Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “FACILITY TRAINING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Current Status of the DOE/NNSA Nuclear Criticality Safety Program Hands-On Criticality Safety Training

The U.S. Department of Energy/National Nuclear Security Administration (DOE/NNSA) Nuclear Criticality Safety Program (NCSP) has conducted two-week Nuclear Criticality Safety (NCS) Practitioner courses since 2011 to support the training and qualification of new NCS staff. The course was developed in accordance with the American National Standard Institute/American Nuclear Society (ANSI/ANS) standard for NCS training and qualifications (ANSI/ANS-8.26-2007). In 2013, an NCS Manager’s course was developed for process supervisors, managers, regulators, and other professionals with NCS-related responsibilities. This course was revised in 2019 for Criticality Safety Officers (CSOs) based on an NCSP Criticality Safety Support Group tasking (2018-01). This course was piloted at the Nevada Field Office and the National Criticality Experiments Research Center (NCERC) in June 2021. These courses consist of the following training components: classroom education, facility training, and hands-on subcritical and critical experiments training. The two-week Practitioner course offers a week of classroom training, with practical workshops and exercises focused on teaching students how to perform an NCS evaluation. The second week of training involves hands-on critical and subcritical experiments and measurements. The first week is offered in Las Vegas, Nevada, at the DOE Nevada Field Office or the National Atomic Testing Museum. Depending on the student’s clearance level, the second week is offered at Sandia National Laboratory (SNL) (uncleared and L-cleared students) or at the National Criticality Experiments Research Center (Q-cleared students). The one-week Manager’s course is offered at SNL or NCERC, depending on clearance or interest, and includes classroom and hands- on critical and subcritical experiments and measurements. This paper provides an overview and status report for the DOE/NNSA NCSP training courses in NCS and to provide information about future course offerings. This paper discusses the challenges associated with executing the training courses during the COVID-19 pandemic. The 2-week Practitioner and 1-week manager courses are currently offered twice per year and adjustments are made based upon demand.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Current Status of the DOE/NNSA Nuclear Criticality Safety Program Hands-On Criticality Safety Training [Abstract]

The U.S. Department of Energy/National Nuclear Security Administration (DOE/NNSA) Nuclear Criticality Safety Program (NCSP) has conducted two-week Nuclear Criticality Safety (NCS) Practitioner courses since 2011 to support the training and qualification of new NCS staff. The course was developed in accordance with the American National Standard Institute/American Nuclear Society (ANSI/ANS) standard for NCS training and qualifications (ANSI/ANS-8.26-2007). In 2013, an NCS Manager’s course was developed for process supervisors, managers, regulators, and other professionals with NCS-related responsibilities. This course was revised in 2019 for Criticality Safety Officers (CSOs) based on an NCSP Criticality Safety Support Group tasking (2018-01). This course was piloted at the Nevada Field Office and the National Criticality Experiments Research Center (NCERC) in June 2021. These courses consist of the following training components: classroom education, facility training, and hands-on subcritical and critical experiments training. The two-week Practitioner course offers a week of classroom training, with practical workshops and exercises focused on teaching students how to perform an NCS evaluation. The second week of training involves hands-on critical and subcritical experiments and measurements. The first week is offered in Las Vegas, Nevada, at the DOE Nevada Field Office or the National Atomic Testing Museum. Depending on the student’s clearance level, the second week is offered at Sandia National Laboratory (SNL) (uncleared and L-cleared students) or at the National Criticality Experiments Research Center (Q-cleared students). The one-week Manager’s course is offered at SNL or NCERC, depending on clearance or interest, and includes classroom and hands-on critical and subcritical experiments and measurements. This paper provides an overview and status report for the DOE/NNSA NCSP training courses in NCS and to provide information about future course offerings. This paper will also discuss the challenges associated with executing the training courses during the COVID-19 pandemic. The 2-week Practitioner and 1-week manager courses are currently offered twice per year and adjustments are made based upon demand.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

EVA Training and Development Facilities

Overview: Vast majority of US EVA (ExtraVehicular Activity) training and EVA hardware development occurs at JSC; EVA training facilities used to develop and refine procedures and improve skills; EVA hardware development facilities test hardware to evaluate performance and certify requirement compliance; Environmental chambers enable testing of hardware from as large as suits to as small as individual components in thermal vacuum conditions.

