Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Level 2”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Exceedance Response Action (ERA) Level 2 Technical Report Update

The Sandia National Laboratories, California (SNL/CA) site comprises approximately 410 acres and is located in the eastern portion of Livermore, Alameda County, California. The property is owned by the United States Department of Energy/National Nuclear Security Administration (DOE/NNSA) and is being managed and operated by National Technology & Engineering Solutions of Sandia, LLC (NTESS). Operations at the SNL/CA facility consist of DOE statutory responsibilities for nuclear weapon research and design, development of energy technologies, and basic scientific research. Specific industrial activities occur in discrete buildings and include electroplating or anodizing, machine shop, permitted hazardous waste treatment, storage and disposal facility (TSDF), and a scrap yard. This report provides an update to the ERA Level 2 Technical Report Update previously submitted in June 2022 (2022 ERA L2 Technical Report Update) for iron, aluminum, and pH. In accordance with the California’s General Permit for Discharges of Storm Water Associated with Industrial Activities (IGP) Section XII.D.3.c, an ERA Level 2 Technical Report update is to be submitted with the annual report when a facility utilizing an Industrial Activity Best Management Practice (BMP) Demonstration (IABMPD) experiences additional exceedances of the numeric action levels.

54 ENVIRONMENTAL SCIENCES↗

ChargePoint Level 2 Charging Data

This dataset contains charging data from the SWS Level 2 charger. This charger is exclusively used to charge the 220EV box truck. Data fields include charging duration (HH:MM:SS) and total energy charged during a session.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

ChargePoint Level 2 Charging Data

This dataset contains charging data from the SWS Level 2 charger. This charger is exclusively used to charge the 220EV box truck. Data fields include charging duration (HH:MM:SS) and total energy charged during a session.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

ChargePoint Level 2 Charging Data

This dataset contains charging data from the SWS Level 2 charger. This charger is exclusively used to charge the 220EV box truck. Data fields include charging duration (HH:MM:SS) and total energy charged during a session.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

ChargePoint Level 2 Charging Data

This dataset contains charging data from the SWS Level 2 charger. This charger is exclusively used to charge the 220EV box truck. Data fields include charging duration (HH:MM:SS) and total energy charged during a session.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

ChargePoint Level 2 Charging Data

This dataset contains charging data from the SWS Level 2 charger. This charger is exclusively used to charge the 220EV box truck. Data fields include charging duration (HH:MM:SS) and total energy charged during a session.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

ChargePoint Level 2 Charging Data

This dataset contains charging data from the SWS Level 2 charger. This charger is exclusively used to charge the 220EV box truck. Data fields include charging duration (HH:MM:SS) and total energy charged during a session.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

ChargePoint Level 2 Charging Data

This dataset contains charging data from the SWS Level 2 charger. This charger is exclusively used to charge the 220EV box truck. Data fields include charging duration (HH:MM:SS) and total energy charged during a session.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

ChargePoint Level 2 Charging Data

This dataset contains charging data from the SWS Level 2 charger. This charger is exclusively used to charge the 220EV box truck. Data fields include charging duration (HH:MM:SS) and total energy charged during a session.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

ChargePoint Level 2 Charging Data

This dataset contains charging data from the SWS Level 2 charger. This charger is exclusively used to charge the 220EV box truck. Data fields include charging duration (HH:MM:SS) and total energy charged during a session.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

ChargePoint Level 2 Charging Data

This dataset contains charging data from the SWS Level 2 charger. This charger is exclusively used to charge the 220EV box truck. Data fields include charging duration (HH:MM:SS) and total energy charged during a session.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

ChargePoint Level 2 Charging Data

This dataset contains charging data from the SWS Level 2 charger. This charger is exclusively used to charge the 220EV box truck. Data fields include charging duration (HH:MM:SS) and total energy charged during a session.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

ChargePoint Level 2 Charging Data

This dataset contains charging data from the SWS Level 2 charger. This charger is exclusively used to charge the 220EV box truck. Data fields include charging duration (HH:MM:SS) and total energy charged during a session.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

ChargePoint Level 2 Charging Data

This dataset contains charging data from the SWS Level 2 charger. This charger is exclusively used to charge the 220EV box truck. Data fields include charging duration (HH:MM:SS) and total energy charged during a session.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Code Verification Capabilities and Assessments in Support of ASC V&V Level 2 Milestone #6035

This document provides a summary of the code verification activities supporting the FY17 Level 2 V&V milestone entitled “Deliver a Capability for V&V Assessments of Code Implementations of Physics Models and Numerical Algorithms in Support of Future Predictive Capability Framework Pegposts.” The physics validation activities supporting this milestone are documented separately. The objectives of this portion of the milestone are: 1) Develop software tools to support code verification analysis; 2) Document standard definitions of code verification test problems; and 3) Perform code verification assessments (focusing on error behavior of algorithms). This report and a set of additional standalone documents serve as the compilation of results demonstrating accomplishment of these objectives.

97 MATHEMATICS AND COMPUTING↗

ASC CSSE Level 2 Milestone #6362: Resilient Asynchronous Many Task Programming Model

This report is an outcome of the ASC CSSE Level 2 Milestone 6362: Analysis of Re- silient Asynchronous Many-Task (AMT) Programming Model. It comprises a summary and in-depth analysis of resilience schemes adapted to the AMT programming model. Herein, performance trade-offs of a resilient-AMT prograrnming model are assessed through two ap- proaches: (1) an analytical model realized by discrete event simulations and (2) empirical evaluation of benchmark programs representing regular and irregular workloads of explicit partial differential equation solvers. As part of this effort, an AMT execution simulator and a prototype resilient-AMT programming framework have been developed. The former permits us to hypothesize the performance behavior of a resilient-AMT model, and has undergone a verification and validation (V&V) process. The latter allows empirical evaluation of the perfor- mance of resilience schemes under emulated program failures and enabled the aforementioned V&V process. The outcome indicates that (1) resilience techniques implemented within an AMT framework allow efficient and scalable recovery under frequent failures, that (2) the abstraction of task and data instances in the AMT programming model enables readily us- able Application Program Interfaces (APIs) for resilience, and that (3) this abstraction enables predicting the performance of resilient-AMT applications with a simple simulation infrastruc- ture. This outcome will provide guidance for the design of the AMT programming model and runtime systems, user-level resilience support, and application development for ASC's next generation platforms (NGPs).

97 MATHEMATICS AND COMPUTING↗

ASC ATDM Level 2 Milestone #6015: Asynchronous Many-Task Software Stack Demonstration

This report is an outcome of the ASC ATDM Level 2 Milestone 6015: Asynchronous Many-Task Software Stack Demonstration. It comprises a summary and in depth analysis of DARMA and a DARMA-compliant Asynchronous Many-Task (AMT) runtime software stack. Herein performance and productivity of the over- all approach are assessed on benchmarks and proxy applications representative of the Sandia ATDM applications. As part of the effort to assess the perceived strengths and weaknesses of AMT models compared to more traditional methods, experiments were performed on ATS-1 (Advanced Technology Systems) test bed machines and Trinity. In addition to productivity and performance assessments, this report includes findings on the generality of DARMAs backend API as well as findings on interoperability with node- level and network-level system libraries. Together, this information provides a clear understanding of the strengths and limitations of the DARMA approach in the context of Sandias ATDM codes, to guide our future research and development in this area.

97 MATHEMATICS AND COMPUTING↗