Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Double Beam”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Mode I fracture testing fixture

An apparatus and method for preparing Double Cantilever Beam (DCB) specimens are disclosed as an apparatus and method for conducting Mode I fracture resistance testing using the DCB specimens. In a first embodiment, a drill jig is used to locate the DCB specimen and guide a drilling process during creation of at least one through-hole in the DCB specimen. The drilling process may employ a traditional drill and drill bit, a laser drill, or a water jet. In another embodiment, a set of rotating pin blocks, each with a full-round or a half-round specimen pin at one end and a hanger full-round pin at the other end, engage the DCB specimen and facilitate the internal application of a fracturing load to the DCB specimen for the Mode I fracture resistance test. The present invention may significantly reduce the time and materials needed to prepare and test a DCB specimen.

Briggs, Timothy↗

Design and Analysis of the Staggered Double Grating Slow Wave Circuit for 263 GHz Sheet Beam TWT

The complete design process of a high-frequency circuit for a 263 GHz staggered double grating, sheet beam traveling wave tube is presented in this article. Here, this device, for use in a pulsed electron paramagnetic resonance spectrometer instrument, requires >30 dB gain and a 20 GHz bandwidth centered at 263 GHz. In addition to the standard Pierce gain analysis and point by point particle in cell (PIC) simulation, a novel fast pulse response analysis technique was utilized to determine the accurate synchronization voltage and test the ``hot” feature of the high-frequency circuit. Since this new method can evaluate the entire bandwidth in a single simulation, it can significantly reduce the computational resources normally required for the conventional PIC analysis while also illustrating the potential instabilities near the band edge. Good agreement between the fast pulse response and PIC simulation results validate the accuracy of this novel method. According to the analysis results and given the manufacturing limits of nano/micro-computer numerical control (CNC) machining, an appropriate SWS, coupler, and sever designs were chosen to complement the simulated design. Finally, a prototype circuit was manufactured and cold tested to verify the design and inspect the machining tolerances.

42 ENGINEERING↗

Precision Measurement of Neutrino Oscillation Parameters with 10 Years of Data from the NOvA Experiment

This Letter reports measurements of muon-neutrino disappearance and electron-neutrino appearance and the corresponding antineutrino processes between the two NOvA detectors in the NuMI neutrino beam. These measurements use a dataset with double the neutrino mode beam exposure that was previously analyzed, along with improved simulation and analysis techniques. A joint fit to these samples in the three-flavor paradigm results in the most precise single-experiment constraint on the atmospheric neutrino mass-splitting, $Δm^2_{32}= 2.431^{+0.036}_{-0.034} (-2.479^{+0.036}_{-0.036}) \times 10^{-3}$~eV$^2$ if the mass ordering is Normal (Inverted). In both orderings, a region close to maximal mixing with $\sin^2θ_{23}=0.55_{+0.06}^{-0.02}$ is preferred. The NOvA data show a mild preference for the Normal mass ordering with a Bayes factor of 2.4 (corresponding to 70% of the posterior probability), indicating that the Normal ordering is 2.4 times more probable than the Inverted ordering. When incorporating a 2D $Δm^2_{32}\textrm{--}\sin^2 2θ_{13}$ constraint based on Daya Bay data, this preference strengthens to a Bayes factor of 6.6 (87\%).

FOS: Physical sciences↗

FRIB Beam Power Ramp-up: Status and Plans

After project completion on scope, on cost, and ahead of schedule, the Facility for Rare Isotope Beams began operations for scientific users in May of 2022. The ramp-up to a beam power of 400 kW is planned over a six-year period; 1 kW was delivered for initial user runs from in 2022, and 5 kW was delivered as of February 2023. Test runs with 10 kW 36Ar and 48Ca beams were conducted in July 2023. Upgrade plans include doubling the primary-beam energy to 400 MeV/nucleon for enhanced discovery potential (¿FRIB 400¿). This talk reports on the strategic plans towards high power operations emphasizing challenges and resolutions in beam-interception devices and targetry systems, radiation protection and controls, and legacy system renovation and integration.

43 PARTICLE ACCELERATORS↗

Measurement of single- and double-polarization observables in the photoproduction of 𝜋 + ⁢𝜋 − meson pairs off the proton using CLAS at Jefferson Laboratory

The photoproduction of 𝜋 + ⁢𝜋 − meson pairs off the proton has been studied in the reaction 𝛾⁢𝑝→𝑝⁢𝜋 + ⁢𝜋 − using the CEBAF Large Acceptance Spectrometer (CLAS) and the frozen-spin target (FROST) in Hall B at the Thomas Jefferson National Accelerator Facility. For the first time, the beam and target asymmetries, 𝐼 𝑠,𝑐 and 𝑃 𝑥,𝑦 , have been measured along with the beam-target double-polarization observables, 𝑃$^{𝑠,𝑐}_{𝑥,𝑦}$, using a transversely polarized target with center-of-mass energies ranging from 1.51 GeV up to 2.04 GeV. These data and additional 𝜋⁢𝜋 photoproduction observables from CLAS and experiments elsewhere were included in a partial-wave analysis within the Bonn-Gatchina framework. Significant contributions from 𝑠-channel resonance production are observed in addition to 𝑡-channel exchange processes. The data indicate significant contributions from 𝑁* and Δ* resonances in the third and fourth resonance regions.

