Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “OpEx”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Hawaii Solar Desalination Project

This project built the world’s largest Forward Osmosis (FO) solar thermal desalination plant at the NELHA Hawaii Ocean Science and Technology Park for a high visibility “on sun” demonstration of seawater desalination for agricultural applications. The project included re-commissioning an existing 2MW micro-dish solar thermal array and coupling it to a next-generation 500m3/day FO system. The purpose of the project was to validate FO at commercial scale; to verify that the water produced is safe for potential downstream agricultural users; to gather data on capital cost, energy consumption and operating expense for the technology; and to demonstrate that FO can be successfully coupled to low-grade thermal resources. The plant implemented advancements in FO component technology, including hot nano-filtration, polymeric heat exchangers, draw solutions, and improved FO membranes, and operated from June 2022 to September 2023 - producing 30gpm of permeate water. Thermal energy was below 30kWh/m 3 during operation, establishing a new benchmark in thermal desalination technology, with recovery rates at times exceeding 65%, well above what commercial RO systems can achieve. Combining the plant capital cost (CAPEX) and the operating expenses (OPEX) yields a Levelized Cost of Water (LCOW) that is competitive with existing carbon-intensive technologies such as RO. The ability of the plant to operate from a renewable resource paves the way toward a low-carbon desalination future using low-grade thermal resources.

14 SOLAR ENERGY↗

Reduced LCoE CSP Through Utilizing Process Gas Lubricated Bearings in Oil-Free Drivetrains

The GE Research team proposed to advance the TRL level of process lubricated gas bearings from TRL3 based on the DE-EE0007109 program to TRL5 addressing a critical risk item that radial gas bearings can provide satisfactory rotordynamic performance in supporting a representative rotor for sCO2 Power Cycles. The ability to apply process lubricated gas bearings can provide cost savings with reduction of the associated lube oil systems and an efficiency benefit worth 2% efficiency for the turbomachinery configuration first presented in DE-EE005804. The process lubricated gas bearings are enablers for advanced hermetically sealed configurations that have the potential for significant advancement in sCO2 Power Cycles for CSP applications including the 2% efficiency increase referred to above in addition to OPEX savings with no need to refill the CO2 valued at 60k USD/yr and cost reductions of 50 USD/kWe all leading to a potential 0.95¢/kWh reduction positively impacting CSP goals.

14 SOLAR ENERGY↗

MADWEC Techno-Economic Analysis: Cooperative Research and Development Final Report

The objective of this project was for the facility to conduct a techno-economic assessment of the Maximal Asymmetric Drag Wave Energy Converter (MADWEC), developed by the University of Massachusetts Dartmouth (UMass Dartmouth), used for powering remote monitoring and AUV charging systems compared to other existing power supply options. The assessment estimates capital expenditures (CapEx), operational expenditures (OpEx), and power performance for 18 scenarios with the purpose of identifying key cost drivers, comparing total system cost, and comparing the power performance of the power supply options in terms of required installed capacity and estimated theoretical annual energy performance. The scenarios include two end-uses: (1) AUV charging and (2) offshore remote monitoring); three power sources: (1) MADWEC), (2) photovoltaic (PV) solar buoy, (3) and traditional battery swapping); and three locations; (1) nearshore, (2) far-offshore, and (3) high-latitude). In addition, other project goals included developing high level installation, operation, and maintenance plans for each scenario.

16 TIDAL AND WAVE POWER↗

DigiFloat (Final Scientific/Technical Report)

This purpose of this report is to document the development of a floating offshore wind platform Digital Twin for the ARPA-E-funded DigiFloat project led by Principle Power, Inc. In Offshore Wind, Digital Twins are aimed at reducing farm-wide OPEX expenditures through reduced-basis inspection, assessing life extension methods, and obtaining better knowledge of the deployed assets for future product optimization. There is a high level of technical effectiveness and economic feasibility for the technology investigated, as it uses commercial off-the-shelf sensors, and a commercial software package. A substantial portion of the project goals are improvement of existing technology for use with floating wind turbines, and new application of an existing technology to a rapidly-growing sector. A few sensors applied to a small number of units bring benefit to the entire fleet of floating wind turbines in a given farm, and in other future wind farms. The benefits to the public of this project are further optimization and maturation of floating wind technology, to bring it to the U.S. market faster and cheaper.

