Remote Manipulator System (RMS)-based Controls-Structures Interaction (CSI) flight experiment feasibility study

The feasibility of an experiment which will provide an on-orbit validation of Controls-Structures Interaction (CSI) technology, was investigated. The experiment will demonstrate the on-orbit characterization and flexible-body control of large flexible structure dynamics using the shuttle Remote Manipulator System (RMS) with an attached payload as a test article. By utilizing existing hardware as well as establishing integration, operation and safety algorithms, techniques and procedures, the experiment will minimize the costs and risks of implementing a flight experiment. The experiment will also offer spin-off enhancement to both the Shuttle RMS (SRMS) and the Space Station RMS (SSRMS).

Demeo, Martha E.↗

A tidal wind model for 85-120 km based on CIRA-86 - A feasibility study

The feasibility of deriving a climatology of the diurnal variations of the wind in the 85-120 km region from the tidal components of density, temperature and composition contained in the new COSPAR CIRA-86 is examined. The CIRA density and temperature model is employed to derive the eastward and northward pressure gradient forces that serve as the forcing functions in the coupled momentum equations. At midlatitudes, the model shows some of the general features observed in the radar tidal data, e.g., the dominant semidiurnal tide with increasing amplitude with height and clockwise (counterclockwise) rotation of the velocity vector seen in the Northern (Southern) Hemisphere.

Fleming, E. L.↗

Feasibility Study for Battle Mountain Renewable Energy Park

The Feasibility Study for the Battle Mountain Renewable Energy Park project (“Feasibility Study”) will assess the feasibility, benefits and impacts of a 5 Mega Watt (MW) solar photovoltaic (PV) generating system (the “Solar Project” or “Energy Park”) on the Te-Moak Tribe of Western Shoshone Indians of Nevada Battle Mountain Colony in Battle Mountain, Nevada (NV). The Energy Park will provide power for export to utility off-takers and job training and employment for Tribal members and revenue for the Tribe. This Feasibility Study will be a collaborative effort between the Tribal government, consultants, Tribal members and stakeholders and will allow the Tribe to make informed decisions regarding the Solar Project.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Net-zero Microgrid Program Report: Microrred de la Montaña Feasibility Study (Executive Summary Extended)

This feasibility study provides the technical and economic rationale for the Microrred de la Montaña as a viable solution for supplying reliable and resilient electricity to an underserved region in Puerto Rico – a region that is the first to be disconnected from the grid and the last to be restored, enduring months long outages. It begins the process of the development of the microgrid through conceptual design, engineering, detailed electrical design, implementation, and operation. The Microrred de la Montaña is organized under the governance of the Cooperativa Hidroeléctrica de la Montaña (Cooperativa) which has legal status as a cooperative and power provider under the laws of Puerto Rico. The members are the municipalities of Adjuntas, Jayuya, Lares and Utuado with a combined population of 90,000. These municipalities are in central Puerto Rico – a mountainous region that is extremely vulnerable to weather events and excessive, long-duration power outages and are among the poorest and most disadvantaged regions in Puerto Rico. Funding from external sources is necessary to acquire the resources for a resilient power delivery system. Regulatory support is necessary to establish operational relationships with the incumbent power providers. The Microrred de la Montaña is envisioned as a resilient microgrid that manages distributed energy resources – local solar, storage, and hydroelectricity over an upgraded distribution network within the boundaries of four municipalities. This feasibility study provides the results of an extensive techno-economic analysis to form a sound basis for decision-making by community leaders, their constituents, funding and investment agencies, and regulators to realize the benefits that are achievable by fully implementing the design and planning recommended for the Microrred de la Montaña.

