Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PPAs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

54 records · Page 3

Utility-Scale Solar Data Update (2020 Edition) [Slides]

Berkeley Lab’s 2020 update of utility-scale solar data and trends provides an overview of key trends in the U.S. market, with a focus on 2019. Highlights of this year’s update include: More than 4.5 GWAC of utility-scale solar (i.e., ground-mounted solar projects larger than 5 MWAC) achieved commercial operations in 2019, bringing cumulative capacity to 29 GWAC. Projects are spread across all 10 regions that we track, though more heavily concentrated in the sunniest regions. The median installed cost of projects that came online in 2019 fell to $\$$1.4/WAC ($\$$1.2/WDC), down 20% from 2018 and down by more than 70% from 2010. 77% of projects and 88% of capacity added in 2019 used single-axis tracking. Average capacity factors range from 17% in the least-sunny regions to 30% where it is sunniest. Single-axis tracking adds roughly five percentage points to capacity factor in the regions with the strongest solar resource. Nationwide average levelized power purchase agreement (PPA) prices fell to $\$$24/MWh in 2019, down 17% from 2018 and more than 80% since 2010. Thirty-nine projects (totaling 4.2 GWAC) in our PPA price sample include battery storage (totaling 2.3 GWAC and 9.5 GWh). In the “lower 48” states, a number of these recent PV+battery PPAs have been inked in the mid-$\$$20/MWh range (levelized in 2019 dollars).Not including the 30% investment tax credit (ITC), the median levelized cost of energy (LCOE) from utility-scale PV has declined by 85% since 2010, to $\$$40/MWh in 2019. When the 30% ITC is included within the LCOE calculation, the median LCOE closely tracks the median PPA price over time. In higher-penetration markets like CAISO, the value of solar has been declining, but falling PPA prices have largely kept pace, preserving solar's net value. At the end of 2019, there were nearly 370 GW of solar in interconnection queues from all 7 ISOs and 30 additional utilities across the country. Nearly a third of this proposed solar capacity is paired with battery storage.

14 SOLAR ENERGY↗

Hybrid Power Plants: Status of Operating and Proposed Plants, 2022 Edition [Slides]

Falling battery prices and the growth of variable renewable generation are driving a surge of interest in “hybrid” power plants that combine, for example, wind or solar generating capacity with co-located batteries. While most of the current interest involves pairing photovoltaic (PV) plants with batteries, other types of hybrid or co-located plants with wide-ranging configurations have been part of the U.S. electricity mix for decades. This annually updated briefing tracks and maps existing hybrid or co-located plants across the United States while also synthesizing data mined from power purchase agreements (PPAs) and generation interconnection queues to shed light on near- and long-term development pipelines. The scope includes co-located hybrid plants that pair two or more generators and/or that pair generation with storage at a single point of interconnection, and full hybrids that feature co-location and co-control. The focus is on plants with one megawatt (MW) or more of capacity; smaller (often behind-the-meter) projects are also increasingly common, but are not included in this data synthesis. Key findings from the latest briefing include: -At the end of 2021, there were nearly 300 hybrid plants (>1 MW) operating across the United States, totaling nearly 36 gigawatts (GW) of generating capacity and 3.2 GW/8.1 GWh of energy storage. PV+storage plants are by far the most common, dominating in terms of plant number (140), storage capacity (2.2 GW/7.0 GWh), storage:generator ratio (53%), and storage duration (3.2 hours). But there are nearly twenty other hybrid plant configurations as well, including several different fossil hybrid categories (each dominated by the fossil component) as well as wind+storage, wind+PV, wind+PV+storage, geothermal+PV, and others. -Last year was a breakout year for PV+storage hybrids in particular: 67 of the 74 hybrids added in 2021 were PV+storage. By the end of 2021, there were more GW of battery capacity installed in PV+storage hybrids (2.2 GW) than as standalone storage plants (1.8 GW). The difference is even starker in energy terms, with PV+storage plants hosting twice as much battery capacity as standalone storage plants (7 GWh vs. 3.5 GWh, respectively). Much of the battery capacity added in hybrid form in 2021 was a battery retrofit to a pre-existing PV plant. -Data on plants under development from the interconnection queues of all seven ISOs/RTOs plus 35 individual utilities suggest that these hybridization trends are likely to continue. At the close of 2021, there were more than 670 GW of solar plants in the nation’s queues; 285 GW (~42%) of this capacity was proposed as a hybrid, most typically pairing PV with battery storage (PV+storage represented nearly 90% of all hybrid capacity in the queues). For wind, 247 GW of capacity sat in the queues, with 19 GW (~8%) proposed as a hybrid, again most-often pairing wind with storage (wind+storage represented ~4% of all hybrid capacity in the queues). Meanwhile, nearly half of all storage in the queues is estimated to be part of a hybrid plant. While many of these proposed plants will not ultimately reach commercial operations, the depth of interest in hybrid plants—especially PV+storage—is notable.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Hybrid Power Plants: Status of Operating and Proposed Plants, 2023 Edition [Slides]

