Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Operations coordination plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Firmware Architecture of the ARMADAS Bolting Robot

The Automated Reconfigurable Mission Adaptive Digital Assembly Systems (ARMADAS) project, under development at NASA Ames Research Center, has demonstrated on-ground autonomous robotic assembly of extensive digital structures, and it is now moving forward towards in-space demonstration. The ARMADAS system comprises of the operation software, the operation user interface (opsUI), and a swarm of robots. The robotic system consists of a multitude of collaborative agents specifically designed to transport, place and bolt the building blocks, called voxels (volumetric pixels). This paper focuses on the bolting robot, referred to as Mobile Metamaterial Internal Co-Integrator (MMIC-I). MMIC-I is a battery-powered crawling robot. It navigates the structure through extension, contraction and gripping. Two distinct controller boards operate the robot's two symmetric modules, referred to as module A and B. Board A is the master board: it coordinates motion planning and motion primitives execution, hosts the WiFi client, performs periodic self-assessment and system idle check and triggers faults if anomalies are detected. Board B periodically sends a heartbeat to board A, through a wired communication channel that uses the Serial protocol. Additionally, board A's WiFi client receives heartbeat packet requests or motion/bolting commands from a dedicated server board, and acknowledges reception sending back a response heartbeat packet containing information about the overall robot status, e. g. electrical current and voltage values, target and actual angles, operating mode, fault status. Whenever a motion command is sent, the motion planning section of the firmware determines the current robot configuration, using Inertial Measurement Unit readings and the motors Pulse Width Modulation values. Afterwards, it calculates the list of primitives needed to reach the target state, and controls their execution in the proper order. MMIC-I can receive and execute motion and bolting commands only when it is in operational mode. MMIC-I has three operating modes: standby, operational and safed. Standby mode is automatically entered upon startup. While in standby mode, all motors are powered off, and the only accepted commands are the ones relative to a change of mode and heartbeat packet request. Fault detection causes the robot to automatically enter safed or standby mode. Whenever the detected fault occurs within a motion and requires immediate intervention, e. g. an over-current situation, the robot enters safed mode. Safed mode powers off all motors except for the locomotion module, thus preventing the robot from collapsing. Conversely, when the detected fault doesn't require immediate intervention (low battery warning, for instance), the robot enters standby mode after completing the ongoing motion. This paper provides a detailed discussion of MMIC-I's firmware architecture. It accurately describes the implementation approach for each module: sensor data reading, motor control and actuation, WiFi server-client communication, intra-boards Serial communication, operating modes and autonomous fault detection, motion planning, coordination and execution, etc. Moreover, in support of the software description, this paper includes a thorough characterization of MMIC-I's hardware and avionics.

In-space assembly↗

Cyber Conservative Operations

In an era of increasingly sophisticated and pervasive cyber threats, robust cyber resilience strategies are more critical than ever. This paper introduces the concept of Cyber Conservative Operations, a proactive approach designed to assist critical infrastructure owners and operators in managing risk and maintaining resilience in the face of imminent, yet not occurring, cyber events. By leveraging the principles of Cyber-Informed Engineering (CIE) and the energy sector’s practice of conservative operations, Cyber Conservative Operations offer a framework for planning and executing coordinated active defense and resilience-oriented actions ahead of cyber events. This approach aims to minimize the consequences of digitally-enabled hazards and ensure swift recovery from anticipated cyber threats. Cyber Conservative Operations enhance the ability of owners and operators to execute pre-planned defense and resilience actions, thereby reducing the impact of digitally-enabled hazards. These operations are crucial for addressing impacts that cannot be precisely quantified or forecasted and for preparing organizations for rapid recovery from imminent digital threats. The paper begins with a discussion of conservative operations as applied to the bulk power system (BPS), a current mechanism allowing BPS entities to enact defensive operating plans to mitigate impending grid unreliability. Building on this model, we present a concept for implementing cyber conservative operations at asset owner facilities. The paper concludes with two case studies of cyber conservative operations drawn from high-profile cyber events, illustrating the practical application and benefits of this proactive approach.

