Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Mars Exploration Program Architecture Mars Missions”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Launching to the Moon, Mars, and Beyond

America is returning to the Moon in preparation for the first human footprint on Mars, guided by the U.S. Vision for Space Exploration. This presentation will discuss NASA's mission today, the reasons for returning to the Moon and going to Mars, and how NASA will accomplish that mission. The primary goals of the Vision for Space Exploration are to finish the International Space Station, retire the Space Shuttle, and build the new spacecraft needed to return people to the Moon and go to Mars. Unlike the Apollo program of the 1960s, this phase of exploration will be a journey, not a race. In 1966, the NASA's budget was 4 percent of federal spending. Today, with 6/10 of 1 percent of the budget, NASA must incrementally develop the vehicles, infrastructure, technology, and organization to accomplish this goal. Fortunately, our knowledge and experience are greater than they were 40 years ago. NASA's goal is a return to the Moon by 2020. The Moon is the first step to America's exploration of Mars. Many questions about the Moon's history and how its history is linked to that of Earth remain even after the brief Apollo explorations of the 1960s and 1970s. This new venture will carry more explorers to more diverse landing sites with more capable tools and equipment. The Moon also will serve as a training ground in several respects before embarking on the longer, more perilous trip to Mars. The journeys to the Moon and Mars will require a variety of vehicles, including the Ares I Crew Launch Vehicle, the Ares V Cargo Launch Vehicle, the Orion Crew Exploration Vehicle, and the Lunar Surface Access Module. The architecture for the lunar missions will use one launch to ferry the crew into orbit on the Ares I and a second launch to orbit the lunar lander and the Earth Departure Stage to send the lander and crew vehicle to the Moon. In order to reach the Moon and Mars within a lifetime and within budget, NASA is building on proven hardware and decades of experience derived from the Apollo Saturn, Space Shuttle, and contemporary commercial launch vehicle programs. Less than one year after the Exploration Launch Projects Office was formed at NASA's Marshall Space Flight Center, engineers are testing engine components, firing test rocket motors, refining vehicle designs in wind tunnel tests, and building hardware for the first flight test of Ares I, scheduled for spring 2009. The Vision for Exploration will require this nation to develop tools, machines, materials, and processes never before invented, technologies and capabilities that can be turned over to the private sector to benefit nearly all aspects of life on Earth. This new pioneering venture, as did the Apollo Program before it, will contribute to America's economic leadership, national security, and technological global competitiveness and serve as an inspiration for all its citizens.

Sumrall, John P.↗

An Odyssey for the turn of the millennia

The paper discusses one of the goals of the U.S. national space policy, i.e., to expand human presence and activity beyond earth orbit into the solar system. Journeys to the Moon and Mars, involving Space Station Freedom and robotic spacecraft, require advances in technology and opportunities for international cooperation are substantual. Two or more significantly different reference mission architectures are planned to be developed and United States astronauts are expected to land on Mars before 2019. Ideas and technologies which may benefit the Space Exploration Initiative are channeled to a program, called 'Outreach Program', to be later assessed by the Synthesis Group, an organization of senior U.S. specialists.

