Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “General Electric”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Acoustically treated ground test nacelle for the General Electric TF34 turbofan

A description is given of the ground test quiet nacelle for the TF34 engine. The suppression treatment consists of cylindrical splitters in the inlet and fan exhaust ducts plus duct wall treatment and core exhaust wall treatment. Aerodynamic design analysis of the inlet and exhaust ducts and overall engine performance with pressure losses from the acoustic treatment is included. The objectives of the test program are to obtain noise data for a heavily suppressed high bypass turbofan with various arrangements of exhaust systems and acoustic treatment, and to provide a basis for the power plants of the Quiet Experimental STOL Aircraft (Questol).

Edkins, D. P.↗

Evaluation program for secondary spacecraft cells: Initial evaluation tests of General Electric Company 6.0 ampere hour nickel-cadmium spacecraft cells with auxiliary electrodes for the atmospheric Explorer satellite C and D

The capacity of the cells ranged from 6.6 to 7.6 ampere hours during the three capacity tests. No voltage requirements or limits were exceeded during any portion of the test. All cells recovered to a voltage in excess of 1.193 volts during the 24-hour open-circuit portion of the internal short test. All the cells reached a pressure of 20 psia before reaching the voltage limit of 1.550 volts during the pressure versus capacity test. The average ampere/hours in and voltages at this pressure were 9.1 and 1.513, respectively. All cells exhibited pressure decay in the range of 1 to 5 psia during the last 30 minutes of the 1-hour open circuit stand. Average capacity out was 7.2 ampere/hours.

Harkness, J. D.↗

Evaluation program for secondary spacecraft cells. Initial evaluation tests of General Electric Company standard and teflonated negative electrode 20.0 ampere-hour, nickel-cadmium spacecraft cells with auxiliary electrodes

The standard plate cells exhibited higher average end-of-charge (EOC) voltages than the cells with teflonated negative plates; they also delivered a higher capacity output in ampere hours following these charges. All the cells reached a pressure of 20 psia before reaching the voltage limit of 1.550 volts during the pressure versus capacity test. The average ampere hours in and voltages at this pressure were 33.6 and 1.505 volts respectively for the teflonated negative plate cells and 35.5 and 1.523 volts for the standard plate cells. All cells exhibited pressure decay in the range of 1 to 7 psia during the last 30 minutes of the 1-hour open circuit stand. Average capacity out for the teflonated and standard negative plate cells was 29.4 and 29.9 ampere hours respectively.

Source record↗

Evaluation program for secondary spacecraft cells: Initial evaluation tests of General Electric Company 6.0 ampere-hour nickel-cadmium spacecraft cells for the Improved Tiros Operational Satellite (ITOS)

Quality control measures for Ni-Cd spacecraft cells were analyzed. Cells were examined for electrolyte leakage, internal shorts, low capacity, or inability of any cell to recover its open circuit voltage above 1.50 volts during the internal short test. Test results are given in tabular form.

Harkness, J. D.↗

Energy Conversion Alternatives Study (ECAS), General Electric Phase 1. Volume 1: Executive summary

A data base for the comparison of advanced energy conversion systems for utility applications using coal or coal-derived fuels was developed. Estimates of power plant performance (efficiency), capital cost, cost of electricity, natural resource requirements, and environmental intrusion characteristics were made for ten advanced conversion systems. Emphasis was on the energy conversion system in the context of a base loaded utility power plant. All power plant concepts were premised on meeting emission standard requirements. A steam power plant (3500 psig, 1000 F) with a conventional coal-burning furnace-boiler was analyzed as a basis for comparison. Combined cycle gas/steam turbine system results indicated competitive efficiency and a lower cost of electricity compared to the reference steam plant. The Open-Cycle MHD system results indicated the potential for significantly higher efficiency than the reference steam plant but with a higher cost of electricity.

Corman, J. C.↗

Energy Conversion Alternatives Study (ECAS), General Electric Phase 1. Volume 2: Advanced energy conversion systems. Part 1: Open-cycle gas turbines

Ten energy conversion systems are defined and analyzed in terms of efficiency. These include: open-cycle gas turbine recuperative; open-cycle gas turbine; closed-cycle gas turbine; supercritical CO2 cycle; advanced steam cycle; liquid metal topping cycle; open-cycle MHD; closed-cycle inert gas MHD; closed-cycle liquid metal MHD; and fuel cells. Results are presented.

Brown, D. H.↗

Energy Conversion Alternatives Study (ECAS), General Electric Phase 1. Volume 3: Energy conversion subsystems and components. Part 3: Gasification, process fuels, and balance of plant

Results are presented of an investigation of gasification and clean fuels from coal. Factors discussed include: coal and coal transportation costs; clean liquid and gas fuel process efficiencies and costs; and cost, performance, and environmental intrusion elements of the integrated low-Btu coal gasification system. Cost estimates for the balance-of-plant requirements associated with advanced energy conversion systems utilizing coal or coal-derived fuels are included.

Boothe, W. A.↗

Evaluation program for secondary spacecraft cells: Initial evaluation tests of General Electric Company 12.0 ampere-hour nickel-cadmium spacecraft cells for the international ultraviolet explorer

An evaluation test program was conducted to insure that all cells put into the life cycle program are of high quality by the screening of cells found to have electrolyte leakage, internal shorts, low capacity, or inability of any cell to recover its open-circuit voltage above 1.150 volts during the internal short test. The 20 cells were manufactured for the National Aeronautics and Space Administration, Goddard Space Flight Center (GSFC). The cells are from a lot of 175 cells procured for the International Ultraviolet Explorer project. Due to a change in requirements, the project selected to use 6.0 ampere-hour cells. Therefore, the remaining cells of this lot have been placed in storage at GSFC for use on a future GSFC project. All the cells are rated at 12.0 ampere-hours and contain double ceramic seals. Test limits specify those values in which a cell is to be terminated from a particular charge or discharge. Requirements are referred to as normally expected values based on past performance of aerospace nickel cadmium cells with demonstrated life characteristics.

Harkness, J. D.↗

Initial evaluation tests of General Electric Company 26.5 ampere-hour nickel-cadmium spacecraft cells with auxiliary electrodes for the TIROS-N and NOAA-A satellites

This evaluation test program had the purpose to insure that all cells put into the life cycle program are of high quality by the screening of cells found to have electrolyte leakage, internal shorts, low capacity, or inability of any cell to recover its open-circuit voltage above 1.150 volts during the internal short test. Test limits specify those values at which a cell is to be terminated from charge or discharge. Requirements are referenced to as normally expected values based on past performance of aerospace nickel-cadmium cells with demonstrated life characteristics. A requirement does not constitute a limit for discontinuance from test.

Harkness, J. D.↗