The Statistical Spread of Transmission Outages on a Fast Protection Time Scale Based on Utility Data

When there is a fault, the protection system automatically removes one or more transmission lines on a fast time scale of less than one minute. The outaged lines form a pattern in the transmission network. We extract these patterns from utility outage data, determine some key statistics of these patterns, and then show how to generate new patterns consistent with these statistics. The generated patterns provide a new and easily feasible way to model the overall effect of the protection system at the scale of a large transmission system. This new data-driven generative modeling of protection is expected to contribute to simulations of disturbances in large grids so that they can better quantify the risk of blackouts. Analysis of the pattern sizes suggests an index that describes how much outages spread in the transmission network at the fast timescale.

Transmission↗

On-Line Monitoring to Detect Sensor and Process Degradation under Normal Operational Transients - 327

Calibration assessment of nuclear plant sensors and transmitters is currently performed through periodic maintenance actions during plant refueling outages. On-line monitoring (OLM) can be used to reduce the time and cost of this maintenance process by using empirical models to evaluate sensor calibration. The implementation of OLM can also mitigate human error associated with unnecessary maintenance on sensors operating within calibration tolerances. OLM has been studied and validated for plants under steady-state baseload operation, but the extension to load-following operation is not well-documented in the literature. Auto-associative kernel regression (AAKR) provides an error-corrected prediction of process sensor measurements for OLM through a weighted average of historic data. The current study evaluates the performance of AAKR for prediction under normal operational transients (such as expected under load-following operation). Performance of the AAKR model with two anomaly detection routines, error uncertainty limit monitoring (EULM) and sequential probability ratio test (SPRT), was evaluated for normal operation, sensor faults, and process degradation. The data used to develop and evaluate the OLM system were collected from a forced flow loop with temperature and flow sensors. Three models of well-correlated groups of sensors are trained to predict normal system behavior under planned transients. The anomaly detection routines are tested for sensor faults and process faults. The results of this experimental study suggest AAKR and an appropriate anomaly detection routine can be applied for sensor calibration and process fault detection under transient operation. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Model-Predictive Cascade Mitigation in Electric Power Systems With Storage and Renewables-Part I: Theory and Implementation

A novel model predictive control (MPC) scheme is developed for mitigating the effects of severe line-overload disturbances in electrical power systems. A piece-wise linear convex approximation of line losses is employed to model the effect of transmission line power flow on conductor temperatures. Control is achieved through a receding-horizon model predictive control (MPC) strategy which alleviates line temperature overloads and thereby prevents the propagation of outages. The MPC strategy adjusts line flows by rescheduling generation, energy storage and controllable load, while taking into account ramp-rate limits and network limitations. In Part II of this paper, the MPC strategy is illustrated through simulation of the IEEE RTS-96 network, augmented to incorporate energy storage and renewable generation.

Almassalkhi, MR↗

Demonstration of a Novel Synchrophasor-based Situational Awareness System: Wide Area Power System Visualization, On-line Event Replay and Early Warning of Grid Problems

Since the large North Eastern power system blackout on August 14, 2003, U.S. electric utilities have spent lot of effort on preventing power system cascading outages. Two of the main causes of the August 14, 2003 blackout were inadequate situational awareness and inadequate operator training In addition to the enhancements of the infrastructure of the interconnected power systems, more research and development of advanced power system applications are required for improving the wide-area security monitoring, operation and planning in order to prevent large- scale cascading outages of interconnected power systems. It is critically important for improving the wide-area situation awareness of the operators or operational engineers and regional reliability coordinators of large interconnected systems. With the installation of large number of phasor measurement units (PMU) and the related communication infrastructure, it will be possible to improve the operators’ situation awareness and to quickly identify the sequence of events during a large system disturbance for the post-event analysis using the real-time or historical synchrophasor data. The purpose of this project was to develop and demonstrate a novel synchrophasor-based comprehensive situational awareness system for control centers of power transmission systems. The developed system named WASA (Wide Area Situation Awareness) is intended to improve situational awareness at control centers of the power system operators and regional reliability coordinators. It consists of following main software modules: • Wide-area visualizations of real-time frequency, voltage, and phase angle measurements and their contour displays for security monitoring. • Online detection and location of a major event (location, time, size, and type, such as generator or line outage). • Near-real-time event replay (in seconds) after a major event occurs. • Early warning of potential wide-area stability problems. The system has been deployed and demonstrated at the Tennessee Valley Authority (TVA) and ISO New England system using real-time synchrophasor data from openPDC. Apart from the software product, the outcome of this project consists of a set of technical reports and papers describing the mathematical foundations and computational approaches of different tools and modules, implementation issues and considerations, lessons learned, and the results of lidation processes.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Frequency Recovery in Power Grids Using High-Performance Computing