42 - ENGINEERING↗

A Case Study in NREL DERMS Asset Management Implementation

The National Renewable Energy Laboratory (NREL) and Smarter Grid Solutions (SGS) plan to present a case study on their implementation of SGS' Strata Grid Distributed Energy Resource Management System at NREL's Energy Systems Integration Facility (ESIF). The ESIF is one of the nation's premier energy systems integration laboratory facilities focused on development and deployment of clean energy technologies and resilient delivery systems. NREL looked for a DERMS to install at the ESIF that is capable of replicating real world scenarios to control and monitor distributed devices from small residential scale to the grid substation level. The DERMS system demonstrates the use cases of beneficial operation and coordination of modern grid devices, leverage DERs for improved grid planning and operation, demand-side management and customer engagement through bidirectional communication with utilities and energy market operations. The presentation will cover the delivery strategy of NREL and SGS, how the use cases help NREL's research, and NREL and SGS plan to expand the system and use cases.

ARIES↗

Identifying Key Issues and Potential Solutions for Integrated Arrival, Departure, Surface Operations by Surveying Stakeholder Preferences

NASA's Aeronautics Research Mission Directorate (ARMD) collaborates with the FAA and industry to provide concepts and technologies that enhance the transition to the next-generation air-traffic management system (NextGen). To facilitate this collaboration, ARMD has a series of Airspace Technology Demonstration (ATD) sub-projects that develop, demonstrate, and transitions NASA technologies and concepts for implementation in the National Airspace System (NAS). The second of these sub-projects, ATD-2, is focused on the potential benefits to NAS stakeholders of integrated arrival, departure, surface (IADS) operations. To determine the project objectives and assess the benefits of a potential solution, NASA surveyed NAS stakeholders to understand the existing issues in arrival, departure, and surface operations, and the perceived benefits of better integrating these operations. NASA surveyed a broad cross-section of stakeholders representing the airlines, airports, air-navigation service providers, and industry providers of NAS tools. The survey indicated that improving the predictability of flight times (schedules) could improve efficiency in arrival, departure, and surface operations. Stakeholders also mentioned the need for better strategic and tactical information on traffic constraints as well as better information sharing and a coupled collaborative planning process that allows stakeholders to coordinate IADS operations. To assess the impact of a potential solution, NASA sketched an initial departure scheduling concept and assessed its viability by surveying a select group of stakeholders for a second time. The objective of the departure scheduler was to enable flights to move continuously from gate to cruise with minimal interruption in a busy metroplex airspace environment using strategic and tactical scheduling enhanced by collaborative planning between airlines and service providers. The stakeholders agreed that this departure concept could improve schedule predictability and suggested several key attributes that were necessary to make the concept successful. The goals and objectives of the planned ATD-2 sub-project will incorporate the results of this stakeholder feedback.

integrated arrival/departure/surface operations↗

Minimum deltaV Burn Planning for the International Space Station Using a Hybrid Optimization Technique, Level 1

The International Space Station's (ISS) trajectory is coordinated and executed by the Trajectory Operations and Planning (TOPO) group at NASA's Johnson Space Center. TOPO group personnel routinely generate look-ahead trajectories for the ISS that incorporate translation burns needed to maintain its orbit over the next three to twelve months. The burns are modeled as in-plane, horizontal burns, and must meet operational trajectory constraints imposed by both NASA and the Russian Space Agency. In generating these trajectories, TOPO personnel must determine the number of burns to model, each burn's Time of Ignition (TIG), and magnitude (i.e. deltaV) that meet these constraints. The current process for targeting these burns is manually intensive, and does not take advantage of more modern techniques that can reduce the workload needed to find feasible burn solutions, i.e. solutions that simply meet the constraints, or provide optimal burn solutions that minimize the total DeltaV while simultaneously meeting the constraints. A two-level, hybrid optimization technique is proposed to find both feasible and globally optimal burn solutions for ISS trajectory planning. For optimal solutions, the technique breaks the optimization problem into two distinct sub-problems, one for choosing the optimal number of burns and each burn's optimal TIG, and the other for computing the minimum total deltaV burn solution that satisfies the trajectory constraints. Each of the two aforementioned levels uses a different optimization algorithm to solve one of the sub-problems, giving rise to a hybrid technique. Level 2, or the outer level, uses a genetic algorithm to select the number of burns and each burn's TIG. Level 1, or the inner level, uses the burn TIGs from Level 2 in a sequential quadratic programming (SQP) algorithm to compute a minimum total deltaV burn solution subject to the trajectory constraints. The total deltaV from Level 1 is then used as a fitness function by the genetic algorithm in Level 2 to select the number of burns and their TIGs for the next generation. In this manner, the two levels solve their respective sub-problems separately but collaboratively until a burn solution is found that globally minimizes the deltaV across the entire trajectory. Feasible solutions can also be found by simply using the SQP algorithm in Level 1 with a zero cost function. This paper discusses the formulation of the Level 1 sub-problem and the development of a prototype software tool to solve it. The Level 2 sub-problem will be discussed in a future work. Following the Level 1 formulation and solution, several look-ahead trajectory examples for the ISS are explored. In each case, the burn targeting results using the current process are compared against a feasible solution found using Level 1 in the proposed technique. Level 1 is then used to find a minimum deltaV solution given the fixed number of burns and burn TIGs. The optimal solution is compared with the previously found feasible solution to determine the deltaV (and therefore propellant) savings. The proposed technique seeks to both improve the current process for targeting ISS burns, and to add the capability to optimize ISS burns in a novel fashion. The optimal solutions found using this technique can potentially save hundreds of kilograms of propellant over the course of the ISS mission compared to feasible solutions alone. While the software tool being developed to implement this technique is specific to ISS, the concept is extensible to other long-duration, central-body orbiting missions that must perform orbit maintenance burns to meet operational trajectory constraints.