O'Handley, Douglas A.↗

Ares Launch Vehicles Overview: Space Access Society

America is returning to the Moon in preparation for the first human footprint on Mars, guided by the U.S. Vision for Space Exploration. This presentation will discuss NASA's mission, the reasons for returning to the Moon and going to Mars, and how NASA will accomplish that mission in ways that promote leadership in space and economic expansion on the new frontier. The primary goals of the Vision for Space Exploration are to finish the International Space Station, retire the Space Shuttle, and build the new spacecraft needed to return people to the Moon and go to Mars. The Vision commits NASA and the nation to an agenda of exploration that also includes robotic exploration and technology development, while building on lessons learned over 50 years of hard-won experience. NASA is building on common hardware, shared knowledge, and unique experience derived from the Apollo Saturn, Space Shuttle, and contemporary commercial launch vehicle programs. The journeys to the Moon and Mars will require a variety of vehicles, including the Ares I Crew Launch Vehicle, which transports the Orion Crew Exploration Vehicle, and the Ares V Cargo Launch Vehicle, which transports the Lunar Surface Access Module. The architecture for the lunar missions will use one launch to ferry the crew into orbit, where it will rendezvous with the Lunar Module in the Earth Departure Stage, which will then propel the combination into lunar orbit. The imperative to explore space with the combination of astronauts and robots will be the impetus for inventions such as solar power and water and waste recycling. This next chapter in NASA's history promises to write the next chapter in American history, as well. It will require this nation to provide the talent to develop tools, machines, materials, processes, technologies, and capabilities that can benefit nearly all aspects of life on Earth. Roles and responsibilities are shared between a nationwide Government and industry team. The Exploration Launch Projects Office at the Marshall Space Flight Center manages the design, development, testing, and evaluation of both vehicles and serves as lead systems integrator. A little over a year after it was chartered, the Exploration Launch Projects team is testing engine components, refining vehicle designs, performing wind tunnel tests, and building hardware for the first flight test of Ares I-X, scheduled for spring 2009. The Exploration Launch Projects team conducted the Ares I System Requirements Review (SRR) at the end of 2006. In Ares' first year, extensive trade studies and evaluations were conducted to refine the design initially recommended by the Exploration Systems Architecture Study, conceptual designs were analyzed for fitness, and the contractual framework was assembled to enable a development effort unparalleled in American space flight since the Space Shuttle. Now, the project turns its focus to the Preliminary Design Review (PDR), scheduled for 2008. Taking into consideration the findings of the SRR, the design of the Ares I is being tightened and refined to meet the safety, operability, reliability, and affordability goals outlined by the Constellation Program. The Ares V is in the early design stage, focusing its activities on requirements validation and ways to develop this heavy-lift system so that synergistic hardware commonality between it and the Ares I can reduce the operational footprint and foster sustained exploration across the decades ahead.

Cook, Steve↗

Preparing for Humans at Mars, MPPG Updates to Strategic Knowledge Gaps and Collaboration with Science Missions

The Mars Program Planning Group (MPPG) was an agency wide effort, chartered in March 2012 by the NASA Associate Administrator for Science, in collaboration with NASA's Associate Administrator for Human Exploration and Operations, the Chief Scientist, and the Chief Technologist. NASA tasked the MPPG to develop foundations for a program-level architecture for robotic exploration of Mars that is consistent with the President's challenge of sending humans to the Mars system in the decade of the 2030s and responsive to the primary scientific goals of the 2011 NRC Decadal Survey for Planetary Science. The Mars Exploration Program Analysis Group (MEPAG) also sponsored a Precursor measurement Strategy Analysis Group (P-SAG) to revisit prior assessments of required precursor measurements for the human exploration of Mars. This paper will discuss the key results of the MPPG and P-SAG efforts to update and refine our understanding of the Strategic Knowledge Gaps (SKGs) required to successfully conduct human Mars missions.

