Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Phase III”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Wyoming CarbonSAFE Phase III: Site Characterization and Permitting Commercial-Scale Carbon Storage Complex Feasibility Study at Dry Fork Station, Wyoming

This report presents the findings of the technical and non-technical site characterization and permitting activities (“Phase III”) conducted under the Wyoming CarbonSAFE: Accelerating CCUS Commercialization and Deployment at Dry Fork Power Station (DFS) and the Wyoming Integrated Test Center project (“Wyoming CarbonSAFE”). Wyoming CarbonSAFE is part of the U.S. Department of Energy’s (DOE) National Energy Technology Laboratory (NETL) Carbon Storage Assurance Facility Enterprise (“CarbonSAFE”) Initiative. The results of Phase III demonstrate that the Wyoming CarbonSAFE project - referred to as the Northern Powder River Basin Carbon Sequestration Hub (NPRB-CSH) - meets the technical, regulatory, and commercial feasibility requirements necessary to advance toward commercial development and construction. The activities completed under this project Phase make the NPRB-CSH one of the region’s most commercially ready carbon storage sites. Completion of this Phase included the finalization of all site surface and subsurface characterization activities, completion and testing of two Class VI standard wells, 10 draft Class VI permits-to construct to address the future needs of a storage complex, finalized NEPA assessments, transportation and capture FEED studies, and a full commercialization strategy with economic modeling, operation and site closure strategies. The NPRB-CSH meets all requirements to progress to a CarbonSAFE Phase IV program or advance to full commercial operations under the development of a business partner.

01 COAL, LIGNITE, AND PEAT↗

Subtask 2.18 - Advancing CO 2 Capture Technology: Partnership for CO 2 Capture (PCO 2 C) Phase III

Industries and utilities continue to investigate ways to decrease their carbon footprint. Carbon capture and storage (CCS) can enable existing power generation facilities to meet the current national CO 2 reduction goals. The Partnership for CO2 Capture Phase III focused on several important research areas in an effort to find ways to decrease the cost of capture across both precombustion and postcombustion platforms. Two flue gas pretreatment technologies for postcombustion capture, an SO 2 reduction scrubbing technology from Cansolv Technologies Inc. and the Tri-Mer filtration technology that combines particulate, NOx, and SO 2 control, were evaluated on the Energy & Environmental Research Center’s (EERC’s) pilot-scale test system. Pretreating the flue gas should enable more efficient, and therefore less expensive, CO 2 capture. Both technologies were found to be effective in pretreating flue gas prior to CO 2 capture. Two new postcombustion capture solvents were tested, one from the Korea Carbon Capture and Sequestration R&D Center (KCRC) and one from CO 2 Solutions Incorporated. Both of these solvents showed the ability to capture CO 2 while requiring less regeneration energy, which would reduce the cost of capture. Hydrogen separation membranes from Commonwealth Scientific and Industrial Research Organisation were evaluated through precombustion testing. They are composed of vanadium alloy, which is less expensive than the palladium alloys that are typically used. Their performance was comparable to that of other membranes that have been tested at the EERC. Aspen Plus® software was used to model the KCRC and CO 2 Solutions solvents and found that they would result in significantly improved overall plant performance. The modeling effort also showed that the parasitic steam load at partial capture of 45% is less than half that of 90% overall capture, indicating savings that could be accrued if 90% capture is not required. Modeling of three regional power plants using the Carnegie Mellon Integrated Environmental Control Model showed that, among other things, the use of a bypass during partial capture may minimize the size of the capture tower(s) and result in a slight reduction in the revenue required to operate the capture facility. The results reinforced that a one-size-fits-all approach cannot be taken to adding capture to a power plant. Laboratory testing indicated that Fourier transform infrared spectroscopy could be used to continuously sample stack emissions at CO 2 capture facilities to detect and quantify any residual amine or its degradation products, particularly nitrosamines. The information gathered during Phase III is important for utility stakeholders as they determine how to reduce their CO 2 emissions in a carbon-constrained world. This subtask was funded through the EERC–U.S. Department of Energy (DOE) Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FC26-08NT43291. Nonfederal funding was provided by the North Dakota Industrial Commission, PPL Montana, Nebraska Public Power District, Tri-Mer Corporation, Montana–Dakota Utilities Co., Basin Electric Power Cooperative, KCRC/Korean Institute of Energy Research, Cansolv Technologies, and CO 2 Solutions, Inc.

