Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Measurement and Verification Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

ICARUS: new voyage to sterile neutrino search in the Short Baseline Program

The ICARUS collaboration operated the 760-ton T600 detector in a successful three-year physics run at the underground LNGS laboratories studying neutrino oscillations with the CNGS neutrino beam from CERN, and searching for atmospheric neutrino interactions. ICARUS performed a sensitive search for LSND-like anomalous νe appearance in the CNGS beam, which contributed to the constraints on the allowed parameters to a narrow region around $Δm^2=1 e\text{V}^2$, where all the experimental results can be coherently accommodated at 90% C.L. After a significant overhaul at CERN, the T600 detector has been installed at Fermilab. In 2020 cryogenic commissioning began with detector cool down, liquid Argon filling and recirculation. ICARUS has started operations and is presently in its commissioning phase with the aim of collecting its first neutrino events from the Booster Neutrino Beam and the NuMI off-axis beam. The main goal of the first year of ICARUS data taking will then be the definitive verification of the recent claim by NEUTRINO-4 short baseline reactor experiment both in the $ν_μ$ channel with the BNB and in the $ν_e$ with NuMI. After the first year of operations, ICARUS will commence its search for evidence of a sterile neutrino jointly with the SBND near detector, within the Short Baseline Neutrino (SBN) program. The ICARUS exposure to the NuMI beam will also give the possibility for other physics studies such as light dark matter searches and neutrino-Argon cross section measurements. The proposed contribution addresses ICARUS achievements, its status and plans for the new run at Fermilab and the ongoing developments of the analysis tools needed to fulfill its physics program.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

National CO 2 budgets (2015–2020) inferred from atmospheric CO 2 observations in support of the global stocktake

Accurate accounting of emissions and removals of CO 2 is critical for the planning and verification of emission reduction targets in support of the Paris Agreement. Here, we present a pilot dataset of country-specific net carbon exchange (NCE; fossil plus terrestrial ecosystem fluxes) and terrestrial carbon stock changes aimed at informing countries' carbon budgets. These estimates are based on “top-down” NCE outputs from the v10 Orbiting Carbon Observatory (OCO-2) modeling intercomparison project (MIP), wherein an ensemble of inverse modeling groups conducted standardized experiments assimilating OCO-2 column-averaged dry-air mole fraction (X CO 2 ) retrievals (ACOS v10), in situ CO 2 measurements or combinations of these data. The v10 OCO-2 MIP NCE estimates are combined with “bottom-up” estimates of fossil fuel emissions and lateral carbon fluxes to estimate changes in terrestrial carbon stocks, which are impacted by anthropogenic and natural drivers. These flux and stock change estimates are reported annually (2015–2020) as both a global 1° x 1° gridded dataset and a country-level dataset and are available for download from the Committee on Earth Observation Satellites' (CEOS) website. Across the v10 OCO-2 MIP experiments, we obtain increases in the ensemble median terrestrial carbon stocks of 3.29–4.58 Pg CO2 yr -1 (0.90–1.25 Pg C yr -1 ). This is a result of broad increases in terrestrial carbon stocks across the northern extratropics, while the tropics generally have stock losses but with considerable regional variability and differences between v10 OCO-2 MIP experiments. We discuss the state of the science for tracking emissions and removals using top-down methods, including current limitations and future developments towards top-down monitoring and verification systems.

54 ENVIRONMENTAL SCIENCES↗

Adaptive Protection and Validated Models to Enable Deployment of High Penetrations of Solar PV (PV-MOD)