Viking↗

Human Space Exploration: The Moon, Mars, and Beyond

America is returning to the Moon in preparation for the first human footprint on Mars, guided by the U.S. Vision for Space Exploration. This presentation will discuss NASA's mission, the reasons for returning to the Moon and going to Mars, and how NASA will accomplish that mission in ways that promote leadership in space and economic expansion on the new frontier. The primary goals of the Vision for Space Exploration are to finish the International Space Station, retire the Space Shuttle, and build the new spacecraft needed, to return people to the Moon and go to Mars. The Vision commits NASA and the nation to an agenda of exploration that also includes robotic exploration and technology development, while building on lessons learned over 50 years of hard-won experience. Why the Moon? Many questions about the Moon's potential resources and how its history is linked to that of Earth were spurred by the brief Apollo explorations of the 1960s and 1970s. This new venture will carry more explorers to more diverse landing sites with more capable tools and equipment for extended expeditions. The Moon also will serve as a training ground before embarking on the longer, more difficult trip to Mars. NASA plans to build a lunar outpost at one of the lunar poles, learn to live off the land, and reduce dePendence on Earth for longer missions. America needs to extend its ability to survive in hostile environments close to our home planet before astronauts will reach Mars, a planet very much like Earth. NASA has worked with scientists to define lunar exploration goals and is addressing the opportunities for a range of scientific study on Mars. In order to reach the Moon and Mars within a lifetime and within budget, NASA is building on common hardware, shared knowledge, and unique experience derived from the Apollo Saturn, Space Shuttle and contemporary commercial launch vehicle programs. The journeys to the Moon and Mars will require a variety of vehicles, including the Ares I Crew Launch Vehicle, which transports the Orion Crew Exploration Vehicle, and the Ares V Cargo Launch Vehicle, which transports the Lunar Surface Access Module. The architecture for the lunar missions will use one launch to ferry the crew into orbit, where it will rendezvous with the Lunar Module in the Earth Departure Stage, which will then propel the combination into lunar orbit. The imperative to explore space with the combination of astronauts and robots will be the impetus for inventions such as solar power and water and waste recycling. This next chapter in NASA's history promises to write the next chapter in American history, as well. It will require this nation to provide the talent to develop tools, machines, materials, processes, technologies, and capabilities that can benefit nearly all aspects of life on Earth. Roles and responsibilities are shared between a nationwide Government and industry team. The Exploration Launch Projects Office at the Marshall Space Flight Center manages the design, development, testing, and evaluation of both vehicles and serves as lead systems integrator. A little over a year after it was chartered, the Exploration Launch Projects team is testing engine components, refining vehicle designs, performing wind tunnel tests, and building hardware for the first flight test of Ares I-l, scheduled for spring 2009. The U.S. Vision for Space Exploration lays out a roadmap for a long-term venture of discovery. This endeavor will inspire and attract the best and brightest students to power this nation successfully to the Moon, Mars, and beyond. If one equates the value proposition for space with simple dollars and cents, the potential of the new space economy is tremendous, from orbital space delivery services for the International Space Station to mining and solar energy collection on the Moon and asteroids. The Vision for Space Exploration is fundamentally about bringing the resources of the solar system within the economic sphere of humaind. Given the immense size of our solar system, the amount of available material and energy within it present an enormous economic opportunity.

Sexton, Jeffrey D.↗

NASA Crew Launch Vehicle Approach Builds on Lessons from Past and Present Missions

The United States Vision for Space Exploration, announced in January 2004, outlines the National Aeronautics and Space Administration's (NASA) strategic goals and objectives, including retiring the Space Shuttle and replacing it with a new human-rated system suitable for missions to the Moon and Mars. The Crew Exploration Vehicle (CEV) that the new Crew Launch Vehicle (CLV) lofts into space early next decade will initially ferry astronauts to the International Space Station and be capable of carrying crews back to lunar orbit and of supporting missions to Mars orbit. NASA is using its extensive experience gained from past and ongoing launch vehicle programs to maximize the CLV system design approach, with the objective of reducing total lifecycle costs through operational efficiencies. To provide in-depth data for selecting this follow-on launch vehicle, the Exploration Systems Architecture Study was conducted during the summer of 2005, following the confirmation of the new NASA Administrator. A team of aerospace subject matter experts used technical, budget, and schedule objectives to analyze a number of potential launch systems, with a focus on human rating for exploration missions. The results showed that a variant of the Space Shuttle, utilizing the reusable Solid Rocket Booster as the first stage, along with a new upper stage that uses a derivative of the RS-25 Space Shuttle Main Engine to deliver 25 metric tons to low-Earth orbit, was the best choice to reduce the risks associated with fielding a new system in a timely manner. The CLV Project, managed by the Exploration Launch Office located at NASA's Marshall Space Flight Center, is leading the design, development, testing, and operation of this new human-rated system. The CLV Project works closely with the Space Shuttle Program to transition hardware, infrastructure, and workforce assets to the new launch system . leveraging a wealth of lessons learned from Shuttle operations. The CL V is being designed to reduce costs through a number of methods, ranging from validating requirements to conducting trades studies against the concept design. Innovations such as automated processing will build on lessons learned from the Shuttle, other launch systems, Department of Defense operations experience, and subscale flight tests such as the Delta Clipper-Experimental Advanced (DCXA) vehicle operations that utilized minimal touch labor, automated cryogen ic propellant loading , and an 8-hour turnaround for a cryogenic propulsion system. For the CLV, the results of hazard analyses are contributing to an integrated vehicle health monitoring system that will troubleshoot anomalies and determine which ones can be solved without human intervention. Such advances will help streamline the mission operations process for pilots and ground controllers alike. In fiscal year 2005, NASA invested approximately $4.5 billion of its $16 bill ion budget on the Space Shuttle. The ultimate goal of the CLV Project is to deliver a safe, reliable system designed to minimize lifecycle costs so that NASA's budget can be invested in missions of scientific discovery. Lessons learned from developing the CLV will be applied to the growth path for future systems, including a heavy lift launch vehicle.