01 COAL, LIGNITE, AND PEAT↗

Criticality Control Overpack Fire Testing (Phase III)

This report will describe the one test conducted during phase III of the Pipe Overpack Container (POC) test campaign, present preliminary results from these tests, and discuss implications for the Criticality Control Overpack (CCO). The goal of this test was to see if aerosol surrogate material inside the Criticality Control Container (CCC) gets released when the drum lid of the CCO comes off during a thirty-minute long, fully-engulfing, fire test. As expected from POC tests conducted in Phase I and II of this test campaign, the CCO drum lid is ejected about one minute after the drum is exposed to fully-engulfing flames. The remaining pressure inside the drum is high enough to eject the top plywood dunnage a considerable distance from the drum. Subsequently, most of the bottom plywood dunnage supporting the CCC burns off during and after the fire. High pressure buildup inside the CCC and inside two primary containers holding the surrogate powder also results in damage to the filter media of the CCC and the filter-house, thread attachment of the primary canisters. No discernable release of surrogate powder material was detected from the two primary containers when pre- and post-test average mass were compared. However, when the average masses are corrected to account for possible uncertainties in mass measurements, error overlap does not preclude the possibility that some surrogate powder mass may have been lost from these primary canisters. Still, post-test conditions of the secondary canisters enclosing these two primary canisters suggest it is very unlikely this mass loss would have escaped into the CCC.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Validation of Numerical Models of the Offshore Wind Turbine From the Alpha Ventus Wind Farm Against Full-Scale Measurements Within OC5 Phase III

The main objective of the Offshore Code Comparison Collaboration Continuation, with Correlation (OC5) project is validation of aero-hydro-servo-elastic simulation tools for offshore wind turbines (OWTs) through comparison of simulated results to the response data of physical systems. Phase III of the OC5 project validates OWT models against the measurements recorded on a Senvion 5M wind turbine supported by the OWEC Quattropod from the alpha ventus offshore wind farm. The following operating conditions of the wind turbine were chosen for the validation: (1) idling below the cut-in wind speed, (2) rotor-nacelle assembly (RNA) rotation maneuver below the cut-in wind speed, (3) power production below and above the rated wind speed, and (4) shutdown. A number of validation load cases were defined based on these operating conditions. The following measurements were used for validation: (1) strains and accelerations recorded on the support structure and (2) pitch, yaw, and azimuth angles, generator speed, and electrical power recorded from the RNA. Strains were not directly available from the majority of the OWT simulation tools; therefore, strains were calculated based on out-of-plane bending moments, axial forces, and cross-sectional properties of the structural members. The simulation results and measurements were compared in terms of time series, discrete Fourier transforms, power spectral densities, and probability density functions of strains and accelerometers. A good match was achieved between the measurements and models setup by OC5 Phase III participants.

17 WIND ENERGY↗

Technical Submittal in Support of Draft EA (SECARB Phase III Work Product 3.1.2a)

This Environmental Information Volume (EIV) has been prepared to compile information required by the National Environmental Policy Act (NEPA) to evaluate the potential for adverse environmental, ecological, cultural, and socioeconomic impacts of the proposed Southeast Regional Carbon Sequestration Partnership (SECARB) Phase III Early Test project. The proposed action is for the U.S. Department of Energy (DOE) to provide funding to a team led by the Texas Bureau of Economic Geology (BEG) at the University of Texas at Austin to coordinate with the Denbury Resources International Company and the Southern State Energy Board (SSEB) to inject and closely monitor the flow of 1.5 million metric tons of supercritical carbon dioxide (CO2) into the brine-bearing Tuscaloosa Formation on the flank of the structure downdip of the oil-bearing zone. The proposed injection period for the Phase III Early Test is 18 months followed by at least one year of postinjection monitoring.

