Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “LEASING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

To Own or Lease Solar: Understanding Commercial Retailers' Decisions to Use Alternative Financing Models

This report examines the tradeoffs among financing methods for businesses installing onsite photovoltaics (PV). We present case studies of PV financing strategies used by two large commercial retailers that have deployed substantial U.S. PV capacity: IKEA, which owns its PV, and Staples, which purchases power generated from onsite PV systems through power purchase agreements (PPAs). We also analyze the financial considerations that influence any company's choice of PV financing strategy. Our goal in this report is to clarify the financial and institutional costs and benefits of financing strategies and to inform other companies that are considering launching or expanding similar PV programs.

14 SOLAR ENERGY↗

Assessing Impacts on Pressure Stabilization and Leasing Acreage for CO 2 Storage Utilizing Oil Migration Concepts

Favorable geological storage for CO 2 has long been pictured as large anticlines with thick sandstones, similar to oil reservoirs in the petroleum system. Unlike oil, however, stored CO 2 does not need to be recoverable, which raises the possibility of using dissolution and residual trapping to augment the capacity of buoyant traps and tap more of the bulk rock volume. The work presented builds on that idea, asking the following question: If we inject CO 2 down to a syncline – analogous to the carrier bed in the petroleum system – how would this injection mechanism impact storage capacity and plume shape, migration, and stabilization? To address this question, we built a reservoir model, based on seismic interpretation of Middle Miocene strata, offshore Galveston, Texas. 3-D seismic and well logs were used to characterize key intervals. Reservoirs chosen for modeling are progradational-aggradational sands with mud intercalation. They have a higher degree of heterogeneity than the more conventional reservoirs commonly targeted for CO 2 storage. Modeling investigated how far the CO 2 plume would migrate under two scenarios: (1) injecting CO 2 at the base of the salt withdrawal basin (syncline scenario) and (2) injecting CO 2 at the base of the structural closure, similar to a common injection well location for EOR purposes (base scenario). For each scenario, we separately simulated injection of 30 MT of CO 2 and 60 MT of CO 2 continuously for 30 years and observe the plume and pressure evolution for 100 years after the injection stops. The simulation shows that injecting the CO 2 into a syncline limits the vertical migration of CO 2 , thus making synclinal injection more secure. In the syncline scenario, the geological layer around the injection point is more heterogeneous than the layer in the base scenario; thus, the CO 2 tends to migrate laterally. Additionally, in the syncline scenario, the plume does not even reach the upper part of the anticline, allowing us to safely store an additional amount of CO 2 into the reservoir. Furthermore, the simulation also shows that in the syncline scenario, the times needed for the reservoir to reach its stabilized pressure after the end of injections are faster. To summarize, CO 2 injection at the base of a syncline could provide additional storage, increase the safety of the project from the limited vertical plume migration, and expedite plume stabilization, which could result in the decrease of monitoring frequency as the project runs, thus lowering the operating cost of the project in the long run.

58 GEOSCIENCES↗

Implementing High-Efficiency Rooftop Units in Leased Buildings

This case study details a project completed by Efficiency Vermont to install 66 high-efficiency rooftop unit replacements on a large 140,000-square-foot office building, which realized 163 kW in electricity demand reduction and $93,000 annual utility cost savings.

utility, project financing, office building, comme↗

Implementing Solar - Leased Retail Building

This case study describes a multi-site solar photovoltaic (PV) installation project undertaken by BJ’s Wholesale Club. It describes how BJ’s worked with their landlords to overcome the split incentive of the installation, ongoing operational requirements, roof maintenance, and vacancy/turnover at several locations in Massachusetts, Maryland, and New Jersey.

Commercial, retail, leased, solar, solar photovolt↗

Nuclear Islands: International Leasing of Nuclear Fuel Cycle Sites to Provide Enduring Assurance of Peaceful Use

Current International Atomic Energy Agency safeguards do not provide adequate protection against the diversion to military use of materials or technology from certain types of sensitive nuclear fuel cycle facilities. In view of highly enriched uranium’s relatively greater ease of use as a nuclear explosive material than plutonium and the significant diseconomies of commercial spent fuel reprocessing, this article focuses on the need for improved international controls over uranium enrichment facilities as the proximate justification for creation of an International Nuclear Fuel Cycle Association (INFCA). In principle, the proposal is equally applicable to alleviating the proliferation concerns provoked by nuclear fuel reprocessing plants and other sensitive nuclear fuel cycle facilities. The INFCA would provide significantly increased nonproliferation assurance to its member states and the wider international community by holding long-term leasehold contracts to operate secure restricted zones containing such sensitive nuclear facilities.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

FAST Equipment Lease with Liberty University, Inc. (Cooperative Research and Development Final Report)

Liberty University, Inc. (Participant) will receive government owned equipment from NREL to evaluate and perform fatigue testing of bladders in use for small scale pumped storage hydropower. NREL is providing technical support to advance Liberty University's pumped storage hydropower (PSH) concept towards commercialization. The concept creates modular upper and lower watertight enclosures (tanks or reservoirs) connected by a series of modular pipe lengths (penstock).

