Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Operation Reserve”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Multi-timescale operations of nuclear-renewable hybrid energy systems for reserve and thermal product provision

In this paper, an optimal operation strategy of a nuclear-renewable hybrid energy system (N-R HES), in conjunction with a district heating network, is developed within a comprehensive multi-timescale electricity market framework. The grid-connected N-R HES is simulated to explore the capabilities and benefits of N-R HES of providing energy products, different reserve products, and thermal products. An N-R HES optimization and control strategy is formulated to exploit the benefits from the hybrid energy system in terms of both energy and ancillary services. A case study is performed on the customized NREL-118 bus test system with high renewable penetrations, based on a multi-timescale (i.e., three-cycle) production cost model. Both day-ahead and real-time market clearing prices are determined from the market model simulation. In conclusion, the results show that the N-R HES can contribute to the reserve requirements and also meet the thermal load, thereby increasing the economic efficiency of N-R HES (with increased revenue ranging from 1.55% to 35.25% at certain cases) compared to the baseline case where reserve and thermal power exports are not optimized.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Team X Report #1401: Exoplanet Coronagraph STDT Study 2013-06

This document is intended to stimulate discussion of the topic described. All technical and cost analyses are preliminary. This document is not a commitment to work, but is a precursor to a formal proposal if it generates sufficient mutual interest. The data contained in this document may not be modified in any way. Cost estimates described or summarized in this document were generated as part of a preliminary, first-order cost class identification as part of an early trade space study, are based on JPL-internal parametric cost modeling, assume a JPL in-house build, and do not constitute a commitment on the part of JPL or Caltech. JPL and Team X add cost reserves for development and operations. Unadjusted estimate totals and cost reserve allocations would be revised as needed in future more-detailed studies as appropriate for the specific cost-risks for a given mission concept.

cost estimating↗

Scheduler Modeling of IBR Plants for Providing Ancillary Services [SWR-25-16]

Inverter-based resources (IBRs) have been integral components of modern power systems and their capability in providing grid services have been widely studied. To promote the deployment of IBR grid services in real utility operation, this software proposes a scheduler model for IBRs. The energy and reserve are co-optimized in day-ahead, various ancillary services, including operating reserve provision, peak load reduction, voltage regulation and power factor control are integrated in the model.

Wang, Xiaofei [National Renewable Energy Laborator↗

A Deep Reinforcement Learning-based Reserve Optimization in Active Distribution Systems for Tertiary Frequency Regulation

Federal Energy Regulatory Commission (FERC)Orders 841 and 2222 have recommended that distributed energy resources (DERs) should participate in energy and reserve markets; therefore, a mechanism needs to be developed to facilitate DERs’ participation at the distribution level. Although the available reserve from a single distribution system may not be sufficient for tertiary frequency regulation, stacked and coordinated contributions from several distribution systems can enable them participate in tertiary frequency regulation at scale. This paper proposes a deep reinforcement learning (DRL)-based approach for optimization of requested aggregated reserves by system operators among the clusters of DERs. The co-optimization of cost of reserve, distribution network loss, and voltage regulation of the feeders are considered while optimizing the reserves among participating DERs. The proposed framework adopts deep deterministic policy gradient (DDPG), which is an algorithm based on an actor-critic method. The effectiveness of the proposed method for allocating reserves among DERs is demonstrated through case studies on a modified IEEE 34-node distribution system.

deep reinforcement learning, distributed energy re↗

Igor

SAND2023-05551O Igor, an open-source software, manages large clusters of users in a high-performance computing community. The systems allows users to choose an operating system and reserve and request hosts. The administrative side sets up and executes requests from users while simultaneously giving them tools to manage and enforce reservation policies and user access to the hosts. Sandia National Laboratories is a multimission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC, a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration under contract DE-NA0003525.

