Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Leasing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

U.S. Residential Photovoltaic (PV) System Prices, Q4 2013 Benchmarks: Cash Purchase, Fair Market Value, and Prepaid Lease Transaction Prices

The price of photovoltaic (PV) systems in the United States (i.e., the cost to the system owner) has dropped precipitously in recent years, led by substantial reductions in global PV module prices. This report provides a Q4 2013 update for residential PV systems, based on an objective methodology that closely approximates the book value of a PV system. Several cases are benchmarked to represent common variation in business models, labor rates, and module choice. We estimate a weighted-average cash purchase price of $3.29/W for modeled standard-efficiency, polycrystalline-silicon residential PV systems installed in the United States. This is a 46% decline from the 2013-dollar-adjusted price reported in the Q4 2010 benchmark report. In addition, this report frames the cash purchase price in the context of key price metrics relevant to the continually evolving landscape of third-party-owned PV systems by benchmarking the minimum sustainable lease price and the fair market value of residential PV systems.

14 SOLAR ENERGY↗

Leasing Into the Sun: A Mixed Method Analysis of Transactions of Homes with Third Party Owned Solar

This analysis is the first to examine if homes with third-party owned (TPO) PV systems are unique in the marketplace as compared to non-PV or non-TPO PV homes. This is of growing importance as the number of homes with TPO systems is nearly a half of a million in the US currently and is growing. A hedonic pricing model analysis of 20,106 homes that sold in California between 2011 and 2013 is conducted, as well as a paired sales analysis of 18 pairs of TPO PV and non-PV homes in San Diego spanning 2012 and 2013. The hedonic model examined 2,914 non-TPO PV home sales and 113 TPO PV sales and fails to uncover statistically significant premiums for TPO PV homes nor for those with pre-paid leases as compared to non-PV homes. Similarly, the paired sales analysis does not find evidence of an impact to value for the TPO homes when comparing to non-PV homes. Analyses of non-TPO PV sales both here and previously have found larger and statistically significant premiums. Collection of a larger dataset that covers the present period is recommended for future analyses so that smaller, more nuanced and recent effects can be discovered.

14 SOLAR ENERGY↗

Bureau of Reclamation Hydropower Lease of Power Privilege: Case Studies and Considerations

This report analyzes the U.S. Bureau of Reclamation's (Reclamation) lease of power privilege (LOPP) regulatory process for a nonfederal entity to use a Reclamation jurisdictional dam or conduit for power generation. Recent federal initiatives encouraging hydropower development at federally-owned facilities coupled with Reclamation's hydroelectric potential has led to an increased interest in powering Reclamation dams and conduits through the LOPP process. During the last five years, 23 of the 36 total LOPP projects (76 MW) have been initiated and are at some phase of the development process. Resource assessments analyzed in this report identify over 360 MW of hydroelectric potential at Reclamation-owned dams and conduits. This report provides considerations from Reclamation staff involved in the LOPP regulatory process and developers that have received an LOPP and are currently generating hydropower at a Reclamation dam or conduit. The authors also analyze LOPP regulatory processing timelines before and after the implementation of federal initiatives to streamline the LOPP process and provide case studies of hydropower projects that have obtained an LOPP.

13 HYDRO ENERGY↗

Representative Project Design Envelope for Floating Offshore Wind Energy: A Focus on the California 2023 Federal Leases

NREL developed recommendations for a representative project design envelope (RPDE) for floating offshore wind energy projects in the California lease areas, considering industry feedback from offshore wind farm developers. The RPDE provides estimates of minimum and maximum values for project design parameters that are relevant for assessing environmental impacts. The design envelope considers the practical range of technology options that may be deployed and accounts for major physical constraints, technology feasibility, and supply chain readiness. In addition to the RPDE, this report presents four scenarios that illustrate some of the differences between technologies that could be used offshore California, as well as descriptions of the typical installation processes that are expected to be used for floating offshore wind farms.

