Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Integration and Testing of DERs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Enhancing Active Distribution Systems Resilience by Fully Distributed Self-Healing Strategy

Distributed restoration can exploit smart grid technologies to enhance the resilience of active distribution networks toward a self-healing smart grid. However, the large number of decision variables, especially the binary ones for reconfiguration, bring challenges to developing scalable distributed distribution service restoration (DDSR) strategies. This paper proposes a fully distributed solution procedure based on the alternating direction method of multipliers (ADMM) for mixed-integer programming problems and applies to develop the DDSR framework. The method consists of relax-drive-polish phases, 1) relaxing binary variables, and applying the convex ADMM as a warm start; 2) driving the solutions toward Boolean values through a proximal operator; 3) fixing the obtained binding binary variables and solving the rest of the problem to polish results and achieve a high-quality suboptimal solution. Then, an autonomous clustering strategy and consensus ADMM are integrated with the proposed method to realize the fully distributed cluster-based framework of DDSR. This framework can first determine DER scheduling and switch status for reconfiguration to energize the out-of-service areas from local faults, and then provide the load restoration solution in a distributed manner for total blackouts in large-scale distribution networks. Furthermore, the effectiveness and scalability of the proposed DDSR framework are demonstrated through testing on the IEEE 123-node, IEEE 8500-node, and synthetic 100k-node test feeders.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Scalable Solution for Grid Optimization and DER Integration (CRADA Final Report)

Utilidata Inc. is an energy software company that provides clean energy and digital solutions for utilities. This work was the result of Utilidata Inc. being awarded a New York State Energy Research and Development Agency award to integrate Utilidata volt-VAR optimization (VVO) software with smart inverters to explore enhanced voltage control. This project was conducted in partnership with Utilidata Inc., National Grid, the New York State Energy and Research Development Authority, and the National Renewable Energy Laboratory (NREL). As part of the project NREL conducted modeling and simulation analysis, developed cost-benefit analysis framework, and conducted laboratory testing to understand the potential for smart inverter integration to a centralized VVO control scheme. The remainder of the report provides an executive summary of the work, an introduction to the challenges, sections detailing specific aspects of the work, and the overall findings and conclusions.

14 SOLAR ENERGY↗

Grid Resiliency with a 100% Renewable Microgrid

San Diego Gas & Electric Company (SDG&E) installed America’s first and largest utility-scale microgrid in Borrego Springs in 2013. The first generation Borrego Springs Microgrid utilized diesel generators to form and stabilize the microgrid island, with support from grid-scale batteries and local solar photovoltaic (PV) generation. In this project, SDG&E in partnership with National Renewable Energy Laboratory (NREL) demonstrated through modeling, simulation and utility field testing that blackstart and islanding of the microgrid can be led with 100% renewable, inverter based resources (IBRs), to help reduce community reliance on conventional generation resources. Through equipment upgrades, grid-forming island leader capability was transitioned to a battery IBR instead of the Borrego Springs Microgrid diesel generators. A new microgrid controller was integrated to the microgrid and programmed to control and manage multiple energy storage systems. Synchrophasor and other power quality data verified autonomous, high-speed response of the IBRs through blackstart, islanding, and load step testing. Results of project field evaluations provide distribution systems operators (DSO) with increased confidence that renewable, IBR can replace traditional generators to blackstart and island microgrids and rapidly establish stable island frequency with rapid changes in peak power demand. Importantly, the project validated the integration feasibility of a distributed energy resource management system (DERMS) controller that manages multiple grid-forming and grid-following IBRs, establishing a standard design interface to reduce the complexity of integrating new DERs in the future and supporting replication by the industry. As a result of learnings in this project, SDG&E has implemented the microgrid controller strategy at multiple other microgrid sites, thereby validating the replicability of the solution. Hardware-in-the-loop (HIL) simulations including power and controller HIL hardware — along with electromagnetic transient (EMT) simulations of Borrego Springs Microgrid —informed adjustments to inverter parameters and were important to characterize the performance of the IBRs in relevant operating conditions before deployment. The EMT and HIL simulations of islanding the entire community are important contributions in providing confidence in IBR performance prior to future islanding of the community in the field. High-fidelity EMT and/or HIL simulation of IBRs can de-risk field operations, and its relevance and importance as a tool is increasing as distribution grids and microgrids become more complex and dynamic with an increasing proportion of renewable generation, distributed energy storage, and two-way power and energy flows.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electrical Fault and Power Quality Detection Algorithms and Customer-Owned DERs Monitoring with a Cyber Grid Guard System and DLT

