Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “ICV”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

48 records · Page 3

Preliminary Assessment of Suomi-NPP VIIRS On-orbit Radiometric Performance

The Visible-Infrared Imaging Radiometer Suite (VIIRS) is a key instrument on-board the Suomi National Polar-orbiting Partnership (NPP) spacecraft that was launched on October 28th 2011. VIIRS was designed to provide moderate and imaging resolution of most of the globe twice daily. It is a wide-swath (3,040 km) cross-track scanning radiometer with spatial resolutions of 370.and 740 m at nadir for imaging and moderate bands, respectively. It has 22 spectral bands covering the spectrum between 0.412 11m and 12.01 11m, including 14 reflective solar bands (RSB), 7 thermal emissive bands (TEB), and 1 day-night band (ON B). VIIRS observations are used to generate 22 environmental data products (EORs). This paper will briefly describe NPP VIIRS calibration strategies performed by the independent government team, for the initial on-orbit Intensive Calibration and Validation (ICV) activities. In addition, this paper will provide an early assessment of the sensor on-orbit radiometric performance, such as the sensor signal to noise ratios (SNRs), dual gain transition verification, dynamic range and linearity, reflective bands calibration based on the solar diffuser (SO) and solar diffuser stability monitor (SOSM), and emissive bands calibration based on the on-board blackbody calibration (OBC). A comprehensive set of performance metrics generated during the pre-launch testing program will be compared to VIIRS on-orbit early performance, and a plan for future cal/val activities and performance enhancements will be presented.

Oudrari, Hassan↗

Initial Calibration Activities and Performance Assessments of NOAA-20 VIIRS

The second VIIRS instrument was launched on-board the NOAA-20 (formerly JPSS-1) satellite onNovember 18, 2017. It was designed and built with the same performance requirements as the first VIIRSon-board the S-NPP launched on October 28, 2011. Currently, the NOAA-20 is orbiting the Earth in thesame plane as the S-NPP but separated in time and space by 50 minutes. The VIIRS observations are made in22 spectral bands, including a day-night band (DNB) that cover wavelengths from visible to long-waveinfrared. The sensor's on-orbit calibration is provided by a set of on-board calibrators (OBCs), which includea solar diffuser (SD), a solar diffuser stability monitor (SDSM), and a blackbody (BB). After turn-on, theVIIRS instrument conducted a series of post-launch testing (PLT) and intensive calibration and validation(ICV) activities, including those performed via spacecraft maneuvers, designed to verify and establishinstrument on-orbit calibration performance baseline. This paper provides an overview of NOAA-20 VIIRSICV activities and an assessment of its initial on-orbit performance with a focus on several key calibrationparameters, such as the detector response (or gain), dynamic range, and signal-to-noise ratio (SNR). Variousissues identified and lessons learned from initial instrument operation and calibration are also discussed insupport of long-term monitoring (LTM) of NOAA-20 VIIRS calibration and data quality.

Calibration↗

Early Results From NOAA-21 (JPSS-2) VIIRS on-Orbit Calibration

Launched on November 10, 2022, the NOAA-21 (N-21) VIIRS has successfully completed its initial post-launch testing (PLT) and intensive calibration and validation (ICV) activities. It is now operated in its nominal configuration and characterized using measurements from its on-board calibrators (OBC) and lunar observations. In this paper, we provide a brief description of N-21 VIIRS on-orbit operation and calibration activities and present results derived from its early mission performance assessments, including examples of its OBC performance, spectral band responses, as well as detector signal to noise characteristics. As shown in this paper, the overall performance of N-21 VIIRS is better than that of its predecessor currently operated on the S-NPP and comparable to the one onboard the N-20, with an exception of relatively large changes in its SWIR band responses.