17 WIND ENERGY↗

High-Temperature Active Magnetic Bearing Development for Supercritical CO 2 Machinery Applications

Hermetic machinery utilizing gas bearings for MW-scale supercritical CO 2 (sCO 2 ) machinery applications can have significantly lower power loss and enable improved cycle efficiency compared to conventional machinery with oil-lubricated bearings. Active magnetic bearings (AMBs) are another option anticipated to have similar power loss and load capacity to gas bearings as well as offering larger mechanical tolerances, the ability to tune properties, and high reliability due to lack of mechanical wear. AMBs also have proven commercial experience at MW-scale, though environments for high-temperature sCO 2 power cycle machinery conditions are novel. Besides the potential impact of AMBs for sCO 2 turbomachinery, the technology also offers promising benefits for steam and gas turbines for power generation, compressors and expanders for industrial heat and power, and in other oil and gas and space applications. The goals of this project were to conceptual design an AMB and perform material testing. Conceptual designs for radial and thrust AMBs were produced based on a hermetically-sealed sCO 2 machinery waste-heat recovery (WHR) application for sizing and loads, and choosing a target design temperature of 540°C useful for high-temperature sCO 2 turbines for concentrating solar power (CSP) applications. Conceptual designs were initially developed for multiple radial and thrust AMBs with spreadsheet-based calculations before selecting one of each to develop further using higher-fidelity design methods for magnetic and structural performance. It was found that the radial AMB at 540°C was feasible, but the thrust AMB needed to be limited to 315°C for high-speed operation. The decision for a reduced-temperature thrust AMB was the result of several significant conclusions: 1) Hiperco 50A, originally chosen for good magnetic performance at high temperature, had insufficient strength for high-speed operation, so it was replaced with 17-4 PH. 2) The reduced magnetic performance from 17-4 PH yielded a larger bearing size, reducing the strength margin. 3) This ultimately led to a creative design implementing a more-compact E-core topology, compared to the original (conventional) C-core, and an integral shaft-disk with Hirth joint connection. These conceptual designs are unique for the size and temperature in CO 2 , relevant for MW-scale CSP applications. Long term, high temperature test data was generated for several materials, filling a void in the current body of literature. Corrosion and magnetic performance measurements were produced for PM materials (Alnico 5-7C, Alnico 9C, and SmCo) with and without nickel-coating for environments of high-temperature CO 2 up to 550°C at atmospheric pressure and 450°C at 103 bar for up to 6,000 hours. Corrosion measurements were also produced for Hiperco 50, a SM material relevant for AMB laminations, with and without C5 coating. Comparisons were also made for 450°C and 550°C, atmospheric pressure air exposures up to 5,000 hours. Results generally show that coatings can be effective at improving oxidation resistance of the bare materials, and Alnicos generally outperformed SmCo after high-temperature exposure. In addition to technical feasibility demonstrated by the design, economic feasibility was demonstrated by updating the TEA from the reference machine, re-evaluating it with CAPEX and OPEX to reflect estimated changes from process-lubricated bearings to AMBs. AMBs were shown to be comparable in performance to process-lubricated bearings, still showing a notable improvement over conventional machinery architecture with oil-lubricated bearings.

