Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “EVM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Thoughts on Earned Value Assessments

This slide presentation reviews the concepts of Earned Value reporting and Earned Value Metrics (EVM) and the implementation for the Constellation Program. EVM is used to manage both the contract and civil service workforce, and used as a measure of contractor costs and performance. The Program EVM is not as useful for Level of Effort tasking, for either contractor, or civil service employees. Some issues and concerns in reference to EVM and the process for the use of EVM for Mission assurance are reviewed,

Pido, Kelle↗

Reference Guide for Project-Control Account Managers

The purpose of this guide is intended to be a quick reference for a Project-Control Account Manager (P-CAM) or technical manager empowered with a project’s cost, schedule, and technical responsibilities of a control account(s) when Earned Value Management (EVM) is required. The overall objective is to support the P-CAM in performing their responsibilities as they relate to EVM. In addition, the reference guide describes at a summary level how the scope, schedule, and budget of a project integrate for optimal planning and control of prime contracts and in-house projects. Because NASA implements a diverse and unique portfolio of projects, those projects have traditionally created project-specific systems to manage planning and performance analysis. However, establishment and implementation of a project management system that is common across all centers and mission directorates will facilitate the adoption of best business practices. In addition, the application of timely and predictive analysis, as well as, providing all stakeholders with greater insight into project performance will enhance opportunities for project success. For more detailed information, refer to the NASA EVM System Description; Integrated Baseline Review (IBR) Handbook; EVM Implementation Handbook; Schedule Management Handbook; Work Breakdown Structure (WBS) Handbook; and other agency/industry documentation. In addition, you may contact your local center’s EVM Focal Points. All this information and more can be found at and/or the NASA Engineering Network located at https://nen.nasa.gov/web/pm.

Christopher Lewis Sadler↗

Lessons Learned from NASA Goddard Space Flight Center’s Product Development Lead Training Schedule and Cost Development Workshop: Continuous Improvement

This presentation provides a status of the Goddard Space Flight Center (GSFC) effort to increase foundational knowledge of Product Development Leads (PDLs) in schedule and cost management including earned value management (EVM). In 2012, GSFC’s Engineering and Technology Directorate (ETD) implemented an in-house training program to prepare PDLs for managing the technical, cost, schedule, and risk aspects of spaceflight systems to meet their subsystem commitments. Developed in-house, the PDL training program provides an integrated approach to requirements development, risk, schedule and cost management, EVM, performance tracking, and other areas. The program has been held twice yearly since its inception with 531 participating and 451 completing the curriculum. In 2017, the program won the Robert H. Goddard award for Quality and Process Improvement. Program development and evolution were presented in the 2018 NASA Schedule and Cost Symposium. The presentation was so well received that this year we focus on one workshop within the program: Schedule and Cost Development, including EVM. We examine the on-going logic modeling process and how participant and stakeholder data influence workshop content and design, and how the disciplines of schedule and cost contribute to mission success. In this presentation we refresh you on how the approach integrates lecture, small group discussion, estimating, case study exercises, and problem solving. We update you on the data collected from participants and stakeholders, and we discuss how we use these data to measure training effectiveness. Specific topics include: • How the logic model is used as the backbone for continuous program improvement, • How feedback influences implementation and curriculum updates, • How data collection and analysis inform workshop content and development, including participant discoveries of EVM data, • How including the resource analyst and planner in the product development team supports project success.

Lessons Learned↗

Preliminary Study on the Suitability of a Second-Order Reconstructed Discontinuous Galerkin Method for RELAP-7 Thermal-Hydraulic Modeling

