The Cires facility in Morvilliers: from a VLL waste disposal facility to the development of industrial activities - 15252
The disposal facility of CIRES for very low level wastes was designed to provide safe and cost effective services to waste generators, in particular for decommissioning works. The facility could significantly increase waste annual deliveries to meet waste generators' needs and accommodate large disused components as PWR steam generators after decontamination. However an anticipated saturation of its capacity is foreseen as needs for disposal has doubled since its start-up. The geometry of the cells was optimized and the technical capacity of the repository is presently by 40% above its licensed capacity. Saturation has been delayed; however a new facility will be necessary by 2030 and other waste management options are to be considered as recycling of metallic wastes or crushed concrete rubble. CIRES facility also became Andra's industrial platform for the management of institutional wastes. A grouping and a storage facility have been built and a new processing facility should start up in 2016. (authors)