Cupples, Scott↗

STS-104 Crew Training Clips

The crewmembers of STS-104, Commander Steven Lindsey, Pilot Charles Hobaugh, and Mission Specialists Michael Gernhardt, James Reilly, and Janet Kavandi, are seen during various stages of their training. Footage shows the following: (1) Water Survival Training at the Neutral Buoyancy Laboratory (NBL); (2) Rendezvous and Docking Training in the Shuttle Mission Simulator; (3) Training in the Space Station Airlock; (4) Training in the Virtual Reality Lab; (5) Post-insertion Operations in the Fixed Base Simulator; (6) Extravehicular Activity Training at the NBL; (7) Crew Stowage Training in the Space Station Mock-up Training Facility; and (8) Water Transfer Training in the Crew Compartment Trainer.

Source record↗

AVESTAR Center for operational excellence of IGCC power plants with CO2 capture

This slideshow presentation begins by outlining US energy challenges, particularly with respect to power generation capacity and clean energy plant operations. It goes on to describe the Advanced Virtual Energy Simulation Training And Research (AVESTAR{sup TM}). Its mission and goals are given, followed by an overview of integrated gasification combined cycle (IGCC) with CO{sub 2} capture. The Dynamic Simulator/Operator Training System (OTS) and 3D Virtual Immersive Training System (ITS) are then presented. Facilities, training, education, and R&D are covered, followed by future simulators and directions.

01 COAL, LIGNITE, AND PEAT↗

HEU Removal from MNSR Reactors

This artifact is a slide presentation about spent HEU core removal of a Chinese-built Miniature Neutron Source Reactor (MNSR). The presentation describes the Skoda VPVR/M cask in detail and the auxiliary equipment needed to safely remove the spent HEU and transport it. Removal activities of MNSR spent HEU from Ghana and Nigeria MNSRs, and air transport from these countries to China are discussed. The International MNSR Training Facility in Ghana is also mentioned.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Task Order 22 – Engineering and Technical Support, Deep Borehole Field Test. AREVA Summary Review Report

Under Task Order 22 of the industry Advisory and Assistance Services (A&AS) Contract to the Department of Energy (DOE) DE-NE0000291, AREVA has been tasked with providing assistance with engineering, analysis, cost estimating, and design support of a system for disposal of radioactive wastes in deep boreholes (without the use of radioactive waste). As part of this task order, AREVA was requested, through a letter of technical direction, to evaluate Sandia National Laboratory’s (SNL’s) waste package borehole emplacement system concept recommendation using input from DOE and SNL. This summary review report (SRR) documents this evaluation, with its focus on the primary input document titled: “Deep Borehole Field Test Specifications/M2FT-15SN0817091” Rev. 1 [1], hereafter referred to as the “M2 report.” The M2 report focuses on the conceptual design development for the Deep Borehole Field Test (DBFT), mainly the test waste packages (WPs) and the system for demonstrating emplacement and retrieval of those packages in the Field Test Borehole (FTB). This SRR follows the same outline as the M2 report, which allows for easy correlation between AREVA’s review comments, discussion, potential proposed alternatives, and path forward with information established in the M2 report. AREVA’s assessment focused on three primary elements of the M2 report: the conceptual design of the WPs proposed for deep borehole disposal (DBD), the mode of emplacement of the WP into DBD, and the conceptual design of the DBFT. AREVA concurs with the M2 report’s selection of the wireline emplacement mode specifically over the drill-string emplacement mode and generically over alternative emplacement modes. Table 5-1 of this SRR compares the pros and cons of each emplacement mode considered viable for DBD. The primary positive characteristics of the wireline emplacement mode include: (1) considered a mature technology; (2) operations are relatively simple; (3) probability of a radiological release due to off-normal events are relatively low; (4) costs are relatively low; and (5) maintenance activities are relatively simple. The primary drawback associated with the wireline emplacement mode for DBD is the number of emplacement trips-in to the borehole, which results in a relatively higher probability for a drop event. Fortunately, the WPs can be engineered with impact limiters that will minimize the likelihood of a breach of the WP due to a drop. The WP designs presented in the M2 report appear to be focused on compatibility with the drill-string emplacement mode (e.g., the threaded connections). With the recommendation that the wireline emplacement mode be utilized for the DBFT, some changes may be warranted to these WPs. For example, the development of a WP release connection that is more reliable than the currently credited connection, which is considered to have a high failure probability, and the integration of an impact limiter into its design. The M2 report states the engineering demonstration of the DBFT will occur in the FTB over a 4-year period. AREVA recommends development and testing of the WP emplacement handling equipment occur separately (but concurrently, if not earlier) from the FTB at a mock-up facility. The separation of this activity would prevent schedule interference between the science and engineering thrusts of the project. Performing tests in a mock-up facility would allow additional control and observation compared to the FTB. The mock-up facility could also be utilized as a training facility for future operations. Terminal velocity and impact limiter testing would require the FTB for testing, since these areas would be difficult to reproduce in a limited depth mock-up. Although only at the end of the conceptual stage of design development, DBD appears to be a viable solution for some waste forms produced by the nuclear industry. However, regulatory requirements have yet to be established for pre- and post-closure performance of DBD and should be established as soon as possible. Some of the main areas of focus from a regulatory perspective include: (1) establishing acceptable performance requirements for the long-term behavior of DBD; (2) determining acceptable borehole abandonment criteria; (3) establishing retrievability requirements; (4) developing a consensus on the factor of safety (FoS) for the emplacement mode and WP; and (5) establishing safety and safeguards performance requirements for DBD. Although conservative requirements have been utilized to provide the foundation for the conceptual design of DBD, regulatory requirements and feedback are necessary to confirm recommendations made herein and to ensure the long-term performance of DBD is acceptable. The combination of the M2 report and this SRR is intended to facilitate the completion of the conceptual design for DBD for the Cs and Sr capsules and calcined waste forms. Using the conceptual design, preliminary design activities (the second stage of a three-stage process described in the M2 report) can proceed and the DBFT utilized to support, demonstrate, and confirm engineering elements of this design.