Dumbacher, Daniel L.↗

The Gateway as a Building Block for Space Exploration and Development

The Gateway, which will be a small, human-tended space station in orbit around the Moon, is an example of the building block approach to space exploration and development. The National Aeronautics and Space Administration (NASA) leads the Gateway Program and serves as the integrator of the spaceflight capabilities and contributions of U.S. commercial partners and international partners. Gateway is a cornerstone of deep space human exploration, one critical element of the strategies and architectures that will enable human exploration of the solar system. This paper will outline: 1) The concept of operations and describe how Gateway is a multipurpose space station, supporting lunar surface missions, cis-lunar research, and as a proving ground for human missions to Mars; 2) Gateway’s international partnerships as an expansion of the partnerships of the “second generation of space programmes,” namely the International Space Station (ISS); and 3) Future commercial, scientific, and technology demonstration opportunities that this infrastructure building block provides. Lastly, the strategies and architectures for future space exploration and development must include thoughtful approaches to the management and business operations of government space programs. This includes planning for limited outyear growth in budgets, partnership and acquisition strategies, pursuing public-private partnerships and the use of firm-fixed price contracts, enabling vendor-to-vendor relationships, the use of multilateral interoperability standards, and incorporating key lessons learned from prior governmental Programs. This paper will discuss the strategies and approaches undertaken when establishing the Gateway Program at the NASA Johnson Space Center in 2019 and the current operational status of this new, lean, and efficient Program.

Gateway↗

The Gateway as a Building Block for Space Exploration and Development

The Gateway, which will be a small, human-tended space station in orbit around the Moon, is an example of the building block approach to space exploration and development. The National Aeronautics and Space Administration (NASA) leads the Gateway Program and serves as the integrator of the spaceflight capabilities and contributions of U.S. commercial partners and international partners. Gateway is a cornerstone of deep space human exploration, one critical element of the strategies and architectures that will enable human exploration of the solar system. This paper will outline: 1) The concept of operations and describe how Gateway is a multi-purpose space station, supporting lunar surface missions, cis-lunar research, and as a proving ground for human missions to Mars; 2) Gateway’s international partnerships as an expansion of the partnerships of the “second generation of space programmes,” namely the International Space Station (ISS); and 3) Future commercial, scientific, and technology demonstration opportunities that this infrastructure building block provides. Lastly, the strategies and architectures for future space exploration and development must include thoughtful approaches to the management and business operations of government space programs. This includes planning for limited outyear growth in budgets, partnership and acquisition strategies, pursuing public-private partnerships and the use of firm-fixed price contracts, enabling vendor-to-vendor relationships, the use of multilateral interoperability standards, and incorporating key lessons learned from prior governmental Programs. This paper will discuss the strategies and approaches undertaken when establishing the Gateway Program at the NASA Johnson Space Center in 2019 and the current operational status of this new, lean, and efficient Program.

Gateway↗

Datascope to Enable Earth Independent Medical Operations (EIMO)