13 HYDRO ENERGY↗

Ion-optical and Associated Magnet Feasibility Study of a High Rigidity Spectrometer

Ion-optical and magnet-feasibility studies were performed for the High Rigidity Spectrometer (HRS) at the Facility for Rare Isotope Beam (FRIB). The High Rigidity Spectrometer (HRS) will be the centerpiece experimental tool of the Facility for Rare-Isotope Beams (FRIB) fast-beam program The high magnetic rigidity of the HRS (8 Tm) will match the rigidities at which rare-isotope production yields at the FRIB fragment separator are maximum across the entire chart of nuclei and enable experiments with the most neutron-rich nuclei available at FRIB. Gain factors in luminosity of up to two orders of magnitude are achievable compared to running with existing spectrometers, which have a maximum rigidity of 4 Tm. The ion-optical studies were performed to ensure that the layout and properties meet the requirements for the scientific program envisioned for and articulated by the FRIB user community. Based on the ion-optical studies, magnet-feasibility studies were carried out to ensure that the magnets required for the HRS meet these requirements and can be constructed. The results of the ion-optical and magnet-feasibility studies form the basis of the pre-conceptual design for the HRS.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Geosynchronous Microwave Atmospheric Sounding Radiometer (MASR) antenna feasibility study. Volume 3: Antenna feasibility

Antenna systems capable of operating with a multichannel microwave radiometer intended for mapping severe storm activity over patches on the surface of the earth 750 km square were compared. These systems included a paraboloidal reflector with an offset focal point feed, and a symmetrical Cassegrain reflector system. Both systems are acceptable from the point of view of beam efficiency, however, from the point of view of maintaining the required positional accuracies and surface tolerances, as well as from the point of view of manufacturability, cost effectiveness, and technical risk, the symmetrical Casegrain was selected as the preferred configuration. Performance characteristics were calculated and a mechanical design study was conducted to provide estimates of the technical risk, costs, and development time required for the construction of such an antenna system.

Villeneuve, A. T.↗

PUEBLO OF ZIA RENEWABLE ENERGY DEVELOPMENT FEASIBILITY STUDY

The Pueblo of Zia will conduct a comprehensive feasibility study for best-use application(s) for development of renewable energy resources on its tribally held TRUST lands (i.e., Trust Lands of Zia Indian Reservation). The feasibility study is essential for determining the technical and economic viability of a future renewable project(s) on Zia tribal lands, including the potential economic and environmental benefits for the Tribe. Project Objectives: The feasibility study is essential for determining the technical and economic viability of future renewable project(s) on Zia tribal lands, including the potential economic and environmental benefits for the Tribe to: 1. Provide a balanced local renewable power supply for Zia Pueblo, its members, tribal offices, schools and buildings, and businesses on tribal lands 2. Provide a firm power supply for export and commercial market distribution 3. Provide economic development for the Tribe and its members, including job training and creation, each in accordance with the goals and objectives as conveyed by the Pueblo of Zia Tribal Council, Tribal Administration, and outlined in The Pueblo of Zia Comprehensive Plan and Pueblo of Zia — Zia Enterprise Zone Master Plan. A key goal of the study is to analyze the integrated development of solar, geothermal, and wind renewable energy resources at Zia Pueblo, with added potential to combine gas-fired generation to accomplish energy firming. Geothermal offers a base load source of energy, providing power continuously for end users. Wind and solar offer intermediate and peaking sources of energy, which can be harvested throughout the day, with periods of variable but predicable output. Variability will be managed in an integrated manner, using Zia Pueblo's combined renewable resources to generate high-quality power. Tasks are intended to collect, catalog, map, and analyze existing data on Zia Pueblo's renewable energy resource base and then match resource attributes with the most suitable renewable technologies for tribal energy consumption and needs. Also, key impacts on cultural and social values of Zia Pueblo will be addressed. Selected most favorable uses and technologies will be further investigated to determine initial feasibility and market for business development for up to six sites located on tribal land. The anticipated result will be the recommended development of sites that have sufficient background study completed to warrant a business plan, detailed engineering feasibility, and acquisition of project financing. Valuable technical and economic information will accrue from this study that may be applied to scale up or down the various power technology potential on Zia Pueblo for maximum benefit and best area(s) of application, project phasing and potential for future replicability and expansion.