Improving battery technology and the growth of variable renewable generation are driving a surge of interest in “hybrid” power plants that combine, for example, wind or solar generating capacity with co-located batteries. While most of the current interest involves pairing photovoltaic (PV) plants with batteries, other types of hybrid or co-located plants with wide-ranging configurations have been part of the U.S. electricity mix for decades. This annually updated briefing tracks and maps existing hybrid or co-located plants across the United States while also synthesizing data from power purchase agreements (PPAs) and generation interconnection queues to shed light on near- and long-term development pipelines. The scope includes “co-located hybrids” that pair two or more resources (e.g., multiple types of generation and/or generation with storage) that are operated largely independently behind a single point of interconnection, and “full hybrids” that also feature coordinated operations of the co-located resources. The focus is on plants with one megawatt (MW) or more of capacity; smaller (often behind-the-meter) projects are also increasingly common, but are not included in this data synthesis. Key findings from the latest briefing include: -At the end of 2022, there were 374 hybrid plants (>1 MW) operating across the United States (+25% compared to the end of 2021), totaling nearly 41 GW of generating capacity (+15%) and 5.4 GW/15.2 GWh of energy storage (+69%/+88%). PV+storage plants are by far the most common, dominating in terms of plant number (213), storage capacity (4.0 GW/12.5 GWh), storage:generator capacity ratio (49%), and storage duration (3.1 hours). But there are nearly twenty other hybrid plant configurations as well, including several different fossil hybrid categories (each dominated by the fossil component) as well as wind+storage, wind+PV, wind+PV+storage, geothermal+PV, and others. -Last year was another strong year for PV+storage hybrids in particular: 59 of the 62 hybrids added in 2022 were PV+storage. As of the end of 2022, there was roughly as much storage capacity operating within PV+storage hybrid plants as in standalone storage plants (~4 GW each). In storage energy terms, however, PV+storage edged out standalone storage by ~2 GWh (12.5 GWh vs. 10.4 GWh, respectively). -Interconnection queue data show continued strong developer interest in hybridization. At the close of 2022, there were 51% more hybrid plants—representing 59% more generating capacity—in interconnection queues across the United States than there were at the end of 2021. Solar dominates these proposed plants as well: at the close of 2022, there were 457 GW of solar capacity proposed as a hybrid (representing ~48% of all solar capacity in the queues), most typically pairing PV with battery storage. At the same time, there were 24 GW of wind capacity proposed as a hybrid (representing ~8% of all wind capacity in the queues), again most-often pairing wind with storage. Meanwhile, more than half of all storage in the queues is estimated to be part of a hybrid plant. While many of the plants proposed in the queues will not ultimately reach commercial operations, the depth of interest in hybrid plants—especially PV+storage—is notable, particularly in certain regions. For example, in CAISO, 97% of all solar capacity and 45% of all wind capacity in the queues is proposed as a hybrid. -The report also surveys power purchase agreement (PPA) price data from a sample of operating and proposed PV+storage plants. Though PV+storage PPA prices have fallen over time, “levelized storage adders” have recently increased somewhat to ~$\$ $7000/MW-month, ~$\$ $60/MWh-stored (assuming one full cycle per day), or ~$\$ $15/MWh-PV. Some of the recent price increase could simply reflect a trend towards higher battery:PV capacity ratios over time, which increases costs, all else being equal. The well-publicized impact of inflationary and supply chain pressures on battery prices is no doubt a contributor as well.