Maintaining electric power system stability is paramount, especially in extreme contingencies involving unexpected outages of multiple generators or transmission lines that are typical during severe weather events. Such outages often lead to large supply-demand mismatches followed by subsequent system frequency deviations from their nominal value. The extent of frequency deviations is an important metric of system resilience, and its timely mitigation is a central goal of power system operation and control. This paper develops a novel nonlinear model predictive control (NMPC) method to minimize frequency deviations when the grid is affected by an unforeseen loss of multiple components. Our method is based on a novel multi-period alternating current optimal power flow (ACOPF) formulation that accurately models both nonlinear electric power flow physics and the primary and secondary frequency response of generator control mechanisms. We develop a distributed parallel Julia package for solving the large-scale nonlinear optimization problems that result from our NMPC method and thereby address realistic test instances on existing high-performance computing architectures. Our method demonstrates superior performance in terms of frequency recovery over existing industry practices, where generator levels are set based on the solution of single-period classical ACOPF models.

nonlinear model predictive control↗

ReNew100: Reliable Power System Operation with 100% Renewable Generation

The ReNew100 project has developed and demonstrated an operator support system (OSS) to operate power systems with 100% renewable power generation from inverter-based resources (IBRs) like wind and solar that significantly reduces the risk of widespread power outages in a simulated operational environment at Technology Readiness Level (TRL) 6. The OSS achieves resilient operation for power systems under changing operation modes including varying combinations of conventional and renewable generation, including cases with 100% renewable generation from wind and solar IBRs. The OSS continuously monitors the N-1 security of the power system, which refers to the ability of the power systems to survive single outages of power system elements, like the loss of a generator or a power line, without causing widespread power outages beyond those expected and planned for. If the OSS identifies that the system is not N-1 secure, an automatic Controller Parameter Optimization (CoPO) developed within Renew100 is activated to optimize the N-1 security of the system by tuning controller parameters within different assets like batteries, wind, and solar plants. The core innovation of ReNew100 is the development of this CoPO as well as the demonstration of the OSS for a real-time simulation of the Hawai'i Island power system. Moreover, Renew100 has developed new model calibration techniques for dynamic power system models and demonstrated them for Hawai'i Island.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Series FACTS Devices for Increasing Resiliency in Severe Weather Conditions

Severe weather conditions are low-probability, high-impact events that affect grid operations. The majority of power outages are caused by severe weather conditions. Grid resiliency to weather events can be enhanced by decreasing the reliance on its affected sections. One way to do this is to reduce the power flow through lines vulnerable to severe weather. If a line is disconnected, its initial power flow is distributed through the neighbor lines, which may cause congestion in the grid. FACTS devices can be used to control the power flow of lines that have a higher chance of power outages. Most previous works do not consider weather events in power flow control. In this work, a linearized optimal power flow (OPF)–based algorithm is developed to minimize the real power flow of vulnerable lines considering the thermal limits of lines to prevent infeasible solutions; the simulation is fast, making it suitable for large-scale systems. The proposed optimization problem is presented as a mixed-integer linear program (MILP), making it capable of using short-term load forecasting due to its high solution speed. The proposed optimization problem considers multiple lines with different outage probabilities and the uncertainties of the weather forecast. Moreover, it estimates the power reduction in vulnerable lines due to changes in the series FACTS devices. The performance of the proposed optimization problem is tested on IEEE 14-, 30-, and 118-bus systems for several scenarios. The results are validated with the AC power flow results from MATPOWER.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Business Case for Nuclear Plant Control Room Modernization

