Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Outage Recovery”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

48 records · Page 3

Launch Complex 34, SWMU Cc054 2021 DNAPL Source Zone Operations, Maintenance, and Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ) and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 12 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. Site-wide biennial LTM sampling was not conducted during this reporting period and is scheduled to be conducted in December 2022. The timeframe for activities documented in this PMR extends from April 1, 2021 to March 31, 2022. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the DSZ and deep dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to re-characterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS to more adequately capture residual contaminant mass. The operational period for Year 12 of the HCS was from April 1, 2021 to March 31, 2022. Operational runtime for the system was 94 percent during Year 12, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2022, a total of 285,712,801 gallons of groundwater containing 84,933 pounds of VOCs have been removed by the HCS. Influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 12,000 µg/L (March 2022). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2021 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events in 2017, 2018, 2019, and 2020. Full vertical profile sampling was completed at each DPT from 8 to 98 ft bls, at 5 foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations at depths ranging from 8 to 98 ft bls. An overall increasing trend of TCE concentrations was observed in DPT samples during this reporting period, which may be due to several recovery wells that were turned off during the AS Pilot Study in the DSZ that operated from July 2021 to February 2022 (documented separately from this report). The maximum TCE concentration in 2021 was 15,400,000 µg/L in the 58 ft bls depth interval at DPT597 (previous maximum result in 2020 was 1,690,000 at 48 ft bls at DPT596). During the 2021 DPT event, the overall majority of TCE contamination was identified in the 58 ft bls interval (below Layer 4), where in the previous year the majority of mass was observed in Layer 4. This trend appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, monitoring well samples were collected from deep wells in the DSZ area (Layers 7 and 8) to verify vertical delineation. All monitoring well results were non-detect or below cleanup levels, with exception of one well (IW0162, screened 105 to 115 ft bls, which is below the existing recovery well capture zone) where TCE was identified above cleanup target levels. The HS 6 AS system remained operational during the reporting period covered under this report. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual prior to this operational period. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2021 show concentrations of contaminants of concern (cis-1,2-dichloroethene, trans-1,2- dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. Overall, the tasks associated with Year 12 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with the recommendations of the 2020 LC34 (Year 11) Operations, Maintenance, and Monitoring Report for DNAPL Source Zone, Site Wide LongTerm Monitoring, and Hot Spot 6 Air Sparging System PMR (NASA, 2021c). Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

trichloroethene↗

A two-stage service restoration method for electric power distribution systems

Improving the reliability of power distribution systems is critically important for both utilities and customers. This calls for an efficient service restoration module within a distribution management system to support the implementation of self-healing smart grid networks. Although the emerging smart grid technologies, including distributed generators (DGs) and remote-controlled switches, enhance the self-healing capability and allow faster recovery, they still pose additional complexity to the service restoration problem, especially under cold load pickup (CLPU) conditions. Herein, a novel two-stage restoration framework is proposed to generate a restoration solutions with a sequence of control actions. The first stage generates a restoration plan that supports both the traditional service restoration using feeder reconfiguration and the grid-forming DG-assisted intentional islanding methods. The second stage generates an optimal sequence of switching operations to bring the outaged system quickly to the final restored configuration. The problem is formulated as a mixed-integer linear program that incorporates system connectivity, operating constraints, and the CLPU models. It is demonstrated that on using a multi-feeder test case, the proposed framework is effective in utilizing all available resources to quickly restore the service and generate an optimal sequence of switching actions to be used by the operator to reach the desired optimal configuration.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Near Real-Time Applications of Earth Remote Sensing for Response to Meteorological Disasters