Brown, Aaron J.↗

Managing the Electricity-Gas Interface: Current Environment and Emerging Solutions

Natural gas generators are now the largest producers of electricity in the United States and the largest single end-use consumer of natural gas. Natural gas markets, which first developed to meet commercial and residential heating demands during winter months, are now entwined with electricity markets, which developed when natural gas provided a much lower fraction of total fuel supply for the electricity market. More coordination, both in daily operations and long-term planning, is required to ensure the continued supply of reliable electricity and natural gas. This report provides an overview of the evolution and current state of electricity and natural gas markets in the United States and summarizes the ways in which the two industries interact. The report describes areas warranting greater coordination between the natural gas and electricity industries. This report also discusses the current state of natural gas and electricity models and the need for integrated models that include dynamic simulations of pipeline operations, especially when large amounts of variable generation exists in the electrical system. It outlines current modeling work being done to better simulate operations and planning of both systems.

54 ENVIRONMENTAL SCIENCES↗

Ground Segment Operations Concept for the Orion Artemis-2 Optical Communications System

The ACCESS Project (formerly Space Network) will implement an optical communications ground segment to support the Orion Artemis II Optical Communications (O2O) demonstration as part of the next manned human spaceflight mission to the moon, Artemis II. O2O implements laser communication (lasercomm) technology for operational use on the Orion series of spacecraft, as a development test objective (DTO), in order to demonstrate the feasibility and operational utility of lasercomm for human spaceflight missions. O2O consists of three segments: Space Segment, Ground Segment, and Operations Segment. The Space Segment consists of the Space Terminal Element and the Orion spacecraft. The Space Terminal Element effort is managed by the GSFC Laser-Enhanced Mission Communications Navigation and Operational Services (LEMNOS) project in collaboration with MIT Lincoln Laboratory. The Ground Segment consists of an optical ground terminal (GT) at the White Sands Complex (WSC), which is being developed in collaboration with MIT Lincoln Laboratory, the Ground Segment Operations and Analysis (GSOA) element and Ground Data Element (GDE), and a second optical GT in the Optical Communications Telescope Laboratory (OCTL) at the JPL Table Mountain Facility. The Operations Segment consists of the Artemis II Mission Control Center (MCC), the Lasercomm Space Terminal Console (LSTC), and the Lasercomm Link Planning & Analysis Center (LPAC), all located at the Johnson Space Center (JSC). O2O utilizes pulse-position modulation (PPM) direct-to-earth services resulting in an 80 Mbps downlink data rate from lunar orbit. The O2O concept of operations is to provide optical services for a minimum of 1 hour per day for each day of the Artemis II mission. O2O will utilize a 10-20 Mbps uplink data rate and 40-260 Mbps downlink data rate, depending on the Artemis II mission phase. The ACCESS project will also provide a centralized mission data interface for user data distribution and storage to the MCC and perform planning and scheduling of services in coordination with the Operations Segment for the O2O Ground Segment. The O2O Ground Segment will support the following O2O mission phases: Pre-Mission Planning; Daily Operations Planning; Event Execution; and Post-Pass Reporting. O2O will be used to exchange data files between Orion and the MCC and to distribute real-time video through the optical downlink service to the MCC; which would not be possible without the high-bandwidth link that O2O will provide to Orion. In this paper, I will discuss the O2O Ground Segment development approach and how it will support these critical O2O functions: plan and schedule the contact; acquire and track the optical link; flow information bidirectionally; distribute information; and control and accommodate the system.

