Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PRA Analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Dynamic Event Tree Analysis Through RAVEN

Conventional Event-Tree (ET) based methodologies are extensively used as tools to perform reliability and safety assessment of complex and critical engineering systems. One of the disadvantages of these methods is that timing/sequencing of events and system dynamics is not explicitly accounted for in the analysis. In order to overcome these limitations several techniques, also know as Dynamic Probabilistic Risk Assessment (D-PRA), have been developed. Monte-Carlo (MC) and Dynamic Event Tree (DET) are two of the most widely used D-PRA methodologies to perform safety assessment of Nuclear Power Plants (NPP). In the past two years, the Idaho National Laboratory (INL) has developed its own tool to perform Dynamic PRA: RAVEN (Reactor Analysis and Virtual control ENvironment). RAVEN has been designed in a high modular and pluggable way in order to enable easy integration of different programming languages (i.e., C++, Python) and coupling with other application including the ones based on the MOOSE framework, developed by INL as well. RAVEN performs two main tasks: 1) control logic driver for the new Thermo-Hydraulic code RELAP-7 and 2) post-processing tool. In the first task, RAVEN acts as a deterministic controller in which the set of control logic laws (user defined) monitors the RELAP-7 simulation and controls the activation of specific systems. Moreover, RAVEN also models stochastic events, such as components failures, and performs uncertainty quantification. Such stochastic modeling is employed by using both MC and DET algorithms. In the second task, RAVEN processes the large amount of data generated by RELAP-7 using data-mining based algorithms. This paper focuses on the first task and shows how it is possible to perform the analysis of dynamic stochastic systems using the newly developed RAVEN DET capability. As an example, the Dynamic PRA analysis, using Dynamic Event Tree, of a simplified pressurized water reactor for a Station Black-Out scenario is presented.

42 ENGINEERING↗

Dynamic Positioning System (DPS) Risk Analysis Using Probabilistic Risk Assessment (PRA)

The National Aeronautics and Space Administration (NASA) Safety & Mission Assurance (S&MA) directorate at the Johnson Space Center (JSC) has applied its knowledge and experience with Probabilistic Risk Assessment (PRA) to projects in industries ranging from spacecraft to nuclear power plants. PRA is a comprehensive and structured process for analyzing risk in complex engineered systems and/or processes. The PRA process enables the user to identify potential risk contributors such as, hardware and software failure, human error, and external events. Recent developments in the oil and gas industry have presented opportunities for NASA to lend their PRA expertise to both ongoing and developmental projects within the industry. This paper provides an overview of the PRA process and demonstrates how this process was applied in estimating the probability that a Mobile Offshore Drilling Unit (MODU) operating in the Gulf of Mexico and equipped with a generically configured Dynamic Positioning System (DPS) loses location and needs to initiate an emergency disconnect. The PRA described in this paper is intended to be generic such that the vessel meets the general requirements of an International Maritime Organization (IMO) Maritime Safety Committee (MSC)/Circ. 645 Class 3 dynamically positioned vessel. The results of this analysis are not intended to be applied to any specific drilling vessel, although provisions were made to allow the analysis to be configured to a specific vessel if required.

Thigpen, Eric B.↗

Dynamic Positioning System (DPS) Risk Analysis Using Probabilistic Risk Assessment (PRA)

The National Aeronautics and Space Administration (NASA) Safety & Mission Assurance (S&MA) directorate at the Johnson Space Center (JSC) has applied its knowledge and experience with Probabilistic Risk Assessment (PRA) to projects in industries ranging from spacecraft to nuclear power plants. PRA is a comprehensive and structured process for analyzing risk in complex engineered systems and/or processes. The PRA process enables the user to identify potential risk contributors such as, hardware and software failure, human error, and external events. Recent developments in the oil and gas industry have presented opportunities for NASA to lend their PRA expertise to both ongoing and developmental projects within the industry. This paper provides an overview of the PRA process and demonstrates how this process was applied in estimating the probability that a Mobile Offshore Drilling Unit (MODU) operating in the Gulf of Mexico and equipped with a generically configured Dynamic Positioning System (DPS) loses location and needs to initiate an emergency disconnect. The PRA described in this paper is intended to be generic such that the vessel meets the general requirements of an International Maritime Organization (IMO) Maritime Safety Committee (MSC)/Circ. 645 Class 3 dynamically positioned vessel. The results of this analysis are not intended to be applied to any specific drilling vessel, although provisions were made to allow the analysis to be configured to a specific vessel if required.