Bagwell, Allen↗

Modifications to Solar Titan-130 Combustion Systems for Efficient, High Turndown Operation

The project team of Southwest Research Institute® (SwRI®), Solar Turbines Incorporated (Solar), the Electric Power Research Institute (EPRI), the University of California, Irvine (UCI), and the Georgia Institute of Technology (Georgia Tech) investigated methods to allow higher efficiency part-load operation of a Solar Titan 130 gas turbine. The objective was to develop a low-emission combustion system capable of sustaining combustion and avoiding lean blowout during high turndown operation, which would allow the gas turbine to operate as efficiently as possible at part load. Currently, electric utility markets are beginning to experience substantial increases in renewable energy generation. Some of these renewable energy sources have highly variable output in an uncontrolled manner. In order to maintain grid stability, there is a need for power plants to ramp up power to the grid rapidly to make up for drops in renewable generation. This is often termed spinning reserve, but the size of this reserve may need to increase as renewable penetration into the electric utility market increases. Small combined heat and power (CHP) power plants provide a promising option for meeting this spinning reserve requirement. In order to operate in spinning reserve while still meeting the heat requirements for the CHP, the gas turbine needs to operate efficiently at very low loads. Efficient, high turndown operations in this engine are limited by the lean flammability limit of the premixed combustion system. This project sought enhance the lean operability range of the Titan 130 combustor. First, the project team participated in a brainstorming activity and ultimately selected two concepts to explore: fuel augmentation with hydrogen (H2) to improve the stability at lean operating conditions and modifications to the fuel nozzle to improve the emissions performance at lean operating conditions. Analytical and laboratory investigations were accomplished by UCI to investigate the efficacy of H2 addition at improving lean blow out (LBO) limits and the resulting emissions. These investigations used a variety of chemical reactor network (CRN) and CFD models, validated against laboratory data, to model the impact of H 2 and inform the experimental efforts accomplished by SwRI and Solar. Ultimately, both the CRN and CFD models yielded generally good agreement with the experimental data below a particular temperature threshold. Atmospheric tests of a full-scale T130 annular combustor were performed at SwRI facilities in San Antonio, Texas, to investigate the use of H 2 addition. For these tests, the T130 combustion system remained largely unchanged; minor modifications were performed to the fuel ducting to allow for the safe use of H 2 . The test ultimately demonstrated that the addition of H 2 to the fuel mixture significantly increased the AFR ratio at which the combustor could operate. This improvement to the LBO limit should allow for less use of compressor bleed and less throttling needed by the inlet guide vanes (IGV). This in turn could result in more efficient operation of the gas turbine at lower load points. The second modification explored in this work was a direct modification to the T130 injector. The project team hypothesized that modifications to the pilot of the T130 injector could provide lower emissions at high turn-down operations. These modifications were manufactured and explored by the team at Solar. High pressure rig tests, originally slated to occur at SwRI, were ultimately accomplished by Solar to maintain overall project budget and mitigate cost growth attributable to supply chain issues and inflation. The pressurized rig tests ultimately showed that the SwRI Project No. 18.24153 - DE-EE0008415 Page 2 Final Technical Report January 24, 2024 modifications did not significantly alter the performance of the combustion system at the high turn-down conditions; both the modified injectors and the baseline configuration exhibited elevated emissions comparted to the full-load operating condition. A final set of studies performed by EPRI investigated the benefit-cost of flexible CHP as well as a grid interconnection study for the California Independent System Operator (CAISO) grid. These studies considered: traditional CHP with no spinning reserve available for on-demand grid support, 50% flexible CHP where 50% of the machine’s capacity is consumed by on-site baseload operations while providing an additional 50% capacity for on-demand grid support, and 70% flexible CHP where 70% of capacity is consumed on-site by baseload operations and 30% is available for on-demand grid support. In all cases, the analyses showed a benefit-to-cost ratio greater than unity implying a positive net present value for all configurations. However, the traditional CHP showed the most economic benefit. These results are sensitive to several factors, many of which are not fully known and may vary over time. Thus site owners must be convinced that taking up the increased costs and risks from flexible CHP would be worth implementing. As the grid in California and across the country transition to incorporate larger renewable energy generation, flexible CHP can provide much needed operating reserves and dispatchability. Alternative fuel options, such as hydrogen blending and biofuels, may also lower carbon intensities of CHP. Flexible CHP should be examined in the evolving market to understand innovative business models, changes market rules and services, and new technologies.