optical communications↗

Wind Tunnel Management and Resource Optimization: A Systems Modeling Approach

Time, money, and, personnel are becoming increasingly scarce resources within government agencies due to a reduction in funding and the desire to demonstrate responsible economic efficiency. The ability of an organization to plan and schedule resources effectively can provide the necessary leverage to improve productivity, provide continuous support to all projects, and insure flexibility in a rapidly changing environment. Without adequate internal controls the organization is forced to rely on external support, waste precious resources, and risk an inefficient response to change. Management systems must be developed and applied that strive to maximize the utility of existing resources in order to achieve the goal of "faster, cheaper, better". An area of concern within NASA Langley Research Center was the scheduling, planning, and resource management of the Wind Tunnel Enterprise operations. Nine wind tunnels make up the Enterprise. Prior to this research, these wind tunnel groups did not employ a rigorous or standardized management planning system. In addition, each wind tunnel unit operated from a position of autonomy, with little coordination of clients, resources, or project control. For operating and planning purposes, each wind tunnel operating unit must balance inputs from a variety of sources. Although each unit is managed by individual Facility Operations groups, other stakeholders influence wind tunnel operations. These groups include, for example, the various researchers and clients who use the facility, the Facility System Engineering Division (FSED) tasked with wind tunnel repair and upgrade, the Langley Research Center (LaRC) Fabrication (FAB) group which fabricates repair parts and provides test model upkeep, the NASA and LARC Strategic Plans, and unscheduled use of the facilities by important clients. Expanding these influences horizontally through nine wind tunnel operations and vertically along the NASA management structure greatly increases the complexity of developing a model that can be used for successfully implementing a standardized management planning tool. The objective of this study was to implement an Integrated Wind Tunnel Planning System to improve the operations within the aeronautics testing and research group, in particular Wind Tunnel Enterprise. The study included following steps: Conducted literature search and expert discussions (NASA and Old Dominion University faculty), Performed environmental scan of NASA Langley wind tunnel operations as foundation for problem definition. Established operation requirements and evaluation methodologies. Examined windtunnel operations to map out the common characteristics, critical components, and system structure. Reviewed and evaluated various project scheduling and management systems for implementation, Evaluated and implemented "Theory of Constraints (TOC)" project scheduling methodology at NASA Langley wind tunnel operations together with NASA staff.

Jacobs, Derya, A.↗

Juno Gravity Science: Five Years of Radio Science Operations with Ka-band Uplink

Since entering orbit on July 4, 2016, the Juno spacecraft has executed 34 closest approach passes of Jupiter, completing the prime mission. During each closest approach, called perijove, the spacecraft comes within 4,000 km of the cloud tops and the motion of the spacecraft becomes perturbed by the gravitational field of Jupiter. These small changes in the motion of the spacecraft are detected using the Juno Gravity Science Instrument by measuring the Doppler shift of the radio link between the Juno spacecraft and NASA’s Deep Space Network (DSN). During a majority of these closest approach passes, the 34-meter DSS-25 antenna transmits simultaneous X-band and Ka-band uplink to the spacecraft. Juno’s onboard X-band transponder and Ka-band translator phase-coherently return the signals back to Earth for reception at the same DSS-25 antenna. The precise frequency of these signals is measured by processing open-loop recordings of the signal. These measurements, characterized by ~5-10 micron/sec accuracies (after calibration of charged particle noise and Earth troposphere), have probed the gravity field of Jupiter to unprecedented precision, allowing for discoveries of Jupiter’s core size and depth of the zonal winds. Successful operations of the instrument during perijoves requires careful planning and coordination between DSN engineers, the Juno project, and the Juno science team. This work discusses the operations of the Juno Gravity Science Instrument after five years of prime mission operations. Lessons learned are documented to be applied to future missions and the Juno extended mission. Although the Juno extended mission formally started on August 1, 2021, on June 7, 2021, the trajectory was modified with a flyby of Ganymede, the third Galilean moon of Jupiter. Gravity and radio science investigations of Jupiter and its moons will continue to play a key role in Juno’s objectives during the extended mission.