13 HYDRO ENERGY↗

Improving High Resolution Offshore Wind Resource Assessments and Forecasts using Observations in the MA/RI Lease Areas

The third Wind Forecast Improvement Project (WFIP3) sought to improve understanding of the physical phenomena in the atmosphere and ocean that dictate the structure and variability of wind and thermodynamic fields within the Marine Atmospheric Boundary Layer (MABL). WFIP3 conducted a comprehensive 18-month observational study over the Northeast U.S. outer continental shelf, a high use coastal zone, using a 3-D multiscale sensor array to highly resolve the temporal, vertical, and horizontal structure of the coupled atmospheric and oceanic boundary layers. Multiple land-based study sites adjacent to the coastal ocean observed surface meteorology and vertical profiles of atmospheric properties via passive infrared and microwave radiometers, active lidars and radars, and radiosondes. At sea, an array of surface flux buoys and two vertical profiling lidar buoys observed both atmospheric and oceanic properties, augmented by land-based oceanographic radar systems and routine ship-based surveys. Intensive observations of the MABL over the ocean was done from an air-sea interaction flux tower and extended deployments of a large barge platform. WFIP3 focused on mesoscale and sub-mesoscale flows -- including sea breezes, low-level jets, low-level clouds, and coastal storms -- and the ability of advanced numerical model parameterizations to represent them within fully coupled oceanic and atmospheric modeling systems and foundational weather forecast models. Numerous critical forecasting phenomena were observed, however the project was terminated prior to the completion of the field observational period and the analysis period.

54 ENVIRONMENTAL SCIENCES↗

Two-Way Option Contracts That Facilitate Adaptive Water Reallocation in the Western United States

Many water markets in the western United States (U.S.) have the ability to reallocate water temporarily during drought, often as short-term water rights leases from lower value irrigated activities to higher value urban uses. Regulatory approval of water transfers, however, typically takes time and involves high transaction costs that arise from technical and legal analyses, discouraging short-term leasing. This leads municipalities to protect against drought-related shortfalls by purchasing large volumes of infrequently used permanent water rights. High transaction costs also result in municipal water rights rarely being leased back to irrigators in wet or normal years, reducing agricultural productivity. This research explores the development of a multi-year two-way option (TWO) contract that facilitates leasing from agricultural-to-urban users during drought and leasing from urban-to agricultural users during wet periods. The modeling framework developed to assess performance of the TWO contracts includes consideration of the hydrologic, engineered, and institutional systems governing the South Platte River Basin in Colorado where there is growing competition for water between municipalities (e.g., the city of Boulder) and irrigators. The modeling framework is built around StateMod, a network-based water allocation model used by state regulators to evaluate water rights allocations and potential rights transfers. Results suggest that the TWO contracts could allow municipalities to maintain supply reliability with significantly reduced rights holdings at lower cost, while increasing agricultural productivity in wet and normal years. Additionally, the TWO contracts provide irrigators with additional revenues via net payments of option fees from municipalities.

54 ENVIRONMENTAL SCIENCES↗

Markets and Economic Requirements for Fission Batteries and Other Nuclear Systems

