Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “IEEE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

IEEE P2988: Recommended Practice of Use and Functions of Virtual Synchronous Machines

Power systems are going through a paradigm shift from centralized generation to distributed generation. This brings unprecedented challenges to power systems stability, reliability, and security. Operating power electronic converters as Virtual Synchronous Machines (VSMs) can bring backward compatibility to power systems, unify and harmonize the integration and interaction of future power systems players, and improve power system stability, reliability, and security. This is vital for the large-scale adoption of distributed energy resources, the advancement of sustainability, and the development of a low-carbon economy. This IEEE 2988 Recommended Practice will define the fundamental principles, mandatory functions, and optional functions of a VSM, i.e., a power electronic converter that is operated to behave like conventional synchronous machines. It will not describe or specify power semiconductor devices, hardware topologies, or micro-controllers that are used to build a VSM. This talk will discuss the activities and development plan for IEEE 2988 with the aim to engaging broad stakeholders and widening participation.

Zhong, Qing-Chang↗

A Generic FSC Wind Park EMT Model with IEEE Std 2800-Compliant Fault Ride-Through Capability

The modern power grid is seeing more and more electricity come from renewable sources like wind farms, which use sophisticated power electronics instead of traditional spinning generators. To keep everything running smoothly and meet industry standards such as IEEE 2800, these systems need smart control strategies. In our work, we built a flexible computer model of a full-scale wind farm converter that can handle grid disturbances without shutting down. When a fault or storm hits, the model’s built-in logic automatically adjusts the currents it sends to the grid and protects its internal energy storage, ensuring the wind farm stays connected and doesn’t damage its own equipment. Once the disturbance clears, the model restores normal operation seamlessly, so there’s no long interruption in power delivery. At the same time, it carefully regulates the voltage where the wind farm ties into the larger grid, helping to maintain safe voltage levels across the network. Our simulations show that this control setup not only meets all the requirements of IEEE Standard 2800 but also allows the wind farm to recover quickly and predictably, keeping the lights on no matter what happens on the grid.

17 WIND ENERGY↗

Stability Impact of IEEE 1547 Operational Mode Changes Under High DER Penetration in the Presence of Cyber Adversary

The IEEE 1547 standard addresses the integration of Distributed Energy Resources (DER) into Area Electric Power Systems (AEPS). The updated standard, released in 2018 with revisions ongoing, specifies the need for more flexible settings, requiring the DER to remain connected during certain disturbances and provide voltage support via active and reactive power modes. With these increased capabilities comes increased risks, and our analysis of the standard has produced potential settings combinations, which, while allowable under the standard, may actually create instability. This contradicts the main purpose of the revised standard. Since the DER must support a communication interface through which the AEPS operator can change settings, adversarial mode changes are possible via a cyberattack. This concern is heightened as DER penetration increases, where under a reasonable threat model, an attacker could affect multiple DER simultaneously. We have conducted a simulation analysis of potentially adverse combinations of mode change and ridethrough parameters on a hypothetical AEPS with varying degrees of DER penetration. We conclude that certain adverse mode changes, whether through error or cyberattack, can lead to unstable conditions with DER penetrations as low as 24% of the AEPS system capacity.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Informative Background on the Interoperability Requirements in IEEE Std 1547-2018

The intent of this document is to support local authorities governing interconnection requirements in adopting the most current requirements for interconnecting distributed energy resources (DERs) to the electric distribution system, as specified in the Institute of Electrical and Electronics Engineers Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces (IEEE Std 1547-2018 ). To create interconnection rules that successfully address policy goals, market trends, and technical requirements, electric service regulators need to be well informed of DER integration considerations. Interconnection processes and technical issues often overlap; the two are not easily segregated, and they are often considered and evaluated concurrently within the context of interconnection rulemaking. Accordingly, this document addresses both the technical issues and related process considerations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

IEEE 123-Bus System A Matrix

System component matrix for IEEE 123 bus distribution system for dynamic simulations.

Sahu, Vibhuti [Oak Ridge National Laboratory] (ORC↗

Considerations for Distributed Energy Resource Integration in Puerto Rico: DOE Multi-Lab Grid Modeling Support for Puerto Rico; Analytical Support for Interconnection and IEEE Std 1547-2018 National Renewable Energy Laboratory (Task 3.0)