Oudrhiri, Kamal↗

Designing Mission Operations for the Gravity Recovery and Interior Laboratory Mission

NASA's Gravity Recovery and Interior Laboratory (GRAIL) mission, to understand the internal structure and thermal evolution of the Moon, offered unique challenges to mission operations. From launch through end of mission, the twin GRAIL orbiters had to be operated in parallel. The journey to the Moon and into the low science orbit involved numerous maneuvers, planned on tight timelines, to ultimately place the orbiters into the required formation-flying configuration necessary. The baseline GRAIL mission is short, only 9 months in duration, but progressed quickly through seven very unique mission phases. Compressed into this short mission timeline, operations activities and maneuvers for both orbiters had to be planned and coordinated carefully. To prepare for these challenges, development of the GRAIL Mission Operations System began in 2008. Based on high heritage multi-mission operations developed by NASA's Jet Propulsion Laboratory and Lockheed Martin, the GRAIL mission operations system was adapted to meet the unique challenges posed by the GRAIL mission design. This paper describes GRAIL's system engineering development process for defining GRAIL's operations scenarios and generating requirements, tracing the evolution from operations concept through final design, implementation, and validation.

MOS↗

NASA Goddard Space Flight Center

The NASA SLR Operational Center is responsible for: 1) NASA SLR network control, sustaining engineering, and logistics; 2) ILRS mission operations; and 3) ILRS and NASA SLR data operations. NASA SLR network control and sustaining engineering tasks include technical support, daily system performance monitoring, system scheduling, operator training, station status reporting, system relocation, logistics and support of the ILRS Networks and Engineering Working Group. These activities ensure the NASA SLR systems are meeting ILRS and NASA mission support requirements. ILRS mission operations tasks include mission planning, mission analysis, mission coordination, development of mission support plans, and support of the ILRS Missions Working Group. These activities ensure than new mission and campaign requirements are coordinated with the ILRS. Global Normal Points (NP) data, NASA SLR FullRate (FR) data, and satellite predictions are managed as part of data operations. Part of this operation includes supporting the ILRS Data Formats and Procedures Working Group. Global NP data operations consist of receipt, format and data integrity verification, archiving and merging. This activity culminates in the daily electronic transmission of NP files to the CDDIS. Currently of all these functions are automated. However, to ensure the timely and accurate flow of data, regular monitoring and maintenance of the operational software systems, computer systems and computer networking are performed. Tracking statistics between the stations and the data centers are compared periodically to eliminate lost data. Future activities in this area include sub-daily (i.e., hourly) NP data management, more stringent data integrity tests, and automatic station notification of format and data integrity issues.

Carter, David↗

Distribution System Parameter and Topology Estimation Applied to Resolve Low-Voltage Circuits on Three Real Distribution Feeders

Accurate distribution secondary low-voltage circuit models are needed to enhance overall distribution system operations and planning, including effective monitoring and coordination of distributed energy resources located in the secondary circuits. We present a full-scale demonstration across three real feeders of a computationally efficient approach for estimating the secondary circuit topologies and parameters using historical voltage and power measurements provided by smart meters. The method is validated against several secondary configurations, and compares favorably to satellite imagery and the utility secondary model. Feeder-wide results show how much parameters can vary from simple assumptions. In conclusion, model sensitivities are tested, demonstrating only modest amounts of data and resolutions of data measurements are needed for accurate parameter and topology results.

