Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Engineering design”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Engineering Design of a Polaris Membrane CO 2 Capture System at a Cement Plant

Sargent & Lundy (S&L) and Membrane Technology and Research, Inc. (MTR) in cooperation with CEMEX, completed an initial engineering design study to evaluate the retrofit of MTR’s membrane-based post-combustion carbon dioxide (CO 2 ) capture technology to the CEMEX Balcones cement plant (Balcones) Kiln 2. The CO 2 capture plant is designed to treat the entire flue gas flow from Kiln 2; it is estimated that this system will capture 2,039 tonnes/day per day (TPD) of CO 2 , approximately 75% of current CO 2 emissions from the kiln. The captured CO 2 is compressed to 2,213 psia (152.58 bara) before flowing to the capture plant boundary tie-point. It was assumed for this study that the CO 2 would be pumped off-site and transferred by pipeline to either a CO 2 storage complex for geological sequestration or elsewhere for Enhanced Oil Recovery (EOR).

42 ENGINEERING↗

Deer Park Energy Center Natural Gas Combined Cycle Carbon Capture System Front-End Engineering Design Study (Final Scientific/Technical Report – Unlimited)

Calpine Texas CCUS Holdings, LLC (Calpine), Shell Catalysts & Technologies (SCT), Technip Energies (TEN), and Sargent & Lundy, LLC (S&L) have conducted a Front-End Engineering Design (FEED) Study to integrate a new carbon capture system at Calpine’s Deer Park Energy Center (DKEC). The DKEC facility is a nominal 1200 MW gas-fired co-generation power plant situated at the Shell Chemical Manufacturing (Shell) Facility located in Deer Park, Texas. Steam is produced for use by the adjacent Shell Chemical Manufacturing Facility as well as by the onsite steam turbine for electrical generation. The power output from DKEC is provided to the Electric Reliability Council of Texas (ERCOT) operated power grid. DKEC provides power to industrial and commercial customers via this interconnection.

03 NATURAL GAS↗

Integrating engineering design improvements with exoelectrogen enrichmentprocess to increase power output from microbial fuel cells

Microbial fuel cells (MFC) hold promise as a green technology for bioenergy production. The challenge is to improve the engineering design while exploiting the ability of microbes to generate and transfer electrons directly to electrodes. A strategy using a combination of improved anode design and an enrichment processwas formulated to improve power densities. The designwas based on a flow-through anode with minimal dead volume and a high electrode surface area per unit volume. The strategy focused on promoting biofilm formation via a combination of forced flow through the anode, carbon limitation, and step-wise reduction of external resistance. The enrichment process resulted in development of exoelectrogenic biofilm communities dominated by Anaeromusa spp. This is the first report identifying organisms fromthe Veillonellaceae family in MFCs. The power density of the resulting MFC using a ferricyanide cathode reached 300Wm−3 net anode volume (3220mWm−2), which is about a third of what is estimated to be necessary for commercial consideration. The operational stability of the MFC using high specific surface area electrodes was demonstrated by operating the MFC for a period of over four months.

biocatalyst↗

Front-End Engineering Design (FEED) Study for a Carbon Capture Plant Retrofit to a Natural Gas-Fired Gas Turbine Combined Cycle Power Plant (2x2x1 Duct-Fired 758-MWe Facility with F Class Turbines)

A comprehensive front-end engineering design (FEED) study has been undertaken by Bechtel National Inc. (Bechtel) for locating a post-combustion capture and compression (PCC) unit at Panda’s Sherman natural gas–combined cycle (NGCC) power plant in Sherman, Texas. This is described in the unredacted FEED Study report (Attachment 1) with all supporting documents, numbering over 150. The Study Report is publicly available. Sizing of the PCC plant is based on treating an amount of flue gas equivalent to that produced when generating 420 MW, which is approximately 68% of the total flue gas emitted by the NGCC power plant operating at guarantee condition with duct burners off. A reduced power plant capacity factor was used for sizing the PCC plant because the gas turbines at the site often operate at reduced load due to the high penetration of renewable power in the ERCOT region. The cost of carbon capture is primarily driven by capital cost (and therefore is highly sensitive to capacity factor). Sizing the capture unit so that when used it is nearly always operating at full capacity is critical to the economic viability of the proposed investment.

