Engineering PapersSearch

SEARCH · Engineering Papers

Results for “Malcolm”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

48 records · Page 3

Distributed Wind Guidebook: Agricultural Producers and Rural Small Business Owners

Distributed wind energy technologies generate clean, carbon-free power close to the point of consumption (i.e., close to people and their energy needs). Distributed wind energy can help individuals, farms, businesses, and communities meet their unique goals, such as reducing impacts on climate change, decreasing electricity bills, boosting energy independence or autonomy from the electric grid, and enhancing grid reliability and resilience. This guidebook is designed to support you in (1) deciding if distributed wind energy is right for you, (2) installing a proven wind turbine technology by working with a reputable installer, and (3) setting up your project for success through its lifetime. The information in this guidebook is tailored to rural small businesses and agricultural producers who are interested in exploring distributed wind energy to meet their electricity, resilience, financial, and environmental goals. You will find gray boxes with key topics, definitions, and considerations throughout the guidebook. The report has been adapted from the Distributed Wind Guidebook, which offers a comprehensive view on core aspects of deploying distributed wind energy technologies. In comparison, this edition of the guidebook is designed to offer a more succinct and tailored guidebook for rural small businesses and agricultural producers. For additional detail on any topic presented within this edition, readers are advised to reference the original version of the Distributed Wind Guidebook.

17 WIND ENERGY

Photovoltaic and Cost Analysis for Winston-Salem, North Carolina

This study assesses the feasibility of solar installations at various sites in Winston-Salem, focusing on factors such as solar resource availability, electricity costs, and rooftop area for photovoltaic systems. The analysis begins by estimating daily energy requirements based on annual electricity use, followed by adjusting for seasonal and operational fluctuations. Using regional solar data from the National Solar Radiation Database (NSRDB), we calculate average peak sun hours to determine effective system sizing. A parametric approach using the System Advisor Model (SAM) refines this sizing process, incorporating a safety margin of 1.2 to address demand peaks. Each PV system is designed to fit available rooftop space, and a coverage threshold of 70% is identified as optimal for maximizing cost savings and sustainability. This threshold allows installations to meet substantial energy demands, supporting energy resilience and enhancing economic returns.

14 SOLAR ENERGY

Power Supply Options for the Marpi Landfill, Saipan: Comprehensive Feasibility Study

The Marpi Landfill (“Marpi” or “the landfill”), located on the northern end of the island of Saipan in the Commonwealth of the Northern Mariana Islands (CNMI), is powered by a single on-site diesel generator that only operates when the landfill is open and staffed. The project team, composed of representatives of the Department of Public Works and the Office of Planning and Development (OPD), aspires to provide the Marpi Landfill with 24-hour power availability despite its remote location to increase the use of sustainable energy and to ensure environmentally compliant landfill operations. This is consistent with the sustainable development goals documented in the 2021–2030 Comprehensive Sustainable Development Plan (OPD 2021), including Goal #12 (ensure environmentally compliant waste management facilities) and Goal #7 (renewable energy deployment). Further, the CNMI has a 20% target for renewable energy consumption by 2030, as documented in the 2021–2030 Comprehensive Sustainable Development Plan (OPD 2021) and the renewable portfolio standard (Public Law 18-62). To accomplish these goals, the Federal Emergency Management Agency, through its Interagency Reimbursable Work Agreement with the U.S. Department of Energy, funded a feasibility study and follow-up study in 2023–2024 to assess and prioritize power supply options for the landfill. This report combines the results from both feasibility studies.

14 SOLAR ENERGY

Typical Use Cases for Energy Storage in Rural Areas

Public power utilities and cooperatives play a crucial role in delivering reliable and affordable electricity to remote and sparsely populated regions. Unlike their urban counterparts, these utilities often face a unique set of challenges that can complicate their operations and service delivery. One of the primary challenges is the vast geographical area they must cover, which often results in higher transmission and distribution costs per customer. Additionally, public power utilities in rural areas often cannot afford the investments required to maintain and upgrade aging grid infrastructure to provide reliable and resilient power or withstand the impacts of recurring, severe weather events, which can cause extended outages and disrupt service delivery. Energy storage has emerged as a promising tool to help public power utilities meet these challenges. By enabling the storage of excess energy during low demand periods and providing a source of backup electricity during outages, energy storage systems can help utilities balance supply and demand more effectively. Additionally, they can help integrate a portfolio of various energy sources, reduce the need for expensive peak power purchases and provide ancillary services that stabilize the grid. This white paper describes potential use cases for energy storage in rural areas as well as documents a set of relevant example projects by project types.