20 FOSSIL-FUELED POWER PLANTS↗

How Can Probabilistic Solar Power Forecasts Be Used to Lower Costs and Improve Reliability in Power Spot Markets? A Review and Application to Flexiramp Requirements

Net load uncertainty in electricity spot markets is rapidly growing. There are five general approaches by which system operators and market participants can use probabilistic forecasts of wind, solar, and load to help manage this uncertainty. These include operator situation awareness, resource risk hedging, reserves procurement, definition of contingencies, and explicit stochastic optimization. We review these approaches, and then provide a case study in which a method for using probabilistic solar forecasts to define needs for reserves is developed and evaluated. The case study has three parts. First, we describe building blocks for enhancing the Watt-Sun solar forecasting system to produce probabilistic irradiance and power forecasts. Second, relationships between Watt-Sun forecasts for multiple sites in California and the system's need for flexible ramp capability (flexiramp) are defined by machine learning and statistical methods. Third, the performance of present methods to defining flexiramp requirements, which are not conditioned on weather and renewables forecasts, is compared with that of probabilistic solar forecast-based requirements, using a multi-timescale production costing model with an 1820-bus representation of the WECC power system. Significant potential savings in fuel and flexiramp procurement costs from using solar-informed reserve requirements are found.

14 SOLAR ENERGY↗

Optimizing Facility Operations by Applying Machine Learning to the Army Reserve Enterprise Building Control System (Final Report)

Thousands of U.S. Department of Defense (DoD) buildings have building automation systems (BASs) and/or advanced meters. Although these systems have a wealth of data, performance optimization requires time and expertise to review and act on that information. Machine learning (ML) can provide automated and actionable insights to controls operators. This demonstration implemented proven ML methods on the Army Reserve Enterprise Building Control System. ML refers to algorithms that “learn” from data and improve their performance on a given task over time. In the buildings domain these tasks range from predicting future energy consumption, to identifying operational issues before faults occur, to optimizing control decisions. To learn, ML requires input data, which – for buildings – typically consists of instrument data such as energy consumption data and subsystem controls information such as set-point temperatures, and context data consisting of information such as the physical location of the building, the area of the building, and the weather. ML models use the relationships learned from the input data to make predictions with new, previously unseen, data. The team was able to investigate and successfully implement the following ML use cases: labeling consumption data as anomalous or non-anomalous; baseline whole-building load prediction (unknown fault status); fault detection (validation not possible); and site prioritization for energy-related projects. Due to the constraints of the project, interventions were not able to be implemented during the demonstration; therefore, assessments of operational cost savings and maintenance avoided could not be performed. The project has been presented at two leading national building conferences and two additional publications to peer-reviewed journals are currently in preparation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Approach to startup inventory for viable commercial fusion power plant

With the increasing efforts to commercialize fusion power, private and government organizations are investing heavily in the development of technology to support a viable fusion power plant. Deuterium-Tritium (DT) fueled reactors are more prevalent than other proposed designs, requiring tritium processing and handling technology for safe operations and self-sufficiency. Further, each fusion power plant will need a specific-to-design startup inventory of tritium to begin operations. This startup inventory is required prior to breeding and is the minimum tritium inventory required to fill each processing component in the fuel cycle, to offset radioactive decay losses, and to avoid a zero-fuel situation for continuous operation. We present an approach to calculate the startup tritium inventory for a 500 MW th reactor, with considerations for reserve inventory for maintenance and commissioning. A baseline startup inventory was calculated to be approximately 327 gs. This value was obtained using modest assumptions about the technology and operating parameters of a fusion power plant. The required operating reserve inventory or the inventory necessary to keep a fusion power plant operational using only direct internal recycling for 24 h for the same plant design is approximately 642 gs. The approach and findings of this paper will enable fusion energy stakeholders to better utilize the existing scarce global tritium supply.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