42 ENGINEERING↗

Injury Surveillance Among NASA Astronauts Using the Barell Injury Diagnosis Matrix

Astronauts perform physically demanding tasks and risk incurring musculoskeletal injuries during both groundbased training and missions. Increased injury rates throughout the history of the U.S. space program have been attributed to numerous factors, including an aging astronaut corps, increased Weightless Environment Training Facility (WETF) and Neutral Buoyancy Laboratory (NBL) training to construct the International Space Station, and improved clinical operations that promote injury prevention and reporting. With NASA program changes through the years (including retirement of the Shuttle program) and an improved training environment (including a new astronaut gym), there is no surveillance program to systematically track injury rates. A limited number of research projects have been conducted over the past 20 years to evaluate musculoskeletal injuries: (1) to evaluate orthopedic injuries from 1987 to 1995, (2) to describe upper extremity injuries, (3) to evaluate EVA spacesuit training related injuries, and (4) to evaluate in-flight musculoskeletal injuries. Nevertheless, there has been no consistently performed comprehensive assessment of musculoskeletal injuries among astronauts. The Barell Injury Diagnosis Matrix was introduced at the 2001 meeting of the International Collaborative Effort (ICE) on Injury Statistics. The Matrix proposes a standardized method of classifying body region by nature of injury. Diagnoses are coded using the International Classification of Diseases, Ninth Revision, Clinical Modification (ICD-9-CM) coding system. The purpose of this study is to assess the usefulness and complexity of the Barell Injury Diagnosis Matrix to classify and track musculoskeletal injuries among NASA astronauts.

Murray, J. D.↗

Current Progress of the Final Design of a Subcritical Assembly at the Oak Ridge National Laboratory