42 ENGINEERING↗

Storage Field Development Plan: One Earth Energy

This Storage Field Development plan presents the Storage Complex characterization results, construction, monitoring, and operational plans, and costs associated with the proposed One Earth Sequestration Carbon Capture and Storage (OES-CCS) site in McLean County, Illinois, near Gibson City. The proposed storage complex, known as the Mt. Simon Storage Complex, comprises the Cambrian Mt. Simon Sandstone reservoir and the primary seal, the Cambrian Eau Claire Formation. The lowermost Underground Source of Drinking Water (USDW) identified for the site is the Ordovician St. Peter Sandstone. Geologic characterization of the Mt. Simon Storage Complex at the OES-CCS site was performed by the Illinois Storage Corridor CarbonSAFE Phase III project, which also prepared and submitted three UIC Class VI applications to construct three injection wells; the permit applications were submitted and are in the federal EPA review process. A characterization well, OEE #1, was drilled to collect site-specific data. These data were analyzed and used to develop the UIC Class VI applications. The OEE #1 well will be converted to an in-zone monitoring (IZM) well for the injection phase. The proposed buildout for the OES-CCS site includes (1) three injection wells (OES #1, OES #2, and OES #3), (2) two IZM wells, (3) two above confining zone (ACZ) monitoring wells, one of which will be used to monitor the lowermost USDW, (4) capture and compression facilities, and (5) transportation facilities, i.e., pipelines. A pre-operational testing program was proposed in the Class VI permit application and will be employed at the site pending approval. Additional pre-injection (baseline), syn-injection, and post-injection monitoring and site care procedures will be followed by OES to ensure that injection activities are protective of human health and the environment. Injection is scheduled to begin in 2025, distributed across the three injection wells in accordance with the permit operating conditions. One Earth Sequestration intends to inject up to 90 million tonnes of CO 2 over a period of approximately 20 years. Injection will begin at approximately 0.5 million tonnes of CO 2 annually and ramp up to a maximum of 4.5 million tonnes annually. Daily injection rates are expected to range from 1,400 to 1,500 tonnes per day initially and reach a maximum of approximately 4,225 tonnes per day, depending on site geology and injectivity at each injection well location, and CO 2 availability. The costs associated with the OES-CCS project include pre-operational costs (e. g. additional seismic data acquisition and well drilling), capture and transportation facility and equipment costs, predicted field operating expenditures (OpEx), and decommissioning and post-injection site care (PISC) costs. The risks associated with project activities, such as site construction, injection operations, and verification of secure storage were evaluated, and mitigation strategies proposed to alleviate those risks.

09 BIOMASS FUELS↗

Computer program optimizes design of nuclear radiation shields

Computer program, OPEX 2, determines minimum weight, volume, or cost for shields. Program incorporates improved coding, simplified data input, spherical geometry, and an expanded output. Method is capable of altering dose-thickness relationship when a shield layer has been removed.

Lahti, G. P.↗

ESA's planning and coordination of the OLYMPUS propagation experiment

An overview of the organization of the OLYMPUS propagation experimenters group (OPEX) is given. Preparations, participation, and experiments are described. Some examples for first statistical results are also reported. OLYMPUS, a 3-axis stabilized communications satellite was launched in 1989 for providing experimental telecommunications payloads and a propagation beacon payload at 12, 20, and 30 GHz to the European Space Agency. From previous experience (OTS), the Agency undertook to carry out extensive preparations with an eye on obtaining the statistical results needed within the limited available lifetime of the spacecraft. The OLYMPUS propagation experiment was conceived as part of ESA's space telecommunications applications program (ESA/IPC/(79)83) with the emphasis on exploring the possibilities and limitations of Ka-band satellite communications. The objectives of the OLYMPUS propagation campaign were: (1) characterization of the slant-path propagation conditions at 20/30 GHz in the various climatic regions of Europe; (2) improvement of the understanding of the link between atmospheric observable (rain rate, cloud thickness, etc.) to propagation impairments such as attenuation, depolarization, scintillation, etc.; and (3) arrive at improved propagation prediction methods.

Arbesser-Rastburg, B.↗

Olympus propagation experiments

A summary of the activities of the OPEX (Olympus Propagation EXperimenters) group is given and some of the recent findings are presented. OLYMPUS, a telecommunication satellite owned by the European Space Agency, was launched on 12 June 1989. After the in-orbit tests were completed (in September 1989) the first propagation experiments started. Throughout 1990 the spacecraft functioned very well and a large number of experimenters received the beacon signals. On 29 May 1991 the spacecraft became inoperational after a major technical problem. With a series of complicated procedures OLYMPUS was recovered on 15 August 1991 - the first time in history that a civilian telecommunications satellite was brought back to service after losing power and telemetry. The propagation experiments were back on track. However, the recovery had used up so much fuel that the North-South station keeping had to be abandoned, which led to a natural increase of inclination at a rate of about 0.8 deg per year. On 10 October 1992 the second 30 GHz beacon tube failed, causing a loss of this beacon signal. The other two beacon frequencies continued to deliver a stable signal for more than two years. On 12 August 1993 the spacecraft experienced another problem with the altitude control, but this time there was not enough fuel left for a recovery maneuver and thus the mission came to an end.