Numerous on‐orbit satellites provide a wide range of spatial, spectral, and temporal resolutions supporting the use of their resulting imagery in assessments of disasters that are meteorological in nature. This presentation will provide an overview of recent use of Earth remote sensing by NASA's Short‐term Prediction Research and Transition (SPoRT) Center in response to disaster activities in 2012 and 2013, along with case studies supporting ongoing research and development. The SPoRT Center, with support from NASA's Applied Sciences Program, has explored a variety of new applications of Earth‐observing sensors to support disaster response. In May 2013, the SPoRT Center developed unique power outage composites representing the first clear sky view of damage inflicted upon Moore and Oklahoma City, Oklahoma following the devastating EF‐5 tornado that occurred on May 20. Subsequent ASTER, MODIS, Landsat‐7 and Landsat‐8 imagery help to identify the damaged area. Higher resolution imagery of Moore, Oklahoma were provided by commercial satellites and the recently available International Space Station (ISS) SERVIR Environmental Research and Visualization System (ISERV) instrument. New techniques are being explored by the SPoRT team in order to better identify damage visible in high resolution imagery, and to monitor ongoing recovery for Moore, Oklahoma. Other applications are being developed to refine light source detections with the VIIRS day‐night band and to map hail during the growing season through combination of available satellite and radar imagery. The aforementioned products and support are not useful unless they are distributed in a timely manner and within an appropriate decision support system. This presentation will provide an update on ongoing activities to support inclusion of these data sets within the NOAA National Weather Service Damage Assessment Toolkit, which allows meteorologists in the field to consult available satellite imagery while performing their damage assessment.

Molthan, Andrew L.↗

Near Real-­Time Applications of Earth Remote Sensing for Response to Meteorological Disasters

Numerous on‐orbit satellites provide a wide range of spatial, spectral, and temporal resolutions supporting the use of their resulting imagery in assessments of disasters that are meteorological in nature. This presentation will provide an overview of recent use of Earth remote sensing by NASA's Short‐term Prediction Research and Transition (SPoRT) Center in response to disaster activities in 2012 and 2013, along with case studies supporting ongoing research and development. The SPoRT Center, with support from NASA's Applied Sciences Program, has explored a variety of new applications of Earth‐observing sensors to support disaster response. In May 2013, the SPoRT Center developed unique power outage composites representing the first clear sky view of damage inflicted upon Moore and Oklahoma City, Oklahoma following the devastating EF‐5 tornado that occurred on May 20. Subsequent ASTER, MODIS, Landsat‐7 and Landsat‐8 imagery help to identify the damaged area. Higher resolution imagery of Moore, Oklahoma were provided by commercial satellites and the recently available International Space Station (ISS) SERVIR Environmental Research and Visualization System (ISERV) instrument. New techniques are being explored by the SPoRT team in order to better identify damage visible in high resolution imagery, and to monitor ongoing recovery for Moore, Oklahoma. Other applications are being developed to refine light source detections with the VIIRS day‐night band and to map hail during the growing season through combination of available satellite and radar imagery. The aforementioned products and support are not useful unless they are distributed in a timely manner and within an appropriate decision support system. This presentation will provide an update on ongoing activities to support inclusion of these data sets within the NOAA National Weather Service Damage Assessment Toolkit, which allows meteorologists in the field to consult available satellite imagery while performing their damage assessment.

Molthan, Andrew L.↗

Power System Resilience Considering Hurricane Storms and Generator Step-up Transformers

Power system resilience describes the system’s ability to withstand and recover quickly from unexpected power outages due to extreme events. As society’s electrification continues at a rapid rate, it is imperative electric infrastructure is designed and operated with extra security. This work studies the impact of severe hurricane storms on the power system located along the United States’ Eastern Seaboard. Specific focus is designated to steady state system operation and loss of large generation step up power transformers. A series of phasor domain power system simulations are conducted to determine the critical point at which the system loses steady state operability. Additionally, active power load shedding and generator dispatching are studied as mitigation and recovery strategies. Results indicate generator dispatching as an effective proactive mitigation strategy and load shedding as an effective recovery strategy.

