ESPC ESA Overview and Requirements
This webinar is the first of a series that provides information, best practices, and resources for implementing energy savings performance contract (ESPC) energy sales agreement (ESA) projects.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
This webinar is the first of a series that provides information, best practices, and resources for implementing energy savings performance contract (ESPC) energy sales agreement (ESA) projects.
This training covers technical, economic and other photovoltaic (PV) project considerations. Technical topics include cost-effectiveness, resilience, cybersecurity, and electrical considerations. In addition, other topics, such as compatibility with agency mission, site plans, coordination with the serving utility, the National Environmental Policy Act, and agency approval requirements. Considerations specific to third-party owned/third-party financed PV projects are also covered, as well as available resources and templates for project development. The training also includes a recap of the first session in the Energy Savings Performance Contracts Energy Sales Agreements (ESPC ESA) Webinar Series.
There is an increasing interest in solar photovoltaics, battery energy storage systems, and geothermal heat pumps to help meet decarbonization and resilience goals. However, facility managers may not know that energy sales agreement (ESA) contracting can be an effective, efficient, and lower cost way to procure and install these projects. FEMP, national labs, and agency partners will discuss best practices and examples that attendees may be able to leverage at their own sites.
Topics discussed include the development status of the Space Shuttle and Spacelab, with attention to Spacelab subsystem performance capabilities and Shuttle-Spacelab flight operations; Spacelab data management and software for science applications, ESA and Space Shuttle pointing systems, and the Space Shuttle's Office of Space and Terrestrial Applications (OSTA)-1 payload. Also covered are the lessons learned from the first Spacelab mission, the pallet-only mode verification flight of the second Spacelab mission, the objectives of the Spacelab mission D1, its role in the German space program, and its implementation, the impact of Spacelab on space-based life sciences research, the high resolution, large area modular reflector array X-ray telescope to be used by Spacelab, and Space Shuttle contamination effects on UV coronagraphic observations.
Features and technologies of planar waveguide array antennas developed for spaceborne microwave sensors are described. Such antennas are made from carbon fiber reinforced plastic (CFRP) employing special manufacturing and metallization techniques to achieve satisfactory electrical properties. Mechanical design enables deployable antenna structures necessary for satellite applications (e.g., ESA ERS-1). The slotted waveguide concept provides high aperture efficiency, good beamshaping capabilities, and low losses. These CFRP waveguide antennas feature low mass, high accuracy and stiffness, and can be operated within wide temperature ranges.
The performance degradation of the European Space Agency (ESA) Deep Space Telecommand receiving subsystem due to the presence of cross-modulation and ranging interference for simultaneous ranging and command operations on the Earth-to-space link is investigated. The most important result is that under imperfect carrier reference the command subcarrier and the ranging tone frequencies can be selected to suppress the cross-modulation interference and interference from the ranging channel for the specified command bit rate and ranging code component. Recommendations as to use of specific command subcarrier frequency, command bit rate, and ranging tone frequency are made for consideration in future standards systems.
An overview of the organization of the OLYMPUS propagation experimenters group (OPEX) is given. Preparations, participation, and experiments are described. Some examples for first statistical results are also reported. OLYMPUS, a 3-axis stabilized communications satellite was launched in 1989 for providing experimental telecommunications payloads and a propagation beacon payload at 12, 20, and 30 GHz to the European Space Agency. From previous experience (OTS), the Agency undertook to carry out extensive preparations with an eye on obtaining the statistical results needed within the limited available lifetime of the spacecraft. The OLYMPUS propagation experiment was conceived as part of ESA's space telecommunications applications program (ESA/IPC/(79)83) with the emphasis on exploring the possibilities and limitations of Ka-band satellite communications. The objectives of the OLYMPUS propagation campaign were: (1) characterization of the slant-path propagation conditions at 20/30 GHz in the various climatic regions of Europe; (2) improvement of the understanding of the link between atmospheric observable (rain rate, cloud thickness, etc.) to propagation impairments such as attenuation, depolarization, scintillation, etc.; and (3) arrive at improved propagation prediction methods.
The increasing worldwide interest in the continuation of lunar exploration has convinced ESA to carry out an investigation of the motivations to return to the Moon to establish a permanent or a semi-permanent manned lunar base. This study also considers the possible role Europe could play in the future exploration and possible utilization of the Moon. The study concentrated in this first phase mainly on scientific questions, leaving technological issues such as transportation, the role of humans, infrastructure, and policy matters to a later phase. It only partially considered questions relating to the exploitation of lunar resources and the impact of human activities on science.
The paper describes the next generation Spacecraft Control System infrastructure (SCOSII) which is being developed at the Operations Centre (ESOC) of the European Space Agency (ESA). The objectives of the new system and selected areas of the proposed hardware and software approach are described.
