At least 55 records · Page 3

An Architectural Survey of the REECo Maintenance Compound, Area 6, Nevada National Security Site, Nye County, Nevada

The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) plans to install a 26.45-mile-long 138-kilovolt (kV) transmission line on the Nevada National Security Site (NNSS) in Nye County, Nevada. This new transmission line will upgrade the electrical transmission system and provide reliable power between Mercury Switching Station in Area 23 and the U1a Facility in Area 1. The proposed upgrade to the power transmission system constitutes an undertaking subject to review under Section 106 of the National Historic Preservation Act (NHPA) (54 United States Code [USC] § 306101) and its implementing regulations, 36 Code of Federal Regulations (CFR) Part 800. A portion of this new transmission line will cross the western perimeter of the Reynolds Electrical and Engineering Company (REECo) Maintenance Compound located in Area 6 of the NNSS. This compound with its trade shops, storage sheds, and yards served as a general construction facility that supported nuclear testing activities on the NNSS from 1967 to 1992. Although three architectural resources in the compound have previously been recorded and evaluated for the National Register of Historic Places (NRHP), other resources within it have not, nor has the compound been recorded and evaluated as a potential district. The State Historic Preservation Officer (SHPO) concurred with NNSA/NFO’s determination that the unevaluated REECo Maintenance Compound will be adversely affected by the proposed undertaking (Reed 2021). The NNSA/NFO, in consultation with the SHPO, then developed the Memorandum of Agreement DE-GM58-22NA25553 between the U.S. Department of Energy and the Nevada State Historic Preservation Officer Regarding Installation of a 138-kilovolt Transmission Line from the Mercury Switching Station to the U1a Facility and the Removal of the Historic 138-kilovolt Transmission Line from the Mercury Switching Station to the U1a Facility in Areas 1, 3, 5, 6, and 23 of the Nevada National Security Site, Nye County, hereafter referred to as the MOA. This architectural survey report was prepared in accordance with MOA Stipulation III.B. It describes the origins, history, layout, and functions of the REECo Maintenance Compound during the Cold War and identifies contributing and noncontributing resources. The report defines a district boundary based on archival research and the field survey and concludes with an appendix that presents digital color images of the compound with descriptions and a map key showing image viewpoints and directions. Although none of the architectural resources are recommended individually eligible, the district evaluation concludes the REECo Maintenance Compound is eligible as a historic district for listing in the NRHP under the Secretary of the Interior’s Significance Criteria A and C at the local level. The historic district retains all seven aspects of integrity and conveys its significance under the abovementioned criteria.

138 kV↗

A Novel Method for Remediation of PCBs in Weathered Coatings

Polychlorinated biphenyls (PCBs) are a group of synthetic aromatic compounds with the general formula C 12H1oCl that were historically used in industrial paints, caulking material and adhesives, as their properties enhanced structural integrity, reduced flammability and boosted antifungal properties. Although the United States Environmental Protection Agency (USEPA) has banned the manufacture of PCBs since 1979, they have been found in at least 500 of the 1,598 National Priorities List (Superfund) sites identified by the USEPA. Prior to the USEPA's ban on PCB production, PCBs were commonly used as additives in paints and asphalt-based adhesives that were subsequently applied to a variety of structures. Government facilities constructed as early as 1930 utilized PCB-containing binders or PCB-containing paints, which are now leaching into the environment and posing ecological and worker health concerns. To date, no definitive in situ, non-destructive method is available for the removal of PCBs found in weathered coatings or on painted structures/equipment. The research described in this paper involves the laboratory development and field-scale deployment of a new and innovative solution for the removal and destruction of PCBs found in painted structures or within the binding or caulking material on structures. The technology incorporates a Bimetallic Treatment System (BTS) that extracts and degrades only the PCBs found on the facilities, leaving the structure virtually unaltered.