Thigpen, Eric B.↗

Advanced Small Modular Reactors: Prototype Development Capabilities of 3D Spatial Interactions and Failures During Scenario Simulation

Computers have been used for 3D modeling and simulation, but only recently have computational resources been able to give realistic results in a reasonable time frame for large complex models. This report addressed the methods, techniques, and resources used to develop a prototype for using 3D modeling and simulation engine to improve risk analysis and evaluate reactor structures and components for a given scenario. The simulations done for this evaluation were focused on external events, specifically tsunami floods, for a hypothetical nuclear power facility on a coastline.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

RAVEN User Manual

RAVEN is a generic software framework to perform parametric and probabilistic analysis based on the response of complex system codes. The initial development was aimed to provide dynamic risk analysis capabilities to the Thermo-Hydraulic code RELAP-7, currently under development at the Idaho National Laboratory (INL). Although the initial goal has been fully accomplished, RAVEN is now a multi-purpose probabilistic and uncertainty quantification platform, capable to agnostically communicate with any system code. This agnosticism includes providing Application Programming Interfaces (APIs). These APIs are used to allow RAVEN to interact with any code as long as all the parameters that need to be perturbed are accessible by inputs files or via python interfaces. RAVEN is capable of investigating the system response, and investigating the input space using Monte Carlo, Grid, or Latin Hyper Cube sampling schemes, but its strength is focused toward system feature discovery, such as limit surfaces, separating regions of the input space leading to system failure, using dynamic supervised learning techniques. The development of RAVEN has started in 2012, when, within the Nuclear Energy Advanced Modeling and Simulation (NEAMS) program, the need to provide a modern risk evaluation framework became stronger. RAVEN principal assignment is to provide the necessary software and algorithms in order to employ the concept developed by the Risk Informed Safety Margin Characterization (RISMC) program. RISMC is one of the pathways defined within the Light Water Reactor Sustainability (LWRS) program. In the RISMC approach, the goal is not just the individuation of the frequency of an event potentially leading to a system failure, but the closeness (or not) to key safety-related events. Hence, the approach is interested in identifying and increasing the safety margins related to those events. A safety margin is a numerical value quantifying the probability that a safety metric (e.g. for an important process such as peak pressure in a pipe) is exceeded under certain conditions. The initial development of RAVEN has been focused on providing dynamic risk assessment capability to RELAP-7, currently under development at the INL and, likely, future replacement of the RELAP5-3D code. Most the capabilities that have been implemented having RELAP-7 as principal focus are easily deployable for other system codes. For this reason, several side activaties are currently ongoing for coupling RAVEN with software such as RELAP5-3D, etc. The aim of this document is the explanation of the input requirements, focalizing on the input structure.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

RAVEN User Manual

RAVEN is a generic software framework to perform parametric and probabilistic analysis based on the response of complex system codes. The initial development was aimed to provide dynamic risk analysis capabilities to the Thermo-Hydraulic code RELAP-7, currently under development at the Idaho National Laboratory (INL). Although the initial goal has been fully accomplished, RAVEN is now a multi-purpose probabilistic and uncertainty quantification platform, capable to agnostically communicate with any system code. This agnosticism includes providing Application Programming Interfaces (APIs). These APIs are used to allow RAVEN to interact with any code as long as all the parameters that need to be perturbed are accessible by input files or via python interfaces. RAVEN is capable of investigating the system response, and investigating the input space using Monte Carlo, Grid, or Latin Hyper Cube sampling schemes, but its strength is focused toward system feature discovery, such as limit surfaces, separating regions of the input space leading to system failure, using dynamic supervised learning techniques. The development of RAVEN started in 2012, when, within the Nuclear Energy Advanced Modeling and Simulation (NEAMS) program, the need to provide a modern risk evaluation framework became stronger. RAVEN principal assignment is to provide the necessary software and algorithms in order to employ the concept developed by the Risk Informed Safety Margin Characterization (RISMC) program. RISMC is one of the pathways defined within the Light Water Reactor Sustainability (LWRS) program. In the RISMC approach, the goal is not just the individuation of the frequency of an event potentially leading to a system failure, but the closeness (or not) to key safety-related events. Hence, the approach is interested in identifying and increasing the safety margins related to those events. A safety margin is a numerical value quantifying the probability that a safety metric (e.g. for an important process such as peak pressure in a pipe) is exceeded under certain conditions. The initial development of RAVEN has been focused on providing dynamic risk assessment capability to RELAP-7, currently under development at the INL and, likely, future replacement of the RELAP5-3D code. Most the capabilities that have been implemented having RELAP-7 as principal focus are easily deployable for other system codes. For this reason, several side activates are currently ongoing for coupling RAVEN with software such as RELAP5-3D, etc. The aim of this document is the explanation of the input requirements, focusing on the input structure.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Risk and Cost Analysis of Utilizing FLEX Equipment for O&M Cost Reduction in Nuclear Power Plants