In this study, the electrical fault and power quality detection algorithms and customer-owned DERs monitoring use cases were implemented, with a Cyber Grid Guard system and DLT. Electrical utilities continue to deploy more intelligent electronic devices (IEDs) inside and outside electrical substations, and are associated with customer-owned distributed energy resources (DERs). Data from these IEDs, such as power meters and protection relays, must be kept confidential and of high integrity. Blockchain technology has the potential to increase microgrid resilience by enhancing data sharing security. The growing use of IEDs and customer-owned renewable energy sources (DERs) may make it necessary to connect Distributed Ledger Technology (DLT) with power system applications. We implemented the electrical faulted phase detection and power quality monitoring algorithms with a Cyber Grid Guard (CGG) system using DLT. In addition, the DERs (wind turbine farms) use case and protective relay cyber-event tests were assessed, by using the CGG system with DLT. In the experimental model, the testbed was created by using a real-time simulator and CGG system with power meters/ protective relays in the loop. The data collected from the CGG system and IEDs were compared with the same time stamp source. These results showed the successful assessment of protection, control and monitoring applications using a CGG system with DLT. In the future, power system applications for the ESGT with DERs and the CGG system will be based on executing smart contracts between electrical utilities and customer-owned DERs.

Piesciorovsky, Emilio↗

Active High Assurance Authentication Protocol (AHAAP)

The AHAAP Maturation Project involves maturation and evaluation of a patented zero-trust tamper-resistant high-assurance session-less dynamic and active device authentication protocol that simultaneously authenticates identity and provides integrity verification in a single step, substantially reducing the risk of cyberattack, and eliminating the need for costly and complex conventional communication security systems requirements (i.e., cryptography, Public Key Infrastructure (PKI), and key management). These cybersecurity attributes of the technology must be preserved when applying the technology to different cybersecurity solutions, including Command & Control (C&C), Over-the-Air (OTA) update, Common Access Card (CAC), and distributed energy resource (DER) implementations, among others. The technology research objective is to test and verify that the cybersecurity attributes of the technology are not degraded in different cybersecurity applications. The primary technology development objective is to build minimum viable products to demonstrate the technology addresses today’s cybersecurity threats so that prospective investors, strategic partners, regulatory agencies, and commercial customers can interact with and assess the protection assured by the technology. The AHAAP Maturation Project goal is to develop, test, and validate one or more AHAAP implementations. The AHAAP Maturation Project tasks are: (i) engineer AHAAP implementation software, (ii) build a functional prototype that implements the AHAAP software for demonstration, testing, analysis, and evaluation purposes, and (iii) generate a report detailing the results of the AHAAP C&C software and hardware implementation. The final project deliverables are: (i) AHAAP software implementation and prototype, (ii) a report from Sandia National Laboratories detailing the results of the AHAAP implementations.

97 MATHEMATICS AND COMPUTING↗

Efficient Topology Assessment for Integrated Transmission and Distribution Network with 10,000+ Inverter-based Resources

The renewable energy proliferation calls upon the grid operators and planners to systematically evaluate the potential impacts of distributed energy resources (DERs). Considering the significant differences between various inverter-based resources (IBRs), especially the different capabilities between grid-forming inverters and grid-following inverters, it is crucial to develop an efficient and effective assessment procedure besides available co-simulation framework with high computation burdens. This paper presents a streamlined graph-based topology assessment for the integrated power system transmission and distribution networks. Graph analyses were performed based on the integrated graph of modified miniWECC grid model and IEEE 8500-node test feeder model, high performance computing platform with 40 nodes and total 2400 CPUs has been utilized to process this integrated graph, which has 100,000+ nodes and 10,000+ IBRs. The node ranking results not only verified the applicability of the proposed method, but also revealed the potential of distributed grid forming (GFM) and grid following (GFL) inverters interacting with the centralized power plants.