This paper presents a generic business case for implementation of technology that supports Control Room Modernization (CRM). The analysis presented in two forms; 1) a standalone technology upgrade, and 2) a technology upgrade that is built upon and incremental to a prior business case created for Mobile Work Packages (MWP). The business case contends that advanced communication and networking and analytical technologies will allow NPP to conduct control room operations with improved focus by reducing human factors and redundant manpower, and therefore operate with fewer errors. While some labor savings can be harvested in terms of overtime, the majority of savings are demonstrated as reduced time to take the plant off line and bring back on line in support of outages. The benefits are quantified to a rough order of magnitude that provides directional guidance to NPPs that are interested in developing a similar business case. This business case focuses on modernization of the operator control room and does not consider a complete overhaul and modernization of a plants instrument and control systems. While operators may be considering such an investment at their plants, the sizable capital investment required is not likely supported by a cost/benefit analysis alone. More likely, it is driven by obsolescence and reliability issues, and requires consideration of mechanical condition of plant systems, capital depreciation, financing, relicensing and overall viability of the plant asset over a 20-year horizon in a competitive market. Prior studies [REF] have indicated that such a modernization of plant I&C systems, alone or as part of a larger modernization effort, can yield very significant reductions in O&M costs. However, the depth of research and analysis required to develop a meaningful business case for a plant modernization effort is well beyond the scope of this study. While CRM as considered in this study can be easily integrated as part of grander plant modernization effort, it can also be considered as a stand-alone project, implemented as a supervisorial layer over and above existing systems. CRM is enabled by a suite of technologies, which are described in further detail in the body of this report. They include: • Modernized control room with interactive displays • High-bandwidth wireless networks • Mobile devices • Component identification technology • Mobile wireless video cameras • Smart or task based operator displays • Computer-Based Procedures (CBP)/Automated Mobile Work Packages (MWP) • Intelligent plant configuration • Advanced data analytics An analysis was conducted to determine how these technologies might impact outage operations at an NPP. The analysis concluded that outage management capabilities would be improved with application of these technologies, and result in annual benefits for the plant. These improved capabilities were identified and described in further detail in this report. • Reduction in need redundant manpower (verification, etc) • Improved critical path shutdown and restart duration during outages • Reduction in human factors and errors • Remote watches • Paperless outage coordination • Bulk work optimization

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Light Water Reactor Sustainability Program Development of an Initial Business Case Framework for Fleet-Based Control Room Modernization

This milestone report presents a plan or framework for developing a generic business case for implementation of technology that supports Control Room Modernization (CRM) in existing power plants (NPP). The decision fund CRM activities often depends on demonstrating actual cost reductions that can be credited to budgets and thereby truly reduce operations and maintenance (O&M) or capital costs. The proposed Business Case Methodology (BCM) thus addresses the fact that the lack of a business case is often cited by utilities as a barrier to pursuing large-scale CRM activities. Using past BCM analyses for CRM as a model for this framework, this BCM proposes to base cost savings on advanced digital instrumentation and control (I&C), human-system interface (HSI), and work process technologies that allow NPP operators to conduct control room operations with improved human factors and efficiency, and therefore operate with fewer operational events. The technologies employed in CRM include large overview displays, task-based operator displays, computer- based procedures, advanced alarm systems, computerized operator support systems, and wireless networks, among others, but this initial plan will also focus only on a subset of these technologies. Thus, under this BCM model, labor savings can be harvested in terms of reduced overtime and redistribution of work. In short, the BCM addresses the benefits of the technology as opposed to the investment costs of the utility. The methodology provides the means to determine the maximum investment that will result in a positive return. Significant savings are also demonstrated as reduced time to bring the plant back on line after completion of outages. The benefits are quantified to a rough order of magnitude, providing directional guidance to NPPs that are interested in developing similar business cases.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A business case for nuclear plant control room modernization - 352

This paper presents a generic business case for implementation of technology that supports Control Room Modernization (CRM) in existing nuclear power plants (NPPs). The business case is based on advanced digital instrumentation and control (I and C), human-system interface (HSI), and work process technologies that allow NPP operators to conduct control room operations with improved human factors and efficiency, and therefore operate with fewer operational events. Labor savings can be harvested in terms of reduced overtime and redistribution of work. Significant savings are also demonstrated as reduced time to bring the plant back on line after completion of outages. The benefits are quantified to a rough order of magnitude, providing directional guidance to NPPs that are interested in developing similar business cases. The technologies employed in CRM include large overview displays, task-based operator displays, computer-based procedures, advanced alarm systems, computerized operator support systems, and wireless networks, among others. The CRM business case is founded on the following categories of cost savings: - Integrated Computer-Based Procedures for Operators; - Reduction in Corrective Action Program Work Due to Operator Error; - Reduction in Outage Critical Path Time; - Operation of Local Control Panels; - Reduction in Control Room Support; - Reduction in Plant Events Resulting in Generation Loss; - Paperless Control Room Processes. In addition to cost savings, these technologies also offer improvements to indirect ways that have impact on key performance indicators of the plant. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

