Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “LICENSES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Modular High Temperature Gas-Cooled Reactor: Licensing Part III

Recent Licensing Experience- Advanced and Micro- Reactors Recent Designs Additional Designs Licensing Challenges for advanced reactors Functional Containment Emergency Planning Zones Autonomous and Remote Operation Transportation Manufacturing Licenses NRC License vs. DOE Authorization Siting and Environmental Impact

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

SIMPLIFIED COST-BENEFIT ANALYSIS OF SUBSEQUENT LICENSE RENEWAL

The license renewal (LR) and subsequent license renewal (SLR) processes, defined in 10 CFR 54, provide a framework for US nuclear plants to extend their operating licenses, but that process can ultimately result in costly, timely, resource intensive efforts to satisfy the requirements for license extension. This report provides areas where the cost, time, and resource efforts may be able to be reduced with additional analytical evaluation, model changes, inspection technique changes, and review of past inspection results.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

MP197HB; First licensed transportation package with canistered high burnup fuel after dry storage - 15580

AREVA TN has recently received the NRC 10 CFR Part 71 transportation license CoC 9302 Revision 7 for the MP197HB transportation package that allows transportation of canistered high burnup fuel assemblies. The Nuclear Horizontal Modular Storage (NUHOMS{sup R}) system canisters containing high burnup PWR and BWR fuel assemblies are now licensed for transportation as a payload in MP197HB after these canisters were in dry storage at the utility ISFSIs. Enhancements have been made to the MP197HB transportation package to improve thermal performance and also provide superior shielding capabilities. Design features of existing AREVA TN transportation packages such as radial fins, thermal shield, neutron resin and optimized gamma and neutron shielding were used to accommodate transportation of high burnup fuel assemblies with heat loads up to 32 kW. The transportation package is designed for exclusive use by rail, truck or marine transport. State-of-the-art analyses methodologies were used to demonstrate compliance with regulatory requirements of 10 CFR 71.55 for the high burnup fuel after dry storage at any ISFSI. Some of the issues addressed in the license application related to the transportation of high burnup fuel included potential degradation of fuel cladding, uncertainty associated with high burnup fuel cladding material properties, and larger radiation and thermal sources due to higher burnups. Bounding conservative assumptions were made where limited test data was available. AREVA TN's licensing approach did not rely on the cladding integrity of high burnup fuel cladding. Instead, the criticality, thermal and shielding analyses were carried out assuming high burnup fuel reconfiguration. With the approval of this transportation package for PWR and BWR canistered high burnup fuel from dry storage at ISFSIs, the utilities can now transport these canisters which are in dry storage at their sites. This is also a major step forward for the canistered fuel that is currently in dry storage at the shutdown plants because they can use this AREVA TN MP197HB transportation package to ship that fuel to any interim storage facility (ISF) or to a repository when they become available. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

On the extension of modern best-estimate plus uncertainy methodologies to future fast reactor and advanced fuel licensing - initial evaluation of issues

Closing the fuel cycle is the major technical challenge to expanding nuclear energy to meet the world's need for benign, environmentally safe electrical power. Closing the fuel cycle means getting the maximum amount of energy possible out of uranium fuel while in turn minimizing the amount of high-level waste that must be stored. DOE's Advance Fuel Cycle Initiative (AFCI) program addresses this challenge by recycling the transuranic (TRU) isotopes contained in spent nuclear fuel; recycling, in turn, minimizes the amount of high-level waste that would require storage in repositories. Developing new fuels and the plants that burn them is a lengthy and expensive process, typically spanning a period of two decades from concept to final licensing. A unique challenge to meeting the AFCI objectives in this area is that the experimental database is seriously incomplete. As such, using a traditional, heavily empirical approach to develop and qualify fuels and plant operation over the operational conditions of a AFCI plant will be very challenging, if not impossible, within the expected schedule and budgetary constraints. To address this concern AFCI has launched an advanced modeling and simulation (M&S) approach to revolutionize fuel development and fast reactor design. This new approach is predicated upon transferring the recent advances in computational sciences and computer technologies into the development of these program elements. The licensing process that has historically been used by the NRC for fuels qualification is based upon using a large body of experimental work to qualify and license a new fuel. If a modeling and simulation approach with more directed experimentation is to be considered as an alternative approach for licensing, then a framework needs to be developed that can be agreed to with the NRC early in the developmental process. The use of modeling and simulation as a means of demonstrating that a design can meet NRC requirements is not new and has precedence in the NRC. The method is generically referred to as a 'Best Estimate plus Uncertainty' approach (BE+U), since the goal of the methodology is to compare the model value (best estimate) plus any uncertainty to a figure of merit like cladding temperature. The challenges for extending the BE+U (1) method for fuel qualification for an Advanced Reactor Fuel are driven by: schedule, the need for data, the data sufficiency, the identification of important phenomenon, the process of validation (with focus on the multi-scale model), and the need to produce and extended best estimate plus uncertainty methodology. This paper examines these issues an offers up a proposed set of methods that extend the current BE+U methodology address most if not all of these challenges.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Draft Operating Procedures for a Generic Repository Licensing Organization