The availability and validation of various PV models in commercial tools differ, with some models not yet thoroughly validated for advanced inverter functionalities and reliable performance under weak system conditions. Many existing models do not fully incorporate new inverter control functions, which can affect system stability. The increasing deployment of solar PV and other inverter-based resources (IBRs), including distributed energy resources (DERs), is influencing the reliable operation of protection schemes in distribution systems and microgrids. Emerging adaptive protection schemes (APS) offer new opportunities for protecting these systems during varying configurations and DER operating conditions, though their demonstration and validation remain limited. Adaptive protection schemes face similar challenges, as they are typically designed for specific configurations. There is a growing need for tools and methodologies to streamline the deployment of adaptive protection for safe and reliable DER integration. The project main objective was to develop and validate high-fidelity generic models of solar PV facilities for stability, protection, EMT, and QSTS analyses. This objective was achieved, and these models can now be integrated into commercial software tools, enabling utilities, vendors, and developers to study high-penetration PV systems more confidently. The project also demonstrated advanced applications of these models, including the design and deployment of adaptive protection schemes in high-penetration field applications and microgrids, supporting grid safety and reliability. Several milestones were reached by the end of the project. A sophisticated inverter test plan was developed, and inverters representative of the North American marketplace were selected. EPRI and NREL tested various inverters, conforming to IEEE standards. Improvements were made to existing generic models of IBR units, IBR plants, and aggregated feeders for various analyses. The first generic electromagnetic transient (EMT) model for a solar PV plant was developed, conforming to IEEE Std 2800™-2022 and validated against laboratory measurements of a 2.2 MVA large-scale battery energy storage system (BESS) inverter. That model was then used to produce reference responses illustrating examples of validated and verified IBR plant models that pass or fail tests for technical minimum capability and performance as specified in the IEEE standard. The developed, tested, and validated generic models can be used for transmission planning, stability assessments, expansion planning, and evaluating potential future IBR interconnection requirements. They can also support interconnection screens and conformity assessments of IBR plants, including solar PV. The project significantly contributed to the ongoing standardization and model-based representation and verification of IBR responses. The project further addressed challenges of common distribution protection schemes with increasing deployment of DER by developing, validating, and demonstrating adaptive protection schemes (APS) that can improve the reliable and safe integration of DER into distribution systems. New APS were designed using improved DER models for three common distribution systems: a radial feeder, a meshed network, and a microgrid. Modeling and hardware-in-the-loop (HIL) testing of the APS were conducted, successfully showing their effectiveness and selectivity. Proof-of-concept field demonstration was achieved for two APS, i.e., one on a radial feeder and another one in a microgrid. Field demonstration could not be achieved for the APS on a meshed network, primarily due apprehension of one utility partner and also due to limited access to the protective algorithms in the network protectors. Guidelines developed from the lessons learned in the project lay out the general process followed in the design, installation, and commissioning of APS for various distribution systems. Distribution utility partners’ apprehension about field demonstration of the new APS were addressed—with varying success—by taking a stepped risk-management approach of modeling of a wide range of sensitivities first, performing in-depth proof-of-concept testing in the laboratory including HIL next, and finally deliberately implementing and commissioning the actual protection equipment and algorithms into parts of—or in parallel operation to—the three real distribution systems. Future work should include pilot projects that further show the acceptable performance of the developed APS before these schemes be rolled out more widely. Inclusion of both utility and original equipment manufacturers (OEMs) in future projects could increase chances of successful field demonstration. Despite challenges in achieving the field demonstration goal of the project for all three APS, the research significantly contributed to the innovation of adaptive protection solutions for scalable and reliable DER integration into distribution systems. This project significantly enhances the understanding of the impact of using appropriate inverter models on distribution and transmission (T&D) systems. By addressing the limitations of existing generic models, the project introduces high-fidelity models for stability, protection, electromagnetic transient (EMT), and quasi-static time series (QSTS) analyses. These models, integrated into commercial software tools, enable utilities, vendors, and developers to confidently study high-penetration PV systems. The project also demonstrates advanced applications, including adaptive protection schemes (APS) for distribution systems and microgrids, ensuring grid safety and reliability. The technical effectiveness and economic feasibility of the methods are evident through the development and validation of sophisticated inverter test plans and the selection of representative inverters. Testing by EPRI and NREL on retail, commercial, and utility-scale inverters, conforming to IEEE standards, underscores the robustness of the models. Improvements to existing generic models for various analyses further enhance their validity and applicability. The project also identifies gaps in common distribution protection schemes and designed new APS using improved DER models, demonstrating their effectiveness through modeling and hardware-in-the-loop (HIL) testing. The project’s benefits to the public are manifold. By advancing the standardization and model-based representation of IBR response, it supports transmission planning, stability assessments, and future IBR interconnection requirements. The generic models can facilitate better communication between transmission planners and developers, supporting expected IBR plant capability and performance. Additionally, the development of APS for radial feeders, meshed networks, and microgrids supports the integration of distributed energy resources (DERs) into distribution systems, enhancing grid reliability and safety. The project’s emphasis on thorough testing and simplicity in design ensures practical and scalable solutions for DER integration.

