consideration for implementation by the COIN Advisory Board. The COIN Pilot produced a number of important outcomes, including important lessons learned for subsequent COIN efforts. The two principal outcomes are these: 1. The COIN Pilot Team conducted a comprehensive examination of the individual unit operations, the integrated system, and external interfaces to produce a timeline of H-Canyon processing and sampling times that had not previously existed. The general timeline served as the baseline from which the Pilot Team identified processing improvements. In addition, the timeline has already been employed in other planning efforts. 2. The COIN Pilot Team determined that innovations to the H-Canyon Dissolving unit operation alone could increase the number of SNF bundles processed through H Canyon by the target of 50%, but with little margin for error. To ensure that the gains in throughput in the Dissolving unit operation would be maintained throughout the facility, the Pilot Team identified four additional improvements to create greater efficiency and flexibility in downstream H-Canyon unit operations. The COIN Pilot Team's innovations reduce the processing time of a single batch of SNF through H Canyon from about 70 days to about 50 days. This talk will review the COIN process and the results of the pilot of the process. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Multi-zone modelling of partially premixed low-temperature combustion in pilot-ignited natural-gas engines

Detailed results from a multi-zone phenomenological simulation of partially premixed advanced-injection low-pilot-ignited natural-gas low-temperature combustion are presented with a focus on early injection timings (the beginning of (pilot) injection (BOI)) and very small diesel quantities (2-3 per cent of total fuel energy). Combining several aspects of diesel and spark ignition engine combustion models, the closed-cycle simulation accounted for diesel autoignition, diesel spray combustion, and natural-gas combustion by premixed turbulent flame propagation. The cylinder contents were divided into an unburned zone, several pilot fuel zones (or 'packets') that modelled diesel evaporation and ignition, a flame zone for natural-gas combustion, and a burned zone. The simulation predicted the onset of ignition, cylinder pressures, and heat release rate profiles satisfactorily over a wide range of BOIs (20-60° before top dead centre (before TDC)) but especially well at early BOIs. Strong coupling was observed between pilot spray combustion in the packets and premixed turbulent combustion in the flame zone and, therefore, the number of ignition centres (packets) profoundly affected flame combustion. The highest local peak temperatures (greater than 2000 K) were observed in the packets, while the flame zone was much cooler (about 1650 K), indicating that pilot diesel spray combustion is probably the dominant source of engine-out emissions of nitrogen oxide (NO x ). Further, the 60° before TDC BOI yielded the lowest average peak packet temperatures (about 1720 K) compared with the 20° before TDC BOI (about 2480 K) and 40° before TDC BOI (about 2700 K). These trends support experimental NO x trends, which showed the lowest NO x emissions for the 60°, 20°, and 40° before TDC BOIs in that order. Parametric studies showed that increasing the intake charge temperature, pilot quantity, and natural-gas equivalence ratio all led to higher peak heat release rates and hotter packets but the pilot quantity and intake temperature affected the potential for NO x formation to a greater extent.

