Engineering PapersSearch

SEARCH · Engineering Papers

Results for “LAUNCH TIME”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

STS-77 Mission Highlights Resource Tape

The flight crew of the STS-77 mission, Cmdr. John H. Casper, Pilot Curtis L. Brown, Jr., and Mission Specialists Andrew S.W. Thomas, Ph.D., Daniel W. Bursch, Mario Runco, Jr., and Marc Garneau, Ph.D., present a video mission over-view of their space flight. Images include: pre-launch activities such as eating the traditional breakfast, crew suit-up, and the ride out to the launch pad. Also, included are various panoramic views of the shuttle on the pad. The crew can be seen being readied in the white room' for their mission. After the closing of the hatch and arm retraction, launch activities are shown including countdown, engine ignition, launch, and the separation of the Solid Rocket Boosters. Following an on-time launch, the crew of Endeavor are shown setting up a variety of experiments that will operate for much of the mission. Also seen is the deployment and inflation of the Spartan Satellite, experiments being conducted in the Spacehab module, thruster firing to stabilized the shuttle, and the mission ending re-entry and landing of the shuttle Endeavor.

Source record

Software Certification and Software Certificate Management Systems

Incremental certification and re-certification of code as it is developed and modified is a prerequisite for applying modem, evolutionary development processes, which are especially relevant for NASA. For example, the Columbia Accident Investigation Board (CAIB) report 121 concluded there is "the need for improved and uniform statistical sampling, audit, and certification processes". Also, re-certification time has been a limiting factor in making changes to Space Shuttle code close to launch time. This is likely to be an even bigger problem with the rapid turnaround required in developing NASA s replacement for the Space Shuttle, the Crew Exploration Vehicle (CEV). Hence, intelligent development processes are needed which place certification at the center of development. If certification tools provide useful information, such as estimated time and effort, they are more likely to be adopted. The ultimate impact of such a tool will be reduced effort and increased reliability.

Denney, Ewen

Space Shuttle Main Engine (SSME) Reliability and Analysis Evolution

The Space Shuttle Main Engine (SSME) is a large thrust class, reusable, staged combustion cycle rocket engine employing liquid hydrogen and liquid oxygen propellants. A cluster of three SSMEs is used on every space shuttle mission to propel the space shuttle orbiter vehicle into low earth orbit. Development of the SSME began in the early 70 s and the first flight of the space shuttle occurred in 1981. Today, the SSME has accrued over one million seconds of ground test and flight operational time, launching 129 space shuttle missions. Given that the SSME is used to launch a manned vehicle, its reliability must be commensurate for the task. At the same time, the SSME is a high performance, high power density engine which traditionally does not lend itself towards high reliability. Furthermore, throughout its history, the SSME operational envelope has been explored and expanded leading to several major test failures. Hence, assessing the reliability of the SSME throughout its history has been a challenging undertaking. This paper provides a review and discussion of SSME reliability assessment techniques and results over its history. Basic reliability drivers such as engine design, test program, major failures, redesigns and upgrades will also be discussed.

Stephens, Walter E.

Summary of atmospheric data observations for 155 flight of MSFC/ABMA related aerospace vehicles

A summary of selected atmospheric conditions observed near launch time for 155 NASA-Marshall Space Flight Center and Army Ballistic Missile Agency related vehicles, launched primarilv from Cape Kennedy, Florida, between August 20, 1953, and November 16, 1963, is presented. Values of ambient pressure, temperature, relative humidity, ground winds, visual observations, density aloft, and wind/wind shear aloft are included. The extremes of these parameters are listed for each type of launch vehicle.

Johnson, D. L.

