Engineering PapersSearch

SEARCH · Engineering Papers

Results for “Data analytics”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Cloud Giovanni: Reining in Costs and Improving Performance with Analytical Data Stores Using Scalable Serverless Architecture

Giovanni is the Geospatial Interactive Online Visualization ANd aNalysis Infrastructure developed at NASA GES DISC which provides a simple and intuitive way to visualize, analyze, and access vast amounts of Earth science data. It receives large number of user requests each day for a variety of analysis and visualization services, which leads to the big data challenge of serving gradually increasing large data volumes with diverse statistical algorithms. We hereby propose a multi-dimensional accumulation method which provides fast and cost-efficient cloud analysis for diverse services including both area averaging and time averaging. This method involves the weighted volume integration over multiple variable dimensions (time and space), and is implemented in AWS using Athena providing serverless and highly scalable data analysis. Compared to the standard method, this approach dramatically reduced the computational time by order of magnitude with a minimal AWS cost incurred. For example, for a benchmark of 10-year area averaging over the 1x1 degree daily variable, the computational time was reduced from minutes to seconds, and the Athena cost is only $5 for 100,000 requests.

Zhang, Hailiang

Data Analytics Methods to Measure Plant Outage Resilience

Every 18 or 24 months nuclear power plants (depending on plant configuration, pressurized or boiling water reactor respectively) undergo a period of outage where the plant is taken offline and a large number of maintenance and surveillance activities (that cannot be performed while plant is running) are performed in typically 2–3 weeks. Planning of a plant outage is very challenging since all the activities are required to be performed in the shortest amount of time given available resources (typically contractor crews hired for the duration of the outage). Consequently, plant outages can be costly due the actual loss of power generation and crew costs and, because of it, there is a need to maximize resource usage in the outage planning phase and reduce the risk of outage delays. This paper is addressing these needs by providing a set of analytical methods designed to analyze plant outage schedule and identify critical elements based on available resources (time and crews). These methods are based on natural language processing and optimization algorithms. In this respect, two classes of methods have been developed: one that focuses on the time resource and how variability in the time to complete outage tasks may impact outage delays, and one that minimizes the risk of outage delays by integrating available resources to assess when daily activities should be performed.

97 - MATHEMATICS AND COMPUTING