BACKGROUND: NASA has amassed sixty years of knowledge and experience relevant to maintenance of crew health and performance in low earth orbit. The Apollo Program introduced the importance of ensuring progressively autonomous operational capability. Earth Independent Medical Operations (EIMO) will require a gradual shift in the balance of medical responsibility, management, and authority from terrestrial to space-based assets. Terrestrial assets will continue to be essential for pre-mission screening and planning in addition to maintenance of crew health and performance. However, new capabilities are needed to enable EIMO and the amount of data required to support these systems, and mitigate the impacts of data transmission delays and reduced bandwidth coupled with lack of cloud-like resources and on-board computing capacity that is currently unclear or operationally insufficient. OVERVIEW: The overall goal of EIMO is to develop artificial intelligence (AI)-based solutions to analyze crew health and performance data utilizing a clinical decision support system (CDSS) to provide crew medical officers (CMO) with the equivalent of real-time, on-board medical consults. The EIMO ecosystem is envisioned as a “system of systems” where embedded reference databases and real-time data streams from multiple input vectors continuously and seamlessly assess crew health and performance. EIMO will be designed to make recommendations to the CMO using multi-modal AI-based natural language processing and machine learning methods with interoperability to push/pull data within and between multiple vehicle and habitat architectures. DISCUSSION: Data flows and storage/retrieval capacity are severely constrained during space missions and the challenges will become even greater during exploration missions. Just as each past program from Mercury to the International Space Station (ISS) required rethinking the interaction between ground-based controllers and space-based crew, so too will future missions to the Moon and Mars. While the NASA High-Performance Spaceflight Computing Processor project aims to increase computational capacity by 100 times over current spaceflight computers, the projected deliverable still lags considerably behind what will be needed to enable an AI-driven CDSS. Restrictions in processing speed and data storage capacity, coupled with transmission bottlenecks and delays, necessitate definition and optimization of an integrated data architecture to enable a progressively autonomous medical capability.

Medical operations↗

Moving Towards a Common Ground and Flight Data Systems Architecture for NASA's Exploration Missions

The National Aeronautics and Space Administration has embarked on an ambitious effort to return man to the moon and then on to Mars. The Exploration Vision requires development of major new space and ground assets and poses challenges well beyond those faced by many of NASA's recent programs. New crewed vehicles must be developed. Compatible supply vehicles, surface mobility modules and robotic exploration capabilities will supplement the manned exploration vehicle. New launch systems will be developed as well as a new ground communications and control infrastructure. The development must take place in a cost-constrained environment and must advance along an aggressive schedule. Common solutions and system interoperability and will be critical to the successful development of the Exploration data systems for this wide variety of flight and ground elements. To this end, NASA has assembled a team of engineers from across the agency to identify the key challenges for Exploration data systems and to establish the most beneficial strategic approach to be followed. Key challenges and the planned NASA approach for flight and ground systems will be discussed in the paper. The described approaches will capitalize on new technologies, and will result in cross-program interoperability between spacecraft and ground systems, from multiple suppliers and agencies.

Rader. Steve↗

Using Open Standards and NASA Open Source Simulation Tools to Model Artemis Base Camp Mission Timelines

The United States’ National Aeronautics and Space Administration (NASA) has announced that the Artemis Program will return humans to the Moon, establishing a persistent presence with the Artemis Base Camp (ABC), and extend human exploration to Mars. The NASA Exploration Systems Simulations (NExSyS) team at NASA’s Johnson Space Center is using internationally developed simulation interoperability standards and NASA open source simulation tools to support Artemis concept, analysis, designs, development, training, and ultimately operations. The NExSyS team has been tasked to support early ABC architecture and mission analysis using mission time lines developed by the crew operations mission planning team. The NExSyS team is developing a distributed simulation framework with initial Artemis element implementations to model the ABC mission timelines using the international simulation interoperability standard High Level Architecture (HLA), the Simulation Interoperability Standards Organization’s Space Reference Federation Object Model (SpaceFOM), the NASA open source Trick Simulation Environment, and another NASA open source interface package called TrickHLA. The ABC architecture is composed of a number of key surface elements and resources. Some examples of modeled elements (also known as entities) are landers, habitats, rovers, logistics carriers, and astronauts. Some examples of modeled transferable and consumable resources are power, water, oxygen, nitrogen, scientific samples, and food. These entities and resources are modeled in a collection of individual simulations called Federates. A coordinated collection of interoperable federates is called a Federation and when these federates are tied together in a coordinated simulation run, it is referred to as a Federation Execution. The federates communicate through HLA using data exchange formats defined by a collection of machine readable files called Federation Object Models (FOMs). These FOM files are based on extensions to the SpaceFOM. This enables the instantiation and sharing of objects and interactions between federates in the federation. These provide for entity and resource tracking, object transfer, and data collection. Federate interactions are used to trigger events and notify federates of entity or resource transfers. For the initial implementation, the constituent federates are Trick-based simulations that use TrickHLA to provide the required HLA-base interoperability. These Trick-based simulations provide the required modeling for the individual Artemis elements along with the associated element resources. These federates provide a means to explore traverses between surface elements and exploration sites as scheduled in a mission timeline and explore the affects traverse times have on the overall mission timeline. The mission time lines are modeled using a Trick input file event handling capabilities. Each timeline operation is handled as individual simulation events, and triggered based on previous event status, time of operation, and simulated task completions. In addition, the ABC Federation can be used to perform Monte Carlo analysis. The Monte Carlo tool can vary the inputs, timings, and malfunctions to show how various contingencies in the mission can affect the mission timeline.