Low Earth Orbit Raider (LER) winged air launch vehicle concept

The need to launch small payloads into low earth orbit has increased dramatically during the past several years. The Low Earth orbit Raider (LER) is an answer to this need. The LER is an air-launched, winged vehicle designed to carry a 1500 pound payload into a 250 nautical mile orbit. The LER is launched from the back of a 747-100B at 35,000 feet and a Mach number of 0.8. Three staged solid propellant motors offer safe ground and flight handling, reliable operation, and decreased fabrication cost. The wing provides lift for 747 separation and during the first stage burn. Also, aerodynamic controls are provided to simplify first stage maneuvers. The air-launch concept offers many advantages to the consumer compared to conventional methods. Launching at 35,000 feet lowers atmospheric drag and other loads on the vehicle considerably. Since the 747 is a mobile launch pad, flexibility in orbit selection and launch time is unparalleled. Even polar orbits are accessible with a decreased payload. Most importantly, the LER launch service can come to the customer, satellites and experiments need not be transported to ground based launch facilities. The LER is designed to offer increased consumer freedom at a lower cost over existing launch systems. Simplistic design emphasizing reliability at low cost allows for the light payloads of the LER.

Feaux, Karl

Wind measurements by electromagnetic probes

The operation and performance characteristics of the Marshall Space Flight Center's Radar Wind Profiler, designed to provide measurement of the wind in the troposphere, are discussed. The Radar Wind Profiler uses a technology similar to that used in conventional Doppler radar systems, except the frequency is generally lower, antenna is larger, and dwell time is much longer. Its primary function is to monitor the vertical wind profile prior to launch of the Space Shuttle at more frequency intervals and nearer to launch time than is presently possible with the conventional balloon systems. A new wind profile will be obtained on the order of every 15 min based on an average of five wind profiles measured every 3 min at a height interval of 150 m to 20 km. The most significant features of the Radar Wind Profiler are the continuity in time and reliability.

Susko, Michael

V and V of ISHM Software for Space Exploration

NASA has established a far-reaching and long-term program for robotic and manned exploration of the solar system, beginning with missions to the moon and Mars. The Crew Transportation System (CTS), a key system for space exploration, imposes four requirements' that ISHM addresses. These requirements have a wide range of implications for V&V and certification of ISHM. There is a range of time-criticality for ISHM actions, from prognostication, which is often (but not always) non-time-critical, to time-critical state estimation and system management under off-nominal emergency conditions. These are externally imposed requirements on ISHM that are subject to V&V. - In addition, a range of techniques are needed to implement an ISHM. The approaches to ISHM are described elsewhere. These approaches range from well-understood algorithms for low-level data analysis, validation and reporting, to AI techniques for state estimation and planning. The range of techniques, and specifically the use of AI techniques such as reasoning under uncertainty and mission planning (and re-planning), implies that several V&V approaches may be required. Depending on the ISHM architecture, traditional testing approaches may be adequate for some ISHM functionality. The AI-based approaches to reasoning under uncertainty, model-based reasoning, and planning share characteristics typical of other complex software systems, but they also have characteristics that set them apart and challenge standard V&V techniques. The range of possible solutions to the overall ISHM problem impose internal challenges to V&V. The V&V challenges increase when hard real-time constraints are imposed for time-critical functionality. For example, there is an external requirement that impending catastrophic failure of the Launch Vehicle (LV) at launch time be detected and life-saving action be taken within two seconds. In this paper we outline the challenges for ISHM V&V, existing approaches and analogs in other software application areas, and possible new approaches to the V&V challenges for space exploration ISHM.

Markosian, Lawrence

Retrievable Payload Carrier (RPC): Next generation Long Duration Exposure Facility

The Retrievable Payload Carrier (RPC) is described which is a multi-experiment, free-flyer spacecraft being privately developed to make in-space experimentation more accessible and economically feasible for research and development organizations. The carrier concept was derived from NASA's highly successful and flight proven Long Duration Exposure Facility (LDEF). The LDEF capabilities were enhanced to meet new customer requirements. This reusable payload carrier is planned for launch and retrieval by the space shuttle on a regular basis. The RPC's compact design facilitates flexible manifesting of the shuttle cargo bay space, thereby, permitting timely launches and retrievals. The vehicle is designed so that either the entire carrier can be retrieved from orbit, or individual experiment pallets can be removed and replaced in orbit. This gives customers even greater control over their experiment recoveries. A fully operational RPC System consists of: (1) a carrier spacecraft; (2) a ground control station for communication with customer payloads and the carrier; (3) a ground processing facility to provide refurbishment, final checkout, and integration of customer payloads and the carrier; and (4) the personnel required to support both the development and operation phases of the program. Customer payloads will fly 6 to 18 month missions, or longer, as required. Spreading launch, operations, and retrieval costs over multiple experimental payloads results in minimized customer costs. The RPC Program's initial objective is to operate a simple carrier system which meets basic customer service needs.