This document presents a preliminary study on the suitability of a second-order reconstructed discontinuous Galerkin (rDG) method for RELAP-7 thermal-hydraulic modeling. The document begins with a brief description of the governing equations for compressible, two-phase vapor and liquid flow, with a presentation of the seven-equation formulation details. A comparative study between the second-order rDG method and the RELAP-7's finite element method (FEM) with a entropy viscosity method (EVM) based numerical stabilization scheme (namely FEM-EVM) over a series of benchmark test problems is demonstrated. The intent for this suite of test problems is to provide baseline comparison data that demonstrate the performance of 1) the rDG solution and 2) the RELAP-7's FEM-EVM solution (with RELAP-7 code version dated August 15, 2017), on problems from single- to specific, limited two-phase flows. For all the test problems in this document, the rDG solutions were obtained with a second-order, two-step, explicit strong stability preserving Runge-Kutta time integration method. The computational results clearly indicate that the performance of the rDG method is superior to that of the RELAP-7's FEM-EVM method in all the test problems presented. Therefore, as far as the test problems in this document are considered, the second-order rDG method is recommended as an improved solution method option for RELAP-7.

97 MATHEMATICS AND COMPUTING↗

Earned Value Management Systems for Operations Activities

An earned value management system (EVMS), which monitors contractor performance, is a requirement for program and project management for all major acquisitions by the United States Federal Government with development effort: (i.e., an asset requiring management attention because of its importance to an agency’s mission; high development, operating, or maintenance costs; high risk and/or high return). As an area less explored in earned value management (EVM) practices, this paper will survey the application of an EVMS for operations activities defined as: (1) Non-capital asset activities that are projects (or project - like) with definable start and end dates, with discrete scopes of work, and measurable accomplishments; as well as (2) Routine or recurring facility or environmental operations. This paper will examine the use of an EVMS to evaluate performance of operations and maintenance activities required once construction of a capital asset is complete and being used as intended. Such activities include upgrades and maintenance in order for capital assets to meet their mission function over a life-cycle (through repair, replacement, etc.). This paper will provide background on this topic from the perspective of the Department of Energy (DOE) Environmental Management (EM) Program. In addition, it will provide material from a panel discussion provided by a group of experts from the October 2019 Office of Environmental Management Project Management Workshop, as well as material from subsequent research on this topic.

97 MATHEMATICS AND COMPUTING↗

Turbulence modelling in CFD: Present status, future prospects

Information is given in viewgraph form for turbulence modeling in computational fluid dynamics (CFD). The Eddy Viscosity Models (EVM), Algebraic Second Moment Closures (ASM), and Differential Second-Moment Closures (DSM) are considered. It is concluded that EVM's, ASM's, and DSM's will remain in use, though with a steady decline in importance of EVM's and ASM's in favor of DSM's. Improved versions of low-Re two-equation EVM's should lead to more reliable predictions of separated flows than are achievable at present. Further refinement of sub-models in second moment closures can be expected throughout this decade. There will be increasing attention given to interfacing SMC with higher order approaches such as LES, and an increased use of two-time-scale schemes providing distinct time scales for large and fairly small eddies.

Launder, Brian E.↗

Earned Value Management Software Projects

JPL has been attempting to apply EVM techniques for the last 15 years with mixed success, especially when applied to software tasks. One of the main causes is that software presents particular challenges that were not considered during the genesis of EVM. A small number of tasks have been able to use EVM effectively and derive great benefits. This paper discusses challenges specific to software management and how they can be successfully addressed. Specifically, it details lessons learned from the $28 million dollar Next Generation Navigation Software Project that replaced NASA’s deep space navigation software for operations. The project was able to successfully use EVM techniques during a four year period, producing 12 releases on their promised delivery dates and projects actual costs that were within 0.3% of the planned budget (under), in contrast to performance before the techniques were put into practice.

Hanna, Robert A.↗

Use of Historical EM Practices and Policies for Management of Cleanup Program and Address GAO Concerns - 20222

