Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “FNAL”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Assembly of CMS Endcap MIP Timing Detector Module at FNAL

The High-Luminosity LHC (HL-LHC) will enable a more detailed exploration of new phenomena thanks to an anticipated increase in collisions where pileup is expected to reach approximately 200 simultaneous interactions. Many CMS systems will be significantly upgraded to prepare for this new era, including the MIP Timing Detector (MTD) project. The MTD is designed to mitigate the effect of pileup and is set to provide a timestamp accurate to 30 ~ 40 picoseconds for every event, ensuring sustained detector performance at HL-LHC. The MTD is divided into two sections, Barrel Timing Layer (BTL) and Endcap Timing Layer (ETL) which utilize different sensor and ASIC technologies due to the difference in active surfaces, irradiation conditions, and installation schedules. The ETL, composed of two double-sided disks, employs the Low Gain Avalanche Detector (LGAD) sensor and the Endcap Timing Readout Chip (ETROC). More than 8,000 modules, each consisting of four LGAD sensors and ETROCs are required for the ETL detector. These modules will be assembled using an automated robotic gantry that guarantees precise placement at a level of 10 micrometers. In addition, the full assembly of ETL modules includes film application with the jig, wire-bonding, encapsulation with the automated dispensing robot for protecting the wire-bonding, and film curing with a vacuum oven. This talk reports on the successfully completed throughput test with mockup components using the gantry and the successful assembly of real functional modules for beam tests at CERN and FNAL, including the first official ETL module.

Apresyan, Artur↗

MLOps at FNAL

MLOps at FNAL, a brief review.

St. John, Jason Michael [Fermilab] (ORCID:00000001↗

A 2008-2012 Program for HTS Magnet R&D at FNAL

For the development at FNAL of superconducting (SC) accelerator magnets above 20 T for future muon colliders and storage rings, the following High Temperature Superconductor (HTS) magnet development program is proposed. This program is intended to be conducted in close collaboration with U.S. National Labs, Universities and Industry, similarly to the present Nb3Sn magnet and conductor R&D programs. The expected duration of this plan is 4 years.

43 PARTICLE ACCELERATORS↗

Machine Learning for superconducting magnets application (2023 Italian Summer Students program at FNAL Final Report)

This report documents the work I conducted during my internship as part of the Italian Summer Students program at the Fermilab National Accelerator Laboratory (FNAL). Throughout my internship, I was stationed in the Technical Division within the Fermilab laboratory, where I was under the guidance of Emanuela Barzi and co-supervised by Reed Teyber from the Lawrence Berkeley National Laboratory (LBNL). The aim of the project is the study and characterization of quench antenna signals in order gain understanding on the mechanical and electromagnetic phenomena happening inside superconductive magnets. The results presented here identify some potential areas of investigation and potential directions for improving the construction of magnetic superconductors, particularly within the framework of the CCT subscale program at LBNL.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

The FNAL Injector Upgrade Status

The new FNAL H{sup -} injector upgrade is currently being tested before installation in the Spring 2012 shutdown of the accelerator complex. This line consists of an H{sup -} source, low energy beam transport (LEBT), 200 MHz RFQ and medium energy beam transport (MEBT). Beam measurements have been performed to validate the design before installation. The results of the beam measurements are presented in this paper.

43 PARTICLE ACCELERATORS↗

Status of LCLS - II QA Systems Collaboration for Cyromodule Construction at TJNAF and FNAL

At the Thomas Jefferson National Accelerator Facility (Jefferson Lab), we are supporting the LCLS-II Project at SLAC. The plan is to build thirty-five 1.3 GHz continuous wave cryomodules, production to be split between JLab and FNAL (Fermilab). This has required a close collaboration between the partner labs, including enhancing our existing quality systems to include this collaboration. This overview describes the current status of the Quality System development as of August 2015, when the partner labs start the assembly of the prototype cryomodules.

43 PARTICLE ACCELERATORS↗

Improvement of Digital Filter for the FNAL Booster Transverse Dampers

Fermilab Booster has two transverse dampers which independently suppress beam instabilities in the horizontal and vertical planes. A suppression of the common mode signal is achieved by digital notch filter which is based on subtracting beam positions for two consecutive turns. Such system operates well if the orbit position changes sufficiently slow. Unfortunately it is not the case for FNAL Booster where the entire accelerating cycle consists of about 20000 turns, and successful transition crossing requires the orbit drifts up to about 10 μm/turn, resulting in excessive power, power amplifier saturation and loss of stability. To suppress this effect we suggest an improvement of the digital filter which can take into account fast orbit changes by using bunch positions of a few previous turns. To take into account the orbit change up toN-th order polynomial in time the system requires (N + 3) turns of “prehistory”. In the case of sufficiently small gain the damping rate and the optimal digital filter coefficients are obtained analytically. Numerical simulations verify analytical theory for the small gain and predict a system performance with gain increase.