ENLIGHTEN: Electrical Network Line Inspection Guided by High-Speed Technology & Electromagnetic Navigation

Natural disasters are a major cause of power outages, primarily due to their damage to power line infrastructure. As a result, the current state of power maintenance, with a heavy reliance on manual labor, is in trouble. Its lack of speed and autonomy must be addressed to ensure power security for households and institutions worldwide. This innovative approach explores how High-Speed Unmanned Aerial Vehicle (HSUAV) technology can inspect power line infrastructure rapidly in response to natural disaster scenarios. The HSUAV technology will be accompanied by enhanced sensory equipment including light detection and ranging (LiDAR), thermal imaging, and electromagnetic field (EMF) navigation. It would also be supplemented by innovative forms of machine learning models and recharging systems to efficiently detect anomalies in power line infrastructure. The proposed system, ENLIGHTEN, can help restore power in affected communities after a devastating natural disaster, greatly improving relief efforts. In the future, ENLIGHTEN can be expanded beyond the United States and shared worldwide, effectively mitigating the consequences on a larger scale.

UAV systems, Power line management, Natural disast↗

Post-Disaster Microgrid Formation for Enhanced Distribution System Resilience

This paper proposes a deep reinforcement learning (DRL) based approach for post-disaster critical load restoration in active distribution systems to form microgrids through network reconfiguration to minimize critical load curtailments. Distribution networks are represented as graph networks, and optimal network configurations with microgrids are obtained by searching for the optimal spanning forest. The constraints to the research question being explored are the radial topology and power balance. Unlike existing analytical and population-based approaches, which necessitate the repetition of entire analyses and computation for each outage scenario to find the optimal spanning forest, the proposed approach, once properly trained, can quickly determine the optimal, or near-optimal, spanning forest even when outage scenarios change. When multiple lines fail in the system, the proposed approach forms microgrids with distributed energy resources in active distribution systems to reduce critical load curtailment. The proposed DRL-based model learns the action-value function using the REINFORCE algorithm, which is a model-free reinforcement learning technique based on stochastic policy gradients. A case study was conducted on a 33-node distribution test system, demonstrating the effectiveness of the proposed approach for post-disaster critical load restoration.

active distribution systems↗

Stochastic correlation analysis to rank the impact of intermittent wind generation on unreliability margins of power systems

Power systems are vulnerable to extreme contingencies (like an outage of a major generating substation or transmission line) that can cause significant generation and load loss and can lead to further cascading outages of other transmission facilities and generators in the system. Power systems operators take time-ahead actions (real time to day ahead) actions based on forecasted data as well as telemetry. However, there is a probability of extreme swings in wind generation that can push the power system that is already close to system boundaries into unreliable states. Increasing penetration on wind generation and uncertainties in short term forecast can move the system into operational states that can violate N-1 reliability criteria. While the power system planning accounts for worst case analyses to mitigate such emergencies, it is necessary to understand the spatial and temporal correlation of load buses with intermittent wind generation. The ranking of wind generators based on stochastic correlation to unreliability margins of load buses provides an insight of system vulnerabilities that can be corrected by appropriate emergency controls. A Monte-Carlo simulation of wind uncertainty forecast is performed to identify the probability distributions of unreliability margins. Ranking of wind generators is performed based on stochastic correlation analysis of the wind power generated and the load losses at the buses. This helps in not only identifying weak buses in the power system but also in identifying the vulnerable wind locations to plan for system reinforcements. Power system modeling and hybrid simulation to calculate unreliability margins are performed using DCAT and demonstrated on the 32-bus Nordic test system.

generators, wind forecasting, wind power generatio↗

Wind Energy Management System EMS Integration Project: Incorporating Wind Generation and Load Forecast Uncertainties into Power Grid Operations

