Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Eastern Interconnection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Developing a Power Plant Suitability Model for the Energy Zones Mapping Tool

This report provides an example of designing, developing, and running a power plant suitability model in the Energy Zones Mapping Tool (EZMT), a public, web-based mapping tool with a large spatial database focused on energy infrastructure, energy resources, and related siting factors. The example focuses on natural gas combined cycle (NGCC) power plants, which have several unique and interesting characteristics. NGCC plants typically provide peaking power to the electrical grid. Such plants can be started or stopped relatively quickly and are often used to supplement base load plants (such as nuclear or coal) during times of peak electrical consumption or to counterbalance lulls in variable power generation (such as wind or solar). Due to these and other factors, NGCC plants have been projected to increase in number under energy planning studies such as Hadley et al. The scope of the Hadley et. al. study is the Eastern Interconnection (EI), the electrical transmission grid serving much of the United States and Canada east of the Rocky Mountains. Results in the study are organized according to 22 Multi-region National—North American Electricity and Environment Model (NEEM) regions within the EI. NGCC plants usually have lower water requirements than other thermoelectric power plants they may replace; therefore, they are expected to have an interesting role in reducing the overall water requirements of energy generation.

20 FOSSIL-FUELED POWER PLANTS↗

Big Data Synchrophasor Monitoring and Analytics for Resiliency Tracking (BDSMART)

This report contains key findings from a project titled Big Data Synchrophasor Monitoring and Analytics for Resiliency Tracking (BDSMART), which was carried out through a collaborative effort of a team of researchers from Texas A&M Engineering Experiment Station, Temple University, and Quanta Technology, LLC. The in-kind support came from OSIsoft (acquired by AVEVA), which provided their PI Historian software to demonstrate the use case of streaming PMU data. The first section of the report describes the project goals and objectives related to the development of Machine Learning (ML) models capable of detecting and classifying events by processing phasor measurements captured in the field by Phasor Measurement Units (PMUs). The data for this study was contributed by the utilities/ISOs from the Western and Eastern interconnects and ERCOT, further referred to as Interconnect B (IC B), Interconnect A (IC A), and Interconnect C (IC C), respectively. The approach that the BDSMART Research Team proposed and the key research tasks defined by the team are outlined in this section. The next section describes the technical approach. We first discuss the data constraints related to the PMU measurements and data interpretation constraints imposed by the data contributors. They provided neither the topological information of the grid nor PMU placement locations and captured recorded data at very few locations in the system with the reporting rate of either 30 or 60 fps. The recordings are mostly positive sequence voltage, frequency, and ROCOF, and in some limited cases, three-phase voltages and currents. We then reflect on the bad data issues that stem from poor recording practices and vague definitions of the PMU status bits to supposedly be used for bad data identification. Finally, the data discovery points to imprecise time stamps with incomplete event start/end time, as well as inconsistent and incomplete event labeling, which combined make the implementation of the data models using supervising learning quite challenging. Following the data discovery study, we hypothesize that because the IC B data has the most complete labels, we should focus our model development on that data and then test it on data from other interconnects. We also define the common metrics used to evaluate the results from the ML algorithm tests. We concluded this section by summarizing the common ML models we used and explaining how we implemented and tested them. The issues from this section are expanded in the Training Dataset Report from this project. The final section of this report deals with the accomplishments and conclusions. As the accomplishments, we formulate the problem we are solving and what is achieved by solving the problem. We then reflect on each of the analytics tools we developed and point out the performance of each tool when applied to solving the mentioned problems. We reference this work for further details to the papers we published on each tool. In the conclusions, we give recommendations on how to improve future PMU recording practices to facilitate the ML algorithm implementation and guidance for the future standardization work aimed at clarifying the ambiguities associated with the PMU status bits. We finally list future tasks that can bring about further improvements in the proposed algorithms. The issues from this section are expanded in the Training, and Test Dataset Report filed at the project completion date.

