Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Optimal Allocation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Optimizing resource allocation in Miscanthus breeding via sparse testing designs for genomic prediction

Phenotyping high-biomass perennial crops is laborious and the rate of genetic gain in conventional perennial crop breeding programs is typically low. So, it is especially important to identify methods that produce efficiency gains in the breeding process. Miscanthus is a C4 perennial grass with favorable characteristics for producing biomass as a feedstock for biofuels and diverse bio-based products. Increasing biomass yield will increase profitability and environmental benefits, so it is a key target for Miscanthus breeding. In addition, the identification of well-adapted genotypes across a wide range of environmental conditions requires the establishment of multi-environment trials (METs). Sparse testing is a genomic prediction-based strategy that reduces the phenotyping costs in METs by selecting a subset of genotypes to evaluate in a subset of environments and then predicts the performance of the unobserved genotype-environment combinations. A Miscanthus sacchariflorus (MSA) population comprising 336 genotypes observed across three environments was analyzed implementing sparse testing designs. Three prediction models considering main effects (environments, genotypes, genomic) and interaction effects (genotype-by-environment; G×E interaction) were implemented for forecasting dry biomass yield (YDY), total culm (TCM), average internode length (AIL), and culm node number (CNN). Multiple calibration sets based on different compositions and sizes were considered to evaluate performance in terms of the predictive ability (PA) and the mean square error (MSE) for a fixed testing set size. The training set size ranged from 52 to 112 to predict a fixed set of 224 unobserved genotypes across all three environments. The results showed that the model accounting for G×E interaction consistently presented the highest PA and the lowest MSE: for CNN (PA: ~0.77, MSE: ~0.5) and YDY (PA: ~0.70, MSE: ~1.3) while for TCM and AIL these ranged from ~0.28 to 0.41 and ~1.3 to 4.3, respectively. Overall, varying training sets and allocation strategies did not affect PA and MSE, with 52 non-overlapping and 0 overlapping genotypes per environment as the optimal cost-effective allocation framework. This suggests that implementing sparse testing designs could significantly reduce phenotyping costs by fivefold, without compromising PA in breeding programs for perennial crops such as Miscanthus.

Miscanthus sacchariflorus (MSA)↗

Development of an Optimal Water Allocation Decision Tool for the Major Crops During the Water Deficit Period in the Southeast U.S.

We developed a dynamic model to optimize irrigation application in three major crops (corn, cotton and peanuts) grown in the Southeast USA. Water supply amount is generated from an engineering model which is then combined with economic models to find the optimal amount of irrigation water to apply on each crop field during the six critical water deficit weeks in summer. Results indicate that water is applied on the crop with the highest marginal value product of irrigation. Decision making tool such as the one developed here would help farmers and policy makers to find the maximum profitable solution when water shortage is a serious concern.

Paudel, Krishna P.↗

An intelligent allocation algorithm for parallel processing

The problem of allocating nodes of a program graph to processors in a parallel processing architecture is considered. The algorithm is based on critical path analysis, some allocation heuristics, and the execution granularity of nodes in a program graph. These factors, and the structure of interprocessor communication network, influence the allocation. To achieve realistic estimations of the executive durations of allocations, the algorithm considers the fact that nodes in a program graph have to communicate through varying numbers of tokens. Coarse and fine granularities have been implemented, with interprocessor token-communication duration, varying from zero up to values comparable to the execution durations of individual nodes. The effect on allocation of communication network structures is demonstrated by performing allocations for crossbar (non-blocking) and star (blocking) networks. The algorithm assumes the availability of as many processors as it needs for the optimal allocation of any program graph. Hence, the focus of allocation has been on varying token-communication durations rather than varying the number of processors. The algorithm always utilizes as many processors as necessary for the optimal allocation of any program graph, depending upon granularity and characteristics of the interprocessor communication network.