Arbesser-Rastburg, Bertram↗

Vacuum Pump-Down of the Annular Insulation Space for Large Field-Erected Liquid Hydrogen Storage Tanks

Insulation systems are critical to liquid hydrogen storage tank performance. Tanks in the capacity range of 100 to 1,000 m 3 are typically shop built and designed with high-vacuum (HV) multi-layer insulation (MLI), whereas storage vessels larger than 1,000 m 3 are typically field-erected and supplied with bulk fill insulation working at moderate vacuum (MV) levels (1-100 millitorr). For large, field-erected vessels, two types of bulk fill insulation typically used: perlite and hollow glass microspheres (glass bubbles). Selection of either material is driven by a tradeoff between CAPEX and OPEX, such as the material and construction cost versus operating thermal performance and maintenance. In either case, the vacuum level needed to achieve optimum performance is likely to drive the field testing and commissioning portion of the construction schedule. A primary goal of this paper is to present practical experience and data for warm vacuum pressure (WVP) and cold vacuum pressure (CVP) levels. Recommended WVP levels needed prior to cooldown consider both perlite powder and glass bubbles. Pumping time expected to achieve target vacuum levels, considering a variety of factors, is also discussed. Recommendations for a standard practice in vacuum-insulated tank commissioning are based on historical NASA data, and those collected during recent projects.

A M Swanger↗

Techno-Economic Implications of Electrical Machine Scaling for Wave Energy Converters: Preprint

The sizing of an electrical machine for a Wave Energy Converter (WEC) can have a substantial impact on the overall sizing, cost, and rating of the device. An electrical generator is typically part of the power take-off (PTO) system, which is the mechanism by which the energy absorbed by the prime mover is transformed into useable electrical. For practically all WECs, the rate of change of actuation is predominantly determined by the wave resource (i.e., the wave height and frequency) and devices will see a sinusoidally varying velocity according to the wave conditions. The same can then be said for both directly and indirectly coupled PTOs with electrical generators. This techno-economic study investigates electrical machine scaling and associated cost implications through core machine design theory, manufacturer data, supporting literature, and the DOE sponsored Reference Model Project (RMP). The RMP was a partnered effort to develop open-source marine energy (ME) point designs as reference models (RMs) to benchmark ME technology performance and costs, methods for design and analysis of ME technologies, estimations for capital costs, operational costs, and levelized costs of energy (LCOE). The results from this study show torque is directly related to (1) the physical size of the machine required to increase the airgap sheer stresses, (2) the amount of active material, (3) the support structure, (4) bearing size and rating, and (5) offshore cable rating, all of which have a significant effect on overall system costs in terms of both CAPEX and OPEX. This paper aims to be a critical benchmark in helping determine an “optimal” nameplate rating for wave energy devices and their associated PTO. With an optimized rating and sizing process, WEC costs can be reduced, and overall performance can be improved.

cables↗

Techno-Economic Implications of Electrical Machine Scaling for Wave Energy Converters

The sizing of an electrical machine for a Wave Energy Converter (WEC) can have a substantial impact on the overall sizing, cost, and rating of the device. An electrical generator is typically part of the power take-off (PTO) system, which is the mechanism by which the energy absorbed by the prime mover is transformed into useable electrical. For practically all WECs, the rate of change of actuation is predominantly determined by the wave resource (i.e., the wave height and frequency) and devices will see a sinusoidally varying velocity according to the wave conditions. The same can then be said for both directly and indirectly coupled PTOs with electrical generators. This techno-economic study investigates electrical machine scaling and associated cost implications through core machine design theory, manufacturer data, supporting literature, and the DOE sponsored Reference Model Project (RMP). The RMP was a partnered effort to develop open-source marine energy (ME) point designs as reference models (RMs) to benchmark ME technology performance and costs, methods for design and analysis of ME technologies, estimations for capital costs, operational costs, and levelized costs of energy (LCOE). The results from this study show torque is directly related to (1) the physical size of the machine required to increase the airgap sheer stresses, (2) the amount of active material, (3) the support structure, (4) bearing size and rating, and (5) offshore cable rating, all of which have a significant effect on overall system costs in terms of both CAPEX and OPEX. This paper aims to be a critical benchmark in helping determine an “optimal” nameplate rating for wave energy devices and their associated PTO. With an optimized rating and sizing process, WEC costs can be reduced, and overall performance can be improved.