25 ENERGY STORAGE↗

Hybrid Power Plants: Status of Operating and Proposed Plants, 2024 Edition [Slides]

Improving battery technology and the growth of variable renewable generation are driving a surge of interest in “hybrid” power plants that combine, for example, wind or solar generating capacity with co-located batteries. While most of the current interest involves pairing photovoltaic (PV) plants with batteries, other types of hybrid or co-located plants with wide-ranging configurations have been part of the U.S. electricity mix for decades. This annually updated briefing tracks and maps existing hybrid or co-located plants across the United States while also synthesizing data from power purchase agreements (PPAs) and generation interconnection queues to shed light on near- and long-term development pipelines. The scope includes “co-located hybrids” that pair two or more resources (e.g., multiple types of generation and/or generation with storage) that are operated largely independently behind a single point of interconnection, and “full hybrids” that also feature coordinated operations of the co-located resources. The focus is on plants with one megawatt (MW) or more of capacity; smaller (often behind-the-meter) projects are also increasingly common, but are not included in this data synthesis.

14 SOLAR ENERGY↗

Electric Grid and Markets 101 [Slides]

This presentation covers aspects of operating the bulk power system with a focus on the regulatory levels of the US grid at a pretty introductory level. It was meant ot help inform a request from USDA for a "101" presentation that spoke to how electricity markets, contracting and regulation interact with the engineering and physics of operating the bulk power system. They are presently moving to being able to more directly fund PPAs or other non-co-op owned assets for member co-ops, is my understanding.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Impact of Biodiesel, Renewable Diesel, 1-Octanol, Dibutoxymethane, n-Undecane, Hexyl hexanoate and 2-Nonanone with Infrastructure Plastics as Blends with Diesel

In this work the volume and hardness were measured for thermoplastics and thermosetting resins with diesel containing up to 30% of the following blend stocks: biodiesel, renewable diesel, n-undecane, dibutoxymethane, 1-octanol, hexyl hexanoate, and 2-nonanone. Thermoplastics included polyphenylene sulfide (PPS), polyethylene terephthalate (PET), polytetrafluoroethylene (PTFE), polyvinylidene fluoride (PVDF), polyoxymethylene (POM), polybutylene terephthalate (PBT), polypropylene (PP), high density polyethylene (HDPE), nylons, acetals, polyetherimide (PEI), polyetheretherketone (PEEK), a PET co-polymer, polyphthalamides (PPAs), polyarylamide (PARA) and ethylene tetrafluoroethylene (ETFE). Three thermosetting resins were also evaluated. The material specimens were exposed to the test fuels under ambient conditions for 16 weeks. In general, the volume and hardness of the specimens were relatively unaffected following exposure to the test fuels; however, n-undecane produced significant swelling in polypropylene and may not be suitable for use with this material. N-undecane, along with hexyl hexanoate and 2-nonanone also caused low levels of swelling in nylon, which was not significant enough to preclude the use of nylons in sealing applications with these fuels.

09 BIOMASS FUELS↗

Getting from Goals to Projects in the Ground (Presentation)

Presentation given at the 2012 Department of Homeland Security Renewable Energy Roundtable on Energy Savings Performance Contracts (ESPCs) and Power Purchase Agreements (PPAs) for Renewable Energy (RE).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

ESPC Intro and ESPC/PPAs for RE (Presentation)

Presentation given at the 2012 Department of Homeland Security Renewable Energy Roundtable on Energy Savings Performance Contracts (ESPCs) and Power Purchase Agreements (PPAs) for Renewable Energy (RE)

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Appendix B: Commercial Solar Financing Options