Carroll, Chester C.↗

A Method for the Selection of Exploration Areas for Unconformity Uranium Deposits

The method we propose employs two analyses: (1) exploration simulation and risk valuation and (2) portfolio optimization. The first analysis, implemented by the investment worth system (IWS), uses Monte Carlo simulation to integrate a wide spectrum of uncertain and varied components to a relative frequency histogram for net present value of the exploration investment, which is converted to a risk-adjusted value (RAV). Iterative rerunning of the IWS enables the mapping of the relationship of RAV to magnitude of exploration expenditure, X. The second major analysis uses RAV vs. X maps to identify that subset (portfolio) of areas that maximizes the RAV of the firm's multiyear exploration budget. The IWS, which is demonstrated numerically, consists of six components based on the geologic description of a hypothetical basin and project area (PA) and a mix of hypothetical and actual conditions of an unidentified area. The geology is quantified and processed by Bayesian belief networks to produce the geology-based inputs required by the IWS. An exploration investment of $60 M produced a highly skewed distribution of net present value (NPV), having mean and median values of $4,160 M and $139 M, respectively. For hypothetical mining firm Minex, the RAV of the exploration investment of $60 M is only $110.7 M. An RAV that is less than 3% of mean NPV reflects the aversion by Minex to risk as well as the magnitude of risk implicit to the highly skewed NPV distribution and the probability of 0.45 for capital loss. Potential benefits of initiating exploration of a portfolio of areas, as contrasted with one area, include increased marginal productivity of exploration as well as reduced probability for nondiscovery. For an exogenously determined multiyear exploration budget, a conceptual framework for portfolio optimization is developed based on marginal RAV exploration products for candidate PAs. PORTFOLIO, a software developed to implement optimization, allocates exploration to PAs so that the RAV of the exploration budget is maximized. Moreover, PORTFOLIO provides a means to examine the impact of magnitude of budget on the composition of the exploration portfolio and the optimum allocation of exploration to PAs that comprise the portfolio. Using fictitious data for five PAs, a numerical demonstration is provided of the use of PORTFOLIO to identify those PAs that comprise the optimum exploration portfolio and to optimally allocate the multiyear budget across portfolio PAs.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Can pilots time-share better than non-pilots?

The time-sharing ability of 12 male pilots and 12 male college students ranging in age from 18-36 are evaluated and compared. The subjects performed five pairs of dual tasks with varying degrees of structural similarity; the test procedures are described. The time-sharing efficiency and resource allocation optimality of the subjects are analyzed. The data reveal that the pilots and students display similar time-sharing performance; the degree of time-sharing efficiency decreases and resource allocation optimality increases with an increasing degree of structural similarity between the time-shared tasks.

Tsang, P. S.↗

Optimal Black Start Allocation for Power System Restoration

Equipment failures, operator errors, natural disasters and cyber-attacks can and have caused extended blackouts of the electric grid. Even though such events are rare, preparedness for them is critical because extended power outages endanger human lives, compromise national security, or result in economic losses of billions of dollars. Since most of the generating units cannot restart without connecting to an energized grid, the system operator relies on a few units with the ability to start autonomously, called Black Start (BS) units, to restore the power system. Allocating and maintaining these units is costly and can severely impact the restoration security and time. We formulate an optimization problem to optimally allocate BS units in the grid, while simultaneously optimizing over the restoration sequence. We extend existing optimal allocation models by including grid considerations such as active power nodal balance, transmission switching, nodal reactive power support and voltage limits. In order to aid the branch and bound tree that solves the resulting large scale mixed integer program, we propose a randomized heuristic that is executed multiple times in parallel on a high-performance computing environment to find feasible solutions. Here, we proceed to solve the IEEE-39, the IEEE-118, and a simplified WECC system with 225 nodes and 136 generators to near optimality.

97 MATHEMATICS AND COMPUTING↗

Power Optimal Control Allocation for Distributed Electric Propulsion in a Series/Parallel Hybrid Powertrain

This paper describes a thrust allocation scheme that minimizes power consumption in an electrified powertrain with Distributed Electric Propulsion. It takes advantage of an observation about component efficiency maps, that efficiency is often highest at high torque/high speed conditions. This optimal approach is demonstrated to satisfy total thrust and net yaw axis torque requirements, making it suitable for utilizing differential thrust for maneuvering.

electrified aircraft propulsion↗

Power Optimal Control Allocation for Distributed Electric Propulsion in a Series/Parallel Hybrid Powertrain

This paper describes a thrust allocation scheme that minimizes power consumption in an electrified powertrain with Distributed Electric Propulsion. It takes advantage of an observation about component efficiency maps, that efficiency is often highest at high torque/high speed conditions. This optimal approach is demonstrated to satisfy total thrust and net yaw axis torque requirements, making it suitable for utilizing differential thrust for maneuvering.

electrified aircraft propulsion↗

Power Optimal Control Allocation for Distributed Electric Propulsion in a Series/Parallel Hybrid Powertrain