Graph Analysis, Topology evaluation, Infrastructur↗

Controlling distributed energy resources via deep reinforcement learning for load flexibility and energy efficiency

Behind-the-meter distributed energy resources (DERs), including building solar photovoltaic (PV) technology and electric battery storage, are increasingly being considered as solutions to support carbon reduction goals and increase grid reliability and resiliency. However, dynamic control of these resources in concert with traditional building loads, to effect efficiency and demand flexibility, is not yet commonplace in commercial control products. Traditional rule-based control algorithms do not offer integrated closed-loop control to optimize across systems, and most often, PV and battery systems are operated for energy arbitrage and demand charge management, and not for the provision of grid services. More advanced control approaches, such as MPC control have not been widely adopted in industry because they require significant expertise to develop and deploy. Recent advances in deep reinforcement learning (DRL) offer a promising option to optimize the operation of DER systems and building loads with reduced setup effort. However, there are limited studies that evaluate the efficacy of these methods to control multiple building subsystems simultaneously. Additionally, most of the research has been conducted in simulated environments as opposed to real buildings. This paper proposes a DRL approach that uses a deep deterministic policy gradient algorithm for integrated control of HVAC and electric battery storage systems in the presence of on-site PV generation. The DRL algorithm, trained on synthetic data, was deployed in a physical test building and evaluated against a baseline that uses the current best-in-class rule-based control strategies. Performance in delivering energy efficiency, load shift, and load shed was tested using price-based signals. The results showed that the DRL-based controller can produce cost savings of up to 39.6% as compared to the baseline controller, while maintaining similar thermal comfort in the building. The project team has also integrated the simulation components developed during this work as an OpenAIGym environment and made it publicly available so that prospective DRL researchers can leverage this environment to evaluate alternate DRL algorithms.

24 POWER TRANSMISSION AND DISTRIBUTION↗

SCUC-DER Integration Report: Integrating Distributed Energy Resources (DER) Using Advanced Unit Commitment Models and DER Aggregation Methodologies

Distributed energy resources (DERs) are continuing to grow due to regulatory, policy, and market shifts, and it needs to be ensured that small DERs are given a level playing field with traditional resources. Legacy market processes such as unit-commitment problems were designed for a power grid consisting largely of centralized power plants. In contrast, DERs consist of many small devices with distinct operating characteristics that may or may not be connected at the transmission interconnection points, limiting their visibility to the independent system operators (ISOs) who operate wholesale electricity markets. This report details the development and initial results from a simulation platform that integrates state-of-the-art security-constrained unit commitment software, detailed feeder models, and a DER aggregator model to quantify potential DER integration issues. Quantitative results to date illustrate potential infeasible scheduling solutions from SCUC when the DERA includes aggregations of energy-limited energy storage resources. Likewise, if aggregations are not penalized for dispatch deviations, they may have incentives to deviate from the SCUC-determined resource schedules. Assumptions about the amount of aggregated demand response resources (DRRs) and the ability of DERAs to follow profit incentives have an important impact – DRRs have significant flexibility and can typically feasibly meet their SCUC schedule, but on the other hand, their profit incentives can cause unscheduled increases in load before and after DRR dispatch. Computation time results on the SCUC solver and simulation platform only show a modest increase in SCUC solution time as the number of DERAs is increased, but results to date only reflect the RTS-GMLC test system; results may show more significant solver slowdown in larger transmission systems. The largest contribution to simulation time is attributed to the DERA offer generation method, which is suggested for future improvements.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Hardware-in-the-Loop Evaluation of Grid-Edge DER Chip Integration Into Next-Generation Smart Meters

