Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DAWN mission”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Low Altitude Mapping Orbit Design and Maintenance for the Dawn Discovery Mission at Vesta

NASA's Dawn discovery mission will orbit the giant asteroid Vesta beginning in the summer of 2011. Four different near polar science orbits are planned. The lowest planned orbit at Vesta is called the Low Altitude Mapping Orbit or LAMO and is by far the most challenging to design and maintain due to the strong, nonspherical gravity expected there. This paper describes the orbit selection process. The true gravity field of Vesta remains highly uncertain. The proposed orbit selection process will be applied once sufficient gravity knowledge is obtained at higher orbits. The orbit selection process is applied here to a fictitious gravity field based on a Hubble space telescope shape model for Vesta assuming uniform density. The outcome of the process described here is a variety of stable orbits. However, Initially stable orbits at the LAMO altitude are not expected to remain stable operationally due to the unpredictable impulses resulting from the Dawn spacecraft thruster firings to de-saturate its momentum wheels. As a result, orbital maintenance maneuvers will be probably be necessary. This paper also briefly describes the statistical maneuver design process that resulted in the orbit maintenance plan.

orbit stability↗

Petrology and Composition of HED Polymict Breccias

The howardite, eucrite and diogenite (HED) clan of meteorites forms the largest suite of achondrites with over 900 named members. The HEDs are igneous rocks and breccias of igneous rocks from a differentiated asteroid [1]. The consensus view is that these rocks hail from the asteroid 4 Vesta, which will be the first target of NASA's Dawn mission. When Dawn arrives at Vesta, she will begin remote imagery and spectroscopy of the surface. The surface she will observe will be dominated by rocks and soils mixed through impact gardening. To help with the interpretation of the remotely sensed data, we have begun a project on the petrologic and compositional study of a suite of HED polymict breccias. Here we report on the preliminary findings of this project.

Mittlefehldt, David W.↗

Hybrid Differential Dynamic Programming with Stochastic Search

Differential dynamic programming (DDP) has been demonstrated as a viable approach to low-thrust trajectory optimization, namely with the recent success of NASA's Dawn mission. The Dawn trajectory was designed with the DDP-based Static/Dynamic Optimal Control algorithm used in the Mystic software.1 Another recently developed method, Hybrid Differential Dynamic Programming (HDDP),2, 3 is a variant of the standard DDP formulation that leverages both first-order and second-order state transition matrices in addition to nonlinear programming (NLP) techniques. Areas of improvement over standard DDP include constraint handling, convergence properties, continuous dynamics, and multi-phase capability. DDP is a gradient based method and will converge to a solution nearby an initial guess. In this study, monotonic basin hopping (MBH) is employed as a stochastic search method to overcome this limitation, by augmenting the HDDP algorithm for a wider search of the solution space.

Aziz, Jonathan↗

Hybrid Differential Dynamic Programming with Stochastic Search

Differential dynamic programming (DDP) has been demonstrated as a viable approach to low-thrust trajectory optimization, namely with the recent success of NASAs Dawn mission. The Dawn trajectory was designed with the DDP-based Static Dynamic Optimal Control algorithm used in the Mystic software. Another recently developed method, Hybrid Differential Dynamic Programming (HDDP) is a variant of the standard DDP formulation that leverages both first-order and second-order state transition matrices in addition to nonlinear programming (NLP) techniques. Areas of improvement over standard DDP include constraint handling, convergence properties, continuous dynamics, and multi-phase capability. DDP is a gradient based method and will converge to a solution nearby an initial guess. In this study, monotonic basin hopping (MBH) is employed as a stochastic search method to overcome this limitation, by augmenting the HDDP algorithm for a wider search of the solution space.