42 ENGINEERING↗

ARM Radar Science Recommendations from 2017 6th ARM Radar Workshop

The U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) Climate Research Facility’s radar organization was formed to provide an integrated approach to meet the scientific objectives of ARM. The radar organization consists of two groups: Radar Science and Radar Engineering and Operations. The two groups work closely for planning, coordination, and communications to produce high-quality observations and products from the ARM radar network, which consists of complex radars deployed in very challenging environments. In addition, scanning cloud radars are relatively new in the community, with very limited products that are mature enough to be applied for modeling studies. The Radar Science Group and Radar Engineering and Operations Group meet regularly along with researchers and users from the community in a workshop. The overarching objective of the workshop is to maximize the usage of ARM radar data for improving our understanding of processes and, ultimately improving representation of clouds and precipitation in models. The 6th DOE ARM Radar Engineering and Radar Science Workshop was held October 24-26, 2017, at Stony Brook University. Approximately 40 participants were present; a detailed list of participants is listed in Section 5. This report documents recommendations made by members of the science community who attended the workshop. Their recommendations appear italicized in the report. ARM management will consider these recommendations in their future planning and prioritization activities. The topics addressed during the workshop are contained in the agenda (Section 4). Significant action items, recommendations, and comments that came out of the meeting are contained in Section 3. The content in Section 3 presents a path through important discussions that were pursued during the Workshop.

Southern Great Plains, North Slope of Alaska, East↗

Real-Time Multimission Event Notification System for Mars Relay

As the Mars Relay Network is in constant flux (missions and teams going through their daily workflow), it is imperative that users are aware of such state changes. For example, a change by an orbiter team can affect operations on a lander team. This software provides an ambient view of the real-time status of the Mars network. The Mars Relay Operations Service (MaROS) comprises a number of tools to coordinate, plan, and visualize various aspects of the Mars Relay Network. As part of MaROS, a feature set was developed that operates on several levels of the software architecture. These levels include a Web-based user interface, a back-end "ReSTlet" built in Java, and databases that store the data as it is received from the network. The result is a real-time event notification and management system, so mission teams can track and act upon events on a moment-by-moment basis. This software retrieves events from MaROS and displays them to the end user. Updates happen in real time, i.e., messages are pushed to the user while logged into the system, and queued when the user is not online for later viewing. The software does not do away with the email notifications, but augments them with in-line notifications. Further, this software expands the events that can generate a notification, and allows user-generated notifications. Existing software sends a smaller subset of mission-generated notifications via email. A common complaint of users was that the system-generated e-mails often "get lost" with other e-mail that comes in. This software allows for an expanded set (including user-generated) of notifications displayed in-line of the program. By separating notifications, this can improve a user's workflow.

Wallick, Michael N.↗

Multi Sector Planning Tools for Trajectory-Based Operations

This paper discusses a suite of multi sector planning tools for trajectory-based operations that were developed and evaluated in the Airspace Operations Laboratory (AOL) at the NASA Ames Research Center. The toolset included tools for traffic load and complexity assessment as well as trajectory planning and coordination. The situation assessment tools included an integrated suite of interactive traffic displays, load tables, load graphs, and dynamic aircraft filters. The planning toolset allowed for single and multi aircraft trajectory planning and data communication-based coordination of trajectories between operators. Also newly introduced was a real-time computation of sector complexity into the toolset that operators could use in lieu of aircraft count to better estimate and manage sector workload, especially in situations with convective weather. The tools were used during a joint NASA/FAA multi sector planner simulation in the AOL in 2009 that had multiple objectives with the assessment of the effectiveness of the tools being one of them. Current air traffic control operators who were experienced as area supervisors and traffic management coordinators used the tools throughout the simulation and provided their usefulness and usability ratings in post simulation questionnaires. This paper presents these subjective assessments as well as the actual usage data that was collected during the simulation. The toolset was rated very useful and usable overall. Many elements received high scores by the operators and were used frequently and successfully. Other functions were not used at all, but various requests for new functions and capabilities were received that could be added to the toolset.