03 NATURAL GAS↗

Enlightened Education: Solar Engineering Design to Energize School Facilities

Here, this paper explores the potential for universities, colleges, and K-12 schools to implement solar electric infrastructure projects on their campuses that not only provide financial savings but also provide learning environments and instructional opportunities for students. A recent case study at Madison College is presented for a 1.85 MW photovoltaic system that is the largest solar rooftop installation in the State of Wisconsin. The system was designed with several unique features to facilitate public access, provide students with hands-on interaction, and compare and contrast several different types of solar equipment. Special engineering design considerations should be made when installing solar on schools, and recommended practices from the Madison College experience are detailed. Madison College completed a Solar Roadmap in order to prioritize and sequence investment in solar across the multiple buildings and campus locations operated by the college. The featured installation was the first project within that plan. A ten-step guide on how to create a solar roadmap is shared, so that other schools can learn from Madison College’s experience and replicate the process for their own institutions.

14 SOLAR ENERGY↗

Engineering Design with Digital Thread

Digital Thread is a data-driven architecture that links together information generated from across the product lifecycle. Though Digital Thread is gaining traction as a digital communication framework to streamline design, manufacturing, and operation processes in order to more efficiently design, build, and maintain engineering products, a principled mathematical formulation describing the manner in which Digital Thread can be used for critical design decisions remains absent. The contribution of this paper is to present such a formulation from the context of a data-driven design and decision problem under uncertainty. This formulation accounts for the fact that the design process is highly iterative and not all information is available at once. Output design decisions are made not only on what data to collect but also on the costs and benefits involved in experimentation and sensor instrumentation to collect that data. The mathematical formulation is illustrated through an example design of a structural fiber-steered composite component. In this example, the methodology highlights how different sequencing of small-scale experimentation with manufacturing and deployment lead to different designs and different associated costs.

42 ENGINEERING↗

Engineering Design of D1/D3 Dipole Magnets for the Electron-Ion Collider (EIC)

Here, the Electron-Ion Collider (EIC) at Brookhaven National Laboratory (BNL) is designed to deliver a peak luminosity of 10 34 cm −2 s −1 . An electron storage ring (ESR) will be installed in the existing Relativistic Heavy Ion Collider (RHIC) tunnel and will store polarized electron beams from 5 to 18 GeV. The ESR will have 750 dipole magnets with varying field requirements, including 576 super-bend triplets consisting of two magnets D1/D3 and D2. This paper presents on the engineering design of the D1/D3 dipole magnets within the arcs, with special focus on the coil design that allows the magnet to be configured for variable ampere-turns per energy.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Engineering design of vertical test stand cryostat

Under Indian Institutions and Fermilab collaboration, Raja Ramanna Centre for Advanced Technology and Fermi National Accelerator Laboratory are jointly developing 2K Vertical Test Stand (VTS) cryostats for testing SCRF cavities at 2K. The VTS cryostat has been designed for a large testing aperture of 86.36 cm for testing of 325 MHz Spoke resonators, 650 MHz and 1.3 GHz multi-cell SCRF cavities for Fermilab's Project-X. Units will be installed at Fermilab and RRCAT and used to test cavities for Project-X. A VTS cryostat comprises of liquid helium (LHe) vessel with internal magnetic shield, top insert plate equipped with cavity support stand and radiation shield, liquid nitrogen (LN{sub 2}) shield and vacuum vessel with external magnetic shield. The engineering design and analysis of VTS cryostat has been carried out using ASME B&PV Code and Finite Element Analysis. Design of internal and external magnetic shields was performed to limit the magnetic field inside LHe vessel at the cavity surface <1 {micro}T. Thermal analysis for LN{sub 2} shield has been performed to check the effectiveness of LN{sub 2} cooling and for compliance with ASME piping code allowable stresses.