Brooks, Kathleen B.↗

Nuclear Thermal Propulsion Ground Test History

Nuclear Thermal Propulsion (NTP) was started in ~1955 under the Atomic Energy Commission as project Rover and was assigned to Los Alamos National Laboratory. The Nevada Test Site was selected in 1956 and facility construction began in 1957. The KIWI-A was tested on July 1, 1959 for 5 minutes at 70MW. KIWI-A1 was tested on July 8, 1960 for 6 minutes at 85MW. KIWI-A3 was tested on October 10, 1960 for 5 minutes at 100MW. The National Aeronautics and Space Administration (NASA) was formed in 1958. On August 31, 1960 the AEC and NASA established the Space Nuclear Propulsion Office and named Harold Finger as Director. Immediately following the formation of SNPO, contracts were awarded for the Reactor In Flight Test (RIFT), master plan for the Nuclear Rocket Engine Development Station (NRDS), and the Nuclear Engine for Rocket Vehicle Application (NERVA). From December 7, 1961 to November 30, 1962, the KIWI-B1A, KIWI-B1B, and KIWI-B4A were tested at test cell A. The last two engines were only tested for several seconds before noticeable failure of the fuel elements. Harold Finger called a stop to any further hot fire testing until the problem was well understood. The KIWI-B4A cold flow test showed the problem to be related to fluid dynamics of hydrogen interstitial flow causing fuel element vibrations. President Kennedy visited the NTS one week after the KIWI-B4A failure and got to see the engine starting to be disassembled in the maintenance facility. The KIWI-B4D and KIWI-B4E were modified to not have the vibration problems and were tested in test cell C. The NERVA NRX program started testing in early 1964 with NRX-A1 cold flow test series (unfueled graphite core), NRX-A2 and NRX-A3 power test series up to 1122 MW for 13 minutes. In March 1966, the NRX-EST (Engine System Test) was the first breadboard using flight functional relationship and total operating time of 116 minutes. The NRX-EST demonstrated the feasibility of a hot bleed cycle. The NRX-A5 had multiple start-ups in May-June 1966 with 30.75 minutes accumulative operating time at or above 1GW. The NRX-A6 was tested in December 1969 and ran for 62 minutes at 1100 MW. Each engine had post-test examination and found various structure anomalies which were identified for correction and the fuel element corrosion rate was reduced. The Phoebus series of research reactors began testing at test cell C, in June 1965 with Phoebus 1A. Phoebus 1A operated for 10.5 minutes at 1100 MW before unexpected loss of propellant and leading to an engine breakdown. Phoebus 1B ran for 30 minutes in February of 1967. Phoebus 2A was the highest steady state reactor built at 5GW. Phoebus 2A ran for 12 minutes at 4100 MW demonstrating sufficient power is available. The Peewee test bed reactor was tested November- December 1968 in test cell C for 40 minutes at 500MW with overall performance close to pre-run predictions. The XE' engine was the only engine tested with close to a flight configuration and fired downward into a diffuser at the Engine Test Stand (ETS) in 1969. The XE' was 1100 MW and had ~28 start-ups. The nuclear furnace NF-1 was operated at 44 MW with multiple test runs at 90 minutes in the summer of 1972. The NF-1 was the last NTP reactor tested. The Rover/NERVA program was cancelled in 1973. However, before cancellation, a lot of other engineering work was conducted by Aerojet on a 75, 000 lbf prototype flight engine and by Los Alamos on a ~16,000 lbf "Small Engine" nuclear rocket design. The ground test history of NTP at the NRDS also offers many lessons learned on how best to setup, operate, emergency shutdown, and post-test examine NTP engines. The reactor and engine maintenance and disassembly facilities were used for assembly and inspection of radioactive engines after testing. Most reactor/ engines were run at test cell A or test cell C with open air exhaust. The Rover/NERVA program became aware of a new environmental regulation that would restrict the amount of radioactive particulates allowed to be release in open air and successfully demonstrated a scrubber concept with the NF-1. The ETS stand was the only one with a high altitude test chamber used for XE'. The ETS and other test cells showed the effects the engine's radiation had on the facility materials and instrumentation as well as side effects the ground test facility has back on the engine operation. The breakdown of Phoebus 1A at test cell C showed how the site was cleaned up and back to operation for five more engines before the program was cancelled.