This paper describes a thrust allocation scheme that minimizes power consumption in an electrified powertrain with Distributed Electric Propulsion. It takes advantage of an observation about component efficiency maps, that efficiency is often highest at high torque/high speed conditions. This optimal approach is demonstrated to satisfy total thrust and net yaw axis torque requirements, making it suitable for utilizing differential thrust for maneuvering.

electrified aircraft propulsion↗

Iterative-deepening heuristic search for optimal and semi-optimal resource allocation

It is demonstrated that when iterative-deepening A asterisk (IDA asterisk) is applied to one type of resource allocation problem, it uses far less storage than A asterisk, but opens far more nodes and thus has unacceptable time complexity. This is shown to be due, at least in part, to the low-valued effective branching factor that is a characteristic of problems with real-valued cost functions. The semi-optimal, epsilon-admissible IDA asterisk sub epsilon search algorithm that the authors described was shown to open fewer nodes than both A asterisk and IDA asterisk with storage complexity proportional to the depth of the search tree.

Bridges, Susan M.↗

Linear Approximation to Optimal Control Allocation for Rocket Nozzles with Elliptical Constraints

In this paper we present a straightforward technique for assessing and realizing the maximum control moment effectiveness for a launch vehicle with multiple constrained rocket nozzles, where elliptical deflection limits in gimbal axes are expressed as an ensemble of independent quadratic constraints. A direct method of determining an approximating ellipsoid that inscribes the set of attainable angular accelerations is derived. In the case of a parameterized linear generalized inverse, the geometry of the attainable set is computationally expensive to obtain but can be approximated to a high degree of accuracy with the proposed method. A linear inverse can then be optimized to maximize the volume of the true attainable set by maximizing the volume of the approximating ellipsoid. The use of a linear inverse does not preclude the use of linear methods for stability analysis and control design, preferred in practice for assessing the stability characteristics of the inertial and servoelastic coupling appearing in large boosters. The present techniques are demonstrated via application to the control allocation scheme for a concept heavy-lift launch vehicle.

Orr, Jeb S.↗

Optimal Control Allocation for Distributed Electric Propulsion in A Series/Parallel Partial Hybrid Powertrain

The SUbsonic Single Aft eNgine (SUSAN) Electrofan is a NASA concept transport aircraft representative of technology anticipated for a 2040 entry-into-service date. The powertrain consists of a single thrust-producing geared turbofan engine with generators driving a series/parallel partial hybrid power/propulsion system. The architecture includes 16 underwing contrarotating fans, eight on each side. The distributed fans can be used by the flight control system to augment or replace the rudder function. This paper sets up the optimal control problem of setpoint determination for individual wingfans in the distributed propulsion system, accounting for electrical string efficiencies, saturations, and failures. The solution minimizes power consumption while maintaining thrust and torque on the airframe for maneuvering. Additionally, thrust that would have been lost due to temporary fan speed or power saturation is optimally redistributed to maintain overall desired thrust and torque on the aircraft. A simulation of a coordinated turn utilizing the distributed electric propulsion for yaw rate control in a multiple wingfan failure scenario demonstrates the robustness of the powertrain design to failures and helps define its limitations.

Distributed Electric Propulsion↗

Optimal Control Allocation for Distributed Electric Propulsion in A Series/Parallel Partial Hybrid Powertrain

The SUbsonic Single Aft eNgine (SUSAN) Electrofan is a NASA concept transport aircraft representative of technology anticipated for a 2040 entry-into-service date. The powertrain consists of a single thrust-producing geared turbofan engine with generators driving a series/parallel partial hybrid power/propulsion system. The architecture includes 16 underwing contrarotating fans, eight on each side. The distributed fans can be used by the flight control system to augment or replace the rudder function. This paper sets up the optimal control problem of setpoint determination for individual wingfans in the distributed propulsion system, accounting for electrical string efficiencies, saturations, and failures. The solution minimizes power consumption while maintaining thrust and torque on the airframe for maneuvering. Additionally, thrust that would have been lost due to temporary fan speed or power saturation is optimally redistributed to maintain overall desired thrust and torque on the aircraft. A simulation of a coordinated turn utilizing the distributed electric propulsion for yaw rate control in a multiple wingfan failure scenario demonstrates the robustness of the powertrain design to failures and helps define its limitations.