To facilitate the implementation of distributed energy resource management systems (DERMS), we propose to insert a grid-edge distributed energy resource (DER) chip hosting a DERMS algorithm into the next generation of smart meters. This will create a pathway for the wide adoption of DERMS technology because many utilities plan to invest in advanced metering infrastructure in the near future. This will also bridge the gap between an electrical power utility and DERs behind the meter. The DER chip is designed to follow power direction signals from the DERMS coordinator while balancing its local objectives. We tested the chip using a controller- and power-hardware-in-the-loop evaluation under three scenarios that a DERMS could face in the real world. The DER chip was capable of and effective at directing four heterogeneous DERs to respond to a DERMS coordinator for grid services (e.g., voltage regulation and a virtual power plant).

distributed energy resource management system↗

Virtual Power Plants: Pilots, Challenges, and Innovations Shaping Future Development

Virtual Power Plants (VPPs) aggregate distributed energy resources (DERs) to provide grid services traditionally delivered by centralized power plants. This article reviews the current state of VPP deployment, highlighting business models, compensation mechanisms, and global pilot projects. While VPPs offer benefits such as grid flexibility, resilience, and cost savings, challenges remain in communication infrastructure, regulatory frameworks, market access, and customer engagement. To address these, we propose a scalable, privacy-preserving hierarchical VPP architecture that coordinates with distribution utilities and preserves customer data. We also present the Integrated T&D Control Room of the Future as a key test bed for validating and accelerating VPP adoption. These innovations can help transition VPPs from pilot programs to integral components of a modern, reliable power grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Hardware-in-the-Loop Evaluation of Grid-Edge DER Chip Integration Into Next-Generation Smart Meters: Preprint

To facilitate the implementation of distributed energy resource management systems (DERMS), we propose to insert a grid-edge distributed energy resource (DER) chip hosting a DERMS algorithm into the next generation of smart meters. This will create a pathway for the wide adoption of DERMS technology because many utilities plan to invest in advanced metering infrastructure in the near future. This will also bridge the gap between an electrical power utility and DERs behind the meter. The DER chip is designed to follow power direction signals from the DERMS coordinator while balancing its local objectives. We tested the chip using a controller- and power-hardware-in-the-loop evaluation under three scenarios that a DERMS could face in the real world. The DER chip was capable of and effective at directing four heterogeneous DERs to respond to a DERMS coordinator for grid services (e.g., voltage regulation and a virtual power plant).

distributed energy resource management system↗

Job Scheduler-Driven Power Gateway for High Performance Computing

Power gateways in the form of a microgrid can incorporate multiple distributed energy resources (DER) in either grid forming or grid following mode and support high performance computing (HPC) power profiles including the large load-follow requirements observed in multi-user HPC systems. The microgrid’s flexibility to operate in either grid forming or grid following mode and to actively switch between these modes enables baseline power from multiple non-baseline DER while maintaining high power quality metrics for the HPC system. But this enormous flexibility in demand response and time of use shifting is generally programmed independently of any integration with an HPC job scheduler which can better inform the load shaping by the microgrid. While there are many existing approaches where the HPC job scheduler takes in information from the grid to make queue scheduling decisions, this work takes the opposite view and explores a scheduler where the jobs in the queue can directly impact the settings of the grid. Several HPC scheduler strategies are tested where the jobs in the queue directly impact the settings of a microgrid designed for HPC operation which is driving a datacenter with three classes of HPC architectures. The scheduler operation is shown using a microgrid with 64 kW of solar capacity and 320 kWh of battery over a period of 21 days operating with significant low-follow swings, a throttled grid, cloudy conditions, switching between grid following and grid forming modes, and a wide range of battery states-of-charge all while maintaining high quality power metrics. The scheduler provides a mechanism for the job queue to directly impact a power gateway like a microgrid and to improve HPC power outcomes such as maximizing renewable energy usage

microgrid↗

Assessment of wafer scale MoS 2 atomic layers grown by metal–organic chemical vapor deposition using organo-metal, organo-sulfide, and H 2 S precursors