14 SOLAR ENERGY↗

A hingeless rotor XV-15 design integration feasibility study. Volume 1: Engineering design studies

A design integration feasibility study was carried out to investigate what modifications to the basic XV-15 were necessary to accomplish a flight demonstration of the XV-15 with a Boeing hingeless rotor. Also investigated were additional modifications which would exploit the full capability provided by the combination of the new rotor and the existing T53 engine. An evaluation of the aircraft is presented and the data indicate improved air vehicle performance, acceptable aeroelastic margins, lower noise levels and improved flying qualities compared with the XV-15 aircraft. Inspection of the rotor system data provided shows an essentially unlimited life rotor for the flight spectrum anticipated for the XV-15.

Magee, J. P.↗

Nebraska Integrated Carbon Capture and Storage Pre-Feasibility Study

In collaboration with the Nebraska Public Power District (NPPD), the Energy & Environmental Research Center (EERC) has conducted a pre-feasibility study for a commercial-scale carbon dioxide (CO 2 ) geologic storage complex in western Nebraska integrated with potential CO 2 capture at Gerald Gentleman Station (GGS). GGS is the largest coal-fired electricity-generating station in Nebraska, emitting 8.5 million metric tons (Mt) of CO 2 annually, and is located near the town of Sutherland. This pre-feasibility (Phase 1) project has been executed as part of the U.S. Department of Energy (DOE) CarbonSAFE program, a multiphase initiative to support the deployment of large-scale carbon capture and storage (CCS) projects. Each CarbonSAFE project is required to demonstrate the potential to capture and store at least 50 million tonnes (Mt) of CO 2 over a 25-year operational period. The EERC and NPPD established a coordination team to identify challenges to a potential Nebraska CCS project, comprising local stakeholder organizations, which met twice in Lincoln and via several Webinars, providing feedback and guidance throughout the pre-feasibility study. The EERC also secured the technical support of Schlumberger Carbon Services and Computer Modelling Group Ltd. (CMG). The project comprised four technical themes, all using published information sources. Regional and stakeholder analysis, including identification of sensitive environmental areas, potential resource conflicts, and strategies for public outreach. A review of geographic and socioeconomic characteristics, in combination with geologic characterization in the subbasinal analysis described below, identified an area to the southwest and within a 75-mile radius of GGS as the most prospective for development of a storage site. This area largely avoided lands with protected status such as wetlands. A public outreach plan has also been developed for implementation in any further phases of CCS assessment in western Nebraska, for example a CarbonSAFE Phase 2 feasibility study. Scenario analysis, addressing economic and regulatory factors. GGS is the only single major source of CO 2 emissions capable of satisfying the CarbonSAFE 50-Mt scale requirement within the study region. Chemical absorption using amines was identified as the most viable technology for postcombustion CO 2 capture at GGS. The total cost of a CCS project at GGS was estimated to be between $67/tonne CO 2 for capture and auxiliary boiler to minimize parasitic load and $70/tonne CO 2 avoided cost, using the Carnegie-Mellon University Integrated Environmental Control Model (IECM). The total avoided cost included the capture facility and parasitic load, a flue gas desulfurization plant required for the use of amine solvent technology, transport via pipeline, and dedicated storage infrastructure. Nebraska has no legislation in place to address typical CCS-specific issues, for example pore space ownership for storage. Long-term liability, therefore, falls under the U.S. Environmental Protection Agency Underground Injection Control (UIC) Class 6 program regulations. Subbasinal analysis, addressing the potential for a dedicated subsurface “container” to store the required 50-Mt quantity of CO 2 . Modeling and simulation studies identified an area to the southwest of GGS with the potential for storage of 50 Mt CO 2 in the Cloverly Formation, comprising sandstones with interbedded and intermingled shales. The area of review (AOR) that would be required for monitoring under a Class VI operating permit was estimated to be as high as 400–700 square miles, due to uncertain pressure effects. The viability of this storage option is subject to significant uncertainty due to the relatively limited amount of existing characterization data available to the pre-feasibility study; for example, dynamic simulation indicated that the proposed storage rate might require as little as two or as many as 14 injection wells. A key uncertainty is the relative proportion and distribution of sandstone and shale within the Cloverly Formation. A preliminary, semiquantitative risk assessment also suggested uncertainty over storage capacity and injectivity constitute the most significant project risks at this pre-feasibility stage. No assessed risks were considered to rule out the possibility of a project moving to deployment. National Risk Assessment Partnership (NRAP) validation, using software tools developed by the National Energy Technology Laboratory (NETL) to assess risks associated with the potential 50-Mt CO 2 storage complex. NRAP tools were used to assess hypothetical leakage scenarios. Results broadly supported the conclusion of the semiquantitative risk analysis – for example, even worst-case analysis of theoretical leakage scenarios found limited migration rates and impacts. In summary, the work undertaken in this Phase 1 pre-feasibility study has shown that western Nebraska has potential to host a commercial-scale CCS project, including a dedicated storage “container” for 50 Mt of CO 2 . However, the following key challenges would need to be overcome: The business case for deploying CCS projects is uncertain; recently announced federal tax credits and sales of CO 2 for enhanced oil recovery may not cover the full costs of a CCS project at GGS, as estimated by this pre-feasibility study. The potential 50-Mt CO 2 dedicated storage container defined in this pre-feasibility study should be regarded as having a relatively low level of readiness to support a CCS project. Public outreach would be a vital element in western Nebraska, where sensitivities around such environmental issues as water resource protection and pipeline construction would need to be carefully addressed.