97 MATHEMATICS AND COMPUTING↗

Interpreting Forced Oscillation Notifications from ESAMS: General Guidance for Reliability Coordinators

The Eastern Interconnection Situational Awareness Monitoring System (ESAMS) project demonstrated the feasibility of aggregating synchrophasor measurements from across an interconnection, analyzing them, and providing real-time wide-area situational awareness to system operators who may have excellent visibility within their footprint but lack an interconnection-wide view. An application within ESAMS that has garnered industry interest involves detecting forced oscillations visible across multiple areas, identifying the region where the oscillation originated from, quantifying the uncertainty in source localization results, and notifying users in real-time if the detected oscillation amplitudes cross a specified threshold. It is expected that system operators will utilize their internal SCADA/EMS/synchrophasor systems in conjunction with information provided by ESAMS to take effective mitigation actions if forced oscillation notifications are received. This report provides some general guidance on how the ESAMS information can be used for source localization and coordination among multiple reliability coordinators; and also identifies potential enhancements to ESAMS notifications for improved interpretability.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Mitigating Data Center Impact on Grid Stability: A Coordinated Control Strategy Using Verrus StabiliGrid Architecture

Large data centers, which now represent a significant and growing share of the total U.S. grid load, can inadvertently destabilize the electrical grid when they disconnect simultaneously during brief voltage disturbances. The July 10, 2024, Eastern Interconnection incident, in which a sub-100-millisecond transmission fault triggered the cascading loss of approximately 1,500 MW of data center load, illustrates this vulnerability. While commercial battery energy storage systems (BESS) deployed in data centers provide device-level fault ride-through per IEEE 1547, they lack coordination with facility protection logic and uninterruptible power supplies (UPS), limiting their effectiveness as grid-stabilizing assets. This report presents the Verrus StabiliGrid architecture, a coordinated control framework that integrates BESS, UPS, and point-of-interconnection (POI) protection settings to enable data centers to ride through both undervoltage and overvoltage grid contingencies without disconnecting. The four-step strategy encompasses: (1) high-resolution power quality monitoring to detect the grid state during events such as undervoltage, overvoltage, underfrequency, and overfrequency; (2) POI protection settings that allow for extended ride-through and grid-connected operation during grid contingencies; (3) grid state-driven autonomous dispatch of assets to improve grid resilience by reducing power draw during undervoltage or absorbing more power during overvoltage events; and (4) coordinated post-recovery dispatch of data center assets to restore firm load to pre-contingency levels. Validated through controller-hardware-in-the-loop (C-HIL) simulations at the National Laboratory of the Rockies, results show grid import restoration to pre-fault levels within 100 milliseconds of voltage recovery. This work advances the ability of data centers to transition from passive, disturbance-sensitive loads to active participants in grid stability, a capability increasingly required by emerging NERC and ERCOT regulatory frameworks.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Interregional Transmission Operational Coordination (IRTOC)

This report presents a modeling and evaluation framework developed through the Inter-Regional Transmission Operational Coordination (IRTOC) project to study market-to-market (M2M) congestion management across day-ahead and real-time markets. The framework extends the Sienna platform through Sienna Decomposition, a multi-stage evaluation architecture that enables flexible representation of multiple regions and systematic assessment of alternative market coordination designs. Additional modeling capabilities include reserve deliverability constraints, High-Voltage Direct Current (HVDC) optimization for Alternating Current (AC) congestion management, and several real-time distributed coordination algorithms. Case studies using the RTS-GMLC test system and a large-scale Eastern Interconnection model demonstrate that the framework can evaluate alternative coordination structures and quantify their economic and operational impacts. The proposed framework provides a scalable platform for analyzing inter-regional coordination strategies in large-scale electricity markets.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Statistical Steady-State Stability Analysis for Transmission System Planning for Offshore Wind Power Plant Integration

This paper presents a statistical steady-state stability analysis for transmission system planning studies in order to identify operational issues inherent in the integration of offshore wind power plants. It includes normal and contingency operation. This study considers the integration of a 1000-MW offshore wind power plant into the FirstEnergy/PJM service territory in the U.S. Great Lakes region as a case study and uses a realistic computer model of the U.S. Eastern Interconnection, a 63,000-bus test system. The results show the utility of this statistical analysis tool and its effectiveness in identification of the operational impacts as a result of the integration of offshore wind power plant.

Sajadi, Amirhossein↗

Hybrid EMT-TS Simulation Strategies to Study High Bandwidth MMC-Based HVdc Systems

Modular multilevel converters (MMCs) are widely used in the design of modern high-voltage direct current (HVdc) transmission system. High-fidelity dynamic models of MMCs-based HVdc system require small simulation time step and can be accurately modeled in electro-magnetic transient (EMT) simulation programs. The EMT program exhibits slow simulation speed and limitation on the size of the model and brings certain challenges to test the high-fidelity HVdc model in system-level simulations. This paper presents the design and implementation of a hybrid simulation framework, which enables the co-simulation of the EMT model of Atlanta-Orlando HVdc line and the transient stability (TS) model of the entire Eastern Interconnection system. This paper also introduces the implementation of two high-fidelity HVdc line models simulated at different time steps and discusses a dedicated method for sizing the buffer areas on both sides of the HVdc line. The simulation results of the two HVdc models with different sizes of buffer areas are presented and compared.