Several Nuclear Power Plant (NPP) operators in USA have announced to close their plants despite there are remaining years on their operating licenses. The cause of these closures is because the plant operators suffer financial losses. Approximately 80% of USA NPPs would have undergone financial losses if they were situated in a deregulated electricity market. In a deregulated market, electricity generators are independent entities separate from the transmission companies and Independent System Operator (ISO) which manages the market. NPPs in this market are termed merchant NPPs, and their profitability is determined solely from electricity generation revenues. Meanwhile, regulated and public power nuclear units’ profitability is determined by the regulatory process in place for each unit. Due to the complexity of differentiating each regulated and public power NPP’s regulations 36 NPPs are at an immediate risk of retiring early to stop losses, while 27 units will likely to follow in the long run. Today, cost is well-recognized and important factor in NPP decision-making that cannot be ignored. Therefore, it is essential to consider risk and cost together in decision-making to strengthen the position of the nuclear industry in an economically challenging energy market. With operational and maintenance (O&M) cost at 70% of the total operating expenditure of an NPP and some plants closing prematurely despite excellent safety record, there is an urgent need to address the high O&M cost. One of the novel entities that provide additional safety resulting in reduced risk of nuclear power plants is Flex equipment. Flex strategies were postulated by the US NRC in the wake of Fukushima Dai-chi accident to address beyond design-basis accidents and improve plant flexibility. Flex strategy comprise both onsite and off-site component storage for the provision of additional materials and equipment. This work explored innovative ways of utilizing the onsite Flex equipment during regular plant operation, for purposes in addition to the intended use of beyond design basis accidents. This report describes the risk and cost analysis of using Flex equipment during regular or unplanned maintenance.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

SAPHIRE 8 Software Independent Verification and Validation Plan

SAPHIRE 8 is being developed with a phased or cyclic iterative rapid application development methodology. Due to this approach, a similar approach is being taken for the IV&V activities on each vital software object. The IV&V plan is structured around NUREG/BR-0167, “Software Quality Assurance Program and Guidelines,” February 1993. The Nuclear Regulatory Research Office Instruction No.: PRM-12, “Software Quality Assurance for RES Sponsored Codes,” March 26, 2007 specifies that RES-sponsored software is to be evaluated against NUREG/BR-0167. Per the guidance in NUREG/BR-0167, SAPHIRE is classified as “Level 1.” Level 1 software corresponds to technical application software used in a safety decision.

99 GENERAL AND MISCELLANEOUS↗

Modeling uncertainty in requirements engineering decision support

One inherent characteristic of requrements engineering is a lack of certainty during this early phase of a project. Nevertheless, decisions about requirements must be made in spite of this uncertainty. Here we describe the context in which we are exploring this, and some initial work to support elicitation of uncertain requirements, and to deal with the combination of such information from multiple stakeholders.

risk analysis↗

It Depends - An Overview of Probabilistic Risk Analysis Concepts

How do you understand the data and assumptions in your probabilistic analysis? The PRA analyst needs to understand the data and input assumptions to effectively communicate the system/mission's risks. The decision maker also needs to understand conservatisms and how to interpret uncertainty in the PRA results. Properties such as assumptions on the distributions, uncertainty, use of test data, and common cause modeling can be the subject of much discussion, but often are the leading drivers of a risk profile.