This document is milestone M4FT-15SN0826021: Draft Summary of principle operating procedures for a generic repository licensing organization, the result of efforts under work package FT-15SN082602 DOE Managed HLW and SNF Research: Generic Operating Procedures; e.g., Quality Assurance — Sandia National Laboratories (SNL). The objective of this effort was to develop this draft document identifying and summarizing the principle operating procedures for a generic repository licensing organization. The FY16 follow on work package is FT-165N050303: Develop and Implement Operating Procedures — SNL, having a consistent objective to develop a draft document identifying and summarizing the principle operating procedures for a generic repository licensing organization. This document identifies and describes the principle operating procedures for a hypothetical and generic organization with the responsibility to site, characterize, design, license, construct and operate a repository for the disposal of high-level radioactive waste (HLW) and spent nuclear fuel (SNF) managed by the Department of Energy. These principle operating procedures reflect practices that facilitate compliance with U.S. Nuclear Regulatory Commission (NRC) expectations and NQA-1 quality standards.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Picking an Open Source License at LLNL: Guidance and Recommendations from the Computing Directorate

Science and innovation are at the core of LLNL’s mission, and open source software is a vehicle by which LLNL innovations reach the scientific community, the nation, and the world. It also serves as a vehicle for building collaborations, publicizing our capabilities, and attracting new employees. Over half of the software produced by LLNL is open source, and open source licenses are the legal tools that allow our software to be used widely. Choosing an appropriate license can be difficult, but it can be even more difficult to change licenses after your software has amassed a significant number of contributors, so it is important understand the potentially subtle implications of your license choice. This document provides a set of recommendations for the busy and uninitiated. They are not set in stone (there are always exceptions). Our goal is to provide default choices that align best with LLNL’s mission, along with a high-level rationale.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Hydropower Licensing Timeline and Cost Dataset

This dataset provides timeline dates, lengths, project characteristics, license characteristics, and costs of hydropower licensing and relicensing for 107 randomly selected hydropower projects that have been issued licenses since 1 October 2005. Projects included in this dataset were licensed but not necessarily constructed. These data were analyzed and presented in Chapters 3 (timeline data) and 5 (cost data) of the Levine et al. (2021) report

13 HYDRO ENERGY↗

The debate over re-licensing the Vermont Yankee nuclear power plant

In 2009, the NRC's Atomic Safety and Licensing Board approved a 20-year license extension for the Vermont Yankee Nuclear Power plant. Less than seven months later, the Vermont State Senate voted 26-4 to block the required certificate for public good. How did a plant seen as likely to be re-licensed become the first in 20 years to be rejected in a public vote? (author)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

French Cigeo Operational Safety Options: The General Approach and Challenging Issues Towards the Licensing - 18051

After around 25 years of In view of the licensing application, two main milestones for safety are identified for Cigeo: a Safety Options Dossier 'DOS' early 2016 and the safety case to support Future License Application of Cigeo. The Safety Options was an opportunity for Andra to send in advance a first safety case to the French Safety Authority in order to stabilize the safety strategy, the safety requirements, the safety methods, key safety and design options, the list of safety scenarios that are selected and a preliminary 'bounding' impact. The paper describes the approach applied for the operating safety options and the main concluding aspects as well as the challenging issues towards the licensing. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Licensing and Operation of BEA Research Reactor Package for Fuel, Source and Target Payloads - 19198

The Battelle Energy Alliance (BEA) Research Reactor Package (BRR Package) is currently in use for a variety of payload types and operational scenarios. The BRR Package is licensed by the Nuclear Regulatory Commission (NRC), under Certificate of Compliance (CoC) number USA/9341/B(U)F-96. The original packaging design, testing, and safety analysis activities were conducted by Orano Federal Services (Orano FS, formerly AREVA Federal Services) for the Idaho National Laboratory (INL), operated by the Battelle Energy Alliance (BEA) for the U.S. Department of Energy (DOE). One package was built and delivered to the INL in 2009, and has seen routine use since that time, primarily by DOE University Research Reactor programs. This paper will provide a history and description of the original design and licensing of the package and subsequent amended applications for the addition of new payloads. Each additional payload type provided unique design, operational, and licensing challenges - these challenges will be discussed, and the results and lessons learned presented will be beneficial for application in other radioactive material packaging projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Brazilian Audit Tribunal's role in improving the federal environmental licensing process