Liu, Yilu↗

Launch Complex 34, SWMU CCO542022 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot (HS) 6 Air Sparge (AS) System presents the results of Year 13 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, results of the biennial site-wide LTM event, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. This site has been designated Solid Waste Management Unit (SWMU) CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act (RCRA) Corrective Action Program. For the site-wide biennial LTM event, a total of 55 monitoring wells were sampled for volatile organic compounds (VOCs) in February 2023 and one well was sampled for polychlorinated biphenyls (PCBs) in December 2022. One well planned for VOC sampling was found to be destroyed and could not be sampled (CW0002). The LTM wells are screened in two lithologic zones: Layer 1 (0 to 25 feet below land surface [bls]) and Layer 2 (25 to 30 ft bls), and are located in the outlying areas of LC34 to monitor groundwater conditions within the Low-Concentration Plume (LCP), defined as concentrations exceeding Groundwater Cleanup Target Levels (GCTLs), and the High-Concentration Plume (HCP), defined as concentrations exceeding Natural Attenuation Default Concentrations (NADCs). Results from the biennial sampling event indicated overall plume stability and delineation for the plume, which extends over 300 acres. The operational period for Year 13 of the HCS was from April 1, 2022 to March 31, 2023. Operational runtime for the system was 90 percent during Year 13, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2023, a total of 313,673,241 cumulative gallons of groundwater containing 88,337 pounds of VOCs have been removed by the HCS. Influent concentrations of trichloroethene (TCE) have decreased since startup from approximately 280,000 μg/L (January 2010) to 12,000 μg/L (March 2023). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2022 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2021. Full vertical profile sampling was completed at each DPT from 8 to 98 feet bls, at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 μg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 8 to 98 feet bls. In addition to DPT sampling, groundwater samples were collected from deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2022 to verify vertical delineation. Layer 7/8 monitoring well results were non-detect in December 2022, with exception of three wells (IW0162, IW043D2, and IW044D2), where TCE, cis-1,2-dichloroethene (cDCE), and/or vinyl chloride (VC) were detected above GCTLs. These wells are screened 105 to 115 feet bls, which is below the existing recovery well capture zone. TCE was first detected in IW0162 in December 2021 and has since been sampled at least monthly to monitor TCE concentrations. The maximum TCE concentration during this operational period was 15,000 μg/L at IW0162 in March 2023. Because of the increased TCE concentrations in this well, a new recovery well (RW21D), screened 86 to 106 feet bls, was installed in January 2023 and incorporated into existing HCS operations. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual in 2020. The HS 6 AS system remained operational during the reporting period covered under this report. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2022 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. A Phase Two Expansion of the HS 6 AS IM was recently completed. As of the date of this report, the expansion became operational in August 2023 and the first quarter of monitoring was conducted in November 2023. Details of the construction, start-up, and performance monitoring will be included in a future Annual PMR. Overall, the tasks associated with Year 13 operation of the HC IM, operation of the HS 6 AS IM, and biennial site-wide sampling were performed in accordance with recommendations included in the previous 2021 LC34 (Year 12) annual report. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives. Results from the site-wide biennial LTM program also show that the overall network of monitoring wells is adequate to continue monitoring plume-wide conditions.

Complex 34↗

Storm-DEPART (Damage Estimate Prediction and Recovery Tool)

Storm-DEPART (Damage Estimate Prediction and Restoration Tool): Each year hurricanes and tropical storms in the United States damage critical infrastructure assets, disrupt the services they provide, and cause millions to billions of dollars in economic impacts due to extended recovery times. The Storm-DEPART tool and analytical output enable more impactful data-driven decision-making capabilities and strengthen national-level disaster preparedness, response, and recovery. Storm-DEPART, built through multi-month collaboration between Entergy and INL, combines Entergy’s critical infrastructure inventory data with weather forecasts to predict damages to Electric utility’s assets due to natural disasters and the estimated recovery support needed, including time, materials, and resource allocation. In the event of an approaching hurricane, this innovative solution can assess potential damage to power generation capacity, transmission grids, distribution networks, and communications assets from wind bands, storm surge, and flooding. With more effective predictions, Entergy can more efficiently allocate resources to mitigate impacts and optimize recovery for customers. Storm-DEPART also allows Electric utilities the ability to apply a planning scenario and model expected damage to better inform infrastructure restoration needs leading to enhance system resiliency. The technology is fully transferrable to other electric utilities with the same damage estimating challenges. The INL team is working on the evolution of Storm-DEPART to include ice event damage prediction framework.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Decommissioning of Air Sparge System at Vertical Processing Facility, Solid Waste Management Unit 077 Implementation Report