NOAA-21↗

Enrichment Assay Methods for a UF6 Cylinder Verification Station

International Atomic Energy Agency (IAEA) inspectors currently perform periodic inspections at uranium enrichment plants to verify UF6 cylinder enrichment declarations. Measurements are typically performed with handheld high-resolution sensors on a sampling of cylinders taken to be representative of the facility’s entire cylinder inventory. These enrichment assay methods interrogate only a small fraction of the total cylinder volume, and are time-consuming and expensive to execute for inspectors. Pacific Northwest National Laboratory (PNNL) is developing an unattended measurement system capable of automated enrichment measurements over the full volume of Type 30B and Type 48 cylinders. This Integrated Cylinder Verification System (ICVS) could be located at key measurement points to positively identify each cylinder, measure its mass and enrichment, store the collected data in a secure database, and maintain continuity of knowledge on measured cylinders until IAEA inspector arrival. The focus of this paper is the development of nondestructive assay (NDA) methods that combine “traditional” enrichment signatures (e.g. 185-keV emission from U-235) and more-penetrating “non-traditional” signatures (e.g. high-energy neutron-induced gamma rays spawned primarily from U-234 alpha emission) collected by medium-resolution gamma-ray spectrometers (i.e. sodium iodide or lanthanum bromide). The potential of these NDA methods for the automated assay of feed, tail and product cylinders is explored through MCNP modeling and with field measurements on a cylinder population ranging from 0.2% to 5% in U-235 enrichment.

safeguards↗

Installation and operation of GeoMelt{sup R} in container vitrification in NNL Central Lab active rig hall at Sellafield - 15328

Cleanup and subsequent immobilization of wastes on the UK's NDA estate brings major challenges. With the exception of HLW where vitrification is utilized for immobilization, cement is typically used in the management and immobilization of non-heat generating wastes. However some legacy feeds such as those containing reactive metals can be incompatible with cementation technologies, and the application of engineered cement encapsulating product to raw wastes increases wasteform volume. Cementation has also been developed to be compatible with the repository concept, which provides it with a level of protection from the environment. Potential delays in repository implementation and as yet to be determined repository waste form acceptance criteria for some wastes may require the duration of above ground storage of immobilized wastes to be extended with potential effect on the integrity of the wasteform. Vitrification is a treatment option which destroys organics and hazardous inorganics such as asbestos, reduces wasteform volume, and produces a robust leach resistant wasteform. Kurion's GeoMelt{sup R} In-container Vitrification (ICV){sup TM} is a vitrification process wherein the treatment vessel can serve as an interim-storage, transport, and final long-term storage vessel - thus negating the need to pour glass into a separate container, effectively leading to a much simpler system than traditional waste melters. The inherent volume reduction from vitrification results in a dense product with self-shielding properties, and the GeoMelt treatment process has been demonstrated to homogenize elemental metals and radionuclide contaminants of concern, eliminating hot spots and mitigating criticality concerns. All of which opens up alternatives strategies for storage and disposal. GeoMelt has been proven in the commercial and US DOE waste treatment environment with over 26,000 tonnes of hazardous waste treated to date (half of this radioactive). Kurion and the UK's National Nuclear Laboratory (NNL) plan to demonstrate its application to Sellafield radioactive wastes. A small (engineering) scale demonstrator is being installed in the active rig hall at NNL's Central Laboratory at Sellafield UK with a twofold mission; 1) demonstration of the vitrification of ILW/LLW, and 2) processing of smaller volume orphan wastes that currently have no treatment path. The NNL facility will allow the handling of uranium containing materials which form a substantial component of ILW currently stored on the Sellafield site. Accurate DFs across the melter and off gas system are often difficult to obtain using inactive materials at the low concentrations present in radioactive wastes. Installation in the NNL facility will allow trace quantities of active species such as Cs-137 and Tc-99 to be processed as part of a simulant ILW stream and monitoring will allow accurate decontamination factors (DFs) to be established to support future vitrification facility design. In addition to underpinning melter operation and obtaining DFs across the system, the facility will allow the processing of radioactive waste arisings of low activity which may either be typical of larger waste volumes or may present as orphans without a disposition route. In either case the melter facility will be able to vitrify these wastes into a form that will be suitable for interim storage and disposal. Among the feeds envisaged for processing will be asbestos from power stations, contaminated soils, feeds containing uranium metals, ponds solids, sludge, and miscellaneous active laboratory wastes. The NNL Central Lab capability will be used to analyze the active product to support disposal requirements whether through letters of compliance for the Geological Disposal Facility (GDF) or waste acceptance criteria for the Low Level Waste Repository (LLWR). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 76: US DOE Problematic Waste Streams and Policy Impacts