During the past decade, the US Department of Energy (DOE)/National Nuclear Security Administration (NNSA) Nuclear Criticality Safety Program (NCSP) has been coordinating nuclear criticality safety (NCS) courses to provide training and qualification to new staff, supervisors, managers, regulators, and other professionals involved with NCS. To address the growing need for more NCS training possibilities, a subcritical assembly was designed at Oak Ridge National Laboratory (ORNL). The Oak Ridge Subcritical Assembly (ORSA), operated at ORNL, could be used in a new course for fissile material handlers/operators or as a backup training facility for currently existing NCSP hands-on NCS training. This paper describes some of the design steps necessary for obtaining a final ORSA design, beginning with a successful feasibility study performed in 2020. Numerous parameters within each main element of the assembly were considered, such as the reflector used, the type of fuel coating or plating used, and the number of fuel plates used. The design choices related to each parametric study described in this paper are detailed and justified at the end of each subsection. An overview of the current final design characteristics of ORSA and the experiments’ possibilities is also provided. ORSA will be built with fuel plates from legacy Aerojet General Nucleonics (AGN)-201M research reactors currently stored at the Y-12 National Security Complex (Y-12). The cylindrical fuel plates comprise UO 2 particles embedded in polyethylene and have a nominal enrichment of 19.5 ± 0.5 wt % 235 U. The basis for the final design was the feasibility study from 2020. In the feasibility study, ORSA achieved k eff = 0.95, corresponding to a multiplication factor of 20, with approximately 620 g of 235 U (four 4 cm plates, three 2 cm plates, and two 1 cm plates) and an 8.5 cm thick graphite reflector radially and on top of the assembly. The bottom of the assembly has a graphite thickness of 5 cm, and the chosen graphite density was 2.3 g/cm 3 . All design calculations were performed using SCALE 6.2.4 KENO-VI and with the ENDF/B VII.1 Continuous Energy cross-section library.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Automation, robotics, and inflight training for manned Mars missions

The automation, robotics, and inflight training requirements of manned Mars missions will be supported by similar capabilities developed for the space station program. Evolutionary space station onboard training facilities will allow the crewmembers to minimize the amount of training received on the ground by providing extensive onboard access to system and experiment malfunction procedures, maintenance procedures, repair procedures, and associated video sequences. Considerable on-the-job training will also be conducted for space station management, mobile remote manipulator operations, proximity operations with the Orbital Maneuvering Vehicle (and later the Orbit Transfer Vehicle), and telerobotics and mobile robots. A similar approach could be used for manned Mars mission training with significant additions such as high fidelity image generation and simulation systems such as holographic projection systems for Mars landing, ascent, and rendezvous training. In addition, a substantial increase in the use of automation and robotics for hazardous and tedious tasks would be expected for Mars mission. Mobile robots may be used to assist in the assembly, test and checkout of the Mars spacecraft, in the handling of nuclear components and hazardous chemical propellent transfer operations, in major spacecraft repair tasks which might be needed (repair of a micrometeroid penetration, for example), in the construction of a Mars base, and for routine maintenance of the base when unmanned.

Holt, Alan C.↗

The flights before the flight - An overview of shuttle astronaut training

Space shuttle astronaut training is centered at NASA's Johnson Space Center in Houston, Texas. Each astronaut receives many different types of training from many sources. This training includes simulator training in the Shuttle Mission Simulator, in-flight simulator training in the Shuttle Training Aircraft, Extravehicular Activity training in the Weightless Environment Training Facility and a variety of lectures and briefings. Once the training program is completed each shuttle flight crew is well-prepared to perform the normal operations required for their flight and deal with any shuttle system malfunctions that might occur.

Sims, John T.↗

Networked simulation for team training of Space Station astronauts, ground controllers, and scientists - A training and development environment

The purpose of this paper is to describe plans for the Space Station Training Facility (SSTF) which has been designed to meet the envisioned training needs for Space Station Freedom. To meet these needs, the SSTF will integrate networked simulators with real-world systems in five training modes: Stand-Alone, Combined, Joint-Combined, Integrated, and Joint-Integrated. This paper describes the five training modes within the context of three training scenaries. In addition, this paper describes an authoring system which will support the rapid integration of new real-world system changes in the Space Station Freedom Program.