Gerrish, Harold P.↗

Incorporating Coverage-Dependent Reaction Barriers into First-Principles-Based Microkinetic Models: Approaches and Challenges

Mean-field microkinetic models (MKMs) are appealing for their relatively facile construction, computational tractability, and high-throughput catalyst screening capabilities. As such, they will continue to be a valuable tool for materials design in heterogeneous catalysis even as the field aims to describe more complex systems. Numerous prior reports have provided the groundwork for constructing first-principles-based MKMs, including the analysis of strategies for incorporating lateral interactions into thermodynamic parameters (e.g., adsorption energies). Yet, there remains a need for concerted dialogue on methods for calculating and incorporating coverage-dependent kinetic parameters into MKMs. In this Perspective, we assess strategies for doing so, including the corresponding key physical implications and computational challenges. Here, we emphasize that decoupling thermodynamic and kinetic parameters within MKMs can violate thermodynamic consistency and risk unphysical solutions. For some reactions and catalyst materials, scaling relationships can predict coverage-dependent activation energies, but there are several exceptions evident in the literature, indicating that this approach is not universally applicable and that the field could benefit from research aimed at elucidating the limitations. Conducting high-coverage transition state searches is a rigorous but computationally costly strategy, and the effects of various methods for mitigating this cost on resulting energetics have yet to be broadly explored and validated. The goal of this Perspective is to generate discussion on and inspire focused research into the physical relevance of approaches for describing coverage-dependent reaction barriers in MKMs, including the development of computationally tractable methodologies, to advance the applicability of MKMs across diverse reaction chemistries and conditions.

36 MATERIALS SCIENCE↗

Facility engineering and operations

Flight project support for Surveyor III, Lunar Orbiter, Pioneer VII, and Mariner IV MISSIONS, facility construction and equipment for deep space network, and system reliability

MISSION PLANNING↗

Preliminary results for a large angle oblique jet impingement and flow and for the effect of initial conditions on the near field of an axisymmetric jet

The structure of an axisymmetric jet in the near field is discussed for jet noise and for jet impingment schemes for STOL aircraft. It is inferred from previous studies, and the inference is supported by analysis, that the scale and intensity of the turbulence structure at the jet exit plane are the important boundary conditions which effect the development of the flow in the near field. The techniques to study these effects while maintaining a uniform mean flow and the results which document the range of the initial conditions are presented. The large angle, oblique jet impingment condition is of interest in terms of the jet/flap interaction. Detailed turbulence data can be obtained with the specially constructed facility. The development of the flow and instrumentation system and initial data from the new facility are presented.

Foss, J. F.↗

The characteristics of the planned National Transonic Facility

The National Transonic Facility is a high Reynolds number transonic wind tunnel designed to satisfy the research and development needs of NASA, DOD, and industry. The facility design incorporates the cryogenic approach to achieving high Reynolds numbers with manageable model loads. By using temperature as a test variable, a unique capability to clearly separate aeroelastic, Reynolds number, and Mach number effects will be possible. This capability will open new horizons in transonic aerodynamic research. The tunnel design including unique features and operating envelopes is described. A brief overview of the general operating arrangement and the schedule for facility construction is presented.

Mckinney, L. W.↗

Systems analysis of a potential space manufacturing facility

Results of a preliminary design study of the system elements comprising a manufacturing facility in earth orbit are presented. The elements discussed include cis-Lunar transportation, Lunar base, materials transport, factory, living facilities, construction support and energy supply. An evolutionary path of development, production and deployment is presented and step-wise interrelationships discussed.

Driggers, G. W.↗

The universities: Allies and rivals to NASA

NASA's association with the university is reviewed. The development of the 'sustaining university program' is traced historically along with other issues concerning grant policy. Graduate training programs, facility construction, and the development of research institutes are addressed.