14 SOLAR ENERGY↗

Realizing High-Accuracy Low-Cost Measurement and Verification for Deep Cost Savings (BPA Cost Share CRADA)

Developed practitioner workflows that integrate advanced M&V tools with supplementary automated routines for non-routine adjustments and for quantification of savings uncertainty to indicate rigor. Demonstrated these workflows with Seattle City Light, in collaboration with their implementers and evaluators – determine labor and time/cost savings, and uncertainty of the results obtained. Engaged the Pacific Northwest regulatory community to determine acceptance criteria for the required accuracy and reporting of advanced whole-building M&V. Documented the findings to facilitate broad industry uptake of the solutions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Guest Editorial: Planning and operation of resilient distribution system for integrated multi-energy

Resilience is the ability of power systems to prepare for and adapt to low-probability, high-impact incidents and withstand and recover rapidly from disruptions. With the ageing of electricity distribution infrastructure and increasing threats of weather-related incidents and natural disasters, the need to effectively enhance the resilience of the electricity distribution system has become urgent and has attracted worldwide attention. Although there are an increasing number of publications related to enhancing resilience strategies, resilience is an emerging concept in power systems. Existing practices are mostly focused on deploying distributed energy resources (DERs) and microgrids, hardening the existing infrastructures and building redundant capacities. However, from a broader perspective, resilience enhancement of power distribution system is a systematic engineering, involving long-term system planning and upgrading (e.g., deployment of smart grid technologies and intelligent switches), short-term proactive scheduling, real-time robust and resilient control of DERs, and post-event restoration and recovery strategies. Based on this point, this Special Issue in IET Energy System Integration focuses on soliciting the most recent and original technologies, scheduling and control strategies for improving the resilience of power distribution system. Eight papers are presented in this Special Issue, covering various aspects related to resilience enhancement of power distribution system, including fault-tolerant frequency measurement, robust scheduling of integrated electricity and district heating systems, robust control of DERs, efficient methods for safety verification as well as novel graph theory-based approach to restore the distribution systems after multiple simultaneous faults. A brief introduction of these 8 papers is provided below.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY2021

The objective of this work was to determine the realization rate of energy and cost savings from the U.S. Department of Energy’s (DOE’s) Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. Information was extracted from 201 measurement and verification (M&V) reports covering 193 projects to determine reported, estimated, and guaranteed cost savings and the associated reported and estimated energy savings for the previous contract performance year. This report covers projects that had a performance year ending in fiscal year 2021, between October 1, 2020 and September 30, 2021, and had an M&V report issued. Additionally, the annual cost to perform M&V was extracted from the individual project Task Order (TO) Schedules.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Designing and Executing Measurement and Verification Standards for C-PACE Programs: Lessons Learned from Leading C-PACE Programs

This brief seeks to inform Commercial Property Assessed Clean Energy (C-PACE) program administrators about design and execution of measurement and verification (M&V) standards by leveraging the experience of existing C-PACE programs. It also serves as a resource for state and local jurisdictions interested in establishing new C-PACE programs that incorporate M&V standards. It defines M&V standards in broad terms as technical standards to verify and demonstrate performance of C-PACE projects and programs, regardless of whether the programs require performance guarantees or ongoing post-project M&V.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Development of a Portable In Situ Phosphorous Sensor