02 PETROLEUM↗

Validation of Numerical Models of the Offshore Wind Turbine From the Alpha Ventus Wind Farm Against Full-Scale Measurements Within OC5 Phase III

The main objective of the Offshore Code Comparison Collaboration Continuation, with Correlation (OC5) project is validation of aero-hydro-servo-elastic simulation tools for offshore wind turbines (OWTs) through comparison of simulated results to the response data of physical systems. Phase III of the OC5 project validates OWT models against the measurements recorded on a Senvion 5M wind turbine supported by the OWEC Quattropod from the alpha ventus offshore wind farm. The following operating conditions of the wind turbine were chosen for the validation: (1) Idling below the cut-in wind speed; (2) Rotor-nacelle assembly (RNA) rotation maneuver below the cut-in wind speed; (3) Power production below and above the rated wind speed; and (4) Shutdown. A number of validation load cases were defined based on these operating conditions. The following measurements were used for validation: (1) Strains and accelerations recorded on the support structure; (2) Pitch, yaw, and azimuth angles, generator speed, and electrical power recorded from the RNA. Strains were not directly available from the majority of the OWT simulation tools. Therefore, strains were calculated based on out-of-plane bending moments, axial forces, and cross-sectional properties of the structural members. Also, a number of issues arose during the validation: (1) The need for a thorough quality check of sensor measurements; (2) The sensitivity of the turbine loads to the controller and airfoil properties, which were only approximated in the modeling approach; (3) The importance of estimating and applying an appropriate damping value for the structure; and (4) The importance of wind characteristics beyond turbulence on the loads. The simulation results and measurements were compared in terms of time series, discrete Fourier transforms, power spectral densities, probability density functions of strains and accelerometers. A good match was achieved between the measurements and models set up by OC5 Phase III participants.

17 WIND ENERGY↗

Validation of Numerical Models of the Offshore Wind Turbine from the Alpha Ventus Wind Farm Against Full-Scale Measurements Within OC5 Phase III: Preprint

The main objective of the Offshore Code Comparison Collaboration Continuation, with Correlation (OC5) project, is validation of aero-hydro-servo-elastic simulation tools for offshore wind turbines (OWTs) through comparison of simulated results to the response data of physical systems. Phase III of the OC5 project validates OWT models against the measurements recorded on Senvion 5M wind turbine supported by the OWEC Quattropod from the alpha ventus offshore wind farm. The following operating conditions of the wind turbine were chosen for the validation: (1) Idling below the cut-in wind speed; (2) Rotornacelle assembly (RNA) rotation maneuver below the cut-in wind speed; (3) Power production below and above the rated wind speed; and (4) Shut-down. A number of validation load cases were defined based on these operating conditions. The following measurements were used for validation: (1) Strains and accelerations recorded on the support structure; (2) Pitch, yaw, and azimuth angles, generator speed, and electrical power recorded from the RNA. Strains were not directly available from the majority of the OWT simulation tools. Therefore, strains were calculated based on out-of-plane bending moments, axial forces, and geometrical properties of the structural members. Also, a number of issues arose during the validation: (1) The need for a thorough quality check of sensor measurements; (2) The sensitivity of the turbine loads to the controller and airfoil properties, which were only approximated in the modeling approach; (3) The importance of estimating and applying an appropriate damping value for the structure; and (4) The importance of wind characteristics beyond turbulence on the loads. The simulation results and measurements were compared in terms of time series, discrete Fourier transforms (DFTs), power spectral densities (PSDs), probability density functions (PDFs) of strains and accelerometers. A good match was achieved between the measurements and models set up by OC5 Phase III participants.