Source record↗

Meeting today's requirements for large thermal vacuum test facilities

The Lockheed Thermal Vacuum Facility at Sunnyvale, California, completed in late 1986, one of the largest multi-program facilities constructed to date is described. The horizontal 12.2 m diameter by 24.4 m long chamber has removable heads at each end and houses a thermal shroud providing a test volume 10.4 m diameter by 24.4 m long. The chamber and thermal shroud are configured to permit the insertion of a 6.1 m wide by 24.4 m long vibration isolated optical bench. The pumpimg system incorporates an internal cryopumping array, turbomolecular pumps and cryopumps to handle multi-program needs and ranges of gas loads. The high vacuum system is capable of achieving clean, dry and empty pressures below 1.3 times 10 to the minus 6 power Pa (10 to the minus 8 power torr.)

Corinth, R. L.↗

Prediction of physical workload in reduced gravity environments

The background, development, and application of a methodology to predict human energy expenditure and physical workload in low gravity environments, such as a Lunar or Martian base, is described. Based on a validated model to predict energy expenditures in Earth-based industrial jobs, the model relies on an elemental analysis of the proposed job. Because the job itself need not physically exist, many alternative job designs may be compared in their physical workload. The feasibility of using the model for prediction of low gravity work was evaluated by lowering body and load weights, while maintaining basal energy expenditure. Comparison of model results was made both with simulated low gravity energy expenditure studies and with reported Apollo 14 Lunar EVA expenditure. Prediction accuracy was very good for walking and for cart pulling on slopes less than 15 deg, but the model underpredicted the most difficult work conditions. This model was applied to example core sampling and facility construction jobs, as presently conceptualized for a Lunar or Martian base. Resultant energy expenditures and suggested work-rest cycles were well within the range of moderate work difficulty. Future model development requirements were also discussed.

Goldberg, Joseph H.↗

Testing and checkout experiences in the National Transonic Facility since becoming operational

The U.S. National Transonic Facility, constructed by NASA to meet the national needs for High Reynolds Number Testing, has been operational in a checkout and test mode since the operational readiness review (ORR) in late 1984. During this time, there have been problems centered around the effect of large temperature excursions on the mechanical movement of large components, the reliable performance of instrumentation systems, and an unexpected moisture problem with dry insulation. The more significant efforts since the ORR are reviewed and NTF status concerning hardware, instrumentation and process controls systems, operating constraints imposed by the cryogenic environment, and data quality and process controls is summarized.

Bruce, W. E., Jr.↗

Prediction of physical workload in reduced gravity

The background, development, and application of a methodology to predict human energy expenditure and physical workload in low gravity environments, such as a Lunar or Martian base, is described. Based on a validated model to predict energy expenditures in earth-based industrial jobs, the model relies on an elemental analysis of the proposed job. Because the job itself need not physically exist, many alternative job designs may be compared in their physical workload. The feasibility of using the model for prediction of low gravity work was evaluated by lowering body and load weights, while maintaining basal energy expenditure. Comparison of model results was made both with simulated low gravity energy expendiure studies and with reported Apollo 14 Lunar EVA expenditure. Prediction accuracy was very good for walking and for cart pulling on slopes less than 15 deg, but the model underpredicted the most difficult work conditions. This model was applied to example core sampling and facility construction jobs, as presently conceptualized for a Lunar or Martian base. Resultant energy expenditures and suggested work-rest cycles were well within the range of moderate work difficulty. Future model development requirements were also discussed.

Goldberg, Joseph H.↗

On trajectory generation for flexible space crane: Inverse dynamics analysis by LATDYN

For future in-space construction facility, one or more space cranes capable of manipulating and positioning large and massive spacecraft components will be needed. Inverse dynamics was extensively studied as a basis for trajectory generation and control of robot manipulators. The focus here is on trajectory generation in the gross-motion phase of space crane operation. Inverse dynamics of the flexible crane body is much more complex and intricate as compared with rigid robot link. To model and solve the space crane's inverse dynamics problem, LATDYN program which employs a three-dimensional finite element formulation for the multibody truss-type structures will be used. The formulation is oriented toward a joint dominated structure which is suitable for the proposed space crane concept. To track a planned trajectory, procedures will be developed to obtain the actuation profile and dynamics envelope which are pertinent to the design and performance requirements of the space crane concept.

Chen, G.-S.↗