Liu, Yuan↗

Phasor-Measurement-Unit-Based Data Analytics Using Digital Twin and PhasorAnalytics Software

A major objective of this project was to apply GE’s commercial machine learning and data analytics toolsets to large-scale, real-world, anonymized Phasor Measurement Unit (PMU) datasets in order to extract signatures, correlated and/or causal factors, and precursor patterns associated with significant power system phenomena. The project had a particular emphasis on extraction of insights relevant to asset health monitoring, real-time load modeling and cybersecurity monitoring. Additionally, the team was directed to undertake a comprehensive data quality analysis for the provided datasets and encouraged to estimate the ‘machine-learning readiness’ of the datasets by documenting any major obstacles to the application of commercial machine learning algorithms. To accomplish the aforementioned objectives, the project team’s work centered around the identification of key event signatures and application of the identified event signatures for event detection and event classification. The industry-validated, semi-supervised machine learning strategy employed for event signature identification involved several major tasks, including data-preprocessing, generation of an overabundance of features, normal data identification, normality modeling, and event signature identification through a methodical, quantitative ranking of features in order of relevance to each studied event type. Throughout the project, data quality issues and mitigation techniques were investigated. In this report, insights are provided regarding the readiness of the provided synchrophasor datasets for application of machine learning and data analytics. The methodologies employed for this technical strategy are summarized in this report. With regards to data preprocessing and feature generation, the provided Training and Test Datasets were ingested into GE’s big data environment. Subsequently, the team applied bad data cleansing and data imputation scripts, event detection scripts, and application programming interfaces (APIs) to the datasets for convenient data access. The project team completed development and validation of dozens of physics-based, statistics-based and transformation-based feature functions used for the extraction of over 60 synchrophasor features. Using a new parallel feature generation technology developed on this project, over 60 features have been rapidly generated for the full two years’ worth of Training and Test Dataset data associated with both the Eastern and Western interconnects. Even accommodating for temporal down-sampling inherent to the feature extraction procedure, this parallel feature generation activity resulted in a massive feature set with a storage requirement approximately equal to that of the raw training dataset itself. With regards to normal data identification and normality modeling, a normality model was built using the feature data extracted from the Training Dataset and iteratively refined subsequent to incremental adjustments and expansions of the Training Dataset feature data. With respect to event characterization and signature identification, an event signature identification pipeline was developed and used in conjunction with the normality model to identify over 15 event signatures for key event categories within the Training Dataset. The identified event signatures were used to characterize hundreds of key events in terms of relative severity, duration, and location of the event. An investigation was undertaken to identify correlated and causal factors involved in transformer events. A separate investigation into temporal trends in ring-down analysis results was undertaken to determine possible associations between system dynamics and various other factors such as loading, season or year. To validate the identified event signatures, additional work was undertaken to develop signature-based anomaly detection and classification tools suitable for convenient application to the synchrophasor datasets. The anomaly detection and classification tools, suitable for online application, were then applied to the entirety of the Eastern Interconnect Training and Test Datasets. Performance of the event detection and classification tools was evaluated upon receipt of the Test Dataset event logs (i.e., the labels for events contained in the Test Dataset), and promising results were obtained despite several challenges (documented herein) associated with application of supervised or semi-supervised machine learning methods to large-scale, anonymized datasets. Finally, the detection and classification tools were used to detect, classify, and characterize thousands of new events not included in the original event logs provided by the DOE within both the Training and Test Datasets.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Value of Increased HVDC Capacity Between Eastern and Western U.S. Grids: The Interconnections Seam Study

The Interconnections Seam Study examines the potential economic value of increasing electricity transfer between the Eastern and Western Interconnections using high-voltage direct-current (HVDC) transmission and cost-optimizing both generation and transmission resources across the United States, proposing, assessing, justifying, and illustrating a major infrastructure change involving two of the worlds largest power grids. The study conducted a multi-model analysis that used co-optimized generation and transmission expansion planning and production cost modeling. Four transmission designs under eight scenarios were developed and studied to estimate costs and potential benefits. The results show benefit-to-cost ratios that reach as high as 2.5, indicating significant value to increasing the transmission capacity between the interconnections under the cases considered, realized through sharing generation resources and flexibility across regions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Value of Increased HVDC Capacity Between Eastern and Western U.S. Grids: The Interconnections Seam Study