17 WIND ENERGY↗

Modeling Annual Electricity Production and Levelized Cost of Energy from the US East Coast Offshore Wind Energy Lease Areas

Offshore wind energy development along the East Coast of the US is proceeding quickly as a result of large areas with an excellent wind resource, low water depths and proximity to large electricity markets. Careful planning of wind turbine deployments in these offshore wind energy lease areas (LA) is required to maximize power output and to minimize wake losses between neighboring wind farms as well as those internal to each wind farm. Here, we used microscale wind modeling with two wake parameterizations to evaluate the potential annual energy production (AEP) and wake losses in the different LA areas, and we developed and applied a levelized cost of energy (LCoE) model to quantify the impact of different wind turbine layouts on LCoE. The modeling illustrated that if the current suite of LA is subject to deployment of 15 MW wind turbines at a spacing of 1.85 km, they will generate 4 to 4.6% of total national electricity demand. The LCoE ranged from $68 to $102/MWh depending on the precise layout selected, which is cost competitive with many other generation sources. The scale of the wind farms that will be deployed greatly exceed those currently operating and mean that wake-induced power losses are considerable but still relatively poorly constrained. AEP and LCoE exhibited significant dependence on the precise wake model applied. For the largest LA, the AEP differed by over 10% depending on the wake model used, leading to a $10/MWh difference in LCoE for the wind turbine layout with 1.85 km spacing.

58 GEOSCIENCES↗

Applicability of NASA contract quality management and failure mode effect analysis procedures to the USGS Outer Continental Shelf oil and gas lease management program

An approach that might be used for determining the applicability of NASA management techniques to benefit almost any type of down-to-earth enterprise is presented. A study was made to determine the following: (1) the practicality of adopting NASA contractual quality management techniques to the U.S. Geological Survey Outer Continental Shelf lease management function; (2) the applicability of failure mode effects analysis to the drilling, production, and delivery systems in use offshore; (3) the impact on industrial offshore operations and onshore management operations required to apply recommended NASA techniques; and (4) the probable changes required in laws or regulations in order to implement recommendations. Several management activities that have been applied to space programs are identified, and their institution for improved management of offshore and onshore oil and gas operations is recommended.

Dyer, M. K.↗

Exports and leasing: The future of distributed wind?

Distributed wind installations are closing in on the 1 gigawatt capacity threshold. Yet over the past three years, growth rates in distributed wind have plateaued, pressing U.S. manufacturers to look for new ways to open markets. With record small wind sales abroad and new financing mechanisms redefining opportunities at home, exports and wind leasing represent two market drivers that might help industry transition into a new chapter for distributed wind.

Foster, Nikolas AF↗

To Own or Lease Solar: Understanding Commercial Retailers' Decisions to Use Alternative Financing Models

This report examines the tradeoffs among financing methods for businesses installing onsite photovoltaics (PV). We present case studies of PV financing strategies used by two large commercial retailers that have deployed substantial U.S. PV capacity: IKEA, which owns its PV, and Staples, which purchases power generated from onsite PV systems through power purchase agreements (PPAs). We also analyze the financial considerations that influence any company's choice of PV financing strategy. Our goal in this report is to clarify the financial and institutional costs and benefits of financing strategies and to inform other companies that are considering launching or expanding similar PV programs.