risk assessment↗

Overview of New Tools to Perform Safety Analysis: BWR Station Black Out Test Case

Dynamic Probabilistic Risk Assessment (DPRA) methodologies couple system simulator codes (e.g., RELAP, MELCOR) with simulation controller codes (e.g., RAVEN, ADAPT). While system simulator codes accurately model system dynamics deterministically, simulation controller codes introduce both deterministic (e.g., system control logic, operating procedures) and stochastic (e.g., component failures, parameter uncertainties) elements into the simulation. Typically, a DPRA is performed by: 1) sampling values of a set of parameters from the uncertainty space of interest (using the simulation controller codes), and 2) simulating the system behavior for that specific set of parameter values (using the system simulator codes). For complex systems, one of the major challenges in using DPRA methodologies is to analyze the large amount of information (i.e., large number of scenarios ) generated, where clustering techniques are typically employed to allow users to better organize and interpret the data. In this paper, we focus on the analysis of a nuclear simulation dataset that is part of the Risk Informed Safety Margin Characterization (RISMC) Boiling Water Reactor (BWR) station blackout (SBO) case study. We apply a software tool that provides the domain experts with an interactive analysis and visualization environment for understanding the structures of such high-dimensional nuclear simulation datasets. Our tool encodes traditional and topology-based clustering techniques, where the latter partitions the data points into clusters based on their uniform gradient flow behavior. We demonstrate through our case study that both types of clustering techniques complement each other in bringing enhanced structural understanding of the data.

97 MATHEMATICS AND COMPUTING↗

RISK-INFORMED EXTERNAL HAZARDS ANALYSIS BY EEVE TOOLKIT

Introducing risk-informed safety analyses for external events can bring sensible benefits to the nuclear power industry easing the regulatory burden introduced in the aftermath of the Fukushima accident. In the framework of the US-DOE Light-Water Reactor Sustainability program, Risk-Informed Margin Characterization project (LWRS-RISMC), research activities were conducted at INL for developing and applying a toolkit for performing risk-informed external hazards analysis. The “EEVE” (External EVEnts) toolkit, a chain of INL and state-of-the-art codes, was set-up and applied for simulating earthquake-induced transients with internal flooding in a PWR. This was done using methodology set-up for evaluating new data and determining critical areas that would benefit most from advanced analysis methods. The methodology is agnostic and it can be applied to other external hazards than just seismic and flooding (e.g., high winds, intense precipitation, etc.). The first step was the deterministic calculations for evaluating the propagation of a set of earthquakes and for determining the effects on a fire suppression system in an auxiliary building. These deterministic calculations were performed using the LS-DYNA and the OPENSEE structural mechanics codes. Probability failures and event trees of a generic 3-loops Westinghouse PWR were derived from a generic SAPHIRE model. Seismically induced Loss of Offsite Power, Station Blackout, and fire suppression piping failure events were considered. SAPHIRE code allowed a pre-screening of all possible branches of the event tree and a selection of those with the largest Core Damage Frequency increase for further analysis using dynamic PRA methods. INL's EMRALD code performed dynamic PRA calculations of the identified sequences, integrating risk analysis with on-line deterministic safety analysis results (seismically-induced internal flooding calculations by NEUTRINO code and system analysis by RELAP5-3D code). RELAP5-3D Best-Estimate calculations coupled with RAVEN statistical code were used for deriving limit surfaces as function of relevant transient parameters. This data was used by EMRALD for determining the final core status (core damage/core safe). Finally, the coupling of seismic, flooding, system thermal-hydraulic, uncertainty quantification and probabilistic risk analysis for an advanced risk-informed external hazards analysis was demonstrated. Results showed the sensible decrease in the level of conservatism achieved using the developed risk-informed methodology, which allowed also improving the evaluation of the failure modes and failure probabilities of different components.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Analysis of Time Dependent Data and PRA