Keaton Craig Dodd↗

NASA's Space Launch System: An Enabling Capability for Discovery

The National Aeronautics and Space Administration's (NASA's) Space Launch System (SLS) Program, managed at the Marshall Space Flight Center, is making progress toward delivering a new capability for human spaceflight and scientific missions beyond Earth orbit. Developed with the goals of safety, affordability, and sustainability in mind, the SLS rocket will launch the Orion Multi-Purpose Crew Vehicle (MPCV), equipment, supplies, and major science missions for exploration and discovery. Making its first uncrewed test flight in 2017 and its first crewed flight in 2021, the SLS will evolve into the most powerful launch vehicle ever flown, capable of supporting human missions into deep space and to Mars. This paper will summarize the planned capabilities of the vehicle, the progress the SLS Program has made in the years since the Agency formally announced its architecture in September 2011, and the path the program is following to reach the launch pad in 2017 and then to evolve the 70 metric ton (t) initial lift capability to 130 t lift capability. The paper will outline the milestones the program has already reached, from developmental milestones such as the manufacture of the first flight hardware and recordbreaking engine testing, to life-cycle milestones such as the vehicle's Preliminary Design Review in the summer of 2013. The paper will also discuss the remaining challenges in both delivering the 70 t vehicle and in evolving its capabilities to the 130 t vehicle, and how the program plans to accomplish these goals. In addition, this paper will demonstrate how the Space Launch System is being designed to enable or enhance not only human exploration missions, but robotic scientific missions as well. Because of its unique launch capabilities, SLS will support simplifying spacecraft complexity, provide improved mass margins and radiation mitigation, and reduce mission durations. These capabilities offer attractive advantages for ambitious science missions by reducing infrastructure requirements, cost, and schedule. A traditional baseline approach for a mission to investigate the Jovian system would require a complicated trajectory with several gravity-assist planetary fly-bys to achieve the necessary outbound velocity. The SLS rocket, offering significantly higher C3 energies, can more quickly and effectively take the mission directly to its destination, providing scientific results sooner and at lower operational cost. The SLS rocket will launch payloads of unprecedented mass and volume, such as "monolithic" telescopes and in-space infrastructure, and will revolutionize science mission planning and design for years to come. As this paper will explain, SLS is making measurable progress toward becoming a global infrastructure asset for robotic and human scouts of all nations by harnessing business and technological innovations to deliver sustainable solutions for space exploration.

