Ground Control Annual Plan for the Waste Isolation Pilot Plant (Rev. 7)

The Waste Isolation Pilot Plant (WIPP) is designed to permanently dispose of transuranic radioactive waste left from the research and production of nuclear weapons. Transuranic waste consists of clothing, tools, rags, and other such items contaminated with trace amounts of radioactive elements, mostly plutonium. Located in southeastern New Mexico, 26 miles east of Carlsbad, project facilities include disposal rooms excavated in an ancient, stable salt formation 2,150 feet (655 meters) underground. This deep geologic setting requires that a comprehensive ground control program be in place to monitor and assure the stability of the underground openings and address issues of concern. The primary objective of the WIPP ground control program is to provide a safe environment for personnel and equipment in a manner that is consistent with the primary facility operational objective of waste disposal. In meeting this primary objective, the regulatory requirements specific to ground control are also satisfied. The ground control program is a concerted and centralized activity responsible for providing a continuing assessment of the capabilities of the underground openings to achieve that objective. The fundamentals on which the ground control program at WIPP is based are as follows: (1) safe access is maintained as long as access is required; (2) regular ground-control maintenance is required to maintain safe access; (3) ground control maintenance efforts increase with the age of the openings; (4) ground control plans are specific but flexible; and (5) regulatory requirements are met. The extensive geotechnical monitoring program provides a high degree of confidence in the ability to predict and mitigate ground control issues before they become safety problems. The evaluation of ground conditions is a continuous process. The Westinghouse TRU Solutions (WTS) Geotechnical Engineering Section gathers and evaluates data from various sources on a periodic basis. This information is formally presented in a variety of ways, primarily bimonthly and annual reports.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Ground Control Annual Plan for the Waste Isolation Pilot Plant (Rev. 8)

The Waste Isolation Pilot Plant (WIPP) is designed to permanently dispose of transuranic radioactive waste left from the research and production of nuclear weapons. Transuranic waste consists of clothing, tools, rags, and other such items contaminated with trace amounts of radioactive elements, mostly plutonium. Located in southeastern New Mexico, 26 miles east of Carlsbad, project facilities include disposal rooms excavated in an ancient, stable salt formation 2,150 feet (655 meters) underground. This deep geologic setting requires that a comprehensive ground control program be in place to monitor and assure the stability of the underground openings and address issues of concern. The primary objective of the WIPP ground control program is to provide a safe environment for personnel and equipment in a manner that is consistent with the primary facility operational objective of waste disposal. In meeting this primary objective, the regulatory requirements specific to ground control are also satisfied. The ground control program is a concerted and centralized activity responsible for providing a continuing assessment of the capabilities of the underground openings to achieve that objective. The fundamentals on which the ground control program at WIPP is based are as follows: (1) safe access is maintained as long as access is required; (2) regular ground-control maintenance is required to maintain safe access; (3) ground control maintenance efforts increase with the age of the openings; (4) ground control plans are specific but flexible; and (5) regulatory requirements are met. The extensive geotechnical monitoring program provides a high degree of confidence in the ability to predict and mitigate ground control issues before they become safety problems. The evaluation of ground conditions is a continuous process. The Westinghouse TRU Solutions (WTS) Geotechnical Engineering Section gathers and evaluates data from various sources on a periodic basis. This information is formally presented in a variety of ways, primarily bimonthly and annual reports.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of PFLOTRAN Transport Capability for Use in the Waste Isolation Pilot Plant Performance Assessment - 20545