This article describes the role played by the Brazilian Audit Tribunal (Tribunal de Contas da Uniao - TCU) in the external auditing of environmental management in Brazil, highlighting the findings of an operational audit conducted in 2007 of the federal environmental licensing process. Initially, it records the constitutional and legal framework of Brazilian environmental licensing, describing the powers and duties granted to federal, state and municipal institutions. In addition, it presents the responsibilities of the TCU in the environmental area, comparing these with those of other Supreme Audit Institutions (SAI) that are members of the International Organization of Supreme Audit Institutions (INTOSAI). It also describes the work carried out in the operational audit of the Brazilian environmental licensing process and its main conclusions and recommendations. Finally, it draws a parallel between the findings and recommendations made in Brazil with those of academic studies and audits conducted in other countries.

54 ENVIRONMENTAL SCIENCES↗

Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors: Risk-Informed and Performance-Based Evaluation of Defense-in-Depth Adequacy

This document supports the work contained in Nuclear Energy Institute (NEI) 18-04 “Risk-Informed Performance-Based Technology Inclusive Guidance for Advanced Reactor Licensing Basis Development” Revision 0. NEI 18-04 presents a modern, technology-inclusive, risk-informed, and performance-based (TI-RIPB) process for selection of Licensing Basis Events (LBEs); safety classification of structures, systems, and components (SSCs) and associated risk-informed special treatments; and determination of defense-in-depth (DID) adequacy for non-LWRs. The NEI guidance document provides one acceptable means for addressing the aforementioned topics as part of demonstrating a specific design provides reasonable assurance of adequate radiological protection. This report provides the framework and associated methodology guidelines and discussion for establishing, then evaluating, confirming, and documenting the adequacy of defense-in-depth (DID) for advanced non-light-water reactor technologies. It was developed as part of the Licensing Modernization Project led by Southern Company and cost-shared by the United States Department of Energy and has benefited from considerable NRC formal reviews and public workshops. The methodology converts the DID philosophy into a structured process that is implementable, embraces existing United States and international definitions and philosophies of DID that set the foundation for the process. It builds on the DID framework developed in the Department of Energy Next Generation Nuclear Plant Project and earlier works on this subject. The approach to establishing DID adequacy involves the incorporation of DID attributes into the plant capabilities and programmatic elements of DID. The integrated evaluation of DID adequacy includes both quantitative elements to incorporate risk-informed and performance-based (RIPB) considerations and qualitative elements that address uncertainties and limitations in the quantitative models and supporting data. Demonstration of DID adequacy ensures that there are multiple layers of defense for risk-significant challenges to the design and that the plant capabilities and programs that support each layer are provided in a manner that minimizes dependencies among these layers. The focus of this report is assurance of DID adequacy with respect to protection of the public from radiological exposures resulting from accidental releases of radioactive material. While other hazards are not specifically addressed, this methodology is expected to be beneficial for determining DID adequacy for them as well. Risk-informed evaluation of DID considers the integrated performance of all plant SSCs and associated programs to manage daily operational activities, transients, and accidents, including the evaluation of strategies for accident prevention and mitigation. The RIPB LBE scenario methodology used in this evaluation defines the challenges to the plant safety features included in the plant design basis and beyond, and the scope of all deterministic and probabilistic safety evaluations. By examining event sequences across the whole spectrum of LBEs, a systematic assessment of DID can be accomplished.

42 ENGINEERING↗

Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors: Safety Classification and Performance Criteria for Structures, Systems, and Components

This report, “Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors: Safety Classification and Performance Criteria for Structures, Systems and Components,” represents a key element in the development of a framework for the efficient licensing of advanced non-Light Water Reactors (non-LWRs). It is the result of a Licensing Modernization Project (LMP) led by Southern Company and cost-shared by the United States Department of Energy (DOE).