While phosphorus is a critical nutrient for all forms of life, runoff leads to phosphorus accumulation in surface water where it can cause a variety of health, environmental, and economic problems. The Department of Energy is interested in conducting long-term field experiments to monitor the impact of phosphorus in terrestrial and aquatic environments, and to better understand a cost vs. benefit analysis of reducing phosphorus pollution. Performing such long-term experiments requires affordable sensors capable of monitoring low-level phosphorus concentrations under challenging environmental conditions. However, such sensors are currently not available. The goal of this proposed project is to develop and demonstrate a low-cost portable phosphorus sensor suitable for in situ measurements. We will determine the technical requirements for a Raman-based sensor system, design and build a signal amplifier, integrate it with a Raman-based sensor, and demonstrate a proof-of-concept level sensor system. The expected accomplishments for Phase I include the identification of the technical requirements of a combined Raman laser/spectrometer and cavity enhancement system, building a proof-of-concept level sensor system capable of detecting orthophosphate compounds at the desired level of 0.25 mg P/L and organic P compounds, and verification of the sensor performance under laboratory and field conditions. In addition, we will identify initial hardening requirements that will need to be implemented during Phase II. While we plan to develop an integrated sensor system for monitoring phosphorus, the cavity-based enhancement system can also be used in combination with other (non-phosphorus) Raman sensors that we plan to develop or that are already commercially available. A recent market report highlights the increasing demand for such environmental monitoring applications, with the market for chemical detection anticipated to grow at a compound annual growth rate of 6.5% (2020-2025). Wide-spread monitoring of phosphorus could reduce the damage from eutrophication in freshwater, which is estimated to be $2.2 billion annually, thereby increasing biodiversity, reducing costs required for drinking water treatment, and decreasing economic losses related to recreation and angling and lake property values.

54 ENVIRONMENTAL SCIENCES↗

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY 2023

The objective of this work was to determine the realization rate of energy and cost savings from the U.S. Department of Energy’s (DOE’s) Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. Information was extracted from 201 measurement and verification (M&V) reports covering 191 projects to determine reported, estimated, and guaranteed cost savings and the associated reported and estimated energy savings for the previous contract performance year. This report covers projects that had a performance year ending in fiscal year 2023, between October 1, 2022 and September 30, 2023, and had an M&V report issued. Additionally, the annual cost to perform M&V was extracted from the individual project Task Order (TO) Schedules.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Safeguards by Design Projects (FY2020 Final Report)

This University Engagement project challenged engineering students at universities, that do not have Bachelor degrees in nuclear engineering but do have research reactors and some nuclear engineering coursework, to incorporate Safeguards by Design concepts into their Senior Capstone Design Project. This University Engagement project was part of the U. S. Department of Energy’s (DOE) National Nuclear Security Administration (NNSA), Office of Defense Nuclear Nonproliferation, Office of International Nuclear Safeguards, Next Generation Safeguards Initiative, Human Capital Development: University Engagement Program. This program exposed university students with Mechanical Engineering majors and Nuclear Engineering minors to the concepts of international nuclear safeguards. FY20, three teams at the University of Rhode Island and one team at the University of Texas - Austin participated in researching, designing, building, and testing projects to support international nuclear safeguards measurements or verification. The projects involved engaging in activities at the university’s research reactors. All the projects engaged students with prototyping a design and/or tool for application at the Universities’ reactor. At the end of the course, most of the students expressed the experience was a positive and they learned more about international nuclear safeguards and applying requirements than they had previously encountered. This school year the projects were further complicated by the COVID-19 pandemic. Both universities cancelled in class room classes, and limited direct student/professor interactions. Furthermore, Los Alamos National Laboratory (LANL) greatly restricted travel, therefore making it impossible to visit the students at the end of the semester for the review of their design projects. The final design and review meeting for the projects happened via the internet. Additionally, while the teams planned to build prototypes this did not happen since there was a social distancing ban on students meeting in person.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Pre-Commercial Scale-Up of a Gas-Fired Absorption Heat Pump