QCD phenomenology↗

A Compact Gas Liquid Separator for the Spallation Neutron Source Mercury Process Loop

Upgrades at the spallation neutron source (SNS) accelerator at Oak Ridge National Laboratory are underway to double its proton beam power from 1.4 to 2.8 MW. About 2 MW will go to the current first station while the rest will go to the future Second Target Station. The increase of beam power to the first target station is especially challenging for its mercury target. When the short proton beam hits the target, strong pressure waves are generated, causing cavitation erosion and challenging stresses for the target's weld regions. SNS has successfully operated reliably at 1.4 MW by mitigating the pressure wave with the injection of small Helium bubbles into the mercury. To operate reliably at 2 MW, more gas will be injected into mercury to mitigate the pressure wave further. However, the mercury process loop was not originally designed for gas injection, and the accumulation of gas in the pipes is a concern. Due to space constraints, a custom gas liquid separator (GLS) was designed to fit a 90-deg horizontal elbow space in the SNS mercury loop. Simulations and experiments were performed, and a successful design was developed that has the desired efficiency while keeping the pressure losses acceptable.

42 ENGINEERING↗

Cavity Qualification and Production Update for SNS-PPU Cryomodules at Jefferson Lab

The Proton Power Upgrade (PPU) project at Oak Ridge National Lab’s Spallation Neutron Source (SNS) currently being constructed will double the proton beam power capability from 1.4 to 2.8 MW by adding seven cryomodules, each containing four six-cell high-beta (β = 0.81) superconducting radio frequency cavities. Research Instruments, located in Germany, built and processed the cavities at the vendor site, including electropolishing as the final active chemistry step. Twenty-eight cavities for seven cryomodules and an additional four cavities for a spare cryomodules were delivered to Jefferson Lab and first qualification tests were completed on all cavities as received from the vendor. The performance largely exceeded the requirements on quality factor and accelerating gradient. Here we present the status of initial cavity qualification tests, rework on unqualified cavities and final cavity qualification with helium vessel prior to installation in cryomodules. In addition, an update on cryomodule production is presented.

Dhakal, P.↗

Nucleon structure studies: DVCS on polarised protons with the CLAS12 experiment, and development of Micromegas detectors for EIC

The quark and gluon structure of nucleons is crucial for understanding the origin of their mass and spin. This information is encoded in structure function such as Generalised Parton Distributions (GPDs), which provide a three-dimensional picture of the nucleon in terms of its constituents. Deeply Virtual Compton Scattering (DVCS) offers the most direct access to GPDs, but their extraction requires high-precision measurements of multiple observables over a wide kinematic range. In 2022 and 2023 the CLAS12 experiment at Jefferson Lab (JLab) collected data from polarised electron scattering on a longitudinally polarised proton target, enabling the first measurement of polarised DVCS asymmetries at JLab 12GeV kinematics. This thesis will present preliminary measurement of the beam, target and double spin DVCS asymmetries from the CLAS12 polarised proton target data. Nucleon structure studies will also constitute a major part of the physics program at the future Electron Ion Collider (EIC). The development of the first detector at the EIC is ongoing and it requires light Micro-Pattern Gaseous Detectors (MPGDs) for its tracking system. This thesis further reports initial tests of Micromegas MPGDs with a two-dimensional readout developed for EIC.

Polcher, Samy [Univ. Paris-Saclay, Gif-sur-Yvette ↗

Spallation Neutron Source Proton Power Upgrade Low-Level RF Control System Development

The Proton Power Upgrade (PPU) Project is approved for the Spallation Neutron Source at Oak Ridge National Laboratory and will double the proton beam power capability from 1.4 MW to 2.8 MW with 2 MW beam power available to the first target station. A second target station is planned and will utilize the remaining beam power in the future. The proton power increase will be supported with the addition of twenty-eight new superconducting cavities powered by 700 kW peak power klystrons to increase beam energy while increases to the beam current will be done with a combination of existing RF margin, and DTL HPRF upgrades. The original low-level RF control system has proven to be reliable over the past 15 years of operations, but obsolescence issues mandate a replacement system be developed for the PPU project. The replacement system is realized in a µTCA.4 platform using a combination of commercial off-the-shelf boards and custom hardware to support the requirements of PPU. This paper presents the prototype hardware, firmware, and software development activities along with preliminary testing results of the new system.