In the past decades, several numerical simulation codes have been employed to simulate accident dynamics (e.g., RELAP5-3D, MELCOR, MAAP). In order to evaluate the impact of uncertainties into accident dynamics, several stochastic methodologies have been coupled with these codes. These stochastic methods range from classical Monte-Carlo and Latin Hypercube sampling to stochastic polynomial methods. Similar approaches have been introduced into the risk and safety community where stochastic methods (such as RAVEN, ADAPT, MCDET, ADS) have been coupled with safety analysis codes in order to evaluate the safety impact of timing and sequencing of events. These approaches are usually called Dynamic PRA or simulation-based PRA methods. These uncertainties and safety methods usually generate a large number of simulation runs (database storage may be on the order of gigabytes or higher). The scope of this paper is to present a broad overview of methods and algorithms that can be used to analyze and extract information from large data sets containing time dependent data. In this context, 'extracting information' means constructing input-output correlations, finding commonalities, and identifying outliers. Some of the algorithms presented here have been developed or are under development within the RAVEN statistical framework. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Quantifying Risk to Improve Medical System Design for Long Duration Artemis Missions: A Demonstration of NASA's IMPACT Tradespace Analysis Tool

BACKGROUND NASA’s human exploration spaceflight missions to the Moon and Mars present unprecedented challenges for in-mission medical care. A greater distance from Earth will mean increased mission durations, communication delays, limited to no resupply opportunities, and constraints on the evacuation of ill or injured crew. Mass, volume, and power will be limited while higher demands will be placed on the crews to manage medical events. NASA’s Moon to Mars exploration strategy outlines increasingly complex Artemis missions both in terms of duration and operations. In these more challenging deep space missions, it is important to quantitatively estimate the human system risk attributable to medical conditions and use these estimates to advance medical system design. METHODS IMPACT (Informing Mission Planning via Analysis of Complex Tradespaces) is a probabilistic risk assessment (PRA) and tradespace analysis tool developed by NASA to advance exploration mission medical system design. IMPACT v1.0 includes a novel evidence library baselined to exploration environments; an expanded list of 119 medical conditions; a large increase in the number of medical resources and the flexibility of their use; and the ability for rapid and iterative analysis. Medical system risk estimates include loss of crew life, consideration of the need for return to definitive care (medical evacuation), and an estimate of crew time affected due to medical conditions. A notional long duration lunar orbit and lunar surface design reference mission (DRM) was chosen with a 4-astronaut crew to mimic a foundational exploration Artemis mission. The DRM profile includes outbound transit on Orion, Gateway space station rendezvous in lunar orbit, 6 months on the Lunar surface with extravehicular activity (EVA), return rendezvous with Gateway, and transit back to Earth. RESULTS/DISCUSSION: Overall, IMPACT successfully quantified medical risk and derived an optimal medical system to support crew on a long duration lunar mission. In this DRM, the calculated loss of crew life from a medical event was 0.008 events per mission, risk of potential need for evacuation was 0.30 events per mission, and cumulative crew time affected by medical conditions was 103 days. The medical conditions that most contributed to medical risk were decompression sickness, trauma, and respiratory failure. The conditions that had the largest effects on crew performance included musculoskeletal injuries and lunar dust exposure. The IMPACT-generated medical system included resources that target the most common and highest risk conditions and performed as expected. This demonstrates the value of the IMPACT tool in medical system design for human exploration spaceflight missions.

Arian Anderson↗

System Modeling Techniques for PRA P-200

Course Objectives: Build PRA modeling and analysis skills – Event tree and fault tree model development – Dependent failures and common cause modeling – Component failure mechanisms, Improve understanding of quantification process, Improve ability to extract key results from a PRA, Greater familiarity with PRA goals and process, and Aleatory (stochastic) versus Epistemic (state of knowledge) uncertainty