cables↗

High Throughput Laser Processing for Enhanced Battery Performance and Manufacturing

For widespread adoption of electric vehicles, lithium-ion batteries (LiBs) need to achieve energy densities of >275 Wh/kg, cell costs less than $100/kWh, and charge to more than 80% capacity within 15 minutes. Recently, it has been shown that introducing a secondary pore network in thick battery electrodes enables higher extracted capacity without a severe reduction in charge/discharge rate performance. Secondary pore networks consisting of ordered arrays of microstructures reduce tortuosity of Li+-ion transport deep into the thick electrodes, diminishing detrimental concentration gradients within the cell. Ultrafast (femtosecond)-pulsed laser ablation is a promising method to introduce such micro pores or channels in thick battery electrodes as it allows for precise control of pattern geometries, results in minimal damage to the electrode, and can be introduced into existing roll-to-roll electrode manufacturing lines. We have explored laser patterning to create secondary pore networks in a variety of battery electrode materials for both anode and cathode applications and characterized the laser-material interaction parameters. In addition, advanced materials characterization techniques (SEM-EDS, XRD) were used to explore whether ultrafast laser ablation affects the remaining electrode materials' morphology and structure. Furthermore, we have translated lab-scale laser ablation to high-throughput roll-to-roll processing at industrially relevant scales. Finally, we worked with Argonne National Laboratory, developers of the battery cost-analysis package BatPac, to estimate the additional manufacturing costs (CapEx and OpEx) for incorporation of laser-ablation processing to current battery electrode manufacturing. We estimate that ultrafast laser processing will add only -$1kWh, which for considerable improvements in cell performance, creates a compelling case for industry adoption.

battery↗

Levelized Cost of Electricity (LCOE) Content Model for Design of High Deflection Foils for MHK Applications

The LCOE Content Model provides data submitters with an easy and consistent means of uploading data that can be used to calculate the levelized cost of energy for MHK devices. These data are important to DOE and will be used to develop data products that provide quantitative information to guide and support programmatic decisions. Data will also be used to evaluate MHK products and determine costs and can help data users compare the combination of capital costs and operations and maintenance over time. The ultimate goal is to use these data to perform research and tailor programs to best benefit the industry.

16 TIDAL AND WAVE POWER↗

OPEXatLANL Survey Results [Slides]

The survey was open online July 19-August 4, 2021. It was open to all employees with LANL email addresses, Google access. It was used to measure OPEXatLANL awareness, usage. It consisted of 7 multiple-choice questions, 3 short-answer questions. A total of 383 responses were collected (55 managers, 328 non-managers).

99 GENERAL AND MISCELLANEOUS↗

Windfarm Operations and Maintenance cost-Benefit Analysis Tool (WOMBAT)

This report provides technical documentation and background on the newly-developed Wind Operations and Maintenance cost-Benefit Analysis Tool (WOMBAT) software. WOMBAT is an open-source model that can be used to obtain cost estimates for operations and maintenance of land-based or offshore wind power plants. The software was designed to be flexible and modular to allow for implementation of new strategies and technological innovations for wind plant maintenance. WOMBAT uses a process-based simulation approach to model day-to-day operations, repairs, and weather conditions. High-level outputs from WOMBAT, including time-based availability and annual operating costs, are found to agree with published results from other models.

17 WIND ENERGY↗

Technoeconomic Analysis of the Miba Segmented Journal Bearing

This presentation describes a technoeconomic analysis using NLR's Windfarm Operations & Maintenance cost-Benefit Analysis Tool (WOMBAT) to compare operational expenses and levelized cost of energy for wind turbines using standard spherical roller bearings with a novel segmented journal bearing developed by Miba.

17 WIND ENERGY↗