Crofford, Mark↗

Status of the laser manipulations of H- beam at J-PARC

The laser manipulations of H- ion beam by single or double neutralization is a very promising technique and highly essential to utilized in accelerator processes such as stripping, pulse chopping, collimation, extraction, and beam diagnostics for the present and future high-intensity proton accelerators. At J-PARC, we are preparing for a POP (Proof-of-Principle) demonstration 400 MeV H- stripping by using only lasers. A prototype YAG laser system and a laser cavity system to reduce the laser power are being developed through 3 MeV H- neutralization studies. Fermilab utilizes H- neutralization at 0.75 MeV by establishing a laser Notcher system for a gap in the H- pulse needed for a clean beam extraction from the ring. To minimize the laser power and maximize the interaction efficiency are common issue at both laboratories. Under the US-Japan collaboration for high-intensity neutrino beam, we are closely working to establish recycling/reusing of seed laser pulses to reduce a size of the laser system. In parallel, we have also developed non-destructive beam diagnostic systems at lower H- energy of 3 MeV, which will be implemented to the 400 MeV as well as easily applicable to the Fermilab linac including PIP-II linac. Installation of the laser system at J-PARC linac for 400 MeV H- stripping is ongoing to start the POP experimental study in 2023.

43 PARTICLE ACCELERATORS↗

FRIB Transition to User Operations, Power Ramp Up, and Upgrade Perspectives

After project completion on scope, on cost, and ahead of schedule, the Facility for Rare Isotope Beams began operations for scientific users in May of 2022. During the first 12 months of user operations, the FRIB accelerator complex delivered 5250 beam hours, including 1528 hours to nine science experiments conducted with primary beams of 36Ar, 48Ca, 70Zn, 82Se, 124Xe, and 198Pt at beam energies >200 MeV/u; 2724 hours for beam developments, studies, and tuning; and 998 hours to industrial users and non-scientific programs using the FRIB Single Event Effect (FSEE) beam line. The ramp-up to a beam power of 400 kW is planned over a six-year period; 1 kW was delivered for initial user runs from in 2022, and 5 kW was delivered as of February 2023. Upgrade plans include doubling the primary-beam energy to 400 MeV/nucleon for enhanced discovery potential (¿FRIB 400¿). This talk reports on FRIB status and progress since SRF2021, emphasizing lessons learned during the transition from beam commissioning to machine operations, challenges and resolutions for the power ramp-up, progress with accelerator improvements, and R&D for the energy upgrade.

43 PARTICLE ACCELERATORS↗

Longitudinal double helicity asymmetry $A_{LL}$ from direct photon, jet and charged pion production in polarized $\vec{p}+\vec{p}$ collisions

Understanding the proton spin composition from the quarks and gluons spin polarization and their motion is important to test various kinds of sum rules and nonperturbative properties of hadrons. At the Relativistic Heavy Ion Collider (RHIC), we collide longitudinally polarized proton beams and measure the double helicity asymmetry A_{LL} A L L , which is an important physical quantity for extracting the polarized parton distribution functions (PDFs) of the proton. Direct photon, jet and charged pion production are good channels to probe the gluon spin polarization inside the proton, with the ability to probe also the sign of the gluon spin. Direct photon production is the theoretically ``cleanest’’ channel, with little fragmentation contribution, but limited by statistics. On the other hand, jet and charged pion production have more statistics, but include more hard processes and hadronization effects. I will present the recent measurements of direct photon, jet and charged pion A_{LL} A L L s at PHENIX and show their complementary roles in extracting the gluon spin.

Ji, Zhongling↗

Electro- and photoproduction of muon pairs with $$\mu $$CLAS12: double deeply virtual compton scattering, timelike compton scattering, and $$J/\psi $$ production

The CEBAF Large Acceptance Spectrometer for operation at 12 GeV (CLAS12) at the Thomas Jefferson National Accelerator Facility has played a central role in advancing the understanding of nucleon and nuclear structure. As increasingly precise data become available, new physics opportunities emerge that extend beyond the current capabilities of CLAS12. In this article, a program to explore the quark and gluon structure of the nucleon through di-muon electro- and photoproduction is presented. Its primary focus is the measurement of beam-spin asymmetries in Double Deeply Virtual Compton Scattering, . By independently varying the incoming and outgoing photon virtualities and momentum transfer, the DDVCS measurement provides access to the Generalized Parton Distributions over their full three-dimensional phase space, extending beyond the kinematic constraints of Deeply Virtual Compton Scattering and Timelike Compton Scattering. In addition, the large acceptance and high luminosity of the CLAS12 experiment will enable precision measurements of near-threshold production and high-statistics studies of Timelike Compton Scattering.

