Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “NESHAP”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Evaluation of FTWC Vent System

A monitored exhaust system has been designed for use in venting the Flanged Tritium Waste Containers (FTWCs) at LANL. This system will provide controlled exhaust and emissions monitoring for the FTWCs, and also provide general area exhaust around the venting operations to measure any emissions which may bypass the primary vent system. A full description of the process and need for the system is described in the Pre-Construction Application for this project. This document describes the commissioning testing performed on the FTWC vent system to prepare it for use. The system has been tested and shown to meet ANSI standard requirements and is fully suitable for use.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Using the CAP88 Plume Model & Dose Assessment Code for the FTWC Project

The Environmental Protection & Compliance Division (EPC) uses the Clean Air Act Assessment Package – 1988 (CAP88) plume model and dose assessment code to evaluate measured emissions or projected emissions of airborne radionuclides from Los Alamos National Laboratory (LANL) facilities. This software package will use facility data (e.g., stack height and exit velocity), emissions parameters (chemical form and quantity), and environmental data (wind speed and direction) to predict downwind concentrations of radioactive material and subsequent dose to a member of the public at that location. The United States Environmental Protection Agency (EPA) has approved CAP88 for use in demonstrating compliance with the Radionuclide NESHAP2, that portion of the Clean Air Act addressing emissions of airborne radioactive material from Department of Energy facilities. EPC Division has two procedures which discuss the use of CAP88.

61 RADIATION PROTECTION AND DOSIMETRY↗

West Valley Demonstration Project Annual Site Environmental Report (CY2019)

The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2019. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2019 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2020

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2020. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2020. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2020 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

Resource Conservation and Recovery Act↗

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2021

The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2021. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2021 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Review of New or Modified Radioactive Air Emission Sources

This Environmental Protection and Compliance (EPC), Compliance Programs (CP) Quality Procedure (QP) describes the process for review and evaluation of new and modified sources of radioactive air emissions to determine the requirements for pre-construction approval, stack monitoring, stack sampling system upgrade, ambient air monitoring, and the implementation of As Low As Reasonably Achievable (ALARA) principles. These requirements are specified in 40 CFR 61 Subpart H and by DOE Order 458.1, Radiation Protection of the Public and the Environment.

61 RADIATION PROTECTION AND DOSIMETRY↗

PNNL Richland Campus Radionuclide Air Emissions Report for Calendar Year 2020

This report documents radionuclide air emissions that result in the 2020 highest effective dose equivalent (EDE) to an offsite member of the public, referred to as the maximally exposed individual (MEI). The report has been prepared in compliance with the Code of Federal Regulations, Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants, Subpart H, “National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities” and Washington Administrative Code Chapter 246-247, “Radiation Protection–Air Emissions.” The dose to the PNNL Richland Campus MEI from routine major and minor point source emissions in 2020 from PNNL Richland Campus sources is 1.5E-5 mrem (1.5E-7 mSv) EDE. The dose from all fugitive sources is 2.0E-6 mrem (2.0E-8 mSv) EDE. The dose from radon emissions is 9.3E-9 mrem (9.3E-11 mSv) EDE. No nonroutine emissions occurred in 2020. The total radiological dose to the MEI from all PNNL Richland Campus radionuclide emissions, including fugitive emissions and radon, is 1.7E-5 mrem (1.7E-7 mSv) EDE, or more than 100,000 times less than the federal and state standard of 10 mrem/yr, with which the PNNL Richland Campus is in compliance.

40 CFR 61 Subpart H↗

PNNL Richland Campus Radionuclide Air Emissions Report for Calendar Year 2021

This report documents radionuclide air emissions that result in the 2021 highest effective dose equivalent (EDE) to an offsite member of the public, referred to as the maximally exposed individual (MEI). The report has been prepared in compliance with the Code of Federal Regulations, Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants, Subpart H, “National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities” and Washington Administrative Code Chapter 246-247, “Radiation Protection–Air Emissions.” The dose to the PNNL Richland Campus MEI from routine major and minor point source emissions in 2021 from PNNL Richland Campus sources is 1.7E-5 mrem (1.7E-7 mSv) EDE. The dose from all fugitive sources is 1.2E-6 mrem (1.2E-8 mSv) EDE. The dose from radon emissions is 2.1E-9 mrem (2.1E-11 mSv) EDE. No nonroutine emissions occurred in 2021. The total radiological dose to the MEI from all PNNL Richland Campus radionuclide emissions, including fugitive emissions and radon, is 1.8E-5 mrem (1.8E-7 mSv) EDE, or more than 100,000 times less than the federal and state standard of 10 mrem/yr, with which the PNNL Richland Campus is in compliance.

40 CFR 61 Subpart H↗

PNNL-Richland Campus Radionuclide Air Emissions Report for Calendar Year 2022

This report documents radionuclide air emissions that result in the 2022 highest effective dose equivalent (EDE) to an offsite member of the public, referred to as the maximally exposed individual (MEI). The report has been prepared in compliance with the Code of Federal Regulations, Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants, Subpart H, “National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities” and Washington Administrative Code Chapter 246-247, “Radiation Protection–Air Emissions.” The dose to the PNNL Richland Campus MEI from routine major and minor point source emissions in 2022 from PNNL Richland Campus sources is 2.1E-5 mrem (2.1E-7 mSv) EDE. The dose from all fugitive sources is 1.2E-6 mrem (1.2E-8 mSv) EDE. The dose from radon emissions is 9.2E-9 mrem (9.2E-11 mSv) EDE. No nonroutine emissions occurred in 2022. The total radiological dose to the MEI from all PNNL Richland Campus radionuclide emissions, including fugitive emissions and radon, is 2.3E-5 mrem (2.3E-7 mSv) EDE, or more than 100,000 times less than the federal and state standard of 10 mrem/yr, with which the PNNL Richland Campus is in compliance.