The project sought to advance the maturity of SMTI’s 80 kBTU/hr residential space and water heating GAHP from the engineering prototype stage (TRL-7) to pre-production readiness by addressing manufacturing, balance of system design and installation, cost, reliability, and field application questions. As part of this project, the project team has: (1) Matured the design package for a commercially ready product (2) Demonstrated compliance with relevant ANSI standards (3) Completed manufacturing and assembly process specifications (4) Completed total production cost estimates and capital equipment requirements (5) Initiated component and system level reliability assessments (6) Completed a small field demonstration including measured performance, installation requirements and expected costs, and customer/key stakeholder feedback. (7) Completed a Techno-economic analysis for representative applications and climate zones, including justification for utility incentive programs. (8) Completed a market intelligence report. Scope of Work: A multi-faceted project was completed that included: (a) design for manufacturing tasks for both the sealed system and balance of system, (b) development and trial of key manufacturing processes and techniques, (c) evaluation of component and system level reliability, (d) exploration of make/buy decisions including impact on cost and required capital. Additionally, (e) installation and monitoring of a small number of field test units was completed to demonstrate energy savings and collect customer/installer feedback, and (f) a focused market research task was completed to explore potential barriers and improve market introduction plans. These tasks addressed many of the remaining technical risks regarding long-term reliability, verification of manufacturing cost estimates and identification of cost concerns, identify installation and balance of system design criteria necessary to achieve energy savings and installed cost goals, and identify market barriers and strategies prior to product market introduction.

03 NATURAL GAS↗

Energy-Efficient Driving in Connected Corridors via Minimum Principle Control: Vehicle-in-the-Loop Experimental Verification in Mixed Fleets

Connected and automated vehicles (CAVs) can plan and actuate control that explicitly considers performance, system safety, and actuation constraints in a manner more efficient than their human-driven counterparts. In particular, eco-driving is enabled through connected exchange of information from signalized corridors that share their upcoming signal phase and timing (SPaT). This is accomplished in the proposed control approach, which follows first principles to plan a free-flow acceleration-optimal trajectory through green traffic light intervals by Pontryagin's Minimum Principle in a feedback manner. Urban conditions are then imposed from exogeneous traffic comprised of a mixture of human-driven vehicles (HVs) - as well as other CAVs. As such, safe disturbance compensation is achieved by implementing a model predictive controller (MPC) to anticipate and avoid collisions by issuing braking commands as necessary. The control strategy is experimentally vetted through vehicle-in-the-loop (VIL) of a prototype CAV that is embedded into a virtual traffic corridor realized through microsimulation. Up to 36% fuel savings are measured with the proposed control approach over a human-modelled driver, and it was found connectivity in the automation approach improved fuel economy by up to 26% over automation without. Additionally, the passive energy benefits realizable for human drivers when driving behind downstream CAVs are measured, showing up to 22% fuel savings in a HV when driving behind a small penetration of connectivity-enabled automated vehicles.

33 ADVANCED PROPULSION SYSTEMS↗

Opportunities to Implement Solutions to Achieve Remedial Action Objectives in Consideration of Stakeholder Interests - 20365