As Department of Energy (DOE) Environmental Management (EM) program policies and management practices are revised over time, it might be useful to periodically reflect on the DOE EM program's past to identify practices that have worked and those that might be appropriate for possible reuse in the future. An added impetus to examine alternative approaches is the recent Government Accountability Office (GAO) report entitled 'Nuclear Waste Cleanup - DOE Could Improve Program and Project Management by Better Classifying Work and Following Leading Practices.' The February 2019 GAO report states that EM categorizes most of its work in a way that does not adequately involve independent experts and DOE senior leadership. It also noted that EM has not followed leading practices for program and project management that could help keep the cleanup efforts on schedule and control costs. The GAO report recommended that EM, working with DOE Office of Project Management (PM): - Establish requirements and then assess EM's ongoing operations activities to determine if some activities should be reclassified as capital asset projects based on these newly established requirements. - Review and revise EM's 2017 cleanup policy to include program management leading practices related to scope, cost, schedule performance, and independent reviews. - Update the cleanup policy to require that earned value management (EVM) systems be maintained and used in a way that follows EVM best practices. - Develop a policy to ensure that work is categorized as level of effort (LOE) only in appropriate, specified circumstances, such as when work is not measurable or when measurement is impractical. - Integrate EVM data into EM's performance metrics for operations activities. To assist with improving program performance and implementing audit recommendations, this paper reviewed past successful cleanups such as Weldon Springs, Rocky Flats, Fernald, Ashtabula, Battelle Columbus (abs, and other historical resources and people with experience during the early years of EM program. As such, there are several past practices which may well be suited for reuse today. Some of these practices include: - In 1990's, as the DOE EM cleanup program, known as Environmental Restoration came into effect, the known cleanup scope at each geographic location or site was organized into four levels ranging from overall site-wide cleanup effort to the individual 'release sites', providing high granularity to the program. - The cleanup program was organized by geography (Northwest, Southwest, Eastern Area Programs, etc.). These 'sub-program' managers provided a degree of Headquarters oversight and management allowing upper management (EM-1, 2, and 3) to focus on major decisions and issues. - Budget levels at selected cleanup sites were funded above 'minimum-safety' levels to accelerate actual cleanup work. - Past practice utilized EVM techniques and uniform EM oversight over all discrete project-like activities, providing for a coordinated cleanup effort. - EM managed LOE activities using benchmarking and best in class management practice techniques to help manage costs. - EM managed and reviewed entire site cleanup baselines, not only individual projects, focusing on a successful overall outcome. - Sites had a 'Road map' or 'Management Action Plan' that provided the overall strategy or plan for that site's cleanup - this helped with understanding and coordination of efforts. - EM had a robust lessons-learned program and database to capture and transmit worthy ideas. - EM had well-structured cleanup baseline change control policies to control cost and schedule changes, at the contractor and higher Headquarters levels. Finally, some of the GAO observations may be valid, however it is not clear as to their extent. For example, for some operation types of work, the use of the Level of Effort (LOE) earned value method to track progress may be appropriate. Also, to ensure independence of thought, and to obtain useful insight on past practices, it may be suitable to have former EM employees to assist with understanding past practices or to verify that activities have been properly identified. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrating Radio-Over-Fiber Communication System and BOTDR Sensor System

In this paper, we propose and experimentally demonstrate for the first time, the integration of a radio-over-fiber (RoF) communication system and a Brillouin optical time-domain reflectometry (BOTDR) distributed sensor system using a single optical fiber link. In this proof-of-concept integrated system, the communication system is composed of three modulation formats of quadrature phase-shift keying (QPSK), 16-quadrature amplitude modulation (16-QAM) and 64-QAM, which are modulated onto an orthogonal frequency division multiplexing (OFDM) signal. Whereas, the BOTDR sensor system is used for strain and/or temperature monitoring over the fiber distance with a spatial resolution of 5 m using a 25 km single-mode silica fiber. The error vector magnitude (EVM) is analyzed in three modulation formats in the presence of various BOTDR input pump powers. Using QPSK modulation, optimized 18 dBm sensing and 10 dBm data power, the measured EVM values with and without bandpass filter are 3.5% and 14.5%, respectively. The proposed system demonstrates a low temperature measurement error (±0.49 °C at the end of 25 km) and acceptable EVM values, which were within the 3GPP requirements. The proposed integrated system can be effectively applied for practical applications, which significantly reduces the fiber infrastructure cost by effective usage of a single optical fiber link.