17 WIND ENERGY↗

Southwest Regional Partnership on Carbon Sequestration: Phase III (Final Scientific/Technical Report)

The Southwest Regional Partnership on Carbon Sequestration (SWP) is one of 7 regional partnerships formed in 2003 under the U.S. Department of Energy’s (DOE) Regional Carbon Sequestration Partnerships (RCSPs) initiative. The overall purpose of the initiative was to help determine and implement the technology, infrastructure, and regulations most appropriate to promote carbon storage in different regions of the country. Covering Arizona, Colorado, New Mexico, Oklahoma, Utah, and parts of Texas, Wyoming, and Kansas, the SWP evaluated regional carbon storage and utilization potential and focused on technologies and sites that could complement the region’s strong position in energy production. The project progressed through three phases: • Phase I (2003–2005): Characterized regional geologic formations and CO 2 sources, assessed sequestration potential, and identified pilot test sites. • Phase II (2005–2013): Conducted small-scale field tests to validate sequestration methods, including geologic and terrestrial projects. • Phase III (2008–2022): Demonstrated large-scale CO 2 injection at a commercial oil field to test monitoring, verification, and long-term storage strategies. This report covers Phase III. The final project site, the Farnsworth Unit (FWU) in Texas, provided real-world testing of reservoir characterization, monitoring, and risk evaluation tools and processes that could be used in any commercial scale carbon capture, utilization, and storage (CCUS) project. Extensive data collection and analysis helped refine best practices for reservoir characterization, injection monitoring, and storage verification. The SWP contributed to national databases, DOE best practice manuals, and regional geological assessments to support future sequestration efforts. Key lessons learned include the importance of robust data management, strategic site selection, regulatory navigation, and effective industry collaboration. The project’s findings will inform ongoing and future carbon storage initiatives. Task 1 (Regional Characterization) • The SWP continued to participate in national outreach efforts and NATCARB. • The SWP evaluated multiple potential sites before selecting the FWU as the primary field test location. Task 2 (Public Outreach and Education) • The SWP contributed to national databases, DOE best practice manuals, and regional geological assessments to support future sequestration efforts. Task 3 (Permitting and Regulatory Compliance) • The SWP ensured compliance with federal and state regulations, including National Environmental Policy Act (NEPA) requirements. • The SWP obtained all necessary permits for drilling, injection, and monitoring activities. Task 4 (Site Characterization and Planning) • The SWP developed work plans for four key activities: characterization, simulation, monitoring and verification, and risk evaluation. • The SWP collected and synthesized legacy data from multiple sources to build initial static geological models and dynamic reservoir models demonstrating project feasibility. • The SWP conducted an initial risk evaluation and developed mitigation plans. Task 5 (Field Operations and Data Collection) • The SWP drilled, logged, and cored three characterization wells to gather critical subsurface data. • The SWP conducted multiple geophysical surveys, including 3D seismic, crosswell seismic, and vertical seismic profiling, to improve reservoir characterization. Task 6 (Monitoring and Verification) • The SWP performed extensive geological characterization using data from characterization wells and seismic surveys. • The SWP established a surface monitoring network to track CO 2 flux in soil gas, groundwater chemistry, and near-surface atmospheric CO 2 levels. • The SWP built and refined reservoir models to study the effects of relative permeability on simulation behavior and improve calibration with experimental data. Task 7 (Risk Assessment and Model Refinement) • The SWP conducted multiple studies to evaluate reservoir integrity, predict CO 2 plume behavior and improve predictive modeling capabilities. • The SWP refined geological models and used them to enhance the accuracy of simulation models. • The SWP continued quantitative risk assessment of top-ranked risks and strengthened the link between qualitative and quantitative risk methodologies.

02 PETROLEUM↗

SPSP Phase III Recruiting, Selecting, and Developing Secure Power Systems Professionals: Behavioral Interview Guidelines by Job Roles

The Secure Power Systems Professional Phase III final report was released last year which an appendix of Behavioral Interview Guidelines by Job Roles. This new report is that appendix broken out as a standalone document to assist utilities in recruiting and developing Secure Power Systems Professionals at their site. The complete list of knowledge, skills, and abilities required in each of the studied job roles was assembled into the Behavioral Interview Guidelines. The guidelines were developed to apply the results of Phases I and II in a format that can be used in part or in whole to align workforce capabilities with the strategic goals and tactical focus of a power grid organization. These guidelines may 1) be applied to develop performance reviews or to produce individual professional development programs for existing staff; 2) assist in specifying learning objectives for a training or education program; and 3) be easily incorporated into most human capital software to facilitate development of job descriptions that comply with guidelines established by the Society of Human Resource Management. The guidelines can be immediately applied by human resources professionals, recruiters, and hiring managers to assist in recruiting and interviewing candidates for new SPSP position openings.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Risk Assessment using Certification Framework (SECARB Phase III Work Product 3.1.1b)