43 PARTICLE ACCELERATORS↗

Development and Comparison of Mechanical Structures for FNAL 15 T Nb$_3$Sn Dipole Demonstrator

Main design challenges for 15 T accelerator magnets are large Lorentz forces at this field level. The large Lorentz forces generate high stresses in the coil and mechanical structure and, thus, need stress control to maintain them at the acceptable level for brittle Nb3Sn coils and other elements of magnet mechanical structure. To provide these conditions and achieve the design field in the FNAL 15 T dipole demonstrator, several mechanical structures have been developed and analysed. The possibilities and limitations of these designs are discussed in this paper

43 PARTICLE ACCELERATORS↗

Recent Operation of the FNAL Magnetron H- Ion Source

This paper will detail changes in the operational paradigm of the Fermi National Accelerator Laboratory (FNAL) magnetron H- ion source due to upgrades in the accelerator system. Prior to November of 2012 the H- ions for High Energy Physics (HEP) experiments were extracted at ~18 keV vertically downward into a 90 degree bending magnet and accelerated through a Cockcroft-Walton accelerating column to 750 keV. Following the upgrade in the fall of 2012 the H- ions are now directly extracted from a magnetron at 35 keV and accelerated to 750 keV by a Radio Frequency Quadrupole (RFQ). This change in extraction energy as well as the orientation of the ion source required not only a redesign of the ion source, but an updated understanding of its operation at these new values. Discussed in detail are the changes to the ion source timing, arc discharge current, hydrogen gas pressure, and cesium delivery system that were needed to maintain consistent operation at >99% uptime for HEP, with an increased ion source lifetime of over 9 months.

43 PARTICLE ACCELERATORS↗

Status of LCLS - II QA Systems Collaboration for Cyromodule Construction at TJNAF and FNAL

At the Thomas Jefferson National Accelerator Facility (JLab), we are supporting the LCLS-II Project at SLAC. The plan is to build thirty-five 1.3 GHz continuous wave cryomodules, production to be split between JLab and FNAL (Fermilab). This has required a close collaboration between the partner labs, including enhancing our existing quality systems to include this collaboration. This over view describes the current status of the Quality System development as of August 2015, when the partner labs start the assembly of the prototype cryomodules.

McEwen, E. Anne↗

Nb$_{3}$Sn 11 T Dipole for the High Luminosity LHC (FNAL). Chapter 8

This chapter describes the design and parameters of the 11 T dipole developed at the Fermi National Accelerator Laboratory (FNAL) in collaboration with the European Organization for Nuclear Research (CERN) for the High Luminosity LHC project, and presents details of the single-aperture and twin-aperture dipole models that were constructed and tested. Magnet test results including magnet quench performance, magnetic measurements, and quench protection studies performed using the dipole mirror and single-aperture and twin-aperture dipole models are summarized and discussed.

43 PARTICLE ACCELERATORS↗

Workshop on a future muon program at FNAL

The Snowmass report on rare processes and precision measurements recommended Mu2e-II and a next generation muon facility at Fermilab (Advanced Muon Facility) as priorities for the frontier. The Workshop on a future muon program at FNAL was held in March 2023 to discuss design studies for Mu2e-II, organizing efforts for the next generation muon facility, and identify synergies with other efforts (e.g., muon collider). Topics included high-power targetry, status of R&D for Mu2e-II, development of compressor rings, FFA and concepts for muon experiments (conversion, decays, muonium and other opportunities) at AMF. This document summarizes the workshop discussions with a focus on future R&D tasks needed to realize these concepts.

43 PARTICLE ACCELERATORS↗

Proposed FNAL 750 KeV Linac Injector Upgrade

The present FNAL linac H{sup -} injector has been operational since 1978 and consists of a magnetron H{sup -} source and a 750 keV Cockcroft-Walton Accelerator. The proposed upgrade to this injector is to replace the present magnetron source having a rectangular aperture with a circular aperture, and to replace the Cockcroft-Walton with a 200 MHz RFQ. Operational experience at other laboratories has shown that the upgraded source and RFQ will be more reliable and require less manpower than the present system.

43 PARTICLE ACCELERATORS↗

Beam dynamics studies of the 8 GeV Linac at FNAL

The proposed 8-GeV proton driver (PD) linac at FNAL includes a front end up to {approx}420 MeV operating at 325 MHz and a high energy section at 1300 MHz. A normal conducting RFQ and short CH type resonators are being developed for the initial acceleration of the H-minus or proton beam up to 10 MeV. From 10 MeV to {approx}420 MeV, the voltage gain is provided by superconducting (SC) spoke-loaded cavities. In the high-energy section, the acceleration will be provided by the International Linear Collider (ILC)-style SC elliptical cell cavities. To employ existing, readily available klystrons, an RF power fan out from high-power klystrons to multiple cavities is being developed. The beam dynamics simulation code TRACK, available in both serial and parallel versions, has been updated to include all known H-minus stripping mechanisms to predict the exact location of beam losses. An iterative simulation procedure is being developed to interact with a transient beam loading model taking into account RF feedback and feedforward systems.

43 PARTICLE ACCELERATORS↗

The SciBooNE Experiment at FNAL

The SciBooNE experiment is designed to measure neutrino cross sections on carbon around 1 GeV region. This article introduces the SciBooNE experiment and reports on the current status of a cross section measurement of the neutral current neutral p ion production. We used 0.99x10^2^0 protons on target (POT) for this measurement. After event selections, about 450 signal events are estimated in the Monte Carlo(MC) simulation.

Kurimoto, Y.↗

The NOvA experiment at FNAL, status and perspectives

The NO$\nu$A experiment is a new long baseline neutrino experiment designed to measure $\theta_{13}$ through the appear- ance of $\nu_e$ in a $\nu_\mu$ beam, at an off-axis angle of 14 mrad. The NO$\nu$A experiment has constructed and instrumented their near detector and has begun taking data in a surface location that places the detector in both the Neutrinos at the Main Injector (NuMI) neutrino beam and booster neutrino beam at Fermilab. This location provides significant neutrino fluxes for studies of both $\nu_{e}$ and $\nu_\mu$ interactions and for understanding of the detector response to both types of interactions.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