43 PARTICLE ACCELERATORS↗

Front End Engineering Design Report

Energy storage is becoming an increasingly important component on modern power grids to ensure sufficient balancing capability for intermittent renewable power generations is available to maintain system reliability. Although energy storage has traditionally been provided by pumped storage hydroelectric systems, it is not possible to install these at every location and they can be expensive to construct. Lithium Ion batteries are increasingly being used to carry out energy storage grid services, however these can be expensive when specified over a few hours of capacity. An alternative way to store substantial energy is to use thermal energy storage (TES). This has been deployed on concentrated solar units using molten nitrate salts as a storage media. Again, the cost of the material can be prohibitive, thus lower cost alternative materials are being actively sought, such as sand, rocks and concrete. This project investigates the potential for Concrete Thermal Energy Storage (CTES) when used to directly store thermal energy from a thermal plant source. This report represents the initial Front-End Engineering Design (FEED) deliverables that are submitted for the Hazard and Operability (HAZOP) safety review for process validation.

25 ENERGY STORAGE↗

PPPL ST-FNSF Engineering Design Details

One of the goals of the PPPL Spherical Tokamak (ST) Fusion Nuclear Science Facility (FNSF) study was to generate a self-consistent conceptual design of an STFNSF device with sufficient physics and engineering details to evaluate the advantages and disadvantages of different designs and to assess various ST-FNSF missions. This included striving to achieve tritium self-sufficiency; the ability to provide shielding protection of vital components and to develop maintenance strategies that could be used to maintain the in-vessel components (divertors, breeding blankets, shield modules and services) and characterize design upgrade potentials to expanded mission evolutions. With the conceptual design of a 2.2 m ST pilot plant design already completed emphasis was placed on evaluating a range of ST machine sizes looking at a major radius of 1m and a mid-range device size between 1 m and 2.2 m. This paper will present an engineering summary of the design details developed from this study, expanding on earlier progress reports presented at earlier conferences that focused on a mid-size 1.7 m device. Further development has been made by physics in defining a Super-X divertor arrangement that provides an expanded divertor surface area and places all PF coils outside the TF coil inner bore, in regions that improve the device maintenance characteristics. Physics, engineering design and neutronics analysis for both the 1.7 m and 1 m device have been enhanced. In conclusion, the engineering results of the PPPL ST-FNSF study will be presented along with comments on possible future directions.

42 ENGINEERING↗

Preliminary engineering design of sodium-cooled CANDLE core

The CANDLE burning process is characterized by the autonomous shifting of burning region with constant reactivity and constant spacial power distribution. Evaluations of such critical burning process by using widely used neutron diffusion and burning codes under some realistic engineering constraints are valuable to confirm the technical feasibility of the CANDLE concept and to put the idea into concrete core design. In the first part of this paper, it is discussed that whether the sustainable and stable CANDLE burning process can be reproduced even by using conventional core analysis tools such as SLAROM and CITATION-FBR. As a result, it is certainly possible to demonstrate it if the proper core configuration and initial fuel composition required as CANDLE core are applied to the analysis. In the latter part, an example of a concrete image of sodium cooled, metal fuel, 2000MWt rating CANDLE core has been presented by assuming an emerging inevitable technology of recladding. The core satisfies engineering design criteria including cladding temperature, pressure drop, linear heat rate, and cumulative damage fraction (CDF) of cladding, fast neutron fluence and sodium void reactivity which are defined in the Japanese FBR design project. It can be concluded that it is feasible to design CANDLE core by using conventional codes while satisfying some realistic engineering design constraints assuming that recladding at certain time interval is technically feasible.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Engineering Design Elements of a Two-Phase Thermosyphon to Trannsfer NGNP Nuclear Thermal Energy to a Hydrogen Plant

Two hydrogen production processes, both powered by a Next Generation Nuclear Plant (NGNP), are currently under investigation at Idaho National Laboratory. The first is high-temperature steam electrolysis, which uses both heat and electricity; the second is thermo-chemical production through the sulfur iodine process primarily using heat. Both processes require a high temperature (>850°C) for enhanced efficiency; temperatures indicative of the NGNP. Safety and licensing mandates prudently dictate that the NGNP and the hydrogen production facility be physically isolated, perhaps requiring separation of over 100 m.