Perry, Arthur T.

GPS Sounding Rocket Developments

Sounding rockets are suborbital launch vehicles capable of carrying scientific payloads several hundred miles in altitude. These missions return a variety of scientific data including; chemical makeup and physical processes taking place In the atmosphere, natural radiation surrounding the Earth, data on the Sun, stars, galaxies and many other phenomena. In addition, sounding rockets provide a reasonably economical means of conducting engineering tests for instruments and devices used on satellites and other spacecraft prior to their use in more expensive activities. The NASA Sounding Rocket Program is managed by personnel from Goddard Space Flight Center Wallops Flight Facility (GSFC/WFF) in Virginia. Typically around thirty of these rockets are launched each year, either from established ranges at Wallops Island, Virginia, Poker Flat Research Range, Alaska; White Sands Missile Range, New Mexico or from Canada, Norway and Sweden. Many times launches are conducted from temporary launch ranges in remote parts of the world requi6ng considerable expense to transport and operate tracking radars. An inverse differential GPS system has been developed for Sounding Rocket. This paper addresses the NASA Wallops Island history of GPS Sounding Rocket experience since 1994 and the development of a high accurate and useful system.

Bull, Barton

Obtaining coincident image observations for Mission to Planet Earth science data return

One objective of the Mission to Planet Earth (MTPE) program involves comparing data from various instruments on multiple spacecraft to obtain a total picture of the Earth's systems. To correlate image data from instruments on different spacecraft, these spacecraft must be able to image the same location on the Earth at approximately the same time. Depending on the orbits of the spacecraft involved, complicated operational details must be considered to obtain such observations. If the spacecraft are in similar orbits, close formation flying or synchronization techniques may be used to assure coincident observations. If the orbits are dissimilar, the launch time of the second satellite may need to be restricted in order to align its orbit with that of the first satellite launched. This paper examines strategies for obtaining coincident observations for spacecraft in both similar and dissimilar orbits. Although these calculations may be performed easily for coplanar spacecraft, the non-coplanar case involves additional considerations which are incorporated into the algorithms presented herein.

Newman, Lauri Kraft

Atmospheric environment for space shuttle (STS-51L) launch

A summary is given of selected atmospheric conditions observed near Space Shuttle STS-51L launch time on January 28, 1986, at Kennedy Space Center, Florida. Values of ambient pressure, temperature, moisture, ground winds, visual observations (cloud), and winds aloft are included. The sequence of pre-launch Jimsphere measured vertical wind profiles is given. The final atmospheric tape, which consists of wind and thermodynamic parameters versus altitude, for STS-51L vehicle ascent has been constructed. The STS-51L ascent atmospheric data tape has been constructed by Marshall Space Flight Center's Atmospheric Sciences Division to provide an internally consistent data set for use in post flight performance assessments.

Jasper, G. L.

Atmospheric environment for space shuttle (STS-29) launch

This report presents a summary of selected atmospheric conditions observed near Space Shuttle STS-29 launch time on March 13, 1989, at Kennedy Space Center, Florida. Values of ambient pressure, temperature, moisture, ground winds, visual observations (cloud), and winds aloft are included. The sequence of pre-launch Jimsphere-measured vertical wind profiles is given in this report. The final atmospheric tape, which consists of wind and thermodynamic parameters versus altitude, for STS-29 vehicle ascent has been constructed. The STS-29 ascent atmospheric data tape has been constructed by Marshall Space Flight Center's Earth Science and Applications Division to provide an internally consistent data set for use in post-flight performance assessments.

Jasper, G. L.