The Interconnections Seam Study examines the potential economic value of increasing electricity transfer between the Eastern and Western Interconnections using high-voltage direct-current (HVDC) transmission and cost-optimizing both generation and transmission resources across the United States. The study conducted a multi-model analysis that used co-optimized generation and transmission expansion planning and production cost modeling. Four transmission designs under eight scenarios were developed and studied to estimate costs and potential benefits. The results show benefit-to-cost ratios that reach as high as 2.9, indicating significant value to increasing the transmission capacity between the interconnections under the cases considered, realized through sharing generation resources and flexibility across regions.

13 HYDRO ENERGY↗

Use of Machine Learning on PMU Data for Transmission System Fault Analysis

Synchrophasor technology has been used for monitoring, control, and protection of bulk power system for over 10 years. Deployment of phasor measurement units (PMUs) in the USA power system has surpassed 3000 units installed in the transmission substations as stand-alone intelligent electronic devices (IEDs) or as a software add-on to other devices such as digital protective relays (DPRs) or digital fault recorders (DFRs). By now, thousands of terabytes of PMU data may have been captured and stored by various transmission system operators (TSOs) and independent system operators (ISOs). This creates an opportunity to deploy advanced machine learning (ML) techniques to detect and classify faults recorded by PMUs automatically to be used by the system operators for rapid, critical decision-making when manual analysis of the past or unfolding events is not feasible. In this paper we offer a brief background on how the automated fault analysis may be done using DPR and/or DFR data, and compare some of the legacy approaches to the new ML approaches in the context of the system-wide PMU recordings. We then offer insights from developing practical ML solutions that have been applied on field recordings captured by close to 450 PMUs from all three US interconnections (Western, Eastern and ERCOT) over two years (2016-2017). We identify and illustrate ML challenges we addressed: inaccurate data, data with scarce and temporally imprecise fault labels, data recorded by PMUs sparsely located at substations resulting in the fault records taken afar from the ends of the faulted lines, data containing only positive sequence values, and data taken at different voltage levels. We then illustrate the ML model results for fault analysis under different application scenarios. The novelty of this study is not only in the design, implementation, and performance analysis of the ML algorithms, but also in the use of advanced fault modelling and simulation approaches to improve the training results when developing supervised ML models for fault detection and classification. Extensive simulations of faults were conducted on a 14-bus power system to create a training dataset with over 1400 accurately labelled faults. This dataset was applied to enhance the accuracy of fault detection and classification of machine learning-based models trained with small number of labelled faults in large datasets recorded in the grid interconnections ranging from 5,000 to 70,000 buses.

Synchrophasors, Machine Learning, Fault Analysis, ↗

Hydropower operation in future power grid with various renewable power integration

Hydropower generation may play an increasingly important role in the power grid under increasing contribution of variable renewable sources such as wind and solar. An improved understanding of the changes to hydropower dispatch under future higher VRE grid conditions reveals research gap that should be informed power grid planning and reservoir water releases policies considering multiple other water uses and varying hydrologic condition. Here this study aims to understand the role of hydropower in a changing power grid by employing a production cost model, PLEXOS, across future power system scenarios, planning horizons, and regions. We explore optimized hydropower dispatch to understand its potential role in minimizing the system cost and renewable curtailment. We also examine the sensitivity of hydropower revenue under various grid scenarios of the Eastern U.S. and hydrology conditions. Results indicate hydropower generation follows net load and compensates for the variability of solar and wind generation. Although energy prices are lower during some periods in the future grid scenarios, there is a potential for higher revenue for hydropower by providing both energy and ancillary services during times of stress. Additionally, hydropower revenue is sensitive to hydrology in the SERC region, which we considered as an example. The feasibility of hydropower dispatching with higher ramps between low and high hourly-capacity factors, as indicated in the optimization model, requires further study to consider other water use and ecology constraints.

13 HYDRO ENERGY↗

Interconnections Seam Study [Slides]

The Interconnections Seam Study analyzes the grid impacts of increased connections between the Eastern and Western Interconnections in North America.