To ensure the sustainable long-term recovery of Puerto Rico's electric power grid from hurricanes María and Irma and to build capacity to manage future potential natural disasters in the most secure and resilient way, the U.S. Department of Energy (DOE) convened experts from multiple national laboratories to develop a comprehensive set of data, models, analytic tools, and studies, considering inputs from a wide variety of stakeholder groups, to support technically sound recommendations for Puerto Rico's energy investment decisions. A resilient electric grid is vital to Puerto Rico's security, economy, and way of life, and it will provide the foundation for essential services that people and businesses on the island rely on every day. This report shows progress for a grid modeling task under the DOE-sponsored project that is a collaboration among the National Renewable Energy Laboratory (NREL) and other national laboratories. In Phase 1 of the multilab effort to support Puerto Rico's recovery, NREL provided the utility company Puerto Rico Electric Power Authority (PREPA) recommendations for a new framework of interconnection standards to accelerate the integration of utility-scale, transmission-connected renewable electrical generation and energy storage that ensure cross-technology compatibility and enable high deployment levels without compromising grid reliably, safety, or security. This Phase 2 report focuses on the interconnection of distributed energy resources (DERs) to the electric distribution system in Puerto Rico. This report is intended to familiarize the reader with Puerto Rico's distribution infrastructure and operational practices and procedures that are relevant to DER interconnection. The report also provides considerations for streamlining the interconnection process given the expected increase in deployments resulting from Puerto Rico's renewable portfolio standard (RPS) goal of 100% renewables by 2050. Accordingly, the report identifies considerations and concerns associated with the increase in intermittent generation, strategies for DER interconnection best practices, and the potential use of the latest technological solutions identified in the latest revision of the Institute of Electrical and Electronics Engineers (IEEE) 1547-2018 interconnection standard.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Guide to Updating Interconnection Rules and Incorporating IEEE Standard 1547

The intent of this paper is to support local authorities in adopting the most current technical requirements for interconnecting distributed energy resources (DERs) to the electric distribution system as specified in the Institute of Electrical and Electronics Engineers Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces (IEEE Std 1547-2018). To create interconnection rules that successfully address policy goals, market trends, and technical requirements, state regulators need to be well informed of DER integration considerations. Interconnection processes and technical issues often overlap; the two are not easily segregated, and they are often considered and evaluated concurrently within the context of interconnection rulemaking. Accordingly, this paper addresses both the technical issues and related process considerations. A lack of uniform and transparent procedures for addressing interconnection rule changes can result in implementation issues or inefficiencies, such as unclear, lengthy, and complicated interconnection rules that can increase distributed generation "soft costs" (i.e., non-hardware costs). This can further delay the deployment of DERs and jeopardize time-constrained national and state policy goals, such as renewable energy targets, or limit participation in emerging techno-economic trends. Additionally, misconstructed interconnection rules are at risk of becoming mired in stakeholder conflicts. This guide addresses the concerns of electric service regulators from both the process and technical standpoints by presenting a structured, step-by-step approach to developing and updating existing interconnection rules. In this document, the process of developing and updating interconnection rules is subdivided into three steps: (1) determining the context (stakeholders and major drivers); (2) developing the rule, including updating technical requirements; and (3) maintaining and revising the rule over time.

14 SOLAR ENERGY↗

Interconnection of Distributed Energy Resources in the Indian Context: IEEE 1547-2018 Adaptation for Locally-Appropriate Grid Code Development

The rapid growth of distributed energy resources (DERs) in India and ambitious renewable energy goals set forth by the Indian government have created the need for appropriate distribution interconnection standards to ensure continued system stability, reliability, and resilience. Existing DER interconnection codes in India, at the time of publishing this report, lack many of the critical grid support functionalities for DERs which may protect bulk system stability, such as event ride-through provisions, frequency droop control, or appropriate trip thresholds given the increasing importance of distributed generation. The formal adoption of IEEE 1547-2018 by the Bureau of Indian Standards (BIS) marks a significant step towards achieving appropriate interconnection of DERs, though the implementation of such a standard must be accompanied with careful consideration of the current codes, regulations, and operation of the Indian power system. Studies on the performance of the functionalities within 1547-2018, which properly incorporate local operating conditions, can inform decisions related to the adoption and adaptation of the clauses present in the standard. This report outlines several of these key considerations for stakeholders and provides analyses illustrating the performance of grid support functionalities on typical Indian distribution feeders.

1547↗

Studying the Impact of Momentary Cessation of IBRs Compliant With IEEE Std. 2800-2022 on Transmission Line Protection Elements

This paper examines the impact of inverter-based resource (IBR) momentary cessation timing on transmission system protection relays. IEEE Std. 2800 mandates voltage ride-through, requiring IBRs to remain online during voltage disturbances. However, for severe voltage dips (|V| = 0.1 p.u.), the standard permits current blocking. In practice, vendors implement momentary cessation with varying delays, potentially affecting relay operation if IBRs cease too early. This article studies the impact of the time IBRs enter momentary cessation on transmission line protective relays. Using an electromagnetic transient (EMT) simulation, this study models IBR momentary cessation with tunable delays in a realistic transmission network. COMTRADE files generated from EMT simulations are analyzed in MATLAB using detailed protective relay models. Results indicate that IBRs must sustain operation for at least one cycle to ensure proper relay response; otherwise, relays may fail to oper- ate. These findings guide IBR vendors in optimizing momentary cessation settings to enhance transmission line protection.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The ac power line protection for an IEEE 587 Class B environment

The 587B series of protectors are unique, low clamping voltage transient suppressors to protect ac-powered equipment from the 6000V peak open-circuit voltage and 3000A short circuit current as defined in IEEE standard 587 for Category B transients. The devices, which incorporate multiple-stage solid-state protector components, were specifically designed to operate under multiple exposures to maximum threat levels in this severe environment. The output voltage peaks are limited to 350V under maximum threat conditions for a 120V ac power line, thus providing adequate protection to vulnerable electronic equipment. The principle of operation and test performance data is discussed.

Roehr, W. D.↗