This panel provided an overview of DOE problematic waste streams including status and path forward. Potential policy implications that exist now and/or in the future were discussed. Topics included, greater-than-Class C low level waste, depleted uranium, and sodium waste. The panel also discussed potential treatment options for these wastes. As part of the introduction, Renee Echols welcomed the audience and went over a quick overview of what would be discussed on the panel. Theresa Kliczewski provided an overview of why this panel is relevant to US Department of Energy's Office of Environmental Management: there are problematic waste streams that still exist across the DOE cleanup complex. Theresa noted that the DOE EM Headquarters Office of Waste and Materials Management (EM-4.2), for which she is employed with, continues to work with the DOE cleanup sites on a path forward for these problematic waste streams. Presentations proposed include: 1 - Overview of Greater-Than-Class C Low-Level Radioactive Waste Disposal Path Forward (Theresa Kliczewski, US DOE EM (USA)); 2 - Status of Draft Supplemental Environmental Impact Statement for Disposition of Depleted Uranium Oxide Conversion Product Generated from DoE's Inventory of Depleted Uranium Hexafluoride (Jaffet Ferrer-Torres, US DOE (USA)); 3 - Problematic Waste Streams on the Oak Ridge Reservation (John Wrapp, UCOR (USA)); 4 - K Basin Sludge Removal (Ryan Covert, CH2M Hill PRC (USA)); 5 - Providing Technology Solutions for Treatment of Challenging Waste Streams (Tammy Monday, Perma-Fix Environmental Services (USA)); 6 - Treatment of Problematic Reactive Metal Waste Using the GeoMelt{sup R} In-Container Vitrification (ICV{sup TM}) Process (Ron Mitchell, Veolia Nuclear Solutions (USA))

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Thermal stress in degraded forests in the Brazilian Amazon Arc of Deforestation

Understanding thermal stress in tropical forests has taken on new urgency in light of accelerating climate change and expansion of deforestation and forest degradation. Degraded tropical forests in particular may be approaching critical temperature thresholds even more rapidly than intact forests, with implications for tree survival and ecosystem recovery. We investigate thermal stress in degraded tropical forests within the Brazilian Amazon Arc of Deforestation. Using land surface temperature data from the ECOsystem Spaceborne Thermal Radiometer Experiment on the international Space Station (ECOSTRESS), we compared canopy temperatures of intact, selectively logged, and burned forests in Feliz Natal, Mato Grosso, Brazil. Upper canopy temperatures in previously burned forests were 4.1% higher (mean = 36.5 °C) and 50.9% more variable compared to intact and logged forests, which showed remarkably similar temperature distributions (means of 34.9 °C and 35.1 °C, respectively). Modeled leaf temperature distributions based on canopy temperature measurements from one of the warmest days in a 2 year dry season record indicated that 87% of leaves in the warmest burned forest patches exceeded the temperature threshold where respiration surpasses photosynthesis, compared to approximately 72%–74% in intact and logged forests, respectively, in the same time period. After controlling for environmental factors, burned forests were predicted to be 2.6 °C warmer on average [1.39 °C–3.96 °C, 95% credible interval] than intact forests across a 5–40 m canopy height range. Burned forests showed modest thermal recovery over time, with temperatures decreasing by approximately 1.2 °C over a 30 year recovery period. In contrast, logged forests showed minimal thermal differences from intact forests (−0.353 on average, [−1.125–0.274, 95% credible interval]) and negligible change (0.15 °C) over the same timeframe. While the absolute probabilities of exceeding damaging thermal thresholds remain low across all forest types under current climate conditions, the probability of leaves exceeding temperatures that cause permanent leaf damage was ten times higher in burned forests, with implications for the future of burned forest regeneration in water-limited regions of the Amazon basin. In particular, the combination of higher mean temperatures, greater temperature variability, and more frequent exposure to damaging thermal thresholds implies that burned tropical forests will experience substantially higher mortality rates and slower biomass recovery compared to intact and selectively logged forests, especially in water-limited regions where trees cannot rely on evaporative cooling to moderate canopy temperatures.