A case study in the implementation of a soils excavation and removal project conducted at a Formerly Utilized Sites Remedial Action Program (FUSRAP) Maywood Superfund Site (FMSS) vicinity property; an active commercial business, in a densely populated area, with significant operational, technical and, logistical constraints that were expected to limit areas that could be remediated. The United States Army Corps of Engineers-led (USACE) team successfully navigated complex overlapping stakeholder interests to achieve a more efficient and complete removal of contaminated soils and debris while minimizing unnecessary excess costs to the Government. This paper centers on FUSRAP activities at the FMSS vicinity property located at 149-151 Maywood Avenue, Maywood, Bergen County, New Jersey. For most of its FUSRAP history, this ∼109,000 square meter (27-acre) property housed a now-demolished ∼26,000 square meter (6.5-acre) warehouse operated by Sears Logistics Services, a unit of the Sears Roebuck Company (Figure 2). Sears ended its property lease and vacated the warehouse in December 2016. Given that long history and for the purposes of this paper, the property will be referred to as the 'Sears property' or simply 'the property.' The Sears property is approximately 109,000 square meters (27-acres) and is currently zoned for commercial use. The property is bound to the north and northwest by 100 West Hunter Avenue (the Stepan Company), to the northeast by 205 Maywood Avenue, to the east by Maywood Avenue, to the south by 23 West Howcroft Road, and to the west by businesses on NJ Route 17 and the NJ Route 17 roadway. Until December 2016, the property housed a warehouse and distribution center operated by Sears Logistical Services. On-site structures were demolished by the property owner in 2017. The warehouse covered the north section of the property along the Stepan Company property line. A railroad spur from the adjacent property now known as the Maywood Interim Storage Site (MISS) ended at the northeast corner of the warehouse. Wetlands were located east of the warehouse; the rest of the property was covered with paved parking lots and grassed areas. During remediation at the property, opportunities frequently arose where the project team was able to coordinate effectively with stakeholders to sequence remediation activities to facilitate removal of otherwise inaccessible soils and identify opportunities for materials reuse when supported by residual radiological and chemical levels. Some specific opportunities include: - remediating individual truck loading dock bays to maintain tenant operations; - working along a busy highway and in a utility corridor containing a 30-inch high pressure gas main; - remediating Lodi Brook and associated wetlands requiring bypass pumping and other diversionary structures to maintain local community stormwater drainage; - protecting during remediation and supporting access to facilitate tenant/owner maintenance of critical fire protection and water supply system service lines buried in contaminated soils and necessary for safe warehouse operations; and - coordinating with stakeholders to ensure non-radiological contaminants of concern for the site (unaffiliated with FUSRAP) were addressed by the responsible party in a manner that maximized benefit to all parties while supporting an efficient overall site remediation program. Once the property was vacant and the warehouse structure and radiologically non-impacted above-grade structures were demolished, the project identified an opportunity to significantly reduce the volume of waste associated with the foundation of the former warehouse, a foundation suspected of being partially constructed in radiologically contaminated soils. The project developed and implemented supplemental radiological verification survey and sampling strategies based on radiological cross-contamination risk potential with process flow-charts and screening-level based decision points; a program that classified saw-cut sections of concrete based on observed residual surface radioactivity conditions using a combination of gamma sensitive sodium-iodide scans and beta sensitive Geiger-Muller direct measurements. The proposed approach was reviewed with stakeholders with feedback, including consideration of applicable State of New Jersey Site Remediation Program criteria and guidance before implementation. Once classified, additional sampling was performed at frequencies driven by screening. The sampling methods, stockpile sampling frequencies, criteria and, approach to data evaluation were developed in consideration of existing site cleanup standards, regional background ranges, State of New Jersey radiological remediation program guidance, and specific stakeholder input With the property remediation and survey efforts nearly completed, it is relevant to examine retrospectively the objectives, assumptions and limitations in the remedial design (i.e., what was planned) versus what was able to be accomplished through effective teaming. Benefits to other environmental remediation site programs include better understanding of how to work effectively with stakeholders to achieve win-win outcomes, and approaches to site remediation, waste minimization and materials reuse that were successful in their overall outcomes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design, Development and Testing Plan for Energy Efficiency Algorithms Related to Building-Integrated Cooling, Heating, and Power Systems