The power system balancing process, which includes the scheduling, real time dispatch (load following) and regulation processes, is traditionally based on deterministic models. Since the conventional generation needs time to be committed and dispatched to a desired megawatt level, the scheduling and load following processes use load and wind and solar power production forecasts to achieve future balance between the conventional generation and energy storage on the one side, and system load, intermittent resources (such as wind and solar generation), and scheduled interchange on the other side. Although in real life the forecasting procedures imply some uncertainty around the load and wind/solar forecasts (caused by forecast errors), only their mean values are actually used in the generation dispatch and commitment procedures. Since the actual load and intermittent generation can deviate from their forecasts, it becomes increasingly unclear (especially, with the increasing penetration of renewable resources) whether the system would be actually able to meet the conventional generation requirements within the look-ahead horizon, what the additional balancing efforts would be needed as we get closer to the real time, and what additional costs would be incurred by those needs. To improve the system control performance characteristics, maintain system reliability, and minimize expenses related to the system balancing functions, it becomes necessary to incorporate the predicted uncertainty ranges into the scheduling, load following, and, in some extent, into the regulation processes. It is also important to address the uncertainty problem comprehensively by including all sources of uncertainty (load, intermittent generation, generators’ forced outages, etc.) into consideration. All aspects of uncertainty such as the imbalance size (which is the same as capacity needed to mitigate the imbalance) and generation ramping requirement must be taken into account. The latter unique features make this work a significant step forward toward the objective of incorporating of wind, solar, load, and other uncertainties into power system operations. Currently, uncertainties associated with wind and load forecasts, as well as uncertainties associated with random generator outages and unexpected disconnection of supply lines, are not taken into account in power grid operation. Thus, operators have little means to weigh the likelihood and magnitude of upcoming events of power imbalance. In this project, funded by the U.S. Department of Energy (DOE), a framework has been developed for incorporating uncertainties associated with wind and load forecast errors, unpredicted ramps, and forced generation disconnections into the energy management system (EMS) as well as generation dispatch and commitment applications. A new approach to evaluate the uncertainty ranges for the required generation performance envelope including balancing capacity, ramping capability, and ramp duration has been proposed. The approach includes three stages: forecast and actual data acquisition, statistical analysis of retrospective information, and prediction of future grid balancing requirements for specified time horizons and confidence levels. Assessment of the capacity and ramping requirements is performed using a specially developed probabilistic algorithm based on a histogram analysis, incorporating all sources of uncertainties of both continuous (wind and load forecast errors) and discrete (forced generator outages and start-up failures) nature. A new method called the “flying brick” technique has been developed to evaluate the look-ahead required generation performance envelope for the worst case scenario within a user-specified confidence level. A self-validation algorithm has been developed to validate the accuracy of the confidence intervals.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Wildfire Risk Evaluation Framework for Grid Operations and Planning

The United States (US) environmental protection agency's (EPA's) climate change indicators for wildfires show a long-term trend of increased annual wildfire activity, larger wildfire size, and more variable dynamics in wildfire behavior. This has caused more frequent preemptive public safety power shutoff (PSPS) events in the regions with recognized high wildfire risk. These preemptive power shutoffs attempt to prevent the ignition of a wildfire but it nonetheless renders the transmission line non-operational, which often sheds load of downstream communities. As wildfires and PSPS events become more frequent, it is crucial to find the communities most at risk of load shedding. To that end, this paper proposes the wildfire risk evaluation of the system (WiRES) framework, which is a performance-based framework that translates extreme weather-related and PSPS event probabilities into a cumulative probability of a non-operational transmission line. This study also provides a geospatial visualization tool that breaks down the entire western electrical coordinating council (WECC) region into 50 km grid cells which can be used to 1) filter out transmission lines with higher than a threshold outage probability, and 2) graphically discover the affected regions and their biophysical and socioeconomic metrics. %such as the social vulnerability index, population density, gross domestic product, etc. Lastly, an impact assessment study is conducted which connects the results of the proposed framework to python and powerworld-based contingency analysis to highlight the applicability of the framework.