Transition Metal Dichalcogenides (TMDs) are a unique class of materials that exhibit attractive electrical and optical properties which have generated significant interest for applications in microelectronics, optoelectronics, energy storage, and sensing. Considering the potential of these materials to impact such applications, it is crucial to develop a reliable and scalable synthesis process that is compatible with modern industrial manufacturing methods. Metal–organic chemical vapor deposition (MOCVD) offers an ideal solution to produce TMDs, due to its compatibility with large-scale production, precise layer control, and high material purity. Optimization of MOCVD protocols is necessary for effective TMD synthesis and integration into mainstream technologies. Additionally, improvements in metrology are necessary to measure the quality of the fabricated samples more accurately. In this work, we study MOCVD of wafer-scale molybdenum disulfide (MoS 2 ) utilizing two common chalcogen precursors, H 2 S and DTBS. We then develop a metrology platform for wafer scale samples quality assessment. For this, the coalesced films were characterized using Raman spectroscopy, atomic force microscopy, transmission electron microscopy, X-ray photoelectron spectroscopy, and Kelvin probe force microscopy. We then correlate the structural analysis of these grown films with electrical performance by using aerosol jet printing to fabricate van der Pauw test structures and assess sheet resistance.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

SuperLab 2.0 Showcase: Connecting Five Labs to Tackle Grid Complexity and Unlock Unique Grid Asset Potential

SuperLab 2.0 (5-Lab Demo) is a collaborative, national-scale experiment showcasing the coordination of geographically distributed energy assets in real time. The demonstration integrates 25 physical and digital assets, spanning wind, PV, batteries, electrolyzers, DC fast chargers, microgrid controllers, building automation systems, small modular reactor (SMR), control centers, and gas turbines, across five DOE national laboratories-NLR, INL, NETL, LBNL, and SNL. These assets are unified using Energy Sciences Network (ESnet), a low-latency, high-performance U.S. Department of Energy's (DOE) network, and controlled via a centralized energy controller hosted at NLR's ARIES facility. The demonstration validates the ability to stress-test hybrid energy systems under dynamic scenarios to de-risk advanced control strategies for greater resilience and flexibility. SuperLab 2.0 (5-Lab Demo) showcased a major advancement in federated national laboratory collaboration, enabling real-time, cross-laboratory experimentation to coordinate geographically dispersed distributed energy resources (DERs) using various communication protocols and networks. SuperLab 2.0 (5-Lab Demo) built on previous demonstrations conducted between NLR-PNNL and NLR-INL connecting diverse assets including distant protection devices, a SMR simulator, and a high temperature electrolyzer (HTE). Previous demos were based on a single connection between two labs with minimal coordination challenges. The 5-Lab demo with a centralized controller, distributed testbeds across different geographical locations, and use of protocols-based communication represents a scenario closer to real-world grid operations that coordinate resources across a region to meet system needs. This experiment studied how local DER controllers interact with a centralized energy controller during normal and abnormal events to maintain reliability. The SuperLab team across the five labs implemented a notional power system model equivalent of transmission and distribution lines, represented by the data networks interconnecting the labs. Each lab continuously exchanged local parameters (such as P and Q) from its Hardware-In-Loop (CHIL) and Power Hardware-In-Loop (PHIL) assets through centralized energy controller at NLR, enabling real-time interaction and coordination across sites. By leveraging ESnet as the communication backbone, the team successfully operated the distributed assets as a unified power system, with each bus represented by a different laboratory. This setup mirrors how assets interact in real-world power systems across dispersed locations with various protocols and latencies. At each lab site, assets were operated using their own local controllers which were coordinated through an overarching operation and control layer of centralized energy controller, equivalent to how an energy management system (EMS) orchestrates assets across a regional or national grid. SuperLab's federated connectivity utilized a Digital Real-Time Simulators (DRTS)-type gateway to connect Controller Hardware-In-Loop (CHIL) and PHIL assets between labs. To enable this federated connection through ESnet, a deterministic network was established where latency variations were consistent. This consistency allowed the development of digital filters for the power system assets across CHIL and PHIL interfaces to avoid unstable and unreliable grid conditions. This report provides an overview of the cross-laboratory configuration and offers insights into interconnecting geographically distributed research assets to test them as if they were co-located. This experiment represents a step toward linking nine DOE national laboratories, enabling nation-wide simulations that can address utility-driven challenges with grid resilience, flexibility, and modernization.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Voltage Inference Framework for Real-Time Observability in Active Distribution Grids