Waste Isolation Pilot Plant (WIPP) performance assessment (PA) calculations estimate the probability of radionuclide release from the repository to the land surface and across the land withdrawal boundary for a regulatory period of 10,000 years after facility closure. Simulations of flow and transport in the repository and the surrounding Salado Formation are foundational to the PA. Because proposed additional waste emplacement panels would result in an asymmetric repository layout, the US Department of Energy (DOE) is preparing to transition to use of a three-dimensional (3-D) model domain for simulation of flow and transport instead of the two-dimensional (2-D) flared grid domain currently used. DOE has charged Sandia National Laboratories with developing the capability necessary to simulate processes affecting flow and transport in the WIPP in PFLOTRAN, an open-source massively parallel multi-phase flow and reactive transport code. The new flow and transport capabilities developed in PFLOTRAN incorporate WIPP-specific process models and will replace the 2-D simulators (BRAGFLO and NUTS) that are currently utilized for Salado flow and transport calculations in WIPP PA. The focus of this paper is on the development of a new Nuclear Waste Transport (NWT) mode in PFLOTRAN that has all of the capabilities necessary for Salado transport simulations, including the ability to handle complete dry-out (100% gas saturation) of arbitrary cells in the model domain, radionuclide mass conservation at step changes in porosity associated with borehole intrusion, and the ability to calculate fluxes on a flared grid. The new PFLOTRAN transport capability and a suite of verification tests were designed around a list of functional requirements for WIPP PA calculations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Manufacturing demonstration of microbially mediated zinc sulfide nanoparticles in pilot-plant scale reactors

The thermophilic anaerobic metal-reducing bacterium Thermoanaerobacter sp. X513 efficiently produces zinc sulfide (ZnS) nanoparticles (NPs) in laboratory-scale ( ≤24-L) reactors. To determine whether this process can be up-scaled and adapted for pilot-plant production while maintaining NP yield and quality, a series of meso-scale experiments were performed using 100-l and 900-l reactors. Pasteurization and N 2 -sparging replaced autoclaving and boiling for deoxygenating media in the transition from small-scale to pilot-plant reactors. Consecutive 100-L batches using new or recycled media produced ZnS NPs with highly reproducible ~2 nm average crystallite size (ACS) and yields of ~0.5g L -1 , similar to small-scale batches. The 900-L pilot plant reactor produced ~ 320 g ZnS without process optimization or replacement of used medium; this quantity would be sufficient to form a ZnS thin film with ~120 nm thickness over 0.5 m width 13 km length. At all scales, the bacteria produced significant amounts of acetic, lactic and formic acids, which could be neutralized by the controlled addition of sodium hydroxide without the use of an organic pH buffer, eliminating 98% of the buffer chemical costs. In conclusion, the final NP products were characterized using XRD, ICP-OES, FTIR, DLS, and C/N analyses, which confirmed the growth medium without organic buffer enhanced the ZnS NP properties by reducing carbon and nitrogen surface coatings and supporting better dispersivity with similar ACS.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Waste Isolation Pilot Plant Annual Site Enviromental Report for 2008

The purpose of the Waste Isolation Pilot Plant Annual Site Environmental Report for 2008 (ASER) is to provide information required by U.S. Department of Energy (DOE) Order 231.1A, Environment, Safety, and Health Reporting. Specifically, the ASER presents summary environmental data to characterize site environmental management performance; summarize environmental occurrences and responses reported during the calendar year; confirm compliance with environmental standards and requirements; highlight significant facility programs and efforts; and describe how compliance and environmental improvement is accomplished through the WIPP Environmental Management System (EMS). The DOE Carlsbad Field Office (CBFO) and the management and operating contractor (MOC), Washington TRU Solutions LLC (WTS), maintain and preserve the environmental resources at the Waste Isolation Pilot Plant (WIPP). DOE Order 231.1A; DOE Order 450.1A, Environmental Protection Program; and DOE Order 5400.5, Radiation Protection of the Public and the Environment, require that the affected environment at and near DOE facilities be monitored to ensure the safety and health of the public and workers, and preservation of the environment. This report was prepared in accordance with DOE Order 231.1A, which requires that DOE facilities submit an ASER to the DOE Headquarters Chief Health, Safety, and Security Officer. The WIPP Hazardous Waste Facility Permit (HWFP) Number NM4890139088-TSDF (treatment, storage, and disposal facility) further requires that the ASER be provided to the New Mexico Environment Department (NMED). The WIPP mission is to safely dispose of transuranic (TRU) radioactive waste generated by the production of nuclear weapons and other activities related to the national defense of the United States. In 2008, 5,265 cubic meters (m3) of TRU waste were disposed of at the WIPP facility, including 5,216 m3 of contact-handled (CH) TRU waste and 49 m3 of remote-handled (RH) TRU waste. From the first receipt of waste in March 1999 through the end of 2008, 57,873 m3 of TRU waste had been disposed of at the WIPP facility.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Conceptual design of a lunar oxygen pilot plant Lunar Base Systems Study (LBSS) task 4.2