Distributed Electric Propulsion↗

Optimal service allocation among two heterogeneous traffic types with no queueing

Two communication traffic streams with Poisson statistics arrive at a network node. These are to be transmitted across a channel with a total bandwidth capacity of C slots. Messages not accepted at the node are assumed to be lost. Under the assumptions of exponential service time distributions, the problem of dynamic allocation of available channel bandwidth among the two traffic types is studied in order to minimize a weighted sum of blocking probabilities. Modeling the system as a two-dimensional Markov chain is studied to minimize a weighted sum of blocking probabilities. Modeling the system as a two-dimensional Markov chain, it is shown by an application of dynamic programming principles that the optimal policy has the form of a 'switching curve'.

Lambadaris, I.↗

Optimal Control Allocation with Load Sensor Feedback for Active Load Suppression, Experiment Development

The problem of control command and maneuver induced structural loads is an important aspect of any control system design. The aircraft structure and the control architecture must be designed to achieve desired piloted control responses while limiting the imparted structural loads. The classical approach is to utilize high structural margins, restrict control surface commands to a limited set of analyzed combinations, and train pilots to follow procedural maneuvering limitations. With recent advances in structural sensing and the continued desire to improve safety and vehicle fuel efficiency, it is both possible and desirable to develop control architectures that enable lighter vehicle weights while maintaining and improving protection against structural damage. An optimal control technique has been explored and shown to achieve desirable vehicle control performance while limiting sensed structural loads. The subject of this paper is the design of the optimal control architecture, and provides the reader with some techniques for tailoring the architecture, along with detailed simulation results.

controls↗

Optimal Control Allocation with Load Sensor Feedback for Active Load Suppression, Flight-Test Performance

The problem of control command and maneuver induced structural loads is an important aspect of any control system design. The aircraft structure and the control architecture must be designed to achieve desired piloted control responses while limiting the imparted structural loads. The classical approach is to utilize high structural margins, restrict control surface commands to a limited set of analyzed combinations, and train pilots to follow procedural maneuvering limitations. With recent advances in structural sensing and the continued desire to improve safety and vehicle fuel efficiency, it is both possible and desirable to develop control architectures that enable lighter vehicle weights while maintaining and improving protection against structural damage. An optimal control technique has been explored and shown to achieve desirable vehicle control performance while limiting sensed structural loads to specified values. This technique has been implemented and flown on the National Aeronautics and Space Administration Full-scale Advanced Systems Testbed aircraft. The flight tests illustrate that the approach achieves the desired performance and show promising potential benefits. The flights also uncovered some important issues that will need to be addressed for production application.

cFOSS↗

Optimal Control Allocation for Distributed Electric Propulsion in a Series/Parallel Partial Hybrid Powertrain

The SUbsonic Single Aft eNgine (SUSAN) Electrofan is a NASA concept jet transport aircraft with a 2040 entry-into-service date. It utilizes electrified aircraft propulsion (EAP) to enable propulsive and aerodynamic benefits to reduce fuel usage, emissions, and cost. The powertrain consists of a single thrust producing, boundary layer-ingesting (BLI) turbofan gas turbine engine (GTE) with generators driving a series/parallel partial hybrid EAP system. The architecture includes 16 underwing contrarotating BLI fans, eight on each side, in a mailslot configuration. The 16 fans run on power extracted from the GTE through four 5 MW motor/generators connected to the Low-Pressure Spool, and a single 1 MW motor/generator on the High-Pressure Spool. The distributed fans can be used by the flight control to augment or replace the rudder function. At top of climb, the power extracted from the GTE for the fans is boosted by batteries. The design provides redundancy, and the capacity for boost means that the fans are designed to be able to provide additional thrust when necessary. These features can be leveraged in case of a fan or generator failure. This paper sets up the optimal control problem of setpoint determination for individual fans in the distributed propulsion system, accounting for electrical string efficiencies, saturations, and failures. The solution minimizes power consumption while maintaining thrust and torque on the airframe for maneuvering. Additionally, thrust that would have been lost due to temporary fan speed or power saturation is optimally redistributed to maintain overall desired thrust and torque on the aircraft. The power extraction range constraints derive from the gas turbine engine design and the small amount of variation allowed for the engine to maintain operability. The problem formulation allows the number and location of fan failures for which the thrust and torque can be maintained to be investigated, which has implications for certification. Simulations of a coordinated turn utilizing the distributed electric propulsion for yaw rate control under different failure scenarios demonstrate the robustness of the powertrain design to failures and help define its limitations.

Distributed Electric Propulsion↗