33 ADVANCED PROPULSION SYSTEMS↗

10 MWE CDCL Large Pilot Plant – pre-FEED Study

Coal Direct Chemical Looping (CDCL) is an advanced oxy-combustion technology that has the potential to substantially reduce the energy penalty and the cost of electricity (COE) for coal-fired power generation with CO₂ capture. The Babcock & Wilcox Company (B&W) and The Ohio State University (OSU) have been collaborating on the development of an iron oxide oxygen-carrier based chemical looping technology for clean power generation with inherent carbon capture. In this process, coal is dried and pulverized prior to being transported into a moving-bed reducer. In the reducer, coal reacts with the oxygen-carrier particles, forming combustion byproducts, predominantly CO₂ and H₂O, while reducing the iron oxide oxidation state from Fe₂O₃ to a mixture of FeO and Fe. The reduced state particles are then transported to a combustor reactor and re-oxidized with air. Following the oxidation, the oxygen-carrier particles are regenerated, and a large amount of heat is released for steam production. The produced steam is sent to a turbine for electricity generation. Meanwhile, the CO₂–rich stream leaving the reducer is cooled, cleaned, and compressed for subsequent pipeline transportation and sequestration. By combining air separation and fuel conversion into a single system, the CDCL technology enables the intensification of oxy-combustion processes by eliminating the energy and cost intensive cryogenic air separation unit and thereby results in higher overall plant efficiencies and lower COE’s. The use of a moving-bed reducer results in high conversions of volatile hydrocarbons and high CO₂ purity, which reduces the cost of downstream CO₂ purification for sequestration or utilization. The Babcock & Wilcox Company in collaboration with The Ohio State University, Johnson & Matthey, The Electric Power Research Institute, and Dover Light & Power completed a Preliminary Front-End Engineering and Design (Pre-FEED) study of a 10 MWe coal-direct chemical looping (CDCL) pilot plant. The planned system is a modular 10 MWe CDCL large pilot facility consisting in 4 modules of 2.5 MWe each, working in parallel and to be hosted within the current structure at the City of Dover’s Municipal Power Plant. The CDCL system can achieve auto-thermal operation and includes a sub-critical steam cycle for power generation. The pilot system was designed to demonstrate full commercial operation at a reduced scale. The coal distribution per plan area is a representative slice of larger commercial arrangements. The system includes a CO₂ recycle system, but it does not include a compression system. The large pilot includes all the environmental control equipment and oxygen carrier and ash handling systems. As part of the project, the Team performed laboratory testing and carried out multiple pilot test campaigns to obtain design and performance information at the 250 kWth CDCL pilot facility at the Babcock & Wilcox Company’s Research Center. The Team demonstrated sustained operations at designed coal inputs, high coal conversion, high CO₂ purity, heat generation on the combustor, low carbon carryover between reactors and low particle attrition. Emissions generated in the reducer reactor were identified as SO₂ and NO x . The commercial manufacturing cost of oxygen carrier particle was evaluated by JM. A particle manufacturing report was generated and submitted to the DOE. Based on the results from the pilot tests and the pre-FEED design efforts, a techno-economic analysis was performed. The study shows that the CDCL process is a promising carbon-friendly technology capable of producing electricity with high efficiency. The estimated COE of the supercritical CDCL plant is $83.3 / MWh, which meets DOE’s target of less than 30% increase in COE when compared to a supercritical PC plant without CO₂ capture. This is the lowest among the existing carbon capture technologies (post-combustion and oxy-combustion) for fossil fuel power plant. CDCL is evaluated to be the most promising technology for carbon capture from the economic aspect.

01 COAL, LIGNITE, AND PEAT↗

DEVELOPMENT OF A 25 MWTH FLAMELESS PRESSURIZED OXY-COMBUSTION PILOT

The Flameless Pressurized Oxy-Combustion (FPO) cycle, a novel flexible fuel technology, is being developed into a large pilot. This effort seeks to complete the preliminary engineering and planning of a 25 MWth Pilot Plant that will demonstrate the technology for scale-up to a commercial unit. The technology, pioneered by ITEA at the 5 MWth scale, must be brought to a higher technology readiness level (TRL) to be viable at the commercial scale. The 25 MWth pilot cycle was optimized for cost and technology development and demonstration. Preliminary drawings, layouts, and plans were defined. Process flow diagrams were used to describe the pilot configuration in greater detail. A heat and mass balance with stream data was created. A master equipment list specified the operating conditions for major pieces of equipment within the pilot using this heat and mass balance. The 25 MWth FPO pilot is assessed for environmental performance. A test campaign is developed to assess the type of test and number of hours required for pilot demonstration. The environmental performance is compared against projected performance at the commercial scale. This project builds upon extensive evaluation of the techno-economic performance of the FPO technology already performed by ITEA. This includes system improvements, such as the addition of a turbo-expander to the flue gas stream. Some of the performance-enhancing components are not as well defined as others. The primary goal of this effort was to bring all of the core cycle components to the same level of design maturity. A techno-economic assessment (TEA) evaluated the FPO technology at the commercial scale in comparison to the NETL baseline cases. The reference plants were used in combination with proprietary equipment estimates to build a plant capital cost and cost of electricity evaluation. FPO performed better than the sub-bituminous post-combustion capture cases. Further preliminary estimates of improvements to the FPO cycle show even further gains when compared to conventional carbon capture methods.