97 MATHEMATICS AND COMPUTING↗

Peer Review of NRC Standardized Plant Analysis Risk Models

The Nuclear Regulatory Commission (NRC) Standardized Plant Analysis Risk (SPAR) Models underwent a Peer Review using ASME PRA standard (Addendum C) as endorsed by NRC in Regulatory Guide (RG) 1.200. The review was performed by a mix of industry probabilistic risk analysis (PRA) experts and NRC PRA experts. Representative SPAR models, one PWR and one BWR, were reviewed against Capability Category I of the ASME PRA standard. Capability Category I was selected as the basis for review due to the specific uses/applications of the SPAR models. The BWR SPAR model was reviewed against 331 ASME PRA Standard Supporting Requirements; however, based on the Capability Category I level of review and the absence of internal flooding and containment performance (LERF) logic only 216 requirements were determined to be applicable. Based on the review, the BWR SPAR model met 139 of the 216 supporting requirements. The review also generated 200 findings or suggestions. Of these 200 findings and suggestions 142 were findings and 58 were suggestions. The PWR SPAR model was also evaluated against the same 331 ASME PRA Standard Supporting Requirements. Of these requirements only 215 were deemed appropriate for the review (for the same reason as noted for the BWR). The PWR review determined that 125 of the 215 supporting requirements met Capability Category I or greater. The review identified 101 findings or suggestions (76 findings and 25 suggestions). These findings or suggestions were developed to identify areas where SPAR models could be enhanced. A process to prioritize and incorporate the findings/suggestions supporting requirements into the SPAR models is being developed. The prioritization process focuses on those findings that will enhance the accuracy, completeness and usability of the SPAR models.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Treatment of uncertainties associated with PRAs in risk-informed decision making (NUREG1855).

This document provides guidance on how to treat uncertainties associated with probabilistic risk assessment (PRA) in risk-informed decisionmaking. The objectives of this guidance include fostering an understanding of the uncertainties associated with PRA and their impact on the results of PRA and providing a pragmatic approach to addressing these uncertainties in the context of the decisionmaking. In implementing risk-informed decisionmaking, the U.S. Nuclear Regulatory Commission expects that appropriate consideration of uncertainty will be given in the analyses used to support the decision and in the interpretation of the findings of those analyses. To meet the objective of this document, it is necessary to understand the role that PRA results play in the context of the decision process. To define this context, this document provides an overview of the risk-informed decisionmaking process itself. With the context defined, this document describes the characteristics of a risk model and, in particular, a PRA. This description includes recognition that a PRA, being a probabilistic model, characterizes aleatory uncertainty that results from randomness associated with the events of the model. Because the focus of this document is epistemic uncertainty (i.e., uncertainties in the formulation of the PRA model), it provides guidance on identifying and describing the different types of sources of epistemic uncertainty and the different ways that they are treated. The different types of epistemic uncertainty are parameter, model, and completeness uncertainties. The final part of the guidance addresses the uncertainty in PRA results in the context of riskinformed decisionmaking and, in particular, the interpretation of the results of the uncertainty analysis when comparing PRA results with the acceptance criteria established for a specified application. In addition, guidance is provided for addressing completeness uncertainty in risk-informed decision making. Such consideration includes using a program of monitoring, feedback, and corrective action.

99 GENERAL AND MISCELLANEOUS↗

Combining RAVEN, RELAP5-3D, and PHISICS for Fuel Cycle and Core Design Analysis for New Cladding Criteria

The Nuclear Regulatory Commission (NRC) has considered revision of 10 CFR 50.46C rule to account for the effects of burn-up rate in future analysis of reactor accident scenarios so that safety margins may evolve with the operation and reloading of the reactor as dynamic limits. In order to find these limiting conditions, both cladding oxidation and maximum temperature must be cast as functions of fuel exposure. It is computationally intensive to run a plant model through a long duration operational transient to the time of fuel reload, and this must be repeated for each reload until the time of the accident scenario. Moreover, fuel reload patterns may differ in many ways so that calculations with many different core configurations must be considered. To perform such new analyses in a reasonable amount of computational time with good accuracy, Idaho National Laboratory (INL) has developed new multi-physics tools by combining existing codes and adding new capabilities. The Parallel Highly Innovative Simulation INL Code System (PHISICS) toolkit for neutronic and reactor physics is coupled with the Reactor Excursion and Leak Analysis Program (RELAP5-3D) for the Loss of Coolant Accident (LOCA) analysis and RAVEN for the Probabilistic Risk Assessment (PRA) and margin characterization analysis. Expansion of code capability was also necessary. For RELAP5-3D to process a single sequence of cores in a continuous run required modification of RELAP5-3D to restart a sequence of input decks, each with a slightly modified neutronics model or thermal-hydraulic flow region and culminating in an accident scenario. A new multi-deck input processing capability was developed and verified for this analysis. In conclusion, the combined RAVEN/PHISICS/RELAP5-3D tool is used to analyze a typical Pressurized Water Reactor (PWR).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