42 ENGINEERING↗

A Comparison of the U.S. Nuclear Regulatory Commission Technical Evaluation for the Zion and La Crosse License Termination Plans with a Focus on Release Criteria

Zion Nuclear Power Station (ZNPS) and the La Crosse Boiling Water Reactor (LACBWR) sites are both undergoing decommissioning. Although these two sites are different in terms of size, design, and operational history, the approach for defining release criteria for decommissioning at each site is similar. ZNPS consists of two (Units 1 and 2) Pressurized Water Reactors (PWR), each approximately 1100 MWe. ZNPS is located near the city of Zion in northeast Illinois on the west shore of Lake Michigan. The two units were operated from 1973 to 1998. LACBWR was an AEC Demonstration Reactor (50 MWe) which operated from 1967 to 1987. The LACBWR site is in Vernon County, Wisconsin and is shared with an operational fossil plant. EnergySolutions is managing the decommissioning of both these sites under the separate entities ZionSolutions and LaCrosseSolutions. The U.S. Nuclear Regulatory Commission (NRC) transferred the Zion Facility Operating License from Exelon Generation Company, LLC (Exelon) to ZionSolutions on September 1, 2010. A similar license transfer from Dairyland Power Cooperative to LaCrosseSolutions is planned for the second quarter of 2016. On December 19, 2014, ZionSolutions submitted the ZNPS License Termination Plan (LTP). It is expected that the LTP for the La Crosse BWR will be submitted to the NRC in early 2016. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Advanced licensing and safety engineering method - ADLAS{sup TM} - 377

Complex nuclear projects, with long supply chains require detailed understanding and management to succeed. One of the most important success factors is licensing, which has been very challenging in past years in many nuclear projects (both new build projects and modernization projects). To better understand the licensing aspects and the safety features that are behind the licensing requirements, the high level safety engineering method has been developed in Finnish energy company Fortum. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Diablo Canyon power plant digital process protection system replacement licensing experience using ISG-06 - 395

This paper provides a summary of the preparation of a License Amendment Request (LAR) for replacement of the existing Diablo Canyon Power Plant (DCPP) Eagle 21 digital Process Protection System (PPS) by Pacific Gas and Electric Company (PG and E) using US Nuclear Regulatory Commission (USNRC) Digital I and C (DI and C) Interim Staff Guidance (ISG) document ISG-06, Licensing Process . The USNRC has designated the LAR for the DCPP PPS replacement project as the pilot application for use of DI and C ISG-06. DI and C ISG-06, Revision 1, issued for use on January 19, 2011, describes the licensing process the NRC staff may use to review an LAR for a DI and C modification. The LAR for the replacement of the Eagle 21 PPS was submitted to the NRC on October 26, 2011, was accepted for review on January 13, 2012, and was approved on December 21, 2016. A more detailed review of the specific PPS replacement design including the Defense-In-Depth and Diversity approach is provided in a paper presented at the 2015 conference. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Advanced Reactor Licensing

This is the licensing presentation for the Waste Management Symposia 2023. It covers licensing activities, LMP, and manufacturing licenses.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Improved best estimate plus uncertainty methodology including advanced validation concepts to license evolving nuclear reactors

Many evolving nuclear energy programs plan to use advanced predictive multi-scale multi-physics simulation and modeling capabilities to reduce cost and time from design through licensing. Historically, the role of experiments was primary tool for design and understanding of nuclear system behavior while modeling and simulation played the subordinate role of supporting experiments. In the new era of multi-scale multi-physics computational based technology development, the experiments will still be needed but they will be performed at different scales to calibrate and validate models leading predictive simulations. Cost saving goals of programs will require us to minimize the required number of validation experiments. Utilization of more multi-scale multi-physics models introduces complexities in the validation of predictive tools. Traditional methodologies will have to be modified to address these arising issues. This paper lays out the basic aspects of a methodology that can be potentially used to address these new challenges in design and licensing of evolving nuclear technology programs. The main components of the proposed methodology are verification, validation, calibration, and uncertainty quantification. An enhanced calibration concept is introduced and is accomplished through data assimilation. The goal is to enable best-estimate prediction of system behaviors in both normal and safety related environments. To achieve this goal requires the additional steps of estimating the domain of validation and quantification of uncertainties that allow for extension of results to areas of the validation domain that are not directly tested with experiments, which might include extension of the modeling and simulation (M&S) capabilities for application to full-scale systems. The new methodology suggests a formalism to quantify an adequate level of validation (predictive maturity) with respect to required selective data so that required testing can be minimized for cost saving purposes by showing further testing wold not enhance the quality of the validation of predictive tools. The proposed methodology is at a conceptual level. When matured and if considered favorably by the stakeholders, it could serve as a new framework for the next generation of the best estimate plus uncertainty licensing methodology that USNRC developed previously. In order to come to that level of maturity it is necessary to communicate the methodology to scientific, design and regulatory stakeholders for discussion and debates. This paper is the first step to establish this communication.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