The primary objective was to develop conceptual designs of two pilot plants to produce oxygen from lunar materials. A lunar pilot plant will be used to generate engineering data necessary to support an optimum design of a larger scale production plant. Lunar oxygen would be of primary value as spacecraft propellant oxidizer. In addition, lunar oxygen would be useful for servicing nonregenerative fuel cell power systems, providing requirements for life support, and to make up oxygen losses from leakage and airlock cycling. Thirteen different lunar oxygen production methods are described. Hydrogen reduction of ilmenite and extraction of solar-wind hydrogen from bulk lunar soil were selected for conceptual design studies. Trades and sensitivity analyses were performed with these models.

Source record↗

Reinvestigation into Closure Predictions of Room D at the Waste Isolation Pilot Plant

Room D was an in-situ, isothermal, underground experiment conducted at theWaste Isolation Pilot Plant between 1984 and 1991. The room was carefully instrumented to measure the horizontal and vertical closure immediately upon excavation and for several years thereafter. Early finite element simulations of salt creep around Room D under predicted the vertical closure by 4.5×, causing investigators to explore a series of changes to the way Room D was modeled. Discrepancies between simulations and measurements were resolved through a series of adjustments to model parameters, which were openly acknowledged in published reports. Interest in Room D has been rekindled recently by the U.S./German Joint Project III and Project WEIMOS, which seek to improve the predictions of rock salt constitutive models. Joint Project participants calibrate their models solely against laboratory tests, and benchmark the models against underground experiments, such as room D. This report describes updating legacy Room D simulations to today’s computational standards by rectifying several numerical issues. Subsequently, the constitutive model used in previous modeling is recalibrated two different ways against a suite of new laboratory creep experiments on salt extracted from the repository horizon of the Waste Isolation Pilot Plant. Simulations with the new, laboratory-based, calibrations under predict Room D vertical closure by 3.1×. A list of potential improvements is discussed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Continuous Improvement and the Safety Case for the Waste Isolation Pilot Plant Geologic Repository - 13467

The Waste Isolation Pilot Plant (WIPP) is a geologic repository 2150 feet (650 m) below the surface of the Chihuahuan desert near Carlsbad, New Mexico. WIPP permanently disposes of transuranic waste from national defense programs. Every five years, the U.S. Department of Energy (DOE) submits an application to the U.S. Environmental Protection Agency (EPA) to request regulatory-compliance re-certification of the facility for another five years. Every ten years, DOE submits an application to the New Mexico Environment Department (NMED) for the renewal of its hazardous waste disposal permit. The content of the applications made by DOE to the EPA for re-certification, and to the NMED for permit-renewal, reflect any optimization changes made to the facility, with regulatory concurrence if warranted by the nature of the change. DOE points to such changes as evidence for its having taken seriously its 'continuous improvement' operations and management philosophy. Another opportunity for continuous improvement is to look at any delta that may exist between the re-certification and re-permitting cases for system safety and the consensus advice on the nature and content of a safety case as being developed and published by the Nuclear Energy Agency's Integration Group for the Safety Case (IGSC) expert group. DOE at WIPP, with the aid of its Science Advisor and teammate, Sandia National Laboratories, is in the process of discerning what can be done, in a reasonably paced and cost-conscious manner, to continually improve the case for repository safety that is being made to the two primary regulators on a recurring basis. This paper will discuss some aspects of that delta and potential paths forward to addressing them. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Reinvestigation into Closure Predictions of Room D at the Waste Isolation Pilot Plant