Alvarado, J. S.↗

The Continuous Electron Beam Accelerator Facility at 12 GeV

This review paper describes the energy-upgraded Continuous Electron Beam Accelerator Facility (CEBAF) accelerator. This superconducting linac has achieved 12 GeV beam energy by adding 11 new high-performance cryomodules containing 88 superconducting cavities that have operated cw at an average accelerating gradient of 20 MV / m . After reviewing the attributes and performance of the previous 6 GeV CEBAF accelerator, we discuss the upgraded CEBAF accelerator system in detail with particular attention paid to the new beam acceleration systems. In addition to doubling the acceleration in each linac, the upgrade included improving the beam recirculation magnets, adding more helium cooling capacity to allow the newly installed modules to run cold, adding a new experimental hall, and improving numerous other accelerator components. We review several of the techniques deployed to operate and analyze the accelerator performance and document system operating experience and performance. In the final portion of the document, we present much of the current planning regarding projects to improve accelerator performance and enhance operating margins, and our plans for ensuring CEBAF operates reliably into the future. For the benefit of potential users of CEBAF, the performance and quality measures for the beam delivered to each of the experimental halls are summarized in the Appendix. Published by the American Physical Society 2024

43 PARTICLE ACCELERATORS↗

Multichannel Doppler fiber-imager spectrometer for spatiotemporal characterization of high-intensity laser-driven plasmas

Here, we demonstrate a flexible multichannel fiber-based imaging Doppler spectrometer to characterize plasmas in high intensity (≥1 × 10 18 W/cm 2 ) laser-plasma experiments at high repetition rates. This instrument collects data from ×21 different plasma locations combining optical fibers and a single imaging spectrometer. This diagnostic maps the plasma velocity evolution as a function of time with sub-pico-second resolution. Experimental results showing 2D velocity measurements of plasma with 20 μm spatial resolution are presented. Intensities of the order of 10 18 W/cm 2 were used to generate a plasma, while a much less intense, frequency doubled (400 nm), probe beam (10 11 W/cm 2 ) was used to measure the Doppler shift from the plasma critical surface. The instrument can be scaled to a larger number of channels (e.g., 100) still using a single spectrometer.

47 OTHER INSTRUMENTATION↗

Structured large-pore foams improve thermal performance of LiMIT-style liquid lithium PFC

As magnetically confined fusion devices improve, the conditions at the walls become increasingly intense. Plasma facing components (PFCs) must withstand these extreme heat and particle loads without damage or degradation. Liquid lithium PFCs are known to be quite resilient, and the presence of lithium also serves to improve plasma properties. The liquid metal infused trench (LiMIT) concept is an open surface liquid lithium PFC design that has been tested extensively at the University of Illinois and in fusion devices around the world. LiMIT utilizes thermoelectric magnetohydrodynamics (TEMHD) to passively drive liquid lithium flow. This work demonstrates an extension of the LiMIT trench geometry to three dimensions. Additively manufactured large pore metallic foams maintain TEMHD drive while drastically improving heat flux handling and resistance to lithium dryout, a phenomenon where locally high TEMHD forces depresses the lithium level and exposes underlying solid structure. COMSOL multiphysics modeling of the system yields insight into the forces at play in dryout development, and shows the 3D structures can eliminate dryout. Here, low heat proof-of-concept experimental testing of the system matches computational results, and high heat flux electron beam tests more than double the proven operational range of a LiMIT-style PFC, to 6.8 MW m –2 , with no indications of dryout or impending damage.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

ORBITAL ANGULAR MOMENTUM BEAMS RESEARCH USING A FREE-ELECTRON LASER OSCILLATOR

Strong Hadron Cooling (SHC), utilizing the coherent electron cooling scheme, has been extensively investigated for the Electron Ion Collider (EIC). Throughout our cooling optimization studies, we realized that a Super-Gaussian electron bunch offers enhanced performance in comparison to a Gaussian bunch. Our approach involves initiating the electron beam distribution in a double peak form, transitioning them into a Super-Gaussian distribution due to the longitudinal space charge. Subsequently, a chicane within the linac section compresses the bunch to meet the required bunch length. We tuned a third harmonic cavity amplitude to reduce the nonlinear term of the chicane. Moreover, given the low initial current leading to a small but non-uniform slice energy spread, we evaluated utilizing laser heating techniques to achieve a uniformly distributed slice energy spread. In this report, we discuss the concepts and simulation results

Wang, E.↗