42 ENGINEERING↗

Findings on subtask 3.3 – applicability of automated brine chemistry determinations for treatment and recovery processes through facility automation/modularization: engineering design study

Under the Energy & Environmental Research Center’s (EERC’s) ~$\$$22 million Phase II Brine Extraction and Storage Test (BEST) Program, a multimillion-dollar brine treatment technology test bed facility was established in western North Dakota to provide a platform for evaluating developing technologies and approaches for brine treatment and volume reduction. The initial facility, and associated research effort, was funded by the U.S. Department of Energy (DOE), with in-kind contributions provided by several industry participants and the state of North Dakota. Since its opening, the Brine Technology Test Facility (BTTF) has supported performance evaluations of desalination technologies capable of treating high-salinity produced water (PW) and enabled data collection for multiple approaches of PW management and critical material recovery. As part of the decommissioning process for the original project, facility ownership and liability were transferred to Select Water, which is providing the EERC with a continuing site access option for state or federal research and/or commercial technology development. This report documents the findings from a design study conducted by the EERC and the engineering firm that was originally contracted to design and construct the facility (Advanced Engineering and Environmental Services, LLC [AE2S]) that evaluated the current status of BTTF and its systems and developed a retrofit design to increase the facility’s capabilities through automation and modularization of its PW treatment infrastructure. The proposed retrofit will provide DOE and industry with an expanded range of conditioned PW that can be produced at the facility for evaluating fit-for-purpose water treatment technologies, online instrumentation for brine chemistry determination, and systems that recover critical materials like lithium and magnesium. The current facility consists of an 9600-square-foot facility that includes a 40-foot by 65-foot Class 1, Division 2-rated demonstration area and associated control rooms and lab-ready space capable of sourcing oil and gas PW and wastewater from industrial sources or tailoring brine compositions up to 300,000 mg/L total dissolved solids (TDS) and supplying them at rates up to 25 gpm for extended-duration technology demonstrations. The colocation of the facility with Select Water’s water management facilities allows for access and unloading of more than 10,000 bbl/day of trucked water delivered to site and associated access to on-site Class I and Class II brine disposal wells and nearby hazardous waste landfills operated and/or contracted by Select Water to dispose of concentrate and/or effluents associated with the testing.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Diagnostic systems in DEMO: Engineering design issues

The diagnostic systems of DEMO that are mounted on or near the torus, whether intended for the monitoring and control functions of the engineering aspects or the physics behaviour of the machine, will have to be designed to suit the hostile nuclear environment. This will be necessary not just for their survival and correct functioning but also to satisfy the pertinent regulatory bodies, especially where any of them relate to machine protection or the prevention or mitigation of accidents foreseen in the safety case. This paper aims to indicate the more important of the reactor design considerations that are likely to apply to diagnostics for DEMO, drawn from experience on JET, the provisions in hand for ITER and modelling results for the wall erosion and neutron damage effects in DEMO.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Front-End Engineering Design for Carbon Capture from Shell's Deer Park Chemical Complex (Final Scientific/Technical Report)

This is the final scientific/technical report for a Front-End Engineering and Design (FEED) whose objective was to separate and capture over 820,000 tonnes per year (tpy) CO2 emissions from the commercially operated Shell Chemicals Complex located in Deer Park, Texas, USA reducing the overall facility CO2 emissions by 95% while providing energy transition jobs in a commercial area with a high concentration of refinery and chemical facilities producing CO2 emissions. The emission sources at the facility that were in scope were a total of Sixteen Furnaces – 8 OP3 furnaces and 8 OP3/HT2 Furnaces. Other minor sources were out of scope.