As the solar photovoltaic (PV) market in the United States has evolved, so too have the financing mechanisms associated with it. This appendix provides a snapshot of the current commercial solar financing arena and an overview of existing financing mechanisms. While there is significant overlap in solar financing options among the residential, government, and commercial sectors, this report focuses on options and considerations for commercial entities only. Traditional solar financing models are being adapted to encompass increasingly complex relationships between solar energy consumers and solar development. This guide explores the variety of financing options available to commercial entities, ranging from the historical mainstays of the solar financing spectrum - third-party ownership (TPO) models, which include power purchase agreements (PPAs) and leases, in addition to loans and cash purchases - to relatively more recent additions, including property-assessed clean energy (PACE) financing, performance contracting, and green bonds, among others. This appendix ('Appendix B. Commercial Solar Financing Options') is one chapter in the Environmental Protection Agency's broader Guide to Purchasing Green Power, which provides a detailed overview of green power markets and procurement.

14 SOLAR ENERGY↗

The Potential Role of Concentrating Solar Power within the Context of DOE's 2030 Solar Cost Targets

For solar electricity generating technologies to be cost competitive at a large scale with conventionally generated electricity, cost reductions are needed for both concentrating solar power (CSP) and solar photovoltaic (PV) systems. In 2011, the U.S. Department of Energy (DOE) established solar cost targets that corresponded to reducing CSP and PV prices by approximately 75% in order to achieve a levelized cost of electricity (LCOE) of $0.06 per kilowatt-hour (kWh) for both utility-scale PV and high-capacity factor CSP-TES systems in 2020. Utility-scale PV achieved its 2020 cost target in 2017, and recent estimates for the LCOE of CSP-TES with a molten-salt power tower system are approximately $0.10/kWh for projects that are expected to come online in 2020, which represents a substantial reduction since 2010 - when the LCOE for CSP-TES was around $0.21/kWh. To continue the momentum for cost reductions in solar technologies, DOE recently established cost targets for 2030 that would make solar one of the lowest-cost sources of new electricity in the United States. For CSP-based systems, the new targets correspond to an LCOE in 2030 of $0.05/kWh for a dispatchable, high-capacity factor CSP-TES plant configuration. This aggressive target would have been unimaginable a decade ago. However, building on the previously described reduction in CSP-TES costs over the past decade, recent announcements suggest the next phase of projects will continue this downward trend through lower installation costs, attractive financing, longer-duration PPAs, and the ability to capitalize on the value that the flexibility of storage brings CSP. This presentation summarizes a recent report that evaluates the potential impacts of simultaneously achieving the 2030 cost targets for PV and CSP-TES, and it includes a detailed evaluation of the role that CSP-TES could play in realizing those impacts. The scenarios in this analysis are designed to isolate and assess the potential impacts of achieving DOE's 2030 cost targets for CSP-TES and PV, and they do not reflect the potential benefits or system impacts associated with success in other DOE research programs. The low-cost solar scenarios include DOE's 2030 solar cost targets--which are represented via a roughly 50% reduction in LCOE by 2030 (from current levels) with additional cost reductions thereafter representing technology learning and/or improvements that could result from innovation - coupled with a variety of market, technology, and demand assumptions. With these assumptions, the evolution of the contiguous U.S. electricity system is evaluated with NREL's Renewable Energy Deployment System (ReEDS) model, which was specifically designed to represent the temporal and locational value of renewable generation technologies in the U.S. power system. ReEDS relies on system-wide least-cost optimization to estimate the type and location of future generation and transmission capacity. In addition, it accounts for the locational and temporal variations in variable renewable technologies, including the need for new transmission, curtailment, dynamic capacity value, and the need to hold operating reserves to account for the uncertainty and variability of these technologies. This presentation summarizes the key findings that arise from a detailed evaluation of the impacts of achieving DOE's 2030 cost targets for CSP-TES and PV systems, noting again the inherent challenges associated with modeling future scenarios of the large, complex system electricity system in the contiguous United States within the context of various market features.