The Southeast Regional Carbon Sequestration Partnership (SECARB) Phase III 1.5 million tonne CO 2 sequestration project is taking place on the eastern side of an oilfield in southwestern Mississippi in the so-called High Volume Injection Test area (HiVIT). The source of CO 2 for the project is the natural CO 2 reservoir at Jackson Dome, Mississippi. We apply the Certification Framework (CF) approach to assess the risk of CO 2 and brine leakage from the deep reservoir to various compartments where impacts could occur. The large depth (~10,000 ft, 3,050 m) of the Tuscaloosa Formation reservoir, presence of extensive thick marine mudstone confining zone, and well-known geology, among other factors, tend to minimize the likelihood of leakage. On the other hand, the large number of plugged and abandoned (P&A) wells provides potential flow paths for leakage upward to potable aquifers and potentially to the ground surface. A review of site characteristics relevant to leakage risk, simulation of the CO 2 injection, and modeling of performance of P&A wells is presented to demonstrate the application of the Certification Framework (CF) for leakage risk assessment in the context of an enhance Oil Recovery (EOR) project.

02 PETROLEUM↗

GLASS COMPOSITIONS FOR THE NEPHELINE PHASE III STUDY

A series of 29 test glass compositions were selected for Phase III of the nepheline study using a combination of two approaches. The first approach was based on evaluating the glass composition region allowable by all of the Defense Waste Processing Facility (DWPF) Product Composition Control System (PCCS) models with the exception of the current nepheline discriminator. This approach was taken to determine whether there are glass compositions that, while predicted to crystallize nepheline upon slow cooling, would otherwise be acceptable for processing in the DWPF. The second approach was based on quasicrystalline theory of glass structure, which helped predict compositional regions where nepheline should form. A detailed description of this methodology is forthcoming. The selection strategy outlined here will provide an opportunity to determine experimentally whether the glasses that fail the current nepheline discriminator but pass the newly proposed nepheline discriminator are indeed free of nepheline after slow cooling. If this is the case, these data will serve as a significant step toward reducing conservatism in the current nepheline discriminator. The 29 glass compositions selected for testing address both the PCCS model and quasicrystalline theory approaches in evaluating both a reduction in conservatism for the current nepheline discriminator and possible implementation of the newly proposed discriminator based on glass structural theory. These glasses will be fabricated and characterized in the laboratory, with the results and conclusions described in a technical report.

36 MATERIALS SCIENCE↗

Big Sky Regional Carbon Sequestration Partnership (Phase III Final Scientific/Technical Report)