17 WIND ENERGY↗

Power System Event Identification with Transfer Learning Using Large-scale Real-world Synchrophasor Data in the United States

The lack of sufficient labeled events and long training time limit the applicability of deep neural network-based power system event identification using synchrophasor data. In this paper, we propose to leverage transfer learning technique to boost the reliability and reduce the required training time of neural classifier for power system event identification. We use the weights of a neural classifier trained on one transmission system as the initial parameters of another neural classifier for a different transmission system. Numerical tests with real-world synchrophasor data from the Eastern and Western Interconnections of the United States show that the proposed transfer learning approach is very effective in not only improving the training reliability but also reducing the training time.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Synchronized Phasor Measurement Unit-based Central Controller for Normal and Contingent Operation of a High-Capacity HVDC Macrogrid for the Continental US

This paper presents a Synchronized Phasor Measurement Unit (PMU) based controller to support the coordination and operation of a high-capacity high-voltage direct current (HVDC) macrogrid transmission for the continental US. The proposed controller allows for optimal scheduling of each segment of the multi-terminal HVDC network under normal and contingent conditions, while considering minimum levels of frequency response requirements. The performance of the proposed controller is tested on a 100,222-bus representation of the US Eastern and Western interconnections. Results show that a centralized PMU-based controller improves the frequency nadir of the HVDC macrogrid under contingency conditions by 25.9%. Furthermore, the primary frequency response (PFR) of the HVDC macrogrid is increased by 33.4%. The performance of each interconnection under the largest credible contingency conditions is also discussed.

Mohan, Nihal↗

Automated System-wide Event Detection and Classification Using Machine Learning on Synchrophasor Data

As the number of phasor measurement units (PMUs) deployed in a power system increases, and their data volume streamed to the control canter intensifies, operators are facing challenges related to the analysis of such data, which need to be observed and responded to as the measurements are displayed in the Control Room. Humans are generally unable to process such large amount of data efficiently and rapidly. There is an apparent need for automated ways to analyze the data, extract actionable information about occurrence of specific events, and characterize the events quickly and cost effectively. This paper discusses the use of machine learning (ML) to facilitate such tasks by providing automated, highly computationally efficient, and cost-effective ways of extracting actionable information from synchrophasor big data in real-time. We developed Big Data Smart (BDSmart) ML-based prototype tool for the Control Room use that automatically analyses data properties from synchrophasor system measurements taken across the three grid Interconnections in the USA (Western, Eastern and ERCOT). The data collected from several hundreds of PMUs located across the Interconnections over a period of two years have been made available for our extensive study. As a result, we were able to identify a number of big data properties that influence how ML methodology is applied to select, develop, train and test the data models that can eventually be used for the tool implementation. The resulting set of candidate algorithms spans unsupervised, supervised, semi-supervised and transfer-learning approaches. Many ML techniques, such as decision trees, multinomial logistic regression, feed-forward neural networks, K-nearest neighbor, multiclass support vector machine, and single and multi-channel convolutional neural networks, are implemented, and their performance is examined. We offer the results from testing the data models. The novelty of our study is in the approaches for bad data detection and mitigation, selection of a simplified feature for event detection, and data label improvements. As a result, we came up with a list of recommendations for the utilities on how to improve the PMU recording practices to cater to the future ML applications aimed at automating the analysis of synchrophasor data.

Synchrophasors, Machine Learning, System-wide Even↗

Machine Learning Guided Operational Intelligence from Synchrophasors (Final Report)

Schweitzer Engineering Laboratories (SEL) and Oregon State University (OSU) received over 27 terabytes of electrical power system phasor measurement unit (PMU) data for the Eastern, Western, and ERCOT interconnections. The dataset includes measurements spread across 446 PMUs from early 2016 to mid 2018 depending on the interconnect. The full dataset was split into a training and test (holdout) dataset by PNNL. All data was received in the Apache Parquet format. The overarching goal of this project is to develop and execute a strategy to mitigate data anomalies, perform analysis on the dataset, and detect anomalous events in the data.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Frequency Response and Congestion Management using Multi-Terminal HVDC Overlay

Continental level power system interconnections using a High Voltage direct current (HVDC) transmission lines have been considered to bring economic benefits such as interregional power exchange. This paper describes the modeling process and studies the technical benefits of having multiple HVDC lines, including a grid of HVDC lines (macrogrid) configuration, connecting the North American Eastern and Western electric power interconnections. The models developed provide steady state and stability analysis for multiple HVDC overlay topologies and provide technical benefit analysis in terms of frequency response and congestions management. The paper also provides a comparison of different HVDC topologies performance and their grid support in case of major disturbances

Tbaileh, Ahmad↗