40 CFR 61 Subpart↗

West Valley Demonstration Project (WVDP) (Annual Site Environmental Report (ASER), Calendar Year 2022)

The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2022. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2022 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental Air Monitoring at LANL: 2023 External Program Assessment [Slides]

Radioactive Air Emissions Management evaluates radiological impacts of LANL operations on members of the public, identifies and quantifies releases, and assesses impacts. It is not directly affiliated with cleanup operations or programmatic work and has independent oversight. The focus areas in Environmental Compliance Programs are stack emissions measurements, ambient air measurements, minor source operations evaluations, data management and quality assurance, collaboration with Meteorology program, and collaboration with Dose Assessment program (EPC-ES).

54 ENVIRONMENTAL SCIENCES↗

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2023

The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2023. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2023 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

Record of Decision↗

Comparison of Projections for a Short-Term Release, CAP88 vs NARAC

The purpose of this study was to compare the projected dose using different plume models, evaluating a short duration release of tritium to the 16 compliance sectors and 4 additional points of interest using local meteorology. This report is written as guidance to the decision makers when reviewing this specific Gaussian plume model intended for radiological dose assessment and regulatory compliance, called CAP88 1 , as compared to a more-complex model designed for emergency response. The emergency response model, NARAC 2 , can be used to supplement the CAP88 compliance model evaluations, since NARAC is intended for use in situations where releases are shorter in duration and have increased complexity in terrain and meteorology.

54 ENVIRONMENTAL SCIENCES↗

Pacific Northwest National Laboratory Facility Radionuclide Emission Points and Sampling Systems

Battelle–Pacific Northwest Division operates numerous research and development laboratories in Washington State. The U.S. Department of Energy (DOE) contracts to Battelle at Richland facilities on both the DOE Hanford Site and the Pacific Northwest National Laboratory (PNNL)-Richland campus. These facilities have the potential for radionuclide air emissions. The PNNL contract with DOE also includes operations at the PNNL-Sequim campus in Sequim, where there is also the potential for radionuclide air emissions. This document is a periodic update that describes current PNNL facility emission units and sampling systems.

54 ENVIRONMENTAL SCIENCES↗

PNNL-Richland Campus Radionuclide Air Emissions Report for Calendar Year 2023

This report documents radionuclide air emissions that result in the 2023 highest effective dose equivalent (EDE) to an offsite member of the public, referred to as the maximally exposed individual (MEI). The report has been prepared in compliance with the Code of Federal Regulations, Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants, Subpart H, “National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities” and Washington Administrative Code Chapter 246-247, “Radiation Protection–Air Emissions.” The dose to the PNNL-Richland campus MEI from routine emissions sources, excluding radon, in 2023 from campus sources is 2.0E-5 mrem (2.0E-7 mSv) EDE. The dose from radon emissions is 4.0E-7 mrem (4.0E-09 mSv) EDE. No nonroutine emissions occurred in 2023. The total radiological dose to the MEI from all PNNL-Richland campus radionuclide emissions, including fugitive emissions and radon, is 2.1E-5 mrem (2.1E-7 mSv) EDE, or more than 100,000 times less than the federal and state standard of 10 mrem/yr, with which the PNNL-Richland campus is in compliance.

40 CFR 61 Subpart H↗

PNNL-Richland Campus Radionuclide Air Emissions Report for Calendar Year 2024

This report documents radionuclide air emissions that result in the 2024 highest effective dose equivalent (EDE) to an offsite member of the public, referred to as the maximally exposed individual (MEI). The report has been prepared in compliance with the Code of Federal Regulations, Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants, Subpart H, “National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities” and Washington Administrative Code Chapter 246-247, “Radiation Protection–Air Emissions.” The total dose to the MEI from all PNNL-Richland campus radionuclide emissions in 2024, including fugitive emissions and radon, is 1.3E-05 mrem (1.3E-07 mSv) EDE, or 100,000 times less than the federal and state standard of 10 mrem/yr, with which the PNNL Richland campus is in compliance. The dose attributable to radon emissions is 4.1E-10 mrem (4.1E-12 mSv) EDE.

40 CFR 61 Subpart H↗

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2024

The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2024. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2024 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

54 ENVIRONMENTAL SCIENCES↗

TA-54 Flanged Tritium Waste Container Operations, Radioactive Air Emissions Summary Volume 1: Stack Emissions & Off-Site Dose Consequence

In September 2025, pressure mitigation operations began on the four Flanged Tritium Waste Containers (FTWCs) that had been in storage at Los Alamos National Laboratory (LANL), Technical Area (TA-) 54, Area G, Building 1028. Each FTWC was opened at TA-54 and put into a stable configuration, then containers were moved to LANL’s Weapons Engineering Tritium Facility (WETF) for further processing in preparation for shipment off-site. Over the course of 13 operational days, the project had air emissions of 123 curies of tritium (hydrogen-3). The radiological dose to the hypothetical maximally exposed individual (MEI) member of the public from these emissions was 0.012 millirem. This is well within the limits established by the Environmental Protection Agency (EPA), which allows 10 millirem per year to any member of the public. Naturally occurring background radiation in Northern New Mexico averages about 300-400 millirem per year to residents. This report is intended to briefly summarize operations that took place in September and October 2025, provide documentation of the radionuclide air emissions from these operations, and summarize the off-site dose consequence to the public that resulted from these air emissions. Informal notifications addressing these areas were made via email to the EPA and NMED throughout the project, and summaries of these data were also posted on the LANL external web site 1 for FTWC operations.

54 ENVIRONMENTAL SCIENCES↗