Room D was an in-situ, isothermal, underground experiment conducted at the Waste Isolation Pilot Plant between 1984 and 1991. The room was carefully instrumented to measure the horizontal and vertical closure immediately upon excavation and for several years thereafter. Early finite element simulations of salt creep around Room D under-predicted the vertical closure by 4.5×, causing investigators to explore a series of changes to the way Room D was modeled. Discrepancies between simulations and measurements were resolved through a series of adjustments to model parameters, which were openly acknowledged in published reports. Interest in Room D has been rekindled recently by the U.S./German Joint Project III and Project WEIMOS, which seek to improve the predictions of rock salt constitutive models. Joint Project participants calibrate their models solely against laboratory tests, and benchmark the models against underground experiments, such as room D. This report describes updating legacy Room D simulations to today’s computational standards by rectifying several numerical issues. Subsequently, the constitutive model used in previous modeling is recalibrated two different ways against a suite of new laboratory creep experiments on salt extracted from the repository horizon of the Waste Isolation Pilot Plant. Simulations with the new, laboratory-based, calibrations under-predict Room D vertical closure by 3.1×. A list of potential improvements is discussed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Effects of carbon treating on piperazine oxidation in pilot plant testing of PZAS™

From February to June 2019, a pilot plant campaign was run for 2100 h at the National Carbon Capture Center (NCCC) using moderately degraded 5 m PZ with simulated flue gas equivalent to a 0.64 MW natural gas combined cycle. Piperazine with the Advanced Stripper™ (PZAS™) and a baghouse were used, and N 2 sparging was applied at the bottom of the absorber. A carbon bed was activated and showed beneficial effects in removing degradation products and reducing the oxidation rate. The cumulative NH 3 production was 180 mmol/k, indicating a PZ oxidation rate of 0.07 mmol/kg/h (0.3 kg PZ/tonne of CO 2 ). The total formate before turning on the carbon bed was 41 mmol/kg, and the total Fe was 0.1 mmol/kg. Carbon treating reduced NH3 production from 0.1 mmol/kg/h to 0.056 mmol/kg/h after 400 h of operation, reduced the UV-Vis absorbance of the samples at 320 nm, and caused a decrease of dissolved Cr. Bench-scale experiments were performed using the NCCC solvent and the same type of carbon. In bench-scale experiments, the UV-Vis absorbance and the concentration of Fe, Mn, and Cr all decreased. Finally, a linear equilibrium relationship was observed between the UV-Vis absorbance and the carbon loading.

03 NATURAL GAS↗

Separation of packaging plastics by froth flotation in a continuous pilot plant

The objective of the research was to apply froth flotation to separate post-consumer PET (Polyethylene Terephthalate) from other packaging plastics with similar density, in a continuously operated pilot plant. A representative sample composed of 85% PET, 2.5% PVC (Polyvinyl Chloride) and 11.9% PS (Polystyrene) was subjected to a combination of alkaline treatment and surfactant adsorption followed by froth flotation. A mineral processing pilot plant, owned by a Portuguese mining company, was adapted for this purpose. The experimentation showed that it is possible to produce an almost pure concentrate of PET, containing 83% of the PET in feed, in a single bank of mechanical flotation cells. The concentrate grade attained was 97.2% PET, 1.1% PVC and 1.1% PS. By simulation it was shown that the Portuguese recycling industry specifications can be attained if one cleaning and one scavenger stages are added to the circuit.