24 POWER TRANSMISSION AND DISTRIBUTION

Port Gamble S'Klallam Tribe Strategic Energy Plan

The Port Gamble S'Klallam Tribe's Strategic Energy Plan (SEP) details the outcomes and efforts of a 1.5-year Energy Technology Innovation Partnership Program (ETIPP) project. This collaboration involved the Port Gamble S'Klallam Tribe, Spark Northwest, the Pacific Northwest National Laboratory (PNNL), and the National Renewable Energy Laboratory. Project partners supported the Tribe in identifying key energy research focus areas and the Tribe's energy vision. As the technical lead on the project, PNNL led a series of research initiatives to evaluate potential pathways for the Tribe to achieve its energy goals, subsequently providing associated recommendations. The SEP offers a comprehensive analysis encompassing several critical aspects including: -The Tribe's current energy landscape -Availability of renewable resources -Potential microgrid designs, developed by Säzän Group -Critical infrastructure analysis -Electric vehicle integration -An energy workforce development framework, led by Spark Northwest The analysis results come with recommended next steps, categorized by implementation timeframe (short-term, medium-term, long-term) and priority.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Threat Hunt Guide for BESS Environments

The rapid digitalization of the electric grid - driven by the integration of inverter-based resources (IBRs), battery energy storage systems (BESS), and advanced grid control platforms - has significantly enhanced grid efficiency, visibility, and flexibility. However, this evolution also introduces new cybersecurity risks, particularly through supply chain dependencies and operational blind spots at the grid edge. To address these challenges, Idaho National Laboratory (INL), through the Department of Energy (DOE) Office of Cybersecurity, Energy Security, and Emergency Response (CESER) Rapid Risk initiative, conducted a series of rapid risk assessment engagements with energy organizations across the United States. Drawing on lessons learned from these engagements, INL developed the following threat hunting guide for asset owners and operators (AOOs) to enhance their cybersecurity visibility within BESS and IBR systems. The guide demonstrates how to use passive network monitoring to baseline device behavior, detect adversarial activity, and investigate anomalies without disrupting operations. By implementing these practices, energy sector stakeholders can improve coordination between cybersecurity and operations teams and strengthen the resilience of distributed energy resources (DERs) within the modern power grid. Prior to implementing any network monitoring, packet capture, or threat hunting activity described in this guide, AOOs are strongly advised to review applicable governance frameworks, legal requirements, and organizational policies. This guide is intended for informational and educational purposes only. It does not replace compliance with any federal, state, or local cybersecurity mandates or industry standards. Implementation of described configurations, technologies, or analytic workflows is performed at the discretion and responsibility of the asset owner and operator.

25 - ENERGY STORAGE

Makah Tribe Strategic Energy Plan

The U.S. Department of Energy’s (DOE) Energy Transitions Initiative Partnership Project (ETIPP) connects remote and island communities, regional partners, and the DOE national laboratories to support communities as they seek to build resilience in their energy systems. The Makah Tribe faces several energy challenges, including frequent power outages and the potential for an extended outage due to an earthquake or tsunami. The Tribe joined ETIPP in 2022 to address those challenges, seeking to build energy resilience and sovereignty in the community. The Makah Tribe, Spark Northwest, the Pacific Northwest National Laboratory (PNNL), and the National Renewable Energy Laboratory (NREL) collaborated to develop a strategic energy plan as part of the second cohort of ETIPP communities. The long-term energy vision of the Makah Tribe includes increasing energy efficiency in the community, improving energy management capacity, and developing the renewable energy generation and storage sufficient to independently power the Reservation for one year. Additionally, the ETIPP team worked with Makah leadership, staff, and community members to identify a set of community priorities, values, and goals to guide energy development as the Tribe takes the incremental steps toward their vision for energy sovereignty. Those energy values include ecosystem-based management, energy sovereignty and project ownership, workforce development and capacity, economic opportunity, community wellbeing and priorities, and emergency disaster resilience. To understand what would be needed for a year for energy independence, the PNNL team conducted an assessment to determine the current energy usage of the Tribe and also modeled several scenarios for future energy use. Using the energy usage values, the team estimated how two types of renewable energy technology, specifically locally deployed solar and small-scale wind, could contribute towards the energy independence goal. The energy baseline and resource assessment produced the following key findings:

29 ENERGY PLANNING, POLICY, AND ECONOMY

Securing The Future: 2026 Manufacturing & Critical Infrastructure Threat Landscape

This report outlines the current state of manufacturing weaknesses introduced by the complexities of modern environments, including cloud services and Internet of Things (IoT) devices, with particular attention paid to the unique vulnerabilities encountered by SMMs. It also highlights CyManII’s strategic initiatives and collaborative solutions to mitigate these risks and strengthen the cybersecurity posture of the manufacturing ecosystem. Utilizing data from 2025 to inform forward-looking mitigation strategies, this report provides manufacturers with a clear understanding of both current and emerging cybersecurity threats, as well as practical opportunities to strengthen their cyber ecosystems. The following sections detail key vulnerabilities and threat vectors, along with actionable mitigation strategies, many of which have been developed or piloted through CyManII-led efforts. A thorough understanding of these risks and mitigation strategies is essential for manufacturers seeking to strengthen the security and resilience of their manufacturing operations.