Fission Batteries (FBs) are nuclear reactors defined by five characteristics which enable large-scale deployment: cost competitive, standardized sizes for economic mass production, easy installation and removal, secure and safe unattended operation with high reliability. FBs are not defined by technology or power level. Technical and market considerations suggest that most FBs will produce 20 to 30 MWt. This proceedings reports on the outcomes of two workshops that were held in January 2021 to better define markets and economic challenges for FBs. Three major markets were identified. The largest market is the industrial and commercial heat market. There are about 4000 industrial users (excluding utilities) that require more than one megawatt of heat. The number of customers versus size of heat demand was determined. In a low-carbon world there is the potential for many additional customers—including expanded biofuels production and district heat. The second market is for non-grid electricity. This includes co-generation plants that produce heat and electricity for a single customer. The third market is the maritime market with ~100,000 ships worldwide. In the United States, natural gas is the low-cost energy option today and will remain so unless constraints or taxes impact its use. If restrictions on greenhouse gas emissions, the FB competition includes natural gas with carbon capture, biofuels, hydrogen and grid electricity. Natural gas with carbon capture is not economically viable on a small scale. Biofuels may be expensive but may be the economically preferred option for locations with small energy demands of a few megawatts. Hydrogen is a potential competitor with many of the characteristics of natural gas. Grid electricity is not a competitive source of heat. For FBs to be economically competitive, the price of delivered heat must be $20-50/MWh ($6-15/million BTU). The economically competitive range for non-grid electricity is estimated at $70-100/MWh. These electricity prices are competitive with the retail prices of electricity in many parts of the United States for the customer. FBs are not expected to be competitive selling wholesale electricity to the grid. To achieve the aforementioned cost targets for heat and electricity markets, FB designers must (1) maximize the power output within the constraints of a FB (e.g., truck transportability, passive decay heat removal), (2) drastically reduce the size of onsite staff, (3) adopt core designs with low fuel costs (enrichment and fabrication), and (4) develop a system design that is efficiently manufactured in factories. The business case depends upon more than being just a replacement for natural gas. The largest incentives for adoption of FBs is where they create new markets and new sources of revenue. An example is the paper and pulp industry that burns biomass wastes to provide heat and electricity to make paper. An external heat source could meet the demand for heat and electricity by the paper process and enable converting waste biomass into liquid biofuels rather than burning to provide heat. Other markets, such as data centers, are driven by special energy requirements such as extreme reliability. Most customers are not in the energy business but need heat and electricity to produce a product—a manufactured good, education, retail sales (shopping malls), marine transport or some other product. As a consequence, there will be large incentives to lease rather than own FBs. Leasing avoids the regulatory challenges that remain with the owner of the FB. Leasing creates large incentives for FP standardization of sizes and transportability to maintain the value of the FB at the end of the lease—similar to the leasing of jet engines and aircraft. The economic constraints combined with technical constraints suggest competitive FBs will likely have outputs exceeding 10 MWt. There appear to be little incentives for very long-lived reactor cores because such machines require much larger inventories of fuel. Maintenance requirements and the options to provide technology updates may favor shorter lifetimes (~5 years). The assessment is that there is the potential for FBs to be economically viable and play a major role in global decarbonization in three markets: heat, non-grid electricity and maritime applications.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Financial Innovation Among the Community Wind Sector in the United States

In the relatively brief history of utility-scale wind generation, the 'community wind' sector - defined here as consisting of relatively small utility-scale wind power projects that are at least partly owned by one or more members of the local community - has played a vitally important role as a 'test bed' or 'proving ground' for wind turbine manufacturers. In the 1980s and 1990s, for example, Vestas and other now-established European wind turbine manufacturers relied heavily on community wind projects in Scandinavia and Germany to install - and essentially field-test - new turbine designs. The fact that orders from community wind projects seldom exceeded more than a few turbines at a time enabled the manufacturers to correct any design flaws or manufacturing defects fairly rapidly, and without the risk of extensive (and expensive) serial defects that can accompany larger orders. Community wind has been slower to take root in the United States - the first such projects were installed in the state of Minnesota around the year 2000. Just as in Europe, however, the community wind sector in the U.S. has similarly served as a proving ground - but in this case for up-and-coming wind turbine manufacturers that are trying to break into the broader U.S. wind power market. For example, community wind projects have deployed the first U.S. installations of wind turbines from Suzlon (in 2003), DeWind (2008), Americas Wind Energy (2008) and later Emergya Wind Technologies (2010),1 Goldwind (2009), AAER/Pioneer (2009), Nordic Windpower (2010), Unison (2010), and Alstom (2011). Just as it has provided a proving ground for new turbines, so too has the community wind sector in the United States served as a laboratory for experimentation with innovative new financing structures. For example, a variation of one of the most common financing arrangements in the U.S. wind market today - the 'partnership flip structure' - was first developed by community wind projects in Minnesota more than a decade ago (and is therefore sometimes referred to as the 'Minnesota flip' model) before being adapted by the broader wind market. More recently, a handful of community wind projects built in the United States over the past year have been financed via new and creative structures that push the envelope of wind project finance in the U.S. - in many cases, moving beyond the now-standard partnership flip structures. These projects include: (1) a 4.5 MW project in Maine that combines low-cost government debt with local tax equity, (2) a 25.3 MW project in Minnesota using a sale/leaseback structure, (3) a 10.5 MW project in South Dakota financed by an intrastate offering of both debt and equity, (4) a 6 MW project in Washington state that taps into 'New Markets Tax Credits' using an 'inverted' or 'pass-through' lease structure, and (5) a 9 MW project in Oregon that combines a variety of state and federal incentives and loans with unconventional equity from high-net-worth individuals. In most cases, these are first-of-their-kind financing structures that could serve as useful examples for other projects - both community and commercial wind alike. This new wave of financial innovation occurring in the community wind sector has been facilitated by policy changes, most of them recent. Most notably, the American Recovery and Reinvestment Act of 2009 ('the Recovery Act') enables, for a limited time, wind power (and other types of) projects to elect either a 30% investment tax credit ('ITC') or a 30% cash grant (the 'Section 1603 grant') in lieu of the federal incentive that has historically been available to wind projects in the U.S. - a 10-year production tax credit ('PTC'). This flexibility, in turn, enables wind power projects to pursue lease financing for the first time - leasing is not possible under the PTC. Because they are based on a project's cost rather than energy generation, the 30% ITC and Section 1603 grant also reduce performance risk relative to the PTC - this, too, is an important enabler of lease financing. Finally, by providing a cash rather than tax incentive, the Section 1603 grant alone reduces (but does not eliminate) the need for tax appetite among project owners. All of these policy changes can be particularly useful to community wind projects, and have helped to support the different financial structures mentioned above. This special report - which is distilled from a longer Berkeley Lab report - briefly describes just two of these innovative new financing structures: the sale/leaseback structure used in Minnesota and the intrastate offering conducted in South Dakota. Readers interested in more detail on these two structures, as well as the other three projects not covered here, are encouraged to reference the full Berkeley Lab report.