A Novel Secondary Frequency Regulation with Optimal Priority Selection of AGC Contributions

Automatic generation control (AGC) is used to maintain acceptable frequencies during operation owing to fluctuations in load and variable resources. In conventional industry applications, the AGC signal is allocated to each generator according to the predispatched frequency regulation capacity or the order of economic efficiency. However, with the increasing integration of inverter-based resources (IBRs), the retirement of conventional synchronous generators (SGs) has posed new challenges to frequency control schemes because fewer of them are optional for AGC regulation. In this paper, we propose a novel model predictive control (MPC)-based frequency regulation model to reduce control cost and ensure stability, by considering different critical dynamic factors when optimally selecting the AGC units. The proposed control model – developed in a general form – comprehensively embeds characteristics such as generator ramping rates, reserve capacity, and operation cost. The model predictive control–based two-timescale AGC scheme enhances the capability of immunizing the power disturbance from types of resources by coordinating the control signals between faster IBRs and slower SGs. The case study’s proposed model is verified to be effective in synergistically enforcing different dynamic properties of AGC units into the frequency regulation scheme.

Jiang, Sufan [The University of North Carolina at ↗

Solar and Wind Forecast Error Reserve Sharing in a Multi-Utility Region

As electricity systems transition to higher levels of solar and wind generation, electric system operators will likely need to hold additional reserves to manage the forecast error associated with these resources. Because wind and solar forecast errors tend to be poorly correlated across space, system operators can reduce their reserve requirements by sharing reserves. This paper examines the value of forecast error reserve sharing among balancing areas in the Southeast United States. It finds that forecast error reserve requirements increase linearly with growth in solar and wind generation capacity but that reserve sharing can significantly reduce physical (MW) reserve requirements (from 25%-26% to 18%-19% of average load in high solar scenarios). It finds that the value of forecast error reserve sharing declines with higher levels of solar and wind generation, due to lower wholesale energy and reserve prices. Even with declines in wholesale prices, forecast error reserve sharing can still provide substantial value (as much as $\$$400 million per year in a high solar scenario), though with higher levels of solar, wind, and electricity storage, this value is increasingly tied to avoiding scarcity prices. The results suggest the importance of coordinated capacity expansion planning for forecast error reserve sharing.

14 SOLAR ENERGY↗

Nuclear's Role in the U.S. Electricity System: A Multi-Model Inter-Comparison Analysis

Multiple capacity expansion models (CEMs) for the U.S. power system represent the balance of options among generation, transmission, and storage assets that can satisfy electric loads, operating and planning reserves, and policy requirements. These models are typically set up to find the least-cost portfolio of assets that meet specified requirements, and model decisions can include both investments in new, and retirement of existing, resources. The scenarios explored by CEMs can help inform strategies for meeting future electricity and energy needs under a range of future conditions. However, projections can differ between models, sometimes dramatically, for a seemingly similar scenario. Differences in model coverage, structure, and input assumptions contribute to the range of model outcomes. Understanding what drives the biggest differences in model outputs improves model insights and provides context for interpreting results. This summary presents analysis that was performed through a forum of analysts who own, update, and apply CEMs, as well as nuclear experts from national laboratories, industry, and the research community. The following sections describe methods, results, and findings from an original, innovative inter-model comparison that provides insights into what drives the greatest differences in nuclear retirement and deployment projections across models and a range of technology, market, and policy conditions.

capacity expansion model↗

Operational Probabilistic Tools for Solar Uncertainty (OPTSUN) (Final Project Report for DOE Solar Forecasting II Project)