This document discusses the decommissioning of the air sparge (AS) system at the Vertical Processing Facility (VPF), Solid Waste Management Unit 077 at Kennedy Space Center, Florida completed between January 30, 2023, and February 8, 2023. A 2005 Resource Conservation and Recovery Act Facility Investigation identified chlorinated volatile organic compound impacts at the site. Following assessment activities, an AS system was in operation intermittently from April 2012 through October 2017, when the system was permanently shutdown due to equipment failure. Trichloroethene and vinyl chloride remained above their groundwater cleanup target levels in several monitoring wells and the site was moved into the Industrial Area Long Term Monitoring Program. VPF continues to be sampled biennially; the most recent event was May 2022. Successful implementation of this decommissioning project will reduce the risk of accidental AS and soil vapor extraction well damage and will lower operating costs associated with maintaining obsolete AS systems. Decommissioning the AS system at VPF included vegetation clearing to access AS wells and associated piping, abandonment of all on site AS wells, temporary electrical outage, and site restoration. At the completion of demobilization and site restoration activities, the site was returned to its original or better than original condition.

Jason J Bublitz↗

Reinforcement Learning for Intentional Islanding in Resilient Power Transmission Systems

Intentional islanding is the process of identifying and deliberately decomposing the transmission network to form self-sustained islands from an endangered network during disruptions to improve resilience and security. Most existing intentional islanding models are offline resilience decision tools and hence do not provide outage responses in a timely manner. In this paper, a reinforcement learning (RL) based model for intentional islanding is developed, which offers real-time switching control, online deployability, and adaptability to varying system conditions. The intentional islanding process is formulated as a Markov decision process, where the optimal transmission switching policy is learned using the RL approach. The control policy is learned over an environment that encompasses a Power System Simulator for Engineering (PSS/E) model of the transmission network, facilitated by an interface to the standard openAI Gym framework. The proposed RL-based methodology aims to form stable and self-sustainable islands by ensuring voltage stability while reducing the power mismatch in the formed islands. A proximal policy optimization algorithm is designed, which is suitable for controlling the on/off status of the switches with multi-layer perceptron as value and actor networks. The effectiveness of the proposed framework in the self-recovery of the grid by island formation is applied on the modified IEEE 39-bus test network and validated by dynamic simulations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Distribution System Blackstart and Restoration Using DERs and Dynamically Formed Microgrids

Extreme weather events have led to long-duration outages in the distribution system (DS), necessitating novel approaches to blackstart and restore the system. Existing blackstart solutions utilize blackstart units to establish multiple microgrids (MGs), sequentially energize non-blackstart units, and restore loads. However, these approaches often result in isolated MGs. In DERs-aided blackstart, the continuous operation of these MGs is limited by the finite energy capacity of commonly used blackstart units like battery energy storage (BES)-based gridforming inverters (GFMIs). To address this issue, this article proposes a holistic blackstart and restoration framework that incorporates synchronization between dynamic MGs and the entire DS with the transmission grid (TG). To support synchronization, we leveraged virtual synchronous generator-based control for GFMIs to estimate their frequency response to load pick-up events using only initial/final quasi-steady-state points. Subsequently, a synchronization switching condition is developed to model synchronizing switches, aligning them seamlessly with a linearized branch flow problem. Finally, we designed a bottomup blackstart and restoration framework that considers the switching structure of the DS, energizing/synchronizing switches, DERs with grid-following inverters, and BES-based GFMIs with frequency security constraints. In conclusion, the proposed framework is validated in IEEE-123-bus system, considering cases with two and four GFMIs under various TG recovery instants.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The LSBmax algorithm for boosting resilience of electric grids post (N‐2) contingencies