Creech, Stephen D.↗

NASA's Space Launch System: An Enabling Capability for Discovery

The National Aeronautics and Space Administration's (NASA's) Space Launch System (SLS) Program, managed at the Marshall Space Flight Center, is making progress toward delivering a new capability for human spaceflight and scientific missions beyond Earth orbit. Developed with the goals of safety, affordability, and sustainability in mind, the SLS rocket will launch the Orion Multi-Purpose Crew Vehicle (MPCV), equipment, supplies, and major science missions for exploration and discovery. Making its first uncrewed test flight in 2017 and its first crewed flight in 2021, the SLS will evolve into the most powerful launch vehicle ever flown, capable of supporting human missions into deep space and to Mars. This paper will summarize the planned capabilities of the vehicle, the progress the SLS Program has made in the years since the Agency formally announced its architecture in September 2011, and the path the program is following to reach the launch pad in 2017 and then to evolve the 70 metric ton (t) initial lift capability to 130 t lift capability. The paper will outline the milestones the program has already reached, from developmental milestones such as the manufacture of the first flight hardware and recordbreaking engine testing, to life-cycle milestones such as the vehicle's Preliminary Design Review in the summer of 2013. The paper will also discuss the remaining challenges in both delivering the 70 t vehicle and in evolving its capabilities to the 130 t vehicle, and how the program plans to accomplish these goals. In addition, this paper will demonstrate how the Space Launch System is being designed to enable or enhance not only human exploration missions, but robotic scientific missions as well. Because of its unique launch capabilities, SLS will support simplifying spacecraft complexity, provide improved mass margins and radiation mitigation, and reduce mission durations. These capabilities offer attractive advantages for ambitious science missions by reducing infrastructure requirements, cost, and schedule. A traditional baseline approach for a mission to investigate the Jovian system would require a complicated trajectory with several gravity-assist planetary fly-bys to achieve the necessary outbound velocity. The SLS rocket, offering significantly higher C3 energies, can more quickly and effectively take the mission directly to its destination, providing scientific results sooner and at lower operational cost. The SLS rocket will launch payloads of unprecedented mass and volume, such as "monolithic" telescopes and in-space infrastructure, and will revolutionize science mission planning and design for years to come. As this paper will explain, SLS is making measurable progress toward becoming a global infrastructure asset for robotic and human scouts of all nations by harnessing business and technological innovations to deliver sustainable solutions for space exploration.

Creech, Stephen D.↗

New Directions in Space: A Report on the Lunar and Mars Initiatives

This report focuses on one aspect of the current space program: The establishment of a manned base on the Moon and the manned exploration of Mars. These missions were announced by the President last year as a major U.S. space policy objective to be implemented under the leadership of the Vice President, acting as Chairman of the National Space Council. On March 8, 1990, the White House released Presidential guidelines for the execution of the lunar and Mars programs. The guidelines stressed the need for new approaches and the development of innovative technologies with a potential for major cost, schedule and performance improvements. They also called for a competitive environment, with several years allotted to the definition of at least two significantly different human space exploration "reference architectures." Selection of the final technical concepts for the mission is scheduled to occur only after the relative merits of the competing reference architectures have been evaluated.

Seitz, Frederick↗

Exploration Systems Development Mission Directorate (ESDMD) Moon-to-Mars Architecture Definition Document

There are many opportunities in executing the ambitious Moon-to-Mars efforts through an integrated architecture. NASA addresses this in its Moon-to-Mars Strategy and Objectives Development2 document (hereafter referred to as the M2M Strategy). Many of these opportunities involve establishing a system engineering framework that can support the breadth of necessary program and system contributions. By applying these needs to nearer-term lunar development, NASA will be instituting the process, procedures, and techniques needed to enable longer-term Mars goals and more. Some of the challenges being addressed in the M2M Strategy are associated with the architecture definition and include broad/changing goals, funding, and external pressures/influences. This document and the methodology outlined for architecture definition have been crafted to contend with these using an iterative and adaptable framework. The primary purpose of the Architecture Definition Document (ADD) is to capture the methodology, organization, and decomposition necessary to translate the broad objectives outlined in the M2M Strategy into functions and use cases that can be allocated to implementable programs and projects. Inherent in this process will be the need to communicate the long-term vision, maintain traceability to responsible parties, and iterate on the architectural implementation as innovations and solutions develop. This document will be updated and improved in conjunction with the Architecture Concept Review (ACR) which will be held annually to help unify the Agency and to get buy-in and input from across the Agency on the human exploration architecture. The annual nature of the process provides the opportunity to continually incorporate new developments in technologies and new partnerships, whether they be with industry, the U.S. Government, international entities, or academia.