01 COAL, LIGNITE, AND PEAT↗

A novel machine learning-based optimization algorithm (ActivO) for accelerating simulation-driven engine design

A novel design optimization approach (ActivO) that employs an ensemble of machine learning algorithms is presented. The proposed approach is a surrogate-based scheme, where the predictions of a weak leaner and a strong learner are utilized within an active learning loop. The weak learner is used to identify promising regions within the design space to explore, while the strong learner is used to determine the exact location of the optimum within promising regions. For each design iteration, exploration is done by randomly selecting evaluation points within regions where the weak learner-predicted fitness is high. The global optimum obtained by using the strong learner as a surrogate is also evaluated to enable rapid convergence once the most promising region has been identified. First, the performance of ActivO was compared against five other optimizers on a cosine mixture function with 25 local optima and one global optimum. In the second problem, the objective was to minimize indicated specific fuel consumption of a compression-ignition internal combustion (IC) engine while adhering to desired constraints associated with in-cylinder pressure and emissions. In this work, the efficacy of the proposed approach is compared to that of a genetic algorithm, which is widely used within the internal combustion engine community for engine optimization, showing that ActivO reduces the number of function evaluations needed to reach the global optimum, and thereby time-to-design by 80%. Furthermore, the optimization of engine design parameters leads to savings of around 1.9% in energy consumption, while maintaining operability and acceptable pollutant emissions.

97 MATHEMATICS AND COMPUTING↗

Streamlining NIF Design Engineering Processes

As a new project and facility, the National Ignition Facility (NIF) located a Lawrence Livermore National Laboratory (LLNL), adopted a design standard that incorporated a safety criteria process that all equipment was to be designed with thorough design documentation and a level of safety evaluation that guaranteed tractability and success in the commissioning of this new asset. The documentation is in the form of a Mechanical Engineering Safety Note (MESN) or Engineering Note (EN), which is a complete stand-alone review document of each design, with backup support, detailed analysis, drawings and a full review committee signoff. The design safety review process was given conservative Factors of Safety (FS) and guidance to evaluated design adequacy, leading to robust support structures. The MESN, EN, FS and guidance requirements were primarily driven by a need for confidence in the early success of the facility and the importance of personnel safety concerns. As the NIF facility and operations have matured and design loads, usage and risks have been become well defined and empirically validated, and we now have an opportunity to streamline the design process by not requiring such strict adherence to historical practice, specifically for non-personnel safety related requirements. This streamlining helps support a congressional review that was performed on NIF to determine cost saving opportunities in all areas of operation and development. This proposed NIF design guidance design approach would save design time, schedule and material costs. The new design approach includes reductions in FS and reduction in formal documentation, and will be implemented through the release of a NIF Design Guidance Document. This document will be used actively by designers, project engineers, structural analysts, safety engineers, scientists and engineering management to prepare, evaluated and approve designs for NIF experiments. This document will also be used as a general supporting reference for all design reviews involving the active stakeholders. The active stakeholders will gain through a faster design cycle time, from requirements, to concept, to final design, using less expensive materials and fewer design iterations. The passive stakeholders will gain through lighter weight equipment, easier to acquire materials, easier to manufacture parts and shorter schedules to get equipment in the hands of the user.

42 ENGINEERING↗

A cabled acoustic telemetry system for detecting and tracking juvenile salmon: Part 1. Engineering design and instrumentation

The U.S. Army Corps of Engineers-Portland District started development of the Juvenile Salmon Acoustic Telemetry System (JSATS), a nonproprietary technology, in 2001 to meet the needs for monitoring the survival of juvenile salmonids through the 31 federal dams in the Federal Columbia River Power System (FCRPS). Initial development focused on coded acoustic microtransmitters, and autonomous receivers that could be deployed in open reaches of the river for detection of the juvenile salmonids implanted with microtransmitters as they passed the autonomous receiver arrays. In 2006 the Pacific Northwest National Laboratory (PNNL) was tasked with development of an acoustic receiver system for deployment at hydropower facilities (cabled receiver) for detecting fish tagged with microtransmitters as well as tracking them in 2 or 3-dimensions as the fish passed at the facility for determining route of passage. The additional route of passage information, combined with survival estimates, is used by the dam operators and managers to make structural and operational changes at the hydropower facilities to improve survival of fish as they pass the facilities and through the FCRPS.

13 HYDRO ENERGY↗