The Big Sky Carbon Sequestration Partnership (BSCSP) pursued a Phase III demonstration project at Kevin Dome in north central Montana. Kevin Dome covers approximately 700 square miles and is a naturally occurring CO 2 reservoir that is flanked by oil and gas fields. The carbon dioxide (CO 2 ) is in the upper Devonian Duperow (carbonate) formation and does not reach the spill point of the dome; therefore, the dome has potential as a CO 2 sequestration reservoir, a CO 2 supply, or as both if anthropogenic sources and enhanced oil recovery (EOR) operations are associated with the dome. Kevin Dome could potentially act as a buffer to continue accepting anthropogenic CO 2 when EOR flooding operations are interrupted or completed. The project objective was to produce one million tonnes of CO 2 from the gas cap of Kevin Dome, pipe it laterally, inject, and re-store it in the brine leg of the same formation to test the hub / buffer storage concept. This was to be accomplished by drilling up to five production wells, building a short pipeline and compression facilities, and drilling an injection well and several monitoring wells. BSCSP commenced outreach and site characterization activities including acquiring baseline data for near-surface insurance monitoring, acquiring 3-dimensional, 9-component surface seismic over the project area, drilling two test wells (one in the production area and one in the injection area), coring key intervals, and performing comprehensive logging. Well tests of those wells revealed two barriers to the project. The production (Danielson 33-17) well was perforated in multiple zones but failed to produce any significant CO 2 . This was despite being drilled in the near vicinity of a historic well that had produced 3700 MCF per day in a drill stem test. Modeling indicated that this was likely due to a phase change during production causing a temperature drop resulting in hydrate and/or water ice formation that clogged the formation. Tests of the injection zone (Wallewein 22-1) well indicated total dissolved solids (TDS) slightly below the EPA required 10,000 parts per million (ppm) for a Class VI underground injection control permit. While the project was initiated before Class VI rules were promulgated, and this was an experimental project (seemingly qualified for a Class V permit), the Environmental Protection Agency (EPA) indicated that injection would require a Class VI permit. The low salinity result was unexpected as contours plotted based on regional formation water quality data indicated an expected TDS above 20,000 ppm, and wells between the recharge zone and the Wallewein well tested above 10,000 ppm. Faced with the inability to obtain an injection permit, the demonstration project could not proceed. However, the project had generated valuable samples and data on a large natural analog including 32 sq. mi. of 3-D, 9-C seismic, 430 ft. of carbonate core covering seven different depositional environments taken from areas with, and without the presence of CO 2 , 30 ft. of core of two caprocks, a tight carbonate and an anhydrite, a full set of modern logs on both wells, and well tests. DOE decided to re-scope the project around completing studies utilizing this data. This report covers both the initial scope and the re-scope (Task / Section numbers preceded with an R). While the report covers a wide range of project activities, highlights of this work include: Development of a geostatic model using neural nets to match well logs to facies and using multi-waveform seismic to inform reservoir heterogeneity; Unique mechanical testing of permeability – stress relationship in two caprock materials; Development of full waveform inversion to generate a high resolution velocity model; Model development for dual permeability (fracture and matrix) systems to better account for matrix-matrix interactions; Joint seismic wave inversion (including the first quadr-joint inversion) exhibiting better imaging of a challenging reservoir zone in stiff rock; Core flow and core flood results on a reactive carbonate; and Innovative laboratory measurements of seismic response of fractured core as a function of fluid fill.

54 ENVIRONMENTAL SCIENCES↗

Acute Toxicity Profile and Compliance to Accelerated Radiotherapy Plus Carbogen and Nicotinamide for Clinical Stage T2-4 Laryngeal Cancer: Results of a Phase III Randomized Trial

Purpose: To report the acute toxicity profile and compliance from a randomized Phase III trial comparing accelerated radiotherapy (AR) with accelerated radiotherapy plus carbogen and nicotinamide (ARCON) in laryngeal cancer. Methods and Materials: From April 2001 to February 2008, 345 patients with cT2-4 squamous cell laryngeal cancer were randomized to AR (n = 174) and ARCON (n = 171). Acute toxicity was scored weekly until Week 8 and every 2-4 weeks thereafter. Compliance to carbogen and nicotinamide was reported. Results: Between both treatment arms (AR vs. ARCON) no statistically significant difference was observed for incidence of acute skin reactions (moist desquamation: 56% vs. 58%, p = 0.80), acute mucosal reactions (confluent mucositis: 79% vs. 85%, p = 0.14), and symptoms related to acute mucositis (severe pain on swallowing: 53% vs. 58%, p = 0.37; nasogastric tube feeding: 28% vs. 28%, p = 0.98; narcotic medicines required: 58% vs. 58%, p = 0.97). There was a statistically significant difference in median duration of confluent mucositis in favor of AR (2.0 vs 3.0 weeks, p = 0.01). There was full compliance with carbogen breathing and nicotinamide in 86% and 80% of the patients, with discontinuation in 6% and 12%, respectively. Adjustment of antiemesis prophylaxis was needed in 42% of patients. Conclusion: With the exception of a slight increase in median duration of acute confluent mucositis, the present data reveal a similar acute toxicity profile between both regimens and a good compliance with ARCON for clinical stage T2-4 laryngeal cancers. Treatment outcome and late morbidity will determine the real therapeutic benefit.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

