Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “GASKETS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

O-ring gasket test fixture

An apparatus is presented for testing O-ring gaskets under a variety of temperature, pressure, and dynamic loading conditions. Specifically, this apparatus has the ability to simulate a dynamic loading condition where the sealing surface in contact with the O-ring moves both away from and axially along the face of the O-ring.

Turner, James Eric↗

Indium Foil Serves As Thermally Conductive Gasket

Indium foil found useful as gasket to increase thermal conductance between bodies clamped together. Deforms to fill imperfections on mating surfaces. Used where maximum temperature in joint less than melting temperature of indium. Because of low melting temperature of indium, most useful in cryogenic applications.

Eastman, G. Yale↗

Investigation of Bolt Preload Relaxation for JWST Thermal Heat Strap Assembly Joints with Aluminum-1100 and Indium Gaskets

Accurately predicting fastener preload relaxation in the James Webb Space Telescope (JWST) heat strap assemblies is essential to insure adequate thermal performance during its mission lifecycle. The mechanisms for preload relaxation in the strap joints include Al-1100 material creep, indium gasket flow-out, and embedment of the joint faying surfaces. This report documents the results from a bolted joint relaxation test, including analysis and curve fitting of the test data for predicting preloads five years after initial torque application. The report also includes the derivation of a preload uncertainty factor enveloping both torque/preload application scatter and expected preload relaxation at the end of mission life.

Joint↗

Investigation of Bolt Preload Relaxation for JWST Thermal Heat Strap Assembly Joints with Aluminum-1100 and Indium Gaskets

Accurately predicting fastener preload relaxation in the James Webb Space Telescope (JWST) heat strap assemblies is essential to insure adequate thermal performance during its mission lifecycle. The mechanisms for preload relaxation in the strap joints include Al-1100 material creep, indium gasket flow-out, and embedment of the joint faying surfaces. This report documents the results from a bolted joint relaxation test, including analysis and curve fitting of the test data for predicting preloads five years after initial torque application. The report also includes the derivation of a preload uncertainty factor enveloping both torque/preload application scatter and expected preload relaxation at the end of mission life.

Preload↗

NCO-5 Technician Cuts Finger while Cutting Gasket Material

As part of the ADPSM Safety Improvement Plan, the WSST has established a subcommittee for a Learning Team. The purpose of a Learning Team is to transfer and communicate the information into operational feedback and improvement. We want to pay attention to the small things that go wrong because they are often early warning signals and may provide insight into the health of the whole system.

99 GENERAL AND MISCELLANEOUS↗

A novel means to generate high pressure

Diamond anvil cells are the most popular means of generating pressures above 2 GPa. However, in many experiments, such as nuclear magnetic resonance and x-ray absorption, the metallic pressurizing gasket (which confines much of the sample) represents an occluding barrier that requires a low Z gasket material (e.g., Be), a split gasket, or other means to enable better coupling of the sample to electromagnetic radiation. In this paper, we demonstrate a novel method for generating high pressures that confines the sample just above the plane of the gasket by using a diamond with a laser hole drilled into the center of the tip. The sample is then confined by the hole, which is sealed by a flat gasket that fits over the hole. When load is applied to the diamonds, metal flows from the deformed gasket into the hole thereby pressurizing the sample similarly to how a piston pressurizes gas inside a cylinder. The pressurized sample is above the metallic gasket plane just inside the tip of the diamond, and thus easily accessible via x rays or visible light that skims just above the plane of the gasket providing an enhanced aperture of radiation collection. Furthermore, we have demonstrated the utility of this method by obtaining Raman spectra of SnC 2 O 4 and x-ray diffraction spectra of seleno-DL-cystine, all at high pressures.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Mechanical seal with high pressure high temperature secondary seal

A secondary seal of a mechanical seal comprises an annular sealing gasket and backing plate surrounding a cylindrical sealing surface, all of which can be made of the same metallic material. The gasket is C-shaped in cross section, and is axially pressed during operation into a C-shaped groove formed in the backing plate, the groove being shallower and larger in inner diameter than the gasket, so that the gasket, when pressed into the groove, deforms radially inward and seals against both the backing plate and the sealing surface. The contact area between the gasket and sealing surface increases with pressure. In embodiments, when the pressure is released, the gasket retracts from the sealing surface, allowing easy disassembly and allowing axial movement of the gasket and backing plate. Highly polished surfaces of the gasket and sealing surface can allow axial motion thereof during operation to maintain the seal face gap.

42 ENGINEERING↗

Electronic connector sealing system

An electronic sealing system for sealing and shielding an electronic connector from detrimental liquid cleaners that are applied with or without pressure. The electronic sealing system includes a U-shaped holder, a gasket frame, a gasket, a top plate, and several fasteners. The U-shaped holder cradles the electronic connector. The gasket frame abuts a top side of the holder and includes an aperture. The gasket engages a portion of the connector via the aperture. The top plate abuts the gasket frame opposite the holder so as to encapsulate the gasket over the aperture and hence over a portion of the electronic connector. The fasteners secure the U-shaped holder, gasket frame, and top plate together so that the electronic connector is secured with the holder and so that a portion of the electronic connector is sealed via the gasket.

42 ENGINEERING↗