Increasing levels of solar PV can challenge system operations and may require novel methods to operate the power system reliably and efficiently. Power system operating plans generally use deterministic forecasts, in which the variable energy resources are represented by the expected value for each interval of the decision horizon. Probabilistic forecasts are relatively new but have the potential to address the shortfalls of deterministic forecasts. However, understanding how best to use such forecasts is still a key gap in industry and was the focus of this project. The project had three workstreams. In a forecasting workstream, improvements were made to baseline probabilistic forecasts using a number of new approaches such as machine learning methods and improved input data. In a design workstream, advanced simulation tools used these forecasts to investigate newly proposed reserve determination methods. Lastly, in a demonstration workstream a scheduling management platform (SMP) was developed to leverage probabilistic forecasts in a modular and customizable manner. In order to study the benefits that could be accrued, the project team collaborated with three utility partners (Duke Energy, Southern Company and Hawaiian Electric) to deliver improved probabilistic forecasts for each region and to model each region in case studies using advanced production cost modeling tools. Different methods to determine operating reserve requirements from probabilistic forecasts were developed, simulated, and tested across each region. The benefits of using these newly proposed methods varied by utility, but, in general, using probabilistic forecasts as well as historical data to set the reserve requirements seems to improve reliability related results, with less risk of reserve or supply shortfalls. The cost implications were not always straightforward; in some cases the new methods could show a reduction in expected operating costs, but often the increase in reserves associated with better risk mitigation using probabilistic forecasts could result in an increase in operating costs in the simulations. The SMP tool was developed to process probabilistic forecasts from their initial receipt through to scheduling decisions. This open-source tool consists of several modules for scenario development, reserve requirements calculation, and visualization. The SMP tool was demonstrated to a wide range of operators and stakeholders at all three utilities and further improved based on their feedback. The tool will be available on www.epri.com/optsun. The proposed probabilistic information-based reserve determination approaches have the potential to be implemented by different regions to ensure an economic and reliable power system operation on power systems integrating increasing levels of variable renewable resources. The innovative yet practical methods developed in this project demonstrated tangible benefits from using probabilistic forecasts beyond just study-based assessments to include three unique balancing areas. The demonstrated benefits across the multiple utility environments, are expected to provide system operators in all regions the confidence required and a platform to adopt the new forecasting and operating methods.

14 SOLAR ENERGY↗

Design and Operation of Energy Systems with Large Amounts of Variable Generation: IEA Wind TCP Task 25 (Final Summary Report)

This report summarizes findings on wind integration from the 17 countries or sponsors participating in the International Energy Agency Wind Technology Collaboration Program (IEA Wind TCP) Task 25 from 2006-2020. Both real experience and studies are reported. Many wind integration studies incorporate solar energy, and most of the results discussed here are valid for other variable renewables in addition to wind. The national case studies address several impacts of wind power on electric power systems. In this report, they are grouped under long-term planning issues and short-term operational impacts. Long-term planning issues include grid planning and capacity adequacy. Short-term operational impacts include reliability, stability, reserves, and maximizing the value of wind in operational timescales (balancing related issues). The first section presents the variability and uncertainty of power system-wide wind power, and the last section presents recent studies toward 100% shares of renewables. The appendix provides a summary of ongoing research in the national projects contributing to Task 25 for 2021-2024. The design and operation of power and energy systems is an evolving field. As ambitious targets toward net-zero carbon energy systems are announced globally, many scenarios are being made regarding how to reach these future decarbonized energy systems, most of them involving large amounts of variable renewables, mainly wind and solar energy. The secure operation of power systems is increasingly challenging, and the impacts of variable renewables, new electrification loads together with increased distribution system resources will lead to somewhat different challenges for different systems. Tools and methods to study future power and energy systems also need to evolve, and both short-term operational aspects (such as power system stability) and long-term aspects (such as resource adequacy) will probably see new paradigms of operation and design. The experience of operating and planning systems with large amounts of variable generation is accumulating, and research to tackle the challenges of inverter-based, nonsynchronous generation is on the way. Energy transition and digitalization also bring new flexibility opportunities, both short and long term.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Mission Operations with an Autonomous Agent