54 ENVIRONMENTAL SCIENCES↗

SU-E-T-267: Proton Pencil Beam Scanning for Mediastinal Lymphoma: 4-Dimensional Feasibility Study

Purpose: To assess the feasibility of proton pencil beam scanning (PBS) for the treatment of mediastinal lymphoma. Methods: A group of 6 patients were planned using an anterior field with PBS. Spots with ∼5 mm σ were used for all patients, while large spots (∼10 mm σ) were employed for patients with motion perpendicular to the beam (≥5 mm). We considered volumetric repainting such that, in each fraction, the same field would be delivered twice. Four-dimensional dose was calculated on initial and verification 4-dimensional computed tomography (4D-CT) scans (2—3) based on respiratory trace and beam delivery sequence. This was implemented by binning the spots into separate plans on each 4D-CT phase respectively. Four starting phases were sampled for each painting and 4 energy switching times (0.5 s, 1 s, 3 s, and 5 s) were tested, resulting in 2560 dose distributions for the cohort. Plan robustness was measured for target and critical structures in terms of the percentage difference between delivered dose and planned dose. Results: For 5 of the 6 patients, the ITV (internal target volume) D 98% was degraded by <3% (standard deviations ∼ 0.1%) when averaged over the whole course (up to 5% per fraction). Deviations of mean lung dose, heart maximum dose, and cord maximum dose were within 5% of prescribed dose. For one patient with motion perpendicular to the beam (up to 5 mm), the degradation of ITV D 98% was 9% over the whole course (12% per fraction), which was mitigated to 1% (3% per fraction) by employing large spots and repainting. No significant difference in coverage was observed for different energy switching times. Conclusion: This feasibility study demonstrates that, for mediastinal lymphoma, the PBS plan robustness can be maintained during delivery when target motion is measured and volumetric repainting and/or large spots are employed. This work was supported by Ion Beam Application.