20 FOSSIL-FUELED POWER PLANTS↗

PanDA Pilot Submission using Condor-G: Experience and Improvements

PanDA (Production and Distributed Analysis) is the workload management system of the ATLAS experiment, used to run managed production and user analysis jobs on the grid. As a late-binding, pilot-based system, the maintenance of a smooth and steady stream of pilot jobs to all grid sites is critical for PanDA operation. The ATLAS Computing Facility (ACF) at BNL, as the ATLAS Tier1 center in the US, operates the pilot submission systems for the US. This is done using the PanDA 'AutoPilot' scheduler component which submits pilot jobs via Condor-G, a grid job scheduling system developed at the University of Wisconsin-Madison. In this paper, we discuss the operation and performance of the Condor-G pilot submission at BNL, with emphasis on the challenges and issues encountered in the real grid production environment. With the close collaboration of Condor and PanDA teams, the scalability and stability of the overall system has been greatly improved over the last year. We review improvements made to Condor-G resulting from this collaboration, including isolation of site-based issues by running a separate Gridmanager for each remote site, introduction of the 'Nonessential' job attribute to allow Condor to optimize its behavior for the specific character of pilot jobs, better understanding and handling of the Gridmonitor process, as well as better scheduling in the PanDA pilot scheduler component. We will also cover the monitoring of the health of the system.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

First Ever Polymer Flood Field Pilot To Enhance The Recovery Of Heavy Oils On Alaska’s North Slope - Pushing Ahead One Year Later

In June 2018 the team embarked on an ambitious project to address the slow development pace of Alaska’s 20+ billion barrels heavy oil resource via the first ever polymer flood pilot. Following the successful commencement of the pilot in August 2018, the field demonstration, supporting laboratory experiments and numerical simulation have steadily progressed. A significant amount of valuable data and lessons learned have been collected, and are reported in this paper. The ongoing pilot and the research activities is making headway toward the primary objective of validating the use of polymer flooding for extracting heavy oil in Alaska’s challenging environment. The pilot is conducted in two pre-existing pairs of horizontal injectors and producers in an isolated fault block of the Schrader Bluff heavy oil reservoir at the Milne Point Field. A customized polymer blending and pumping unit injects HPAM polymer at a concentration of 1,750 ppm to achieve a target viscosity of 45 cP. Supporting coreflood laboratory experiments have focused on quantification of polymer retention in the rock, and effect of injection water salinity, polymer, and their combinations on oil recovery. The injection and production response of the pilot flood pattern is utilized to develop a history matched reservoir simulation model for forecasting oil recovery beyond the pilot. Finally, specially designed laboratory experiments address anticipated operating concerns regarding post-polymer breakthrough such as oil-water separation efficiency and polymer induced fouling of heater tubes. Polymer has been injected continuously since startup except for two short equipment modification shutdowns, and more recently a prolonged disruption due to polymer hydration issues at the J-pad field site. Cumulatively, over 600,000 lbs. of polymer has been injected, corresponding to ~7%PV. The two producers show significant decrease in the water cut, gradually increasing oil rate, and no polymer breakthrough. Two main observations from the coreflood are a significant uncertainty in polymer retention values, and positive oil recovery response to low salinity water (2,600 mg/liter TDS). The heterogeneity in the flood pattern presents some challenges in obtaining a robust history matched simulation model. Experimental results on produced fluids treatment indicate the formation of a dense polymer deposit, at certain conditions, on heating tubes that can negatively impact the heat transfer efficiency. The scientific knowledge, including the lessons learned during unanticipated shutdowns, quality control, logistics and field data that is being acquired from this effort has referential value for other planned EOR projects. Finally, by all indications, the polymer field pilot is steadily progressing toward achieving the ultimate goal of unlocking the massive heavy oil resources on Alaska North Slope (ANS).

Dandekar, Abhijit↗