07 ISOTOPE AND RADIATION SOURCES↗

Fusion Pilot Plant performance and the role of a Sustained High Power Density tokamak

Recent U.S. fusion development strategy reports all recommend that the U.S. should pursue innovative science and technology to enable construction of a Fusion Pilot Plant (FPP) that produces net electricity from fusion at low capital cost. Compact tokamaks have been proposed as a means of potentially reducing the capital cost of a fusion pilot plant. However, compact steady-state tokamak FPPs face the challenge of integrating a high fraction of self-driven current with high core confinement, plasma pressure, and high divertor parallel heat flux. This integration is sufficiently challenging that a dedicated sustained-high-power-density (SHPD) tokamak facility is proposed by the U.S. community as the optimal way to close this integration gap. Performance projections for the steady-state tokamak FPP regime are presented and a preliminary SHPD device with substantial flexibility in lower aspect ratio (A=2-2.5), shaping, and divertor configuration to narrow gaps to a FPP is described.

core-edge integration↗

Impact of Corrections to the Spallings Volume Calculation on Waste Isolation Pilot Plant Performance Assessment

The numerical code DRSPALL (from direct release spallings) is written to calculate the volume of Waste Isolation Pilot Plant solid waste subject to material failure and transport to the surface (i.e., spallings) as a result of a hypothetical future inadvertent drilling intrusion into the repository. An error in the implementation of the DRSPALL finite difference equations was discovered and documented in a software problem report in accordance with the quality assurance procedure for software requirements. This paper describes the corrections to DRSPALL and documents the impact of the new spallings data from the modified DRSPALL on previous performance assessment calculations. Updated performance assessments result in more simulations with spallings, which generally translates to an increase in spallings releases to the accessible environment. Total normalized radionuclide releases using the modified DRSPALL data were determined by forming the summation of releases across each potential release pathway, namely borehole cuttings and cavings releases, spallings releases, direct brine releases, and transport releases. Because spallings releases are not a major contributor to the total releases, the updated performance assessment calculations of overall mean complementary cumulative distribution functions for total releases are virtually unchanged. Therefore, the corrections to the spallings volume calculation did not impact Waste Isolation Pilot Plant performance assessment calculation results.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Impact of Corrections to the Spallings Volume Calculation on Waste Isolation Pilot Plant Performance Assessment [Poster]

The numerical code DRSPALL (from direct release spallings) is written to calculate the volume of Waste Isolation Pilot Plant solid waste subject to material failure and transport to the surface (i.e., spallings) as a result of a hypothetical future inadvertent drilling intrusion into the repository. An error in the implementation of the DRSPALL finite difference equations was discovered and documented in a software problem report in accordance with the quality assurance procedure for software requirements. This paper describes the corrections to DRSPALL and documents the impact of the new spallings data from the modified DRSPALL on previous performance assessment calculations. Updated performance assessments result in more simulations with spallings, which generally translates to an increase in spallings releases to the accessible environment. Total normalized radionuclide releases using the modified DRSPALL data were determined by forming the summation of releases across each potential release pathway, namely borehole cuttings and cavings releases, spallings releases, direct brine releases, and transport releases. Because spallings releases are not a major contributor to the total releases, the updated performance assessment calculations of overall mean complementary cumulative distribution functions for total releases are virtually unchanged. Therefore, the corrections to the spallings volume calculation did not impact Waste Isolation Pilot Plant performance assessment calculation results.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Impact of Corrections to the Spallings Volume Calculation on Waste Isolation Pilot Plant Performance Assessment - 16135

The numerical code DRSPALL (from direct release spallings) is written to calculate the volume of Waste Isolation Pilot Plant solid waste subject to material failure and transport to the surface (i.e., spallings) as a result of a hypothetical future inadvertent drilling intrusion into the repository. An error in the implementation of the DRSPALL finite difference equations was discovered and documented in a software problem report in accordance with the quality assurance procedure for software requirements. This paper describes the corrections to DRSPALL and documents the impact of the new spallings data from the modified DRSPALL on previous performance assessment calculations. Updated performance assessments result in more simulations with spallings, which generally translates to an increase in spallings releases to the accessible environment. Total normalized radionuclide releases using the modified DRSPALL data were determined by forming the summation of releases across each potential release pathway, namely borehole cuttings and cavings releases, spallings releases, direct brine releases, and transport releases. Because spallings releases are not a major contributor to the total releases, the updated performance assessment calculations of overall mean complementary cumulative distribution functions for total releases are virtually unchanged. Therefore, the corrections to the spallings volume calculation did not impact Waste Isolation Pilot Plant performance assessment calculation results. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Dynamic Waste Isolation Pilot Plant Performance Assessment Tool - 12490