Hajare, Ankur R.↗

WINS. Market Simulation Tool for Facilitating Wind Energy Integration

Integrating 20% or more wind energy into the system and transmitting large sums of wind energy over long distances will require a decision making capability that can handle very large scale power systems with tens of thousands of buses and lines. There is a need to explore innovative analytical and implementation solutions for continuing reliable operations with the most economical integration of additional wind energy in power systems. A number of wind integration solution paths involve the adoption of new operating policies, dynamic scheduling of wind power across interties, pooling integration services, and adopting new transmission scheduling practices. Such practices can be examined by the decision tool developed by this project. This project developed a very efficient decision tool called Wind INtegration Simulator (WINS) and applied WINS to facilitate wind energy integration studies. WINS focused on augmenting the existing power utility capabilities to support collaborative planning, analysis, and wind integration project implementations. WINS also had the capability of simulating energy storage facilities so that feasibility studies of integrated wind energy system applications can be performed for systems with high wind energy penetrations. The development of WINS represents a major expansion of a very efficient decision tool called POwer Market Simulator (POMS), which was developed by IIT and has been used extensively for power system studies for decades. Specifically, WINS provides the following superiorities; (1) An integrated framework is included in WINS for the comprehensive modeling of DC transmission configurations, including mono-pole, bi-pole, tri-pole, back-to-back, and multi-terminal connection, as well as AC/DC converter models including current source converters (CSC) and voltage source converters (VSC); (2) An existing shortcoming of traditional decision tools for wind integration is the limited availability of user interface, i.e., decision results are often text-based demonstrations. WINS includes a powerful visualization tool and user interface capability for transmission analyses, planning, and assessment, which will be of great interest to power market participants, power system planners and operators, and state and federal regulatory entities; and (3) WINS can handle extended transmission models for wind integration studies. WINS models include limitations on transmission flow as well as bus voltage for analyzing power system states. The existing decision tools often consider transmission flow constraints (dc power flow) alone which could result in the over-utilization of existing resources when analyzing wind integration. WINS can be used to assist power market participants including transmission companies, independent system operators, power system operators in vertically integrated utilities, wind energy developers, and regulatory agencies to analyze economics, security, and reliability of various options for wind integration including transmission upgrades and the planning of new transmission facilities. WINS can also be used by industry for the offline training of reliability and operation personnel when analyzing wind integration uncertainties, identifying critical spots in power system operation, analyzing power system vulnerabilities, and providing credible decisions for examining operation and planning options for wind integration. Researches in this project on wind integration included (1) Development of WINS; (2) Transmission Congestion Analysis in the Eastern Interconnection; (3) Analysis of 2030 Large-Scale Wind Energy Integration in the Eastern Interconnection; (4) Large-scale Analysis of 2018 Wind Energy Integration in the Eastern U.S. Interconnection. The research resulted in 33 papers, 9 presentations, 9 PhD degrees, 4 MS degrees, and 7 awards. The education activities in this project on wind energy included (1) Wind Energy Training Facility Development; (2) Wind Energy Course Development.

17 WIND ENERGY↗

Evaluation of lens distortion errors using an underwater camera system for video-based motion analysis

Video-based motion analysis systems are widely employed to study human movement, using computers to capture, store, process, and analyze video data. This data can be collected in any environment where cameras can be located. One of the NASA facilities where human performance research is conducted is the Weightless Environment Training Facility (WETF), a pool of water which simulates zero-gravity with neutral buoyance. Underwater video collection in the WETF poses some unique problems. This project evaluates the error caused by the lens distortion of the WETF cameras. A grid of points of known dimensions was constructed and videotaped using a video vault underwater system. Recorded images were played back on a VCR and a personal computer grabbed and stored the images on disk. These images were then digitized to give calculated coordinates for the grid points. Errors were calculated as the distance from the known coordinates of the points to the calculated coordinates. It was demonstrated that errors from lens distortion could be as high as 8 percent. By avoiding the outermost regions of a wide-angle lens, the error can be kept smaller.

Poliner, Jeffrey↗

Hydraulic Containment of TCE Contaminated Groundwater at the DOE Portsmouth Gaseous Diffusion Plant

