43 records · Page 3

235-F Deactivation and Decommissioning: Inventory and Scenarios

Facility inventory has a significant influence on the fate and transport modeling of 235-F. This memorandum details the proposed source inventory for 235-F for verification from 235-F Risk Reduction (see Tables 7 and 9) and specifies two scenarios that will be investigated using GoldSim and PORFLOW as follows: grout the entire first floor (including the area directly below PuFF cells), and grout the entire first and second floors (including the area directly below PuFF cells).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

GSA Aquifer Cutouts for E-Area PA Revision Transport Simulations

The 2018 General Separations Area (GSA) aquifer model is dissected into four refined cutouts for aquifer transport in preparation for the next E-Area Low-Level Waste Facility (LLWF) Performance Assessment (PA) revision. The recommended refined horizontal and vertical grid sizes are 20 ft and 3 ft, respectively. The horizontal resolution appropriately represents longitudinal dispersion with dispersivity of 15.4 ft. Four cutouts (i.e., West, Center, East 1, and East 2) are selected to adequately contain tracer plumes emanating from disposal units expected in the E-Area LLWF. For feasible computation, each cutout is refined to mesh sizes much less than the PORFLOW limit of 1,024,000 nodes.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Comoparison of Slit Trench and Engineered Trench 3D Vadose Zone Conceptual Models

In the next revision of the E-Area Low-Level Waste Facility (ELLWF) Performance Assessment (PA), radionuclide groundwater transport from slit (ST) and engineered trenches (ET) will be simulated using 3-dimensional PORFLOW models representing the vadose zone. In total, the conceptual framework will aim to model 29 total trenches with a degree of conservatism that provides a high level of confidence in meeting performance objectives. The implementation of generic conceptual models allows for a reasonable number of simulation scenarios, thereby reducing the chances of errors and enabling a better one-to-one comparison between the results, while still capturing the most important features of each trench. The current investigation seeks to understand if a generic trench model based on the general ET footprint can justifiably be used for representing both STs and ETs while maintaining a reasonable degree of conservatism. In this process, the groundwater transport of several key radionuclides was simulated for both ET and ST geometries and the flux-to-the-water-table profiles were compared. For all radionuclides simulated, the ET geometry is shown to be conservative (i.e., produces the highest peak flux to the water table).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Component-In-Grout Model Implementation for the E-Area Low-Level Waste Facility's Performance Assessment

The component-in-grout (CIG) disposal units are below grade earthen trenches that contain grout encapsulated waste components. Components disposed of within the CIG segments consist of large radioactively contaminated equipment and smaller waste forms (e.g., B-25 boxes and SeaLand containers) to fill the space around and above the large equipment. In the 2022 revision of the E-Area Low-Level Waste Facility’s (ELLWF) performance assessment, groundwater radionuclide contaminant transport through the vadose zone will be modeled using the PORFLOW software package for nine existing CIG segments located within the Slit Trench (ST) 23 footprint - no additional CIG segments are planned for at this time. The nine CIG segments have been placed within two of the nominally 20-foot-wide by 656-foot-long ST segments and are surrounded by no less than 1 foot of grout on all sides and up to 4 feet of backfill material. The two most recently placed CIG segments have an additional reinforced concrete mat to improve structural stability.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Performance Assessment for the E-Area Low-Level Radioactive Waste Disposal Facility at the Savannah River Site: Chapter 5

This chapter presents selected GW flow and radionuclide contaminant transport results from PORFLOW for the VZ and aquifer zone for each type of DU (STs, ETs, LAWV, ILV, and NRCDAs). Results for the nominal PA compliance case and various sensitivity cases are given. Results for the VZ include water saturation spatial profiles and radionuclide flux-to-the-water- table time profiles. Aquifer zone results include maximum concentration spatial contours; radionuclide concentration time profiles at the 100-meter POA; and peak concentrations at the 100-meter POA and time of occurrence for each modeled radionuclide.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SDU 6 Modeling Study to Support Design Development

In response to Technical Task Request (TTR) HLW-SSF-TTR-2012-0017 (1), SRNL performed modeling studies to evaluate alternative design features for the 32 million gallon Saltstone Disposal Unit (SDU) referred to as SDU 6. This initial modeling study was intended to assess the performance of major components of the structure that are most significant to the PA. Information provided by the modeling will support the development of a SDU 6 Preliminary Design Model and Recommendation Report to be written by SRR Closure and Waste Disposal Authority. Key inputs and assumptions for the modeling were provided to SRNL in SRR-SPT-2011-00113 (2). A table reiterates the base case and four sensitivity case studies requested in this reference. In general, as shown in Table 4, when compared to Vault 2 Case A, the Base Case SDU 6 design produced higher peak fluxes to the water table during the 10,000 year period of analysis but lower peak fluxes within a 15,000 to 20,000 time frame. SDU 6 will contain approximately ten times the inventory of a single Vault 2 and the SDU 6 footprint is comparable to that of a group of four Vault 2 disposal units. Therefore, the radionuclide flux from SDU 6 and that from a single Vault 2 are not directly comparable. A more direct comparison would be to compare the maximum dose obtained at the 100 m boundary from the seven SDU's that will replace the 64 FDC's analyzed in the 2009 PA. This analysis will be performed in the next set of calculations planned for SDU design evaluation. Aquifer transport and dose calculations were not intended to be part of this initial scoping study. However, results from this study do indicate that replacement of the FDC design with SDU would not yield significantly higher peak doses. If the thickness of the SDU 6 floor is increased, peak doses would not occur during the 10,000 year period of analysis.

54 ENVIRONMENTAL SCIENCES↗

GoldSim E-Area Low-Level Waste Lacility Vadose Zone Model Benchmarking

This report documents the development and benchmarking of the E-Area Low-Level Waste Facility (ELLWF) GoldSim Engineered and Slit Trench (ET and ST) vadose zone models. Subsequent activities (beyond the scope of this effort) will couple the GoldSim-based vadose zone models to the GoldSim aquifer model, with the intent of performing stochastic analyses that couple all pertinent fate and transport processes from the ground surface up to the 100-m Point of Assessment (POA). The benchmarking presented within this report focuses on the Slit Trench 06 (ST06) bydrostratigraphic location that resides within the center set of slit trenches. These GoldSim-based vadose zone models are generic models capable of being benchmarked to any of the other trench locations within E-Area.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