14 SOLAR ENERGY↗

How Local Governments Can Buy Renewable Energy and Support Market Development

This webinar covers strategies local governments can consider to procure renewable energy and support renewable energy market development, including power purchase agreements (PPAs), virtual power purchase agreements (VPPAs), community solar, and more. This webinar also covers how the regulatory landscape impacts the RE purchasing options available to a particular community and highlight case studies from local governments across the U.S. that have successfully implemented these strategies, including Arlington, Virginia and Denver, Colorado. This webinar provides one AICP CM continuing education credit. Who: Chad Laurent, Esq., Principal, Cadmus Group; Jonathan Rogers, Renewable Energy Specialist, Office of Climate Action, Sustainability, Resiliency at the City and County of Denver; John Morrill, Energy Manager, Office of Sustainability & Environmental Management, Arlington County Department of Environmental Services

14 SOLAR ENERGY↗

A Decision-Based Iterative Modeling Framework for Probabilistic Performance Assessments - 18441

Radiological probabilistic performance assessments (PPAs) employ highly complex computer models to simulate the release of radionuclides from wastes in an engineered disposal facility, migration of these radionuclides over time, and resulting radiological dose to potentially exposed individuals. An iterative approach to PPA modeling is described to help define the appropriate complexity of the computer model. An initial model is developed that addresses all relevant processes and media, but that employs preliminary statistical parameter distributions to minimize the initial effort expended. Where appropriate, transport and exposure submodels with simplifying assumptions are also used in the initial model. Different assumptions and boundaries may be explored with the initial model to assess their importance in constraining model results. Exploration of the results of the initial model are used to determine the benefits of model refinements, and to guide such refinements to focus on specific areas of the model that most influence the model outputs of interest. This approach promotes efficiency and model parsimony, but does not compromise defensibility when performed in a transparent manner. Key model boundaries for a PPA include the time frame of the modeling (temporal boundaries), where future human receptors may be located (spatial boundaries), and what types of land uses and activities may exist in the future (exposure scenarios). Simplified transport and exposure models can be useful in helping decision makers and stakeholders establish such boundaries by analyzing the consequences of selecting different bounds and understanding which assumptions and boundaries have the greatest influence on the magnitude and distribution of model results. Pathway analysis and parameter sensitivity analysis performed on PPA model results are key components of the iterative modeling approach. The objective of pathway analysis is to identify the critical radionuclides and pathways contributing to radiation dose during the modeling performance period. An environmental 'pathway' is described by the connections from a waste package or cell in the disposal facility to a future human exposure event. These connections are commonly visualized using graphical means. A simple example of a potentially complete pathway for radon-222 is: radium-containing waste → radon emanation → upwards diffusion in cap material → diffusion/advection into a future building → inhalation exposure to a building occupant Parameter sensitivity analysis is conducted on the results of a PPA to identify those specific model input parameters whose distribution of values contributes the most to the distribution of target model output, such as annual radiation dose. Pathway and sensitivity analyses on initial modeling results provide information for guiding subsequent model development, and possibly interim decisions, by informing questions tied to the modeling objectives and performance criteria. For example, questions related to radiological doses from existing disposals may include: 1. Is radiation dose from radiological exposures either obviously negligible or obviously unacceptable based on initial modeling results? 2. If dose is not obviously negligible or unacceptable relative to applicable performance criteria, what model refinements would reduce uncertainty in the results to better inform decisions? (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Facilitating Sound, Cost-Effective Energy Management (Fact Sheet)

FEMP focuses on the needs of its Federal customers, delivering an array of products grouped into project transaction services, applied technology services, and decision support services. This document outlines FEMP services and programs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

FEMP Renewable Energy Program Overview

Fact sheet describing how the U.S. Department of Energy's (DOE) Federal Energy Management Program (FEMP) provides Federal agencies with information, guidance, and assistance in using renewable energy.

Department of Energy↗

Quantifying the Level of Cross-State Renewable Energy Transactions

This analysis provides first-ever assessment of the extent to which renewable energy is crossing state borders to be used to meet renewable portfolio standard (RPS) requirements. Two primary methods for data collection are Renewable Energy Certificate (REC) tracking and power flow estimates. Data from regional REC tracking systems, state agencies, and utility compliance reports help understand how cross-state transactions have been used to meet RPS compliance. Data on regional renewable energy flow use generator-specific information primarily sourced from EIA, SNL Energy, and FERC Form 1 filings. The renewable energy examined through this method may or may not have actually been used to meet RPS compliance.

small generators, incentive payments, power purcha↗