Abstract A computationally improved algorithm is presented to find the best transmission switching (TS) candidate for boosting resilience of electricity grids subject to ( N ‐2) contingencies. Here, resilience is computed as the reduction in load shed after the above‐mentioned ( N‐ ) contingencies. TS is a planned line outage, and past research shows that changing the transmission system's topology changes the power flow and removes post contingency violations. Finding the best TS candidate in a computationally suitable time for effectively boosting resilience is a challenge. The best TS candidate is found using a novel heuristic method by decreasing the search space based on proximity to the bus with the maximum load shedding (LSB). The LSB algorithm is faster than existing algorithms in the literature; and, it is compatible with both the AC and DC optimal power flow formulations. To validate the authors' claims of speedup and accuracy, two metrics are used to analyze the results from the IEEE 39‐bus and 118‐bus systems. Finally, the inherent parallelism of the LSB algorithm is leveraged on a high‐performance computing platform and applied to the large‐scale Polish 2383‐bus test system to validate scalability in both size and speedup in computation time.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Technology Maturation of Wireless Harsh Environment Sensors For Improved Condition Based Monitoring Of Coal Fired Power Generation

The overall goal of this project was to demonstrate and develop the usage of high-temperature (HT) harsh-environment (HE) wireless surface acoustic wave resonator (SAWR) sensor technology to promote reliable maintenance through condition-based maintenance (CBM) for field applications in harsh service conditions associated with power plant environments. The project aimed to advance the HT HE wireless SAWR sensor technology from TRL 5 to TRL 7. In addition to HT HE wireless temperature sensing, efforts were dedicated during this project to investigate, develop and increase the TRL from 3 to 5 for the following technologies: (a) HT HE strain sensors to address additional CBM monitoring needs, such as boiler tube mechanical / thermal stresses, which can provide early indications for boiler tube cracking and failure; and (b) HT aluminum nitride (AlN) and scandium aluminum nitride (ScAlN) based piezoelectric thin film fabrication and implementation of SAW sensors, with the goal of releasing the need to use single crystal piezoelectric materials for SAWRs and thus broaden possible technology applications to non-planar and harder to modify surfaces. To achieve the goals mentioned above, UMaine and its partner, Environetix Technologies Corporation, established partnerships with the following power plants: Longview Power (Maidsville, WV), a coal-fired power plant; Penobscot Energy Recovery Corp (PERC, Orrington, ME), a waste-to-energy power plant; and the UMaine Steam Plant (Orono, ME), an oil / natural gas power plant. To realize wireless HT HE SAWR sensor systems in these harsh service conditions, the University of Maine research team worked with Environetix and these power plants to define, design, fabricate, test and validate a mature prototype wireless temperature SAWR sensor system for boiler tube applications within the HT HE of the reheater pass damper chamber to directly and wirelessly monitor the temperature at eighteen independent boiler tube locations. The system included three levels, or “tiers”, of wireless communication to enable remote monitoring: Tier 1, the wireless link in the reheater pass damper chamber directly accessing the sensors on the boilers; Tier 2, the wireless local area network link, transmitting processed sensor information within the power plant to the Tier 3, a commercial wireless signal carrier company for secure remote data monitoring outside of the power plant. Regarding the wireless sensor system installed at Longview Power, temperature information from the boilers was continuously transmitted from the Longview boilers at Maidsville, WV, to Environetix headquarters, Orono, ME, over a 34 month period, when the system was finally decommissioned. Strain sensors and piezoelectric ScAlN thin film sensors were successfully installed on the exhaust duct at the UMaine Steam Power plant. The advances in wireless strain sensors and thin film piezoelectric film fabrication and testing were performed mostly in UMaine laboratories and field tested at the UMaine Steam Plant, due to its close proximity to UMaine/Environetix, access to the plant facility, and due to difficulties in accessing the other power plants during the COVID shut-down period. The project accomplished the TRL level increase of the targeted CBM technologies through the successful fabrication, installation, test, and validation of dedicated and commercial wireless sensor systems, utilizing the three different power plants. The outcomes of this project, including the wireless sensor data capability, are expected to yield an advance for CBM in harsh power plant environments. The reduction of maintenance costs, improved safety during plant operation, and increased power plant efficiency will lead to increased revenues (i.e., fewer forced outages) due to better process monitoring enabled by the wireless HT HE SAWR temperature sensor technology.

20 FOSSIL-FUELED POWER PLANTS↗