Active distribution grids are gaining traction to meet the growing environmental, socio-economic, and sustainability targets. Various advanced smart grid technologies facilitate the integration of Distributed Energy Resources (DERs) by supporting the bi-directional power flow. The limited observability of distribution grids, primarily related to their location at the very edge of power system infrastructure, brings challenges to optimal grid management. Moreover, only a limited number of measurements at regular intervals are usually available. This paper presents a novel inference framework, referred to as “Voltage Inference”, to overcome the observability issues. The proposed framework employs a prediction step based on the Multivariate Taylor series approximation, followed by a corrector step that minimizes the estimation error to infer the otherwise unknown voltages from the available measurements. Furthermore, numerical results on the IEEE 13-bus test feeder validate the accuracy and computational performance of the proposed framework.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Visual Tool for Assessing Stability of DER Configurations on Three-Phase Radial Networks

Here, we present a method and tool for evaluating the placement of Distributed Energy Resources (DER) on distribution circuits in order to control voltages and power flows. Our previous work described Phasor-Based Control (PBC), a novel control framework where DERs inject real and reactive power to track voltage magnitude and phase angle targets. Here, we employ linearized power flow equations and integral controllers to develop a linear state space model for PBC acting on a three-phase unbalanced network. We use this model to evaluate whether a given inverter-based DER configuration admits a stable set of controller gains, which cannot be done by analyzing controllability nor by using the Lyapunov equation. Instead, we sample over a parameter space to identify a stable set of controller gains. Our stability analysis requires only a line impedance model and does not entail simulating the system or solving an optimization problem. We incorporate this assessment into a publicly available visualization tool and demonstrate three processes for evaluating many control configurations on the IEEE 123-node test feeder (123NF).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Total Power Factor Smart Contract with Cyber Grid Guard Using Distributed Ledger Technology for Electrical Utility Grid with Customer-Owned Wind Farm

In modern electrical grids, the numbers of customer-owned distributed energy resources (DERs) have increased, and consequently, so have the numbers of points of common coupling (PCC) between the electrical grid and customer-owned DERs. The disruptive operation of and out-of-tolerance outputs from DERs, especially owned DERs, present a risk to power system operations. A common protective measure is to use relays located at the PCC to isolate poorly behaving or out-of-tolerance DERs from the grid. Ensuring the integrity of the data from these relays at the PCC is vital, and blockchain technology could enhance the security of modern electrical grids by providing an accurate means to translate operational constraints into actions/commands for relays. This study demonstrates an advanced power system application solution using distributed ledger technology (DLT) with smart contracts to manage the relay operation at the PCC. The smart contract defines the allowable total power factor (TPF) of the DER output, and the terms of the smart contract are implemented using DLT with a Cyber Grid Guard (CGG) system for a customer-owned DER (wind farm). This article presents flowcharts for the TPF smart contract implemented by the CGG using DLT. The test scenarios were implemented using a real-time simulator containing a CGG system and relay in-the-loop. The data collected from the CGG system were used to execute the TPF smart contract. The desired TPF limits on the grid-side were between +0.9 and +1.0, and the operation of the breakers in the electrical grid and DER sides was controlled by the relay consistent with the provisions of the smart contract. The events from the real-time simulator, CGG, and relay showed a successful implementation of the TPF smart contract with CGG using DLT, proving the efficacy of this approach in general for implementing electrical grid applications for utilities with connections to customer-owned DERs.

24 POWER TRANSMISSION AND DISTRIBUTION↗