The potential of the ESA Global Ozone Monitoring Experiment (GOME) to produce ozone profile information has been examined by carrying out two sample retrievals using simulated GOME data. The first retrieval examines the potential of the GOME instrument to produce stratospheric ozone profiles using the traditional back-scatter ultraviolet technique, while the second examines the possibility of obtaining tropospheric profile information, and improving the quality of the stratospheric profile retrievals, by exploiting the temperature dependence of the ozone Huggins bands.
In 1974 ESOC decided to develop a reusable Mission Control System infrastructure for ESA's missions operated under its responsibility. This triggered a long and successful product development line, which started with the Multi Mission Support System (MSSS) which entered in service in 1977 and is still being used today by the MARECS and ECS missions; it was followed in 1989 by a second generation of systems known as SCOS-I, which was/is used by the Hipparcos, ERS-1 and EURECA missions and will continue to support all future ESCO controlled missions until approximately 1995. In the meantime the increasing complexity of future missions together with the emergence of new hardware and software technologies have led ESOC to go for the development of a third generation of control systems, SCOSII, which will support their future missions up to at least the middle of the next decade. The objective of the paper is to present the characteristics of the SCOSII system from the perspective of the mission control team; i.e. it will concentrate on the improvements and advances in the performance, functionality and work efficiency of the system.
ESA's Infrared Space Observatory (ISO), scheduled for launch within the next 2-3 years, will place a complement of powerful infrared imagers and spectrometers into high orbit, with an operational life anticipated to be about 18 months. During this time, numerous scientific investigations of every conceivable astrophysical target will be made. The purpose of this paper is to consider the instrumental complement in terms of specific observations of Vega-like systems with cold, infrared excesses, in order to investigate problems relating to the evolution of planetary systems, and to optimize the scientific results possible with ISO on such topics.
INTA is currently developing a two-degree-of-freedom antenna pointing mechanism (APM) as part of the ESA ENVISAT POLAR PLATFORM (PPF) program. This mechanism will drive a Ka-band antenna within the Data-Relay Satellite System (DRS) on board the Polar Platform satellite. The first mission using PPF is ENVISAT, which is expected to be flown in 1998. This paper describes the main requirements, design, and test results of this pointing system, as well as the main technical problems from customer requirements and how those have been faced to achieve a final design.
The paper reviews a combined numerical and experimental activity on the Shuttle Orbiter, first performed at NASA Langley within the OEX workshop and subsequently at ESA, as part of the AGARD FDP WG 18 activities. The study at Langley was undertaken to resolve the pitch up anomaly observed during the entry of the first flight of the Shuttle Orbiter. The facilities used at NASA Langley were the 15-in. Mach 6, the 20-in, Mach 6, the 31-in. Mach 10 and the 20-in. Mach 6 CF4 facility. The paper focuses on the high Mach, high altitude portion of the first entry of the Shuttle where the vehicle exhibited a nose-up pitching moment relative to pre-flight prediction of (Delta C(sub m)) = 0 03. In order to study the relative contribution of compressibility, viscous interaction and real gas effects on basic body pitching moment and flap efficiency, an experimental study was undertaken to examine the effects of Mach, Reynolds and ratio of specific heats at NASA. At high Mach, a decrease of gamma occurs in the shock layer due to high temperature effects. The primary effect of this lower specific heat ratio is a decrease of the pressure on the aft windward expansion surface of the Orbiter causing the nose-up pitching moment. Testing in the heavy gas, Mach 6 CF4 tunnel, gave a good simulation of high temperature effects.
The ESA Mars Express Mission will have an excellent opportunity to explore Phobos, even in more detail than Viking.
START is a tool to optimize research and development primarily for NASA missions. It was developed within the Strategic Systems Technology Program Office, a division of the Office of the Chief Technologist at NASA's Jet Propulsion Laboratory. START is capable of quantifying and comparing the risks, costs, and potential returns of technologies that are candidates for funding. START can be enormously helpful both in selecting technologies for development -- within the constraints of budget, schedule, and other resources -- and in monitoring their progress. START's methods are applicable to everything from individual tasks to multiple projects comprising entire programs of investigation. They can address virtually any technology assessment and capability prioritization issue. In this report, START is used to analyze the capability needs using data from NASA's Exploration Systems Architecture Study (ESAS).
The Venus Entry Probe is one of ESA s Technology Reference Studies (TRS). The purpose of the Technology Reference Studies is to provide a focus for the development of strategically important technologies that are of likely relevance for future scientific missions. The aim of the Venus Entry Probe TRS is to study approaches for low cost in-situ exploration of Venus and other planetary bodies with a significant atmosphere. In this paper, the mission objectives and an outline of the mission concept of the Venus Entry Probe TRS are presented.
A viewgraph presentation on planetary exploration in the European Space Agency is shown. The topics include: 1) History of the Solar System Material; 2) ROSETTA: The Comet Mission; 3) A New Name For The Lander: PHILAE; 4) The Rosetta Mission; 5) Lander: Design Characteristics; 6) SMART-1 Mission; 7) MARS Express VENUS Express; 8) Planetary Exploration in ESA The Future.