Brazilian Amazon Arc of Deforestation↗

CH Packaging Operations Manual

This document provides the user with instructions for assembling a payload. All the steps in Subsections 1.2, Preparing 55-Gallon Drum Payload Assembly; 1.3, Preparing "Short" 85-Gallon Drum Payload Assembly (TRUPACT-II and HalfPACT); 1.4, Preparing "Tall" 85-Gallon Drum Payload Assembly (HalfPACT only); 1.5, Preparing 100-Gallon Drum Payload Assembly; 1.6, Preparing Shielded Container Payload Assembly; 1.7, Preparing SWB Payload Assembly; and 1.8, Preparing TDOP Payload Assembly, must be completed, but may be performed in any order as long as radiological control steps are not bypassed. Transport trailer operations, package loading and unloading from transport trailers, hoisting and rigging activities such as ACGLF operations, equipment checkout and shutdown, and component inspection activities must be performed, but may be performed in any order and in parallel with other activities as long as radiological control steps are not bypassed. Steps involving OCA/ICV lid removal/installation and payload removal/loading may be performed in parallel if there are multiple operators working on the same packaging. Steps involving removal/installation of OCV/ICV upper and lower main O-rings must be performed in sequence, except as noted.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CH Packaging Operations Manual (Rev. 10)

This document provides the user with instructions for assembling a payload. All the steps in Subsections 1.2, Preparing 55-Gallon Drum Payload Assembly; 1.3, Preparing "Short" 85-Gallon Drum Payload Assembly (TRUPACT-II and HalfPACT); 1.4, Preparing "Tall" 85-Gallon Drum Payload Assembly (HalfPACT only); 1.5, Preparing 100-Gallon Drum Payload Assembly; 1.6, Preparing Shielded Container Payload Assembly; 1.7, Preparing SWB Payload Assembly; and 1.8, Preparing TDOP Payload Assembly, must be completed, but may be performed in any order as long as radiological control steps are not bypassed. Transport trailer operations, package loading and unloading from transport trailers, hoisting and rigging activities such as ACGLF operations, equipment checkout and shutdown, and component inspection activities must be performed, but may be performed in any order and in parallel with other activities as long as radiological control steps are not bypassed. Steps involving OCA/ICV lid removal/installation and payload removal/loading may be performed in parallel if there are multiple operators working on the same packaging. Steps involving removal/installation of OCV/ICV upper and lower main O-rings must be performed in sequence, except as noted.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CH Packaging Operations Manual (Rev. 10.1)

This document provides the user with instructions for assembling a payload. All the steps in Subsections 1.2, Preparing 55-Gallon Drum Payload Assembly; 1.3, Preparing "Short" 85-Gallon Drum Payload Assembly (TRUPACT-II and HalfPACT); 1.4, Preparing "Tall" 85-Gallon Drum Payload Assembly (HalfPACT only); 1.5, Preparing 100-Gallon Drum Payload Assembly; 1.6, Preparing Shielded Container Payload Assembly; 1.7, Preparing SWB Payload Assembly; and 1.8, Preparing TDOP Payload Assembly, must be completed, but may be performed in any order as long as radiological control steps are not bypassed. Transport trailer operations, package loading and unloading from transport trailers, hoisting and rigging activities such as ACGLF operations, equipment checkout and shutdown, and component inspection activities must be performed, but may be performed in any order and in parallel with other activities as long as radiological control steps are not bypassed. Steps involving OCA/ICV lid removal/installation and payload removal/loading may be performed in parallel if there are multiple operators working on the same packaging. Steps involving removal/installation of OCV/ICV upper and lower main O-rings must be performed in sequence, except as noted.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CNS 10-160B RH Cask Program Guidance (Rev. 2)

The purpose of this document is to provide guidelines and to define responsibilities for use, operation, inspection, and maintenance of the 10-160B cask and directly related components used for shipments of DOE controlled TRU waste. This document complies with the minimum requirements specified in the Safety Analysis Report (SAR) for Model 10-160B Type B Radwaste Shipping Cask and U.S. Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9204. In the event of a conflict between this document and the SAR or C of C, the C of C shall govern.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Supplemental Systems for Unattended UF6 Cylinder Monitoring

Cylinder assay and mass measurements, the mainstay of enrichment plant verification efforts have historically been performed by International Atomic Energy Agency (IAEA) inspectors using portable equipment. For the sake of efficiency, accuracy, and timeliness, such equipment is being supplanted by unattended measurement stations. Ancillary systems must be employed with such stations to ensure that measured parameters are properly recorded, cylinders are positively identified, operations occur according to procedure, and no tampering takes place in the inspectors’ absence. Depending on the facility, it may prove feasible to track cylinders from the measurement vicinity to their storage locations using surveillance. This paper will provide a cursory description of the various subsystems associated with Pacific Northwest National Laboratory’s Integrated Cylinder Verification Station and how inattention to the requirements of such systems could seriously diminish the capability of the integrated whole.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