42 ENGINEERING↗

A normal stress subgrid-scale eddy viscosity model in large eddy simulation

The Smagorinsky subgrid-scale eddy viscosity model (SGS-EVM) is commonly used in large eddy simulations (LES) to represent the effects of the unresolved scales on the resolved scales. This model is known to be limited because its constant must be optimized in different flows, and it must be modified with a damping function to account for near-wall effects. The recent dynamic model is designed to overcome these limitations but is compositionally intensive as compared to the traditional SGS-EVM. In a recent study using direct numerical simulation data, Horiuti has shown that these drawbacks are due mainly to the use of an improper velocity scale in the SGS-EVM. He also proposed the use of the subgrid-scale normal stress as a new velocity scale that was inspired by a high-order anisotropic representation model. The testing of Horiuti, however, was conducted using DNS data from a low Reynolds number channel flow simulation. It was felt that further testing at higher Reynolds numbers and also using different flows (other than wall-bounded shear flows) were necessary steps needed to establish the validity of the new model. This is the primary motivation of the present study. The objective is to test the new model using DNS databases of high Reynolds number channel and fully developed turbulent mixing layer flows. The use of both channel (wall-bounded) and mixing layer flows is important for the development of accurate LES models because these two flows encompass many characteristic features of complex turbulent flows.

Horiuti, K.↗

Earned Value-Added

Earned value management [EVM] ...either you swear by it, or swear at it. Either way, there s no getting around the fact that EVM can be one of the most efficient and insightful methods of synthesizing cost, schedule, and technical status information into a single set of program health metrics. Is there a way of implementing EVM that allows a program to reap its early warning benefits while avoiding the pitfalls that make it infamous to its detractors? That s the question recently faced by the International Space Station [ISS] program.

Jansen, Michael↗

Millimeter-wave home area network prospect with cost-effective RoF links

The growth towards the millimeter-wave band in the home area networks (HAN) leads to high data rate transmission to satisfy the new user services. Unfortunately, the transmission coverage in this band is limited to short distances because of the strong air absorption and obstacles such as walls. The effort is then focused on the extension of the network coverage of the wireless link in this band. Solutions based on multiple connected access points to optical fibers are useful methods to ensure wireless connectivity to the entire home. For HAN applications, radio-over-fiber (RoF) using intensity modulation and direct detection technique is the mostly favorite technology for the transmission of a broadband wireless signal because dealing with a cost-effective solution. We investigate in this paper the performance of such RoF-wireless architecture with low-cost optoelectronic modules through the error vector magnitude (EVM) metric. The RoF links investigated are a directly modulated VCSEL with integrated photoreceiver module, an electroabsorption-modulated laser with PIN photodiode and a Mach–Zehnder Modulator with PIN photodiode. A simulation approach based on equivalent electrical circuit models of photonic components is developed in ADS (Advanced Design System) by using a co-simulation technique that combines both analog and digital signals. The downlink channel of the complete transmission system including wireless channel and frequency conversion circuits to millimeter-wave (mm-wave) band is studied by simulation. The obtained results of EVM show good performances of cost-effective links with QPSK and 16-QAM modulation over a dynamic range of 15 dB.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

A Performance Comparison of Low-Cost Near-Infrared (NIR) Spectrometers to a Conventional Laboratory Spectrometer for Rapid Biomass Compositional Analysis

The performance of a conventional laboratory near-infrared (NIR) spectrometer and two NIR spectrometer prototypes (a Texas Instruments NIRSCAN Nano evaluation model (EVM) and an InnoSpectra NIR-M-R2 spectrometer) are compared by collecting reflectance spectra of 270 well-characterized herbaceous biomass samples, building calibration models using the partial least squares (PLS-2) algorithm to predict five constituents of the samples from the reflectance spectra, and comparing the resulting model statistics. The prediction models developed using spectra from the Foss XDS spectrometer were slightly better than the prediction models developed using spectra from either the TI NIRSCAN Nano EVM and the InnoSpectra NIR-M-R2 as measured by the root mean square error (RMSECV) and the correlation coefficient (R 2 _cv) for “leave-one-out” cross-validation (CV). The models built from the two prototype units were not statistically significantly different from each other (p = 0.05). The Foss spectrometer has a larger wavelength range (400–2500 nm) compared with the two prototypes (900–1700 nm). When the spectra from the Foss XDS spectrometer were truncated so their wavelength range matched the wavelength range of the two prototype units, the resulting model was not statistically significantly different from the models from either prototype.