60 APPLIED LIFE SCIENCES↗

Feasibility study for convertible engine torque converter

The feasibility study has shown that a dump/fill type torque converter has excellent potential for the convertible fan/shaft engine. The torque converter space requirement permits internal housing within the normal flow path of a turbofan engine at acceptable engine weight. The unit permits operating the engine in the turboshaft mode by decoupling the fan. To convert to turbofan mode, the torque converter overdrive capability bring the fan speed up to the power turbine speed to permit engagement of a mechanical lockup device when the shaft speed are synchronized. The conversion to turbofan mode can be made without drop of power turbine speed in less than 10 sec. Total thrust delivered to the aircraft by the proprotor, fan, and engine during tansient can be controlled to prevent loss of air speed or altitude. Heat rejection to the oil is low, and additional oil cooling capacity is not required. The turbofan engine aerodynamic design is basically uncompromised by convertibility and allows proper fan design for quiet and efficient cruise operation. Although the results of the feasibility study are exceedingly encouraging, it must be noted that they are based on extrapolation of limited existing data on torque converters. A component test program with three trial torque converter designs and concurrent computer modeling for fluid flow, stress, and dynamics, updated with test results from each unit, is recommended.

Source record↗

Ute Mountain Ute Tribe Community-Scale Solar Feasibility Study

Parametrix Inc. conducted a feasibility study for the Ute Mountain Ute Tribe to determine whether or not a community-scale solar farm would be feasible for the community. The important part of the study was to find where the best fit for the solar farm could be In the end, a 3MW community-scale solar farm was found best fit with the location of two hayfield sites.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Washoe Tribe Alternative Energy Feasibility Study Final Report

The Washoe Tribe of Nevada and California was awarded funding to complete the Washoe Tribe Alternative Energy Feasibility Study project. The main goal of the project was to complete an alternative energy feasibility study. This study was completed to evaluate “the potential for development of a variety of renewable energy projects and to conduct an alternative energy feasibility study that determines which alternative energy resources have the greatest economic opportunity for the Tribe, while respecting cultural and environmental values” (Baker-Tilly, 2014). The study concluded that distributed generation solar projects are the best option for renewable energy development and asset ownership for the Washoe Tribe. Concentrating solar projects, utility scale wind projects, geothermal, and biomass resource projects were also evaluated during the study and it was determined that these alternatives would not be feasible at this time.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Is Clean Hydrogen Production a Good Fit for Questa? Intermediate Feasibility Study Results

NREL conducted a feasibility study for a clean hydrogen production facility that would be located in Questa, New Mexico. This slide deck presents the history of the coalition of stakeholders that received NREL technical assistance through the Department of Energy's Communities Leading Energy Action Program. It describes how hydrogen is generated and its end uses. It describes two conceptual applications explored in the feasibility analysis, a grid-tied power generation and long-term storage application and a heavy-duty vehicle fueling application. The presentation details the configuration of these to applications in the Questa pilot facility, including system components, required inputs (water, electricity, and land for pv generation), and outputs in kilograms of hydrogen, megawatt hours of power delivered, and hours of vehicle hours of operation. The presentation addresses key concerns raised by groups engaged through a public outreach process, including safety, health, and environmental issues; water use; visual impacts; and costs and alternatives.

heavy-duty vehicle fueling↗

A feasibility study of orbiter flight control experiments

The results of a feasibility study of orbiter flight control experiments performed are summarized. Feasibility studies were performed on a group of 14 experiments selected from a candidate list of 35 submitted to the study contractor by the flight control community. Concepts and requirements were developed for the 14 selected experiments and they were ranked on a basis of technical value, feasibility, and cost. It was concluded that all the selected experiments can be considered as potential candidates for the Orbiter Experiment program, which is being formulated for the Orbiter Flight Tests and subsequent operational flights, regardless of the relative ranking established during the study. None of the selected experiments has significant safety implications and the cost of most was estimated to be less than $200K.

Geissler, W. H.↗

D-21B RBCC Modification Feasibility Study

This report presents a feasibility study on the modifications required to re-engine the Lockheed D-21 Drone for use as a NASA RBCC engine. An introduction, background information, engine configuration and performance, propulsion system integration, loads/thermal analysis, avionics/systems, flight test results, costs and work schedule, and some conclusions are presented.

Source record↗