Wildfire, Resilience, Extreme Events, Grid Reslien↗

Cost Recovery for Standby and Ancillary Services for Distributed Generation: Considerations for New Mexico

A New Mexico statute allows investor-owned utilities to recover costs of “standby and ancillary services” resulting from distributed generation (DG). In attempting to do so, it is important to recognize both the physical and economic impacts, positive and negative, that distributed generation creates. Distributed generation has different impacts on ancillary and standby services depending on the location, capacity, and production patterns of the systems. Low penetrations of small distributed generation systems will not create significant contingencies for utilities. System impact of fluctuations in DG production may be no larger than normal fluctuations caused by customer demand, such as an air conditioner cycling. Higher penetrations and large DG system may produce noticeable impacts; so magnitude is critical when determining potential additional recoverable utility costs. Understanding DG impact on ancillary services is a relatively new and emerging area of study and as such there are not well-established formulas or protocols. Discretion is required. A hosting capacity analysis can help determine how much DG can be implemented before the impacts become substantive. Standby rates are traditionally used for large industrial generators or combined heat and power systems and threshold system size levels are often used in determining applicability of standby rates. System size thresholds may also be appropriate for standby rates and DG. Relatively small, geographically diverse DG systems are unlikely to create a noticeable coincident outage, so developing a standby charge based on assumed coincidence may not be appropriate. Individual lines and feeders may have considerable excess capacity during coincident outages, or they may be fully utilized and facing upgrades in the near future, which could vary over time. Understanding specific events that create concern for utilities is critical to developing an appropriate rate mechanism (e.g., single residential or community system outage, cascading event, clouds, eclipse). Any modeling or studies of the grid should also recognize the unique situation created when DG is coupled with a smart inverter or storage. These devices change the value proposition and can help mitigate some of the voltage and ramping issues DG can pose for a utility. Utilities can recover their fixed costs in a variety of ways, and some are better suited for DG than others. Beyond charging for standby and ancillary services, other options include fixed customer charges, demand charges, minimum bills, time-of-use rates and updated net energy-metering policies. Studies and analyses of the specific impacts that DG has on the grid should inform utilities’ decision-making process because distributed generation creates both costs and benefits for the grid. Any charge specific to DG customers should be backed up with analysis. At the heart of this conversation is utilities attempting to recover fixed costs. Allowing utilities to indiscriminately recover all stranded fixed costs can negatively affect long-term market efficiency by blunting utility incentives to lower costs and acting as a barrier to entry and exit. The current status of New Mexico’s grid, impending infrastructure updates, and likely customer adoption patterns for DG (backed up by transparent analysis) should remain at the forefront when considering charges for standby and ancillary services. Recognizing that utility regulation is largely a reactive process, it is recommended that applications for DG related standby or ancillary services cost recovery mechanisms be thoroughly reviewed by an experienced economist. If the commission has no such skill set on staff, one might be hired.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Mitigating Cascading Outages in Severe Weather Using Simulation-Based Optimization

Severe weather events can trigger cascading power outages and lead to significant losses. In this work, we investigate cascading outage mitigation under severe weather conditions. Given day-ahead weather forecasts and component failure models, we aim to identify a set of power lines that can be hardened to minimize the expected impact of potential cascading outages. Since the expected load shedding cannot be expressed as an explicit function of line hardening decisions and system states, we developed a cascading outage simulator to estimate the expected value of load shedding under various initial weather-related disruption scenarios generated using a weather forecast. To avoid massive enumeration of all possible combinations of line hardening decisions and reduce the simulation efforts, we employed an efficient simulation-based optimization approach that quickly identifies the (near) optimal line hardening decisions in the presence of both large simulation noises due to the highly variable initial disturbances and system states, and significant randomness in the subsequent cascades. Furthermore, the algorithm is also able to utilize parallel computing to dramatically reduce computation time to support decision making in preparation for severe weather conditions. We performed a case study on the Northeast Power Coordinating Council (NPCC) 140-bus system model to demonstrate that our approach can significantly improve power grid resilience to adverse weather events.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Preventive Power Outage Estimation Based on a Novel Scenario Clustering Strategy

The increasing occurrence of extreme weather events is challenging power grid operation. For extreme weather events, the system operator is responsible for estimating the power outages and scheduling the restoration resources. This paper proposes an outage evaluation framework to identify the possible unserved load profiles, vulnerable areas, and mobile energy adequacy. The outputs of an outage prediction model tool are used to generate numerous faulted line scenarios. Next, each scenario's nodal unserved load profile is obtained by solving a three-phase restoration model that considers repair crews and mobile energy resources (MERs). Then, a novel scenario clustering strategy is developed to cluster the unserved load profiles into multiple representative profiles which the system operator can focus on. Finally, case studies on a distribution system evaluate the damage caused by an extreme weather event and verify the effectiveness of the proposed scenario clustering strategy.

MATHEMATICS AND COMPUTING,POWER TRANSMISSION AND D↗