14 SOLAR ENERGY↗

Assessing Impacts on Pressure Stabilization and Leasing Acreage for CO 2 Storage Utilizing Oil Migration Concepts

Favorable geological storage for CO 2 has long been pictured as large anticlines with thick sandstones, similar to oil reservoirs in the petroleum system. Unlike oil, however, stored CO 2 does not need to be recoverable, which raises the possibility of using dissolution and residual trapping to augment the capacity of buoyant traps and tap more of the bulk rock volume. The work presented builds on that idea, asking the following question: If we inject CO 2 down to a syncline – analogous to the carrier bed in the petroleum system – how would this injection mechanism impact storage capacity and plume shape, migration, and stabilization? To address this question, we built a reservoir model, based on seismic interpretation of Middle Miocene strata, offshore Galveston, Texas. 3-D seismic and well logs were used to characterize key intervals. Reservoirs chosen for modeling are progradational-aggradational sands with mud intercalation. They have a higher degree of heterogeneity than the more conventional reservoirs commonly targeted for CO 2 storage. Modeling investigated how far the CO 2 plume would migrate under two scenarios: (1) injecting CO 2 at the base of the salt withdrawal basin (syncline scenario) and (2) injecting CO 2 at the base of the structural closure, similar to a common injection well location for EOR purposes (base scenario). For each scenario, we separately simulated injection of 30 MT of CO 2 and 60 MT of CO 2 continuously for 30 years and observe the plume and pressure evolution for 100 years after the injection stops. The simulation shows that injecting the CO 2 into a syncline limits the vertical migration of CO 2 , thus making synclinal injection more secure. In the syncline scenario, the geological layer around the injection point is more heterogeneous than the layer in the base scenario; thus, the CO 2 tends to migrate laterally. Additionally, in the syncline scenario, the plume does not even reach the upper part of the anticline, allowing us to safely store an additional amount of CO 2 into the reservoir. Furthermore, the simulation also shows that in the syncline scenario, the times needed for the reservoir to reach its stabilized pressure after the end of injections are faster. To summarize, CO 2 injection at the base of a syncline could provide additional storage, increase the safety of the project from the limited vertical plume migration, and expedite plume stabilization, which could result in the decrease of monitoring frequency as the project runs, thus lowering the operating cost of the project in the long run.

58 GEOSCIENCES↗

Implementing High-Efficiency Rooftop Units in Leased Buildings

This case study details a project completed by Efficiency Vermont to install 66 high-efficiency rooftop unit replacements on a large 140,000-square-foot office building, which realized 163 kW in electricity demand reduction and $93,000 annual utility cost savings.

utility, project financing, office building, comme↗

Implementing Solar - Leased Retail Building

This case study describes a multi-site solar photovoltaic (PV) installation project undertaken by BJ’s Wholesale Club. It describes how BJ’s worked with their landlords to overcome the split incentive of the installation, ongoing operational requirements, roof maintenance, and vacancy/turnover at several locations in Massachusetts, Maryland, and New Jersey.

Commercial, retail, leased, solar, solar photovolt↗

Flying low : simple leases with workspace pilot.

As the use of virtual machines (VMs) for scientific applications becomes more common, we encounter the need to integrate VM provisioning models into the existing resource management infrastructure as seamlessly as possible. To address such requirements, we describe an approach to VM management that uses multi-level scheduling to integrate VM provisioning into batch schedulers such as PBS. We then evaluate our approach on the TeraPort cluster at the University of Chicago.

97 MATHEMATICS AND COMPUTING↗

Nuclear Islands: International Leasing of Nuclear Fuel Cycle Sites to Provide Enduring Assurance of Peaceful Use

Current International Atomic Energy Agency safeguards do not provide adequate protection against the diversion to military use of materials or technology from certain types of sensitive nuclear fuel cycle facilities. In view of highly enriched uranium’s relatively greater ease of use as a nuclear explosive material than plutonium and the significant diseconomies of commercial spent fuel reprocessing, this article focuses on the need for improved international controls over uranium enrichment facilities as the proximate justification for creation of an International Nuclear Fuel Cycle Association (INFCA). In principle, the proposal is equally applicable to alleviating the proliferation concerns provoked by nuclear fuel reprocessing plants and other sensitive nuclear fuel cycle facilities. The INFCA would provide significantly increased nonproliferation assurance to its member states and the wider international community by holding long-term leasehold contracts to operate secure restricted zones containing such sensitive nuclear facilities.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