47 OTHER INSTRUMENTATION↗

Simulations of single- and two-phase shock tubes and gravity-driven wave problems with the RELAP-7 nuclear reactor system analysis code

Propagation of pressure waves in single and two-phase flows is of key interest for nuclear safety analyses, reactor design, construction and life extension of nuclear reactors. In this work, we assess the capabilities of RELAP-7, the next-generation nuclear reactor system code, to solve single- and two-phase flows developing pressure waves. RELAP-7 is based on a 7-equation, two-phase flow model, with distinct phasic pressures. It is well established that these hyperbolic conservation laws can develop shocks and discontinuities and thus, require a stabilization numerical method. The all-Mach flow Entropy Viscosity Method (EVM) is now employed in RELAP-7 as a viscous stabilization approach. In this paper, we briefly describe the implementation of the EVM and use open-literature test cases that exhibit pressure waves to show that the entropy viscosity method performs adequately for these single- and two-phase cases.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Numerical modelling of multimode fibre-optic communication lines

The results of numerical modelling of nonlinear propagation of an optical signal in multimode fibres with a small differential group delay are presented. It is found that the dependence of the error vector magnitude (EVM) on the differential group delay can be reduced by increasing the number of ADC samples per symbol in the numerical implementation of the differential group delay compensation algorithm in the receiver. The possibility of using multimode fibres with a small differential group delay for data transmission in modern digital communication systems is demonstrated. It is shown that with increasing number of modes the strong coupling regime provides a lower EVM level than the weak coupling one. (fibre-optic communication lines)

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Thermal design verification testing for the ATS-F and -G spacecraft.

There is a wide fluctuation in the internal power dissipation from the components within the earth viewing module (EVM). The electronic component functional reliability required for a two-to-five year mission is the most significant factor for the thermal design criteria. A mathematical thermal model of the EVM and the orbital environment is used to predict the performance of the thermal control system. Comparisons of the results obtained in chamber thermal balance tests with the data computed on the basis of the theoretical model provide the means for validating the thermal design.

Coyle, M.↗

Aerogel Antennas Communications Study Using Error Vector Magnitude Measurements

This presentation discusses an aerogel antennas communication study using error vector magnitude (EVM) measurements. The study was performed using 2x4 element polyimide (PI) aerogel-based phased arrays designed for operation at 5 GHz as transmit (Tx) and receive (Rx) antennas separated by a line of sight (LOS) distance of 8.5 meters. The results of the EVM measurements demonstrate that polyimide aerogel antennas work appropriately to support digital communication links with typically used modulation schemes such as QPSK and 4 DQPSK. As such, PI aerogel antennas with higher gain, larger bandwidth and lower mass than typically used microwave laminates could be suitable to enable aerospace-to- ground communication links with enough channel capacity to support voice, data and video links from CubeSats, unmanned air vehicles (UAV), and commercial aircraft.

Polyimide Aerogel↗

Aerogel Antennas Communications Study Using Error Vector Magnitude Measurements

This paper discusses an aerogel antennas communication study using error vector magnitude (EVM) measurements. The study was performed using 4x2 element polyimide (PI) aerogel-based phased arrays designed for operation at 5 GHz as transmit (Tx) and receive (Rx) antennas separated by a line of sight (LOS) distance of 8.5 meters. The results of the EVM measurements demonstrate that polyimide aerogel antennas work appropriately to support digital communication links with typically used modulation schemes such as QPSK and pi/4 DQPSK. As such, PI aerogel antennas with higher gain, larger bandwidth and lower mass than typically used microwave laminates could be suitable to enable aerospace-to-ground communication links with enough channel capacity to support voice, data and video links from cubesats, unmanned air vehicles (UAV), and commercial aircraft.

Aerogel Antennas↗