3D Printing

High-Resolution Model Intercomparison Project phase 2 (HighResMIP2) towards CMIP7

Abstract. Robust projections and predictions of climate variability and change, particularly at regional scales, rely on the driving processes being represented with fidelity in model simulations. Consequently, the role of enhanced horizontal resolution in improved process representation in all components of the climate system continues to be of great interest. Recent simulations suggest the possibility of significant changes in both large-scale aspects of the ocean and atmospheric circulations and in the regional responses to climate change, as well as improvements in representations of small-scale processes and extremes, when resolution is enhanced. The first phase of the High-Resolution Model Intercomparison Project (HighResMIP1) was successful at producing a baseline multi-model assessment of global simulations with model grid spacings of 25–50 km in the atmosphere and 10–25 km in the ocean, a significant increase when compared to models with standard resolutions on the order of 1° that are typically used as part of the Coupled Model Intercomparison Project (CMIP) experiments. In addition to over 250 peer-reviewed manuscripts using the published HighResMIP1 datasets, the results were widely cited in the Intergovernmental Panel on Climate Change report and were the basis of a variety of derived datasets, including tracked cyclones (both tropical and extratropical), river discharge, storm surge, and impact studies. There were also suggestions from the few ocean eddy-rich coupled simulations that aspects of climate variability and change might be significantly influenced by improved process representation in such models. The compromises that HighResMIP1 made should now be revisited, given the recent major advances in modelling and computing resources. Aspects that will be reconsidered include experimental design and simulation length, complexity, and resolution. In addition, larger ensemble sizes and a wider range of future scenarios would enhance the applicability of HighResMIP. Therefore, we propose the High-Resolution Model Intercomparison Project phase 2 (HighResMIP2) to improve and extend the previous work, to address new science questions, and to further advance our understanding of the role of horizontal resolution (and hence process representation) in state-of-the-art climate simulations. With further increases in high-performance computing resources and modelling advances, along with the ability to take full advantage of these computational resources, an enhanced investigation of the drivers and consequences of variability and change in both large- and synoptic-scale weather and climate is now possible. With the arrival of global cloud-resolving models (currently run for relatively short timescales), there is also an opportunity to improve links between such models and more traditional CMIP models, with HighResMIP providing a bridge to link understanding between these domains. HighResMIP also aims to link to other CMIP projects and international efforts such as the World Climate Research Program lighthouse activities and various digital twin initiatives. It also has the potential to be used as training and validation data for the fast-evolving machine learning climate models.

54 ENVIRONMENTAL SCIENCES

Rapid Evaluation Framework for the CMIP7 Assessment Fast Track

As Earth system models (ESMs) grow in complexity and in volume of output data, there is an increasing need for rapid, comprehensive evaluation of their scientific performance. The upcoming Assessment Fast Track for the Seventh Phase of the Coupled Model Intercomparison Project (CMIP7) will require expeditious response for model analyses designed to inform and drive integrated Earth system assessments. To meet this challenge, the Rapid Evaluation Framework (REF), a community-driven platform for benchmarking and performance assessment of ESMs, was designed and developed. The initial implementation of the REF, constructed to meet the near-term needs of the CMIP7 Assessment Fast Track, builds upon four disparate community evaluation and benchmarking tools that are coupled together using the Coordinated Model Evaluation Capabilities (CMEC) framework. The REF runs within a containerized workflow for portability and reproducibility and is aimed at generating and organizing diagnostics covering a variety of model variables. The REF leverages well documented observational datasets to provide assessments of model fidelity across a collection of diagnostics. All diagnostics were identified and selected with community involvement and consultation. Operational integration with the Earth System Grid Federation (ESGF) will permit automated execution of the REF for selected diagnostics as soon as model output data are published on ESGF by the originating modeling centers. The REF is designed to be portable across a range of current computational platforms to facilitate use by modeling centers for assessing the evolution of model versions or gauging the relative performance of CMIP simulations before being published on ESGF. When integrated into production simulation workflows, results from the REF provide immediate quantitative feedback that allows model developers and scientists to quickly identify model biases and performance issues. After the REF is released to the community, its subsequent development and support will be prioritized by an international consortium of scientists and engineers, enabling a broader impact across Earth science disciplines. For instance, the REF will facilitate improvements to models and will enhance confidence in model projections through process-based selection of models based on their performance with respect to observations. Production of reproducible diagnostics and community-based assessments are key features of the REF. Furthermore, providing interoperability with existing evaluation packages assures that contributions from previous community efforts will be available for use in future model intercomparison projects.

Hoffman, Forrest [ORNL] (ORCID:0000000158024134)

Transmission-mounted combined energy recovery drive

An energy recovery drive system includes a motor-generator that is structured to selectively operate in a motor mode and a generator mode. A first shaft is operatively coupled to a transmission power take-off shaft. A second shaft is operatively coupled to the motor-generator and to an alternative power source. The energy recovery drive system is controllably operated in a plurality of operating modes. In a first operating mode, the motor-generator is in torque providing engagement with each of the first and second shafts. In a second operating mode, the motor-generator is in torque communicating engagement with each of the first and second shafts. In a third operating mode, which the motor-generator is in torque communicating engagement with the second shaft and is disengaged from transferring torque to the first shaft and from receiving torque from the first shaft.

Correa, Dixon Malcolm