SPSP Phase III Recruiting, Selecting, and Developing Secure Power Systems Professionals: Individual and Team Performance Guidelines

The pending retirement of significant numbers of power system experts and a continuing trend of increasing complexity in modern power systems prompted the U.S. Department of Energy (DOE) to establish the three-phase Secure Power Systems Professional (SPSP) project. The project developed resources for job definition and competency analysis along with tools to guide assessment and curriculum design and to help identify and develop required knowledge, skills, and abilities in technical and operational aspects of power systems cybersecurity. The Secure Power Systems Professional Phase III final report was released last year which an appendix of Individual and Team Performance Guidelines. This new report is that appendix broken out as a standalone document to assist utilities in recruiting and developing Secure Power Systems Professionals at their site. Individual/Team Performance Guidelines were developed for each of the four job roles: the secure power systems engineer, incident responder, intrusion analyst, and security operator. They enable an “at-a-glance” view of the multidisciplinary and collaborative nature of SPSP job roles, for which skill sets were studied and then mapped to stories of critical incidents or vignettes. This afforded an enumeration of tasks required of each job role to effectively perform responsibilities and to meet bestpractice goals for that operation. Assignment of these tasks among the job roles, either as an individual responsibility or a collaborative responsibility, was validated during a job performance model analysis. The analysis identified 13 master vignettes from the collection of critical incident stories, many of which shared a common set of job responsibilities and tasks that were grouped into four vignette categories according to the task requirement for effective response to each event.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Geologic Storage Capacity for CO 2 of The Lower Tuscaloosa Group And Woodbine Formations (SECARB Phase III Work Product 1.1c Final Report)

This report serves as Southeast Regional Carbon Sequestration Partnership (SECARB) Phase III work product 1.1.c “Final Report on the Tuscaloosa Group,” and summarizes the Project Team’s assessment of the carbon dioxide (CO 2 ) storage capacity of saline reservoirs of the Lower Tuscaloosa Group and Woodbine Formation. The Upper Cretaceous age Lower Tuscaloosa Group and equivalent Woodbine Formation offer one of several regionally significant, large capacity CO 2 storage reservoirs along the U.S. Gulf Coast. In addition, the thick, regionally extensive Tuscaloosa Marine Shale (Middle Tuscaloosa) and the equivalent Eagle Ford Shale and overlying Austin Formation provide the primary regional confining units for CO 2 storage in underlying Lower Tuscaloosa and Woodbine reservoir sandstones.

54 ENVIRONMENTAL SCIENCES↗

SECARB Phase III Anthropogenic Test Site Implementation Plan

As part of the Southeastern Regional Carbon Sequestration Partnership’s (SECARB) Phase III initiative, a test site and anthropogenic carbon dioxide (CO 2 ) source have been selected for a large-scale demonstration of CO 2 separation, capture and sequestration in southwestern Alabama. The project, referred to as the Anthropogenic Test, represents a major step toward demonstrating the viability of integrating carbon capture and storage to mitigate climate change. The CO 2 storage project will inject CO 2 captured from Alabama Power's1 Plant Barry, equivalent to emissions from 25 megawatts of generating capacity. The CO 2 will be captured at the plant, transported via a short pipeline to Citronelle oilfield, and injected into brinesaturated Paluxy Formation sandstones at depths of approximately 9,400 to 10,500 ft. The Citronelle field is a working and actively maintained oilfield and provides the project team with a wealth of geophysical information as well as a pre-existing infrastructure to the project. However, completion practices employed in the field eliminates the use of a pre-existing well as the project’s primary injection well. This report outlines the major components of field operational activity and corresponding planning development for safe and reliable project performance: - Existing Infrastructure and Surface Facilities Construction; - Well Construction and Operations; - CO2 Injection; - Area of Review; - Monitoring, Verification and Accounting; - Project Closure.

01 COAL, LIGNITE, AND PEAT↗