Atmospheric environment for space shuttle (STS-30) launch

This report presents a summary of selected atmospheric conditions observed near Space Shuttle STS-30 launch time on May 4, 1989, at Kennedy Space Center, Florida. Values of ambient pressure, temperature, moisture, ground winds, visual observations (cloud), and winds aloft are included. The sequence of pre-launch Jimsphere-measured vertical wind profiles is given in this report. The final atmospheric tape, which consists of wind and thermodynamic parameters versus altitude, for STS-30 vehicle ascent has been constructed. The STS-30 ascent atmospheric data tape has been constructed by Marshall Space Flight Center's Earth Science and Applications Division to provide an internally consistent data set for use in post-flight performance assessments.

Jasper, G. L.

Texture Modification of the Shuttle Landing Facility Runway at the NASA Kennedy Space Center

This paper describes the test procedures and the selection criteria used in selecting the best runway surface texture modification at the Kennedy Space Center (KSC) Shuttle Landing Facility (SLF) to reduce Orbiter tire wear. The new runway surface may ultimately result in an increase of allowable crosswinds for launch and landing operations. The modification allows launch and landing operations in 20-kt crosswinds if desired. This 5-kt increase over the previous 15-kt limit drastically increases landing safety and the ability to make on-time launches to support missions where space station rendezvous is planned.

Daugherty, Robert H.

Texture Modification of the Shuttle Landing Facility Runway at Kennedy Space Center

This paper describes the test procedures and the criteria used in selecting an effective runway-surface-texture modification at the Kennedy Space Center (KSC) Shuttle Landing Facility (SLF) to reduce Orbiter tire wear. The new runway surface may ultimately result in an increase of allowable crosswinds for launch and landing operations. The modification allows launch and landing operations in 20-knot crosswinds, if desired. This 5-knot increase over the previous 15-knot limit drastically increases landing safety and the ability to make on-time launches to support missions in which Space Station rendezvous are planned. The paper presents the results of an initial (1988) texture modification to reduce tire spin-up wear and then describes a series of tests that use an instrumented ground-test vehicle to compare tire friction and wear characteristics, at small scale, of proposed texture modifications placed into the SLF runway surface itself. Based on these tests, three candidate surfaces were chosen to be tested at full-scale by using a highly modified and instrumented transport aircraft capable of duplicating full Orbiter landing profiles. The full-scale Orbiter tire testing revealed that tire wear could be reduced approximately by half with either of two candidates. The texture-modification technique using a Humble Equipment Company Skidabrader(trademark) shotpeening machine proved to be highly effective, and the entire SLF runway surface was modified in September 1994. The extensive testing and evaluation effort that preceded the selection of this particular surface-texture-modification technique is described herein.

Daugherty, Robert H.

Atmospheric environment for space shuttle (STS-26) launch

A summary of selected atmospheric conditions observed near Space Shuttle STS-26 launch time on September 29, 1988, at Kennedy Space Center, Florida is given. Values of ambient pressure, temperature, moisture, ground winds, visual observations (cloud), and winds aloft are included. The sequence of pre-launch Jimsphere measured vertical wind profiles is given. The final atmospheric tape, which consists of wind and thermodynamic parameters versus altitude, for STS-26 vehicle ascent has been constructed. The STS-26 ascent atmospheric data tape has been constructed by Marshall Space Flight Center's Earth Science and Applications Division to provide an internally consistent data set for use in post-flight performance assessments.

Jasper, G. L.

Atmospheric environment for Space Shuttle (STS-32) launch

A summary of selected atmospheric conditions observed near space shuttle STS-32 launch time on January 9, 1990, at Kennedy Space Center, Florida, are presented. Values of ambient pressure, temperature, moisture, ground winds, visual observations (clouds), and winds aloft are included. The sequence of pre-launch Jimsphere-measured vertical wind profiles is also presented. The final atmospheric tape, which consists of wind and thermodynamic parameters versus altitude, for STS-32 vehicle ascent was constructed. The STS-32 ascent atmospheric data tape was constructed to provide an internally consistent data set for use in postflight performance assessments and represents the best estimate of the launch environment that was traversed by the STS-32 vehicle.

Jasper, G. L.