Prevot, Thomas↗

The Waypoint Planning Tool: Real Time Flight Planning for Airborne Science

NASA Earth science research utilizes both spaceborne and airborne real time observations in the planning and operations of its field campaigns. The coordination of air and space components is critical to achieve the goals and objectives and ensure the success of an experiment. Spaceborne imagery provides regular and continual coverage of the Earth and it is a significant component in all NASA field experiments. Real time visible and infrared geostationary images from GOES satellites and multi-spectral data from the many elements of the NASA suite of instruments aboard the TRMM, Terra, Aqua, Aura, and other NASA satellites have become norm. Similarly, the NASA Airborne Science Program draws upon a rich pool of instrumented aircraft. The NASA McDonnell Douglas DC-8, Lockheed P3 Orion, DeHavilland Twin Otter, King Air B200, Gulfstream-III are all staples of a NASA's well-stocked, versatile hangar. A key component in many field campaigns is coordinating the aircraft with satellite overpasses, other airplanes and the constantly evolving, dynamic weather conditions. Given the variables involved, developing a good flight plan that meets the objectives of the field experiment can be a challenging and time consuming task. Planning a research aircraft mission within the context of meeting the science objectives is complex task because it is much more than flying from point A to B. Flight plans typically consist of flying a series of transects or involve dynamic path changes when "chasing" a hurricane or forest fire. These aircraft flight plans are typically designed by the mission scientists then verified and implemented by the navigator or pilot. Flight planning can be an arduous task requiring frequent sanity checks by the flight crew. This requires real time situational awareness of the weather conditions that affect the aircraft track. Scientists at the University of Alabama-Huntsville and the NASA Marshall Space Flight Center developed the Waypoint Planning Tool, an interactive software tool, that enables scientists to develop their own flight plans (also known as waypoints) with point-and-click mouse capabilities on a digital map draped with real time satellite imagery. The Waypoint Planning Tool has further advanced to include satellite orbit predictions and seamlessly interfaces with the Real Time Mission Monitor which tracks the aircraft s position when the planes are flying. This presentation will describe the capabilities and features of the Waypoint Planning Tool highlighting the real time aspect, interactive nature and the resultant benefits to the airborne science community.

He, Yubin↗

Hayabusa Recovery, Curation and Preliminary Sample Analysis: Lessons Learned from Recent Sample Return Mission

I describe lessons learned from my participation on the Hayabusa Mission, which returned regolith grains from asteroid Itokawa in 2010 [1], comparing this with the recently returned Stardust Spacecraft, which sampled the Jupiter Family comet Wild 2. Spacecraft Recovery Operations: The mission Science and Curation teams must actively participate in planning, testing and implementing spacecraft recovery operations. The crash of the Genesis spacecraft underscored the importance of thinking through multiple contingency scenarios and practicing field recovery for these potential circumstances. Having the contingency supplies on-hand was critical, and at least one full year of planning for Stardust and Hayabusa recovery operations was necessary. Care must be taken to coordinate recovery operations with local organizations and inform relevant government bodies well in advance. Recovery plans for both Stardust and Hayabusa had to be adjusted for unexpectedly wet landing site conditions. Documentation of every step of spacecraft recovery and deintegration was necessary, and collection and analysis of launch and landing site soils was critical. We found the operation of the Woomera Text Range (South Australia) to be excellent in the case of Hayabusa, and in many respects this site is superior to the Utah Test and Training Range (used for Stardust) in the USA. Recovery operations for all recovered spacecraft suffered from the lack of a hermetic seal for the samples. Mission engineers should be pushed to provide hermetic seals for returned samples. Sample Curation Issues: More than two full years were required to prepare curation facilities for Stardust and Hayabusa. Despite this seemingly adequate lead time, major changes to curation procedures were required once the actual state of the returned samples became apparent. Sample databases must be fully implemented before sample return for Stardust we did not adequately think through all of the possible sub sampling and analytical activities before settling on a database design - Hayabusa has done a better job of this. Also, analysis teams must not be permitted to devise their own sample naming schemes. The sample handling and storage facilities for Hayabusa are the finest that exist, and we are now modifying Stardust curation to take advantage of the Hayabusa facilities. Remote storage of a sample subset is desirable. Preliminary Examination (PE) of Samples: There must be some determination of the state and quantity of the returned samples, to provide a necessary guide to persons requesting samples and oversight committees tasked with sample curation oversight. Hayabusa s sample PE, which is called HASPET, was designed so that late additions to the analysis protocols were possible, as new analytical techniques became available. A small but representative number of recovered grains are being subjected to in-depth characterization. The bulk of the recovered samples are being left untouched, to limit contamination. The HASPET plan takes maximum advantage of the unique strengths of sample return missions

Zolensky, Michael E.↗

CFO Role in Cost Estimating & Budget Overview: GAO Review [Slides]

CFO works very closely with project controls to ensure correct rates and factors are being used. CFO automates where possible (e.g. upload from Work Package Generator to Oracle) to avoid data entry and errors. Consistent assumptions are made across program areas where possible. Weapons Program Planning & Integration Team coordinates all budget planning activities in PADWP office. Operating under uncertain budget conditions has resulted in close scrutiny of all costs and estimates.

99 GENERAL AND MISCELLANEOUS↗