17 WIND ENERGY↗

Solar Technology Center

The Department of Energy, Golden Field Office, awarded a grant to the UNLV Research Foundation (UNLVRF) on August 1, 2005 to develop a solar and renewable energy information center. The Solar Technology Center (STC) is to be developed in two phases, with Phase I consisting of all activities necessary to determine feasibility of the project, including design and engineering, identification of land access issues and permitting necessary to determine project viability without permanently disturbing the project site, and completion of a National Environmental Policy Act (NEPA) Environmental Assessment. Phase II is the installation of infrastructure and related structures, which leads to commencement of operations of the STC. The STC is located in the Boulder City designated 3,000-acre Eldorado Valley Energy Zone, approximately 15 miles southwest of downtown Boulder City and fronting on Eldorado Valley Drive. The 33-acre vacant parcel has been leased to the Nevada Test Site Development Corporation (NTSDC) by Boulder City to accommodate a planned facility that will be synergistic with present and planned energy projects in the Zone. The parcel will be developed by the UNLVRF. The NTSDC is the economic development arm of the UNLVRF. UNLVRF will be the entity responsible for overseeing the lease and the development project to assure compliance with the lease stipulations established by Boulder City. The STC will be operated and maintained by University of Nevada, Las Vegas (UNLV) and its Center for Energy Research (UNLV-CER). Land parcels in the Eldorado Valley Energy Zone near the 33-acre lease are committed to the construction and operation of an electrical grid connected solar energy production facility. Other projects supporting renewable and solar technologies have been developed within the energy zone, with several more developments in the horizon.

14 SOLAR ENERGY↗

The Birth of a Data Center

Since 2005, Research and Education Campus serves as the gateway to INL University Boulevard Consolidates scientific studies, increased interaction and educational opportunities Teams with local commercial developers, the State of Idaho, and Idaho universities Developed University Boulevard 7 major R&D Leased facilities (388,000 sq. ft.) $122M capital value of leased property Some facilities are at and others forecasted to exceed capacity within 2-3 years as mission growth continues DOE awarded the INL contract to BEA, Feb. 2005. Purpose; transform two uniquely different National Laboratories into the newly formed Idaho National Laboratory Become the pre-eminent, internationally recognized nuclear energy research, development and demonstration laboratory within 10 years. Aggressively streamline, upgrade and plan for new infrastructure INL Infrastructure Transformation Plan, Sept 2005, an overall roadmap for transforming INL to meet the new vision. Key goal; procure 400,000 sq ft of new facility space DOE-NE approved Mission Need document for consolidating the INL Research and Education Campus (REC), Dec. 2005; add or replace 200,000 to 500,000 sq ft of professional scientific space, existing facilities were fair to poor condition. Master Campus Plan requirements document and Environmental Assessment approved January and March 2007 respectively. Defined campus location and REC boundaries. INL and DOE-ID decided, in 2007, to suspend quest for third-party financing, because unlikely to succeed. The strategy was; Keep original target of 200,000 to 500,000 sq ft new space Consolidate existing scattered leases Pursue developer-financed facilities in smaller incremental sizes All leased general purpose buildings;No DOE capital investments (except for utility corridor), developed by others (local developers, State, University, private funding), no government land involved INL-funded tenant improvements

99 GENERAL AND MISCELLANEOUS↗