Building-integrated cooling, heating and power (CHP) systems are more efficient than conventional systems at providing local power and thermal energy, and favorable fuel prices are bound to spur their increased adoption. It is estimated that the total CHP technical potential in the commercial building sector is approximately 76 GW, but only a small fraction of it is actually deployed. Advanced control and monitoring systems that realize the full potential of these CHP systems can transform this capacity into an asset for both the owner and the grid and also accelerate the adoption of these systems in the building sector. However, to realize the full benefit of the CHP systems, we must ensure persistence of energy efficient operations. It has been demonstrated by several studies that as much as 30% of building energy use is wasted. Much of the waste results from the inability to anticipate load variations (design day vs. non-design day operations; diurnal variation of loads), identify improper operation, and efficiently operate, control and maintain building systems. Moreover, many buildings, even those with adequate control infrastructure, lack knowledgeable staff to operate and maintain energy systems. Operators of buildings with CHP systems will constantly need to make tradeoffs (economic dispatch) between onsite power generation and purchasing power, between onsite heat production from distributed generation versus heating/cooling from conventional systems, and different passive and active load management measures. Much of the inefficiency in the current building operations can be eliminated by use of automated performance monitoring (PM), real-time commissioning verification (CxV) and automated fault detection and diagnostic (AFDD) tools. Automation can help system operators make intelligent decisions. Remote and continuous monitoring of system conditions and performance will enable better management and integration of CHP with existing building systems. Continuous PM, real-time CxV and AFDD could alleviate burdens for operations staff, enhance operations and maintenance (O&M), and improve reliability of building and CHP systems. To address the O&M challenges and to provide a means to maximize the rate-of-return of building-integrated CHP systems, the Building Technologies Office (BTO) within the U.S. Department of Energy’s (DOE’s) Office of Energy Efficiency and Renewable Energy (EERE) initiated a project to design, develop, and field test a VOLTTRON™-based supervisory controller and associated open-source algorithms. These algorithms will ensure real-time optimal operation of a building-integrated CHP system, support electric grid reliability, and lead to achieving the goal of a clean, efficient, reliable and affordable next-generation integrated energy systems. This report lists the components for which PM, real-time CxV and AFDD algorithms will be developed, how the algorithms will be tested, and metrics that will be used to validate the algorithms and easy of deployment. Deployment of these algorithms in the field will result in savings reduction in energy consumption of between 10% and 20%.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY 2024

Energy Savings Performance Contracts (ESPCs) are a contractual mechanism that allow a federal agency to procure energy savings and facility improvements without upfront capital costs to reduce costs and enhance mission resiliency. ESPCs are covered under FAR Part 23.2, and 42 USC § 8287. Section 8287(a)(2)(A) of Title 42 of the U.S. Code requires that each energy savings performance contract (ESPC) undergo an annual energy audit, resulting in a separate audit report for every project. The objective of the present report is to compile and analyze all annual ESPC audit reports issued between October 1, 2023, and September 30, 2024, for projects awarded under Generations 1, 2, and 3 of DOE’s ESPC IDIQ contracts. During this period, 205 measurement and verification (M&V) reports were produced for 200 projects; the total number of reports exceeds the number of projects because some projects generated more than one report (for example, a few projects measure savings twice per year and produce two audit reports annually, each covering a different six-month period). By aggregating the results from these individual audits, the report determines the portfolio-wide realization rate of energy and cost savings for all active ESPC projects awarded under DOE’s IDIQ program.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Revisiting “Additional Carbon”: Tracking Atmosphere–Ecosystem Carbon Exchange to Establish Mitigation and Negative Emissions From Bio-Based Systems

Climate stabilization plans rely heavily on advanced bioenergy and bioproducts for substitution of fossil-based energy sources and materials, and increasingly, for negative emissions via the direct sequestration of biogenic carbon. Yet, there remain persistent, largely unresolved critiques of bioenergy assessment methodology, particularly in the areas of land use and biogenic carbon accounting. The concept of “additional carbon” calls for evaluating the climate performance of bio-based systems by whether feedstock production creates measurable new local agro-ecosystem uptake of carbon from the atmosphere. This concept is challenging to operationalize for first-generation biofuels, and has largely been advanced as a negative critique. However, carbon additionality is more straightforward to establish—and less critical to overall system mitigation performance—in advanced bioenergy systems. In this Perspective, I review the additional carbon critique, and why it is analytically challenging to address in first-generation biofuel systems based on conventional food crops with large existing markets. Next, I make a case that carbon additionality (1) is more readily achievable with cellulosic feedstocks, (2) is more directly observable for dedicated biomass crops, and (3) is not a strict requirement for achieving net mitigation in carbon-negative bio-based systems. I end by discussing how centering atmosphere–ecosystem carbon exchanges in bio-based system assessment could create new opportunities for enterprise-scale performance monitoring and verification, augmenting and diversifying the current reliance on model-based life-cycle assessment approaches.