The Waste Isolation Pilot Plant (WIPP) Performance Assessment (PA) methodology comprises a toolbox used to demonstrate regulatory compliance of the repository after facility closure. The PA framework rests upon an extensive suite of computational codes. In some cases, significant alteration of code inputs is a tedious and difficult task. Due to the nature of the application for which they are used, PA codes used in support of WIPP regulatory compliance demonstration must satisfy stringent quality assurance requirements. Consequently, many of the coding practices used during original code development are still implemented today. A more efficient workflow configuration has the potential to alleviate difficulties associated with extensive code input modifications. Here, this potential is assessed via an implementation of a more flexible scientific workflow system for a subset of the codes used in WIPP PA. The scientific workflow approach taken here for a dynamic PA system enables users from disparate backgrounds to dramatically shorten the time between hypothesis and analysis by decreasing the amount of a priori knowledge, from a range of disciplines, needed to execute the code. Having smaller iteration times allows for more ideas to be tested and explored, which leads to safer and more optimized systems. Note that these high-level, dynamic tools are intended only for initial scoping studies on the personal computer of a researcher. Full, regulatory compliance calculations may occur only within a qualified computing environment. However, the WIPP PA tools here may guide future research and indicate regions of the analysis space that are worth further study. This next generation of PA software provides the ability to perform scoping investigations of repository performance quickly and easily, and has an accessible and useful interface to a variety of users, such as fuel cycle systems designers, domain experts such as repository modelers, and policy makers. The purview of this project allows for many opportunities for future work. Foremost among these is the desire to implement the full BRAGFLO suite within the workflow. This will entail porting or wrapping Genmesh, Matset, LHS, and ICSet within Python. Moreover, unifying the two GUIs into a single driver application would be a natural next step. Once the BRAGFLO suite is completed, other portions of WIPP PA could be implemented with corresponding and inter-operable work-flows. Likely first candidates for this are those codes that are similarly computationally intensive, such as the one used to generate complementary cumulative distribution functions used to demonstrate regulatory compliance (code CCDFGF). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The advanced tokamak path to a compact net electric fusion pilot plant

Abstract Physics-based simulations project a compact net electric fusion pilot plant with a nuclear testing mission is possible at modest scale based on the advanced tokamak concept, and identify key parameters for its optimization. These utilize a new integrated 1.5D core-edge approach for whole device modeling to predict performance by self-consistently applying transport, pedestal and current drive models to converge fully non-inductive stationary solutions, predicting profiles and energy confinement for a given density. This physics-based approach leads to new insights and understanding of reactor optimization. In particular, the levering role of high plasma density is identified, which raises fusion performance and self-driven ‘bootstrap currents’, to reduce current drive demands and enable high pressure with net electricity at a compact scale. Solutions at 6–7 T, ∼4 m radius and 200 MW net electricity are identified with margins and trade-offs possible between parameters. Current drive comes from neutral beam and ultra-high harmonic (helicon) fast wave, though other advanced approaches are not ruled out. The resulting low recirculating power in a double null configuration leads to a divertor heat flux challenge that is comparable to ITER, though reactor solutions may require more dissipation. Strong H-mode access (x2 margin over L–H transition scalings) and ITER-like heat fluxes are maintained with ∼20%–60% core radiation, though effects on confinement need further analysis. Neutron wall loadings appear tolerable. The approach would benefit from high temperature superconductors, as higher fields would increase performance margins while potential for demountability may facilitate nuclear testing. However, solutions are possible with conventional superconductors. An advanced load sharing and reactive bucking approach in the device centerpost region provides improved mechanical stress handling. The prospect of an affordable test device which could close the loop on net-electric production and conduct essential nuclear materials and breeding research is compelling, motivating research to validate the techniques and models employed here.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