The Remote Agent (RA) is an Artificial Intelligence (AI) system which automates some of the tasks normally reserved for human mission operators and performs these tasks autonomously on-board the spacecraft. These tasks include activity generation, sequencing, spacecraft analysis, and failure recovery. The RA will be demonstrated as a flight experiment on Deep Space One (DSI), the first deep space mission of the NASA's New Millennium Program (NMP). As we moved from prototyping into actual flight code development and teamed with ground operators, we made several major extensions to the RA architecture to address the broader operational context in which PA would be used. These extensions support ground operators and the RA sharing a long-range mission profile with facilities for asynchronous ground updates; support ground operators monitoring and commanding the spacecraft at multiple levels of detail simultaneously; and enable ground operators to provide additional knowledge to the RA, such as parameter updates, model updates, and diagnostic information, without interfering with the activities of the RA or leaving the system in an inconsistent state. The resulting architecture supports incremental autonomy, in which a basic agent can be delivered early and then used in an increasingly autonomous manner over the lifetime of the mission. It also supports variable autonomy, as it enables ground operators to benefit from autonomy when L'@ey want it, but does not inhibit them from obtaining a detailed understanding and exercising tighter control when necessary. These issues are critical to the successful development and operation of autonomous spacecraft.

Pell, Barney↗

Solar and Wind Forecast Error Reserve Sharing in a Multi-Utility Region

As electricity systems transition to higher levels of solar and wind generation, electric system operators will likely need to hold additional reserves to manage solar and wind forecast error. Because solar and wind forecast errors tend to be weakly correlated across space, system operators can reduce their reserve requirements by sharing reserves. This paper examines the benefits of forecast error reserve sharing among balancing areas in the Southeastern United States, in scenarios in which solar and wind generation ranges from 34% to 65% of total generation. It finds that day-ahead forecast error reserve requirements increase linearly with growth in solar and wind generation capacity (6%-10% of total capacity), but that reserve sharing can significantly reduce these requirements (by 6%-29%). It finds that, in economic terms, the value of forecast error reserve sharing ($\$$0.09-$\$$1.24 billion per year, $\$$0.12-$\$$1.68/MWh of load across scenarios) tends to decline with higher levels of solar and wind generation, due to lower reserve and energy prices. Even with declines in reserve prices, forecast error reserve sharing can still provide substantial value, though with higher levels of solar, wind, and electricity storage this value is increasingly tied to avoiding scarcity prices.

14 SOLAR ENERGY↗

Upper stage in-flight retargeting to enhance geosynchronous satellite operations

Real time utilization of propellant reserves that are not needed is available with the implementation of the in-flight retargeting capability for the Centaur Upper Stage. Application to a performance critical, geosynchronous mission is discussed. The operational duration of the satellite may be increased by selectively choosing the appropriate final orbit injection conditions. During ascent Centaur evaluates the amount of propellant excess available and adjusts the final orbit target to consume the excess. Typical satellite mission requirements are introduced to illustrate the mission analysis process to determine the pre-flight nominal target and the in-flight retarget function.

Lee, Otto W. K.↗

Upper E Traffic Management

This is a slide set as part of a meeting series with members of a working group aimed at the development of a concept that addresses needs and gaps in the management of high altitude airspace operations. This concept leverages elements developed through the UAS Traffic Management project with respect to a coopertive, service-based approach that provides services and capabilities in areas (e.g., Upper E airspace) that currently receive no or limited service from Air Traffic Control. This concept is meant to provide a safe, fair, and scalable approach to management of Upper E operations that reduces the burden on ATC while providing the flexibility and access desired by current and new users of the airspace. This set of slides includes an overview of discussions and industry news covering the time since the previous group meeting, a presentation on initial work titled 'Sensitivity Study of Minimum Reserved Airspace in ETM Operations,' and a high level discussion titled 'Separation Management Service Framework for ETM.'

Upper E↗