54 ENVIRONMENTAL SCIENCES↗

PELICAN Design, Test Planning, and Commissioning Results

To support design efforts for the Versatile Test Reactor (VTR) core assemblies, an experimental facility has been designed and constructed at Argonne National Laboratory to match the hydraulic flow conditions within the VTR’s primary heat transport system (PHTS). This facility, the Pressure drop Experimental Loop for Investigations of Core Assemblies in advanced Nuclear reactors, PELICAN, provides the ability to measure pressure drop across a full-scale fuel assembly containing prototypic axial reflectors, fuel, and plena components. The PELICAN facility was designed and built to offer maximum flexibility, allowing testing from short sub-sections all the way to the full-length core fuel assemblies. The report presents the high-level program objectives, a summary of the facility design, instrumentation, and control systems, and the testing procedure. The outcomes from facility characterization efforts and first test matrix results are then presented and then, finally, the conclusion contains a summary of the future work to be performed. This test facility was designed to match the hydraulic conditions of the flowing sodium in the VTR using water as a surrogate fluid. To do so, the water is elevated to a temperature of 110°C where its viscosity matches that of sodium, and with a 50-HP centrifugal pump, is capable of generating full scale flow rates to achieve prototypic Reynolds and Euler number flow conditions. To prevent boiling, the system is maintained at elevated pressure of at least 2.7-3.0 bar (40-44 psig). A set of 15 tests have been used to perform checkout activities in order to commission the device, survey the capabilities of PELICAN, and generate experimental data at isothermal conditions and over a range of flow rates up to 44 kg/s (700 GPM) to produce datasets used in the verification and validation of VTR design and modeling efforts. Initial testing focused on facility characterization, which assessed the operational capabilities of various control systems. The thermal control system was qualified, including the thermal response of the loop to the heat added by self- and auxiliary heaters, the chiller and heat exchanger systems for removing excess heat, and their coupled ability to maintain steady-state isothermal conditions as desired. Additionally, the pressure control system was verified to ensure necessary operating environments that promote pump health and prevent boiling of loop inventory at high temperatures could be met. With these systems in place, the first set of matrix tests have been carried out using orifice plates with inner diameters of 2.25-inches and 2.5-inches. Orifice plate flow behavior is well covered in scientific literature, and the results find good agreement with the measured pressure drop vs flow rate and those of theoretical predictions. This initial testing not only helps to validate the experiment, but it also produces a high quality data set for a geometry that is easily reproducible for simulations. Finally, the report is concluded with a discussion of the work to come and provides a snapshot of the test articles in the experimental pipeline whose designs are being inspired by the current designs from the VTR.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Demonstrating autonomous controls on hardware test beds is a necessity for successful missions to Mars and beyond

NASA and the Department of Defense are planning for a mission to Mars in the 2030s–2040s using nuclear thermal propulsion (NTP). NTP uses a nuclear reactor to heat flowing hydrogen and create thrust. A serious concern for crewed and uncrewed missions to Mars is the loss of reactor control. The reactor startup and initial rocket impulse are initiated in cislunar or near-earth orbital regions; therefore, radio communications between ground control and the NTP engine should occur in real time. However, radio communications can take more than 20 min, depending on planet positions, to reach Mars orbiters from ground control. To address this delay, local autonomous controls are implemented onboard the NTP engine to ensure acceptable operation. However, autonomous controls have not been demonstrated or implemented in research or power reactor contexts because of safety and reliability concerns. To enable autonomous controls development, demonstration, and validation, Oak Ridge National Laboratory has created a nonnuclear hardware-in-the-loop test bed. Sensors throughout the test bed relay system status and hardware response to the user control algorithm, including measurements of temperature, flow, pressure of a loop, control drum position, and drum speed. This paper discusses the development of this facility and user accessibility.

33 ADVANCED PROPULSION SYSTEMS↗