Moon-to-Mars Strategy↗

Medical System Concept of Operations for Mars Exploration Mission-11: Exploration Medical Capability (ExMC) Element - Human Research Program

NASA’s exploration missions to Mars will have durations of 2-3 years and will take humans farther away from Earth than ever before. This will result in a paradigm shift for mission planning, spacecraft design, human systems integration, and in-flight medical care. Constraints on real-time communication, resupply, and medical evacuation are major architectural drivers. These constraints require medical system development to be tightly integrated with mission and vehicle design to provide crew autonomy and enable mission success. This concept of operations provides a common vision of medical care for developing a medical system for Mars exploration missions. It documents an overview of the stakeholder needs and goals of a medical system and provides examples of the types of activities the system will be used for during the mission. Development of the concept of operations considers mission variables such as distance from Earth, duration of mission, time to definitive medical care, communication protocols between crewmembers and ground support, personnel capabilities and skill sets, medical hardware and software, and medical data management. The information provided in this document informs the ExMC Systems Engineering effort to define the functions to be provided by the medical system. In addition, this concept of operations will inform the subsequent systems engineering process of developing technical requirements, system architectures, interfaces, and verification and validation approaches for the medical system. This document supports the closure of ExMC Gap Med01: We do not have a concept of operations for medical care during exploration missions, corresponding to the ExMC-managed human system risk: Risk of Adverse Health Outcomes & Decrements in Performance due to Inflight Medical Conditions. This document is applicable to the ExMC Element Systems Engineering process and may be used for collaboration within the Human Research Program.

Urbina, Michelle↗

Human Exploration of the Moon and Mars: Space Radiation Data, Modeling and Instrumentation Needs

On January 14, 2004 President Bush announced the Vision for Space Exploration, a program for long-term human and robotic exploration of the solar system which will include a return of humans to the moon not later than 2020, followed by human missions to Mars. Since this announcement, NASA has been developing plans and mission architectures for these human missions as well as robotic precursor missions. Among the critical needs for research and development in support of this Vision are investigations on the ionizing radiation environment and development of instrumentation to guide NASA in managing the radiation exposure of the crew during the manned missions. For mission planning, models are needed for a reference worst-case solar energetic particle event and a reference worst-case galactic cosmic ray environment. During Lunar missions it will be necessary to carefully manage the radiation exposure of the crew in real time because of the variability of the radiation environment due to solar activity. In particular, prompt warnings will be needed when large solar energetic particle events occur. Accurate predictions will also be needed of the particle flux and flux history at the moon to support critical mission management decisions. A new generation of dosimeters and radiation monitors will also be needed to accompany the crew. These instruments must return data in real time so that they can be used in the critical decisions that must be made if a large solar energetic particle event occurs. This is especially true if it occurs during a lunar excursion. A substantial radiation exposure on extended lunar missions and Mars missions comes from galactic cosmic rays. This exposure must be mitigated by radiation shielding and other measures. During Mars missions the galactic cosmic ray exposure occurs primarily during the cruse phase between the Earth and Mars. This is especially true for opposition class missions. These missions would typically last -430 days with only 30-90 days on Mars. Solar energetic particle events are less of a concern on Mars because of its greater distance from the Sun (approximately 1.5 AU) and the partial protection afforded by its atmosphere (approximately 20 grams per square centimeter). The talk will describe the current plans for future human missions to Earth orbit, the Moon and Mars. The needs for data and models of the radiation environment and radiation detectors to support these missions will be discussed.

Adams, James H.↗

Mars sample return, updated to a groundbreaking approach

A Mars Sample Return (MSR) mission is a goal of the Mars Program. Recently, NASA and JPL have been studying the possibility of a Mars Sample Return some time in the next decade of Mars exploration. In 2001, JPL commissioned four industry teams to make a fresh examination of MSR architectures. Six papers on these studies were presented at last year's conference. As new fiscal realities of a cost-capped Mars Exploration Program unfolded, it was evident that these MSR concepts, which included mobility and subsurface sample acquisition, did not fit reasonably within a balanced program. Therefore, at the request of NASA and the science community, JPL asked the four industry teams plus JPL's Team X to explore ways to reduce the cost of a MSR. A NASA-created MSR Science Steering Group (SSG) established a reduced set of requirements for these new studies that built upon the previous year's work. As a result, a new 'Groundbreaking' approach to MSR was established that is well understood based on the studies and independent cost assessments by Aerospace Corporation and SAIC. The Groundbreaking approach appears to be what a contemporary, balanced Mars Exploration Program can afford, has turned out to be justifiable by the MSR Science Steering Group, and has been endorsed by the Mars science community at large. This paper gives a brief overview of the original 2001 study results and discusses the process leading to the new studies, the studies themselves, and the results.

Mars sample return↗