This paper will describe the progress of a groundwater remedial action at the Portsmouth Gaseous Diffusion Plant (PORTS), a Department of Energy (DOE) facility that enriched uranium from the early 1950's until 2000. The X-749 southern boundary hydraulic containment system, combining a four-well extraction system with a previously constructed subsurface barrier wall, has been employed at PORTS. The hydraulic containment project has been implemented as part of containment and remediation of the X-749/X-120 area trichloroethylene (TCE) contaminant. The X-749/X-120 groundwater contaminant plume is located in the south central section (Quadrant I) of the PORTS facility. The plume is associated with the former X-120 Goodyear Training Facility and a landfill known as the X-749 Contaminated Materials Disposal Facility. The principal contaminants of concern are chlorinated solvents (primarily TCE) and technetium-99 (Tc-99). A subsurface barrier wall (X-749 South Barrier Wall) was completed in 1994 at the PORTS southern reservation boundary as an interim remedial measure to slow the advancement of the leading edge of the contaminated groundwater plume or to prevent the plume from migrating off DOE property. Remedial measures identified by Ohio Environmental Protection Agency (Ohio EPA) included installation of a barrier wall around the eastern and southern portions of the X-749 landfill to provide source control and installation of a phyto-remediation system to help contain groundwater flow and remove volatile organic compounds. Previous remedial measures that were implemented as elements of 'closures' on the X-749 landfill included a multimedia cap, barrier walls, and a groundwater collection system. Despite these measures, the X-749/X-120 groundwater plume has migrated beyond the southern DOE property boundary. Current TCE concentrations in off-site groundwater monitoring wells are below the preliminary remediation goal and drinking water maximum contaminant level for TCE of 5 {mu}g/kg, but continue to increase. Hydraulic containment was selected as the method for controlling the plume at the southern DOE property boundary. Recent borings and pumping tests indicate that approximately a 400-foot section of the existing subsurface barrier wall near the DOE property boundary may been improperly keyed into the Sunbury Shale bedrock which underlies the unconsolidated uppermost Gallia sand and gravel aquifer (Gallia). This gap is reported to be as much as 4 vertical feet. In addition, the X-749 groundwater plume is migrating around the western end of the X-749 South Barrier Wall. Four groundwater extraction wells were installed at the DOE property boundary to provide hydraulic control of the plume currently flowing under and around the existing subsurface barrier wall. Placement of the new extraction wells was based on groundwater modeling and data collected from pumping tests in the area. The extracted groundwater is being sent to the on-site X-622 Groundwater Treatment Facility via subsurface piping. The hydraulic containment system began operation in June 2007. The preliminary water elevations from monitoring wells in the vicinity of two of the four extraction wells demonstrate a significant decrease in groundwater potentiometric head in the southern boundary area. The current extraction rates should be adequate to contain the leading edge of the contaminant plume. Monitoring wells in the area will continue to be sampled on a quarterly basis. (authors)

54 ENVIRONMENTAL SCIENCES↗

Web-Based Requesting and Scheduling Use of Facilities

Automated User's Training Operations Facility Utilization Request (AutoFUR) is prototype software that administers a Web-based system for requesting and allocating facilities and equipment for astronaut-training classes in conjunction with scheduling the classes. AutoFUR also has potential for similar use in such applications as scheduling flight-simulation equipment and instructors in commercial airplane-pilot training, managing preventive- maintenance facilities, and scheduling operating rooms, doctors, nurses, and medical equipment for surgery. Whereas requesting and allocation of facilities was previously a manual process that entailed examination of documents (including paper drawings) from different sources, AutoFUR partly automates the process and makes all of the relevant information available via the requester s computer. By use of AutoFUR, an instructor can fill out a facility-utilization request (FUR) form on line, consult the applicable flight manifest(s) to determine what equipment is needed and where it should be placed in the training facility, reserve the corresponding hardware listed in a training-hardware inventory database, search for alternative hardware if necessary, submit the FUR for processing, and cause paper forms to be printed. Auto-FUR also maintains a searchable archive of prior FURs.

Yeager, Carolyn M.↗

Space Station Simulation Computer System (SCS) study for NASA/MSFC. Concept document

NASA's Space Station Freedom Program (SSFP) planning efforts have identified a need for a payload training simulator system to serve as both a training facility and as a demonstrator to validate operational concepts. The envisioned MSFC Payload Training Complex (PTC) required to meet this need will train the Space Station Payload of experiments that will be onboard the Space Station Freedom. The simulation will support the Payload Training Complex at MSFC. The purpose of this SCS Study is to investigate issues related to the SCS, alternative requirements, simulator approaches, and state-of-the-art technologies to develop candidate concepts and designs.

Source record↗

Space Station Simulation Computer System (SCS) study for NASA/MSFC. Volume 1: Baseline architecture report

NASA's Space Station Freedom Program (SSFP) planning efforts have identified a need for a payload training simulator system to serve as both a training facility and as a demonstrator to validate operational concepts. The envisioned MSFC Payload Training Complex (PTC) required to meet this need will train the Space Station payload scientists, station scientists, and ground controllers to operate the wide variety of experiments that will be onboard the Space Station Freedom. The Simulation Computer System (SCS) is made up of the computer hardware, software, and workstations that will support the Payload Training Complex at MSFC. The purpose of this SCS Study is to investigate issues related to the SCS, alternative requirements, simulator approaches, and state-of-the-art technologies to develop candidate concepts and designs.

Source record↗