Aziz, Jonathan↗

Dawn : a mission in developement for exploration of main belt asteroids Vesta and Ceres

Dawn is in development for a 2006 launch on a mission to explore main belt asteroids in order to yield insights into important questions about the formation and evolution of the solar system. Its objective is to acquire detailed data from orbit around two complementary bodies, Vesta and Ceres, the two most massive asteroids. The project relies on extensive heritage from other deep-space and Earth-orbiting missions, thus permitting the ambitious objectives to be accomplished with an affordable budget.

asteroids↗

In-Flight Operation of the Dawn Ion Propulsion System - The First Nine Months

The Dawn mission, part of NASA's Discovery Program, has as its goal the scientific exploration of the two most massive main-belt asteroids, Vesta and Ceres. The Dawn spacecraft was launched from Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H-9.5 (Delta-II Heavy) rocket that placed the 1218 kg spacecraft into an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) which will provide most of the delta-V needed for heliocentric transfer to Vesta, orbit capture at Vesta, transfer to Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, and transfer to Ceres science orbits. The Dawn ion engine design is based on the design validated on NASA's Deep Space 1 mission. However, because of the very substantial (11 km/s) delta-V requirements for this mission Dawn requires two engines to complete its mission objectives. The power processor units (PPU), digital control and interface units (DCIU) slice boards and the xenon control assembly (XCA) are also based on the DS1 design. The DCIUs and thrust gimbal assemblies (TGA) were developed at the Jet Propulsion Laboratory. The spacecraft was provided by Orbital Sciences Corporation, Sterling, Virginia, and the mission is managed by and operated from the Jet Propulsion Laboratory. Dawn partnered with Germany, Italy and Los Alamos National Laboratory for the science instruments. The mission is led by the principal investigator, Dr. Christopher Russell, from the University of California, Los Angeles. The first 80 days after launch were dedicated to the initial checkout of the spacecraft prior to the initiation of long-term thrusting for the heliocentric transfer to Vesta. The IPS hardware, consisting of three ion thrusters and TGAs, two PPUs and DCIUs, xenon feed system, and spacecraft control software, was investigated extensively. Thrust measurements, roll torque measurements, pointing capabilities, control characteristics, and thermal behavior of the spacecraft and IPS were carefully evaluated. The Dawn IPS fully met all its initial checkout performance objectives. Deterministic thrusting for cruise began on December 17, 2007. Over the subsequent approximately 330 days the IPS will be operated virtually continuously at full power thrusting (approximately 91 mN) leading to a Mars flyby in February 2009. The encounter with Mars provides a gravity assist for a plane change and is the only source of post-launch delta-V apart from the IPS. Following the Mars gravity assist IPS will be operated for approximately one year at full power and for 1.3 years at throttled power levels leading to rendezvous with Vesta in August of 2011. Following nine months of orbital operations with IPS providing the propulsion needed for orbit capture, science orbit transfer and orbit maintenance and Vesta escape, Dawn will transit to Ceres with an expected arrival date of February 2015. As of June 16, 2008 the ion thrusters on Dawn have operated for close to 3,846 hours and have delivered nearly 1 km/s of delta-V to the spacecraft. Dawn IPS operation has been almost flawless during the initial checkout and six months of cruise. This paper provides an overview of Dawn's mission objectives, mission and system design, and the results of the post-launch Dawn IPS mission operations through June 2008

Garner, Charles E.↗

Automated Generation and Assessment of Autonomous Systems Test Cases

This slide presentation reviews some of the issues concerning verification and validation testing of autonomous spacecraft routinely culminates in the exploration of anomalous or faulted mission-like scenarios using the work involved during the Dawn mission's tests as examples. Prioritizing which scenarios to develop usually comes down to focusing on the most vulnerable areas and ensuring the best return on investment of test time. Rules-of-thumb strategies often come into play, such as injecting applicable anomalies prior to, during, and after system state changes; or, creating cases that ensure good safety-net algorithm coverage. Although experience and judgment in test selection can lead to high levels of confidence about the majority of a system's autonomy, it's likely that important test cases are overlooked. One method to fill in potential test coverage gaps is to automatically generate and execute test cases using algorithms that ensure desirable properties about the coverage. For example, generate cases for all possible fault monitors, and across all state change boundaries. Of course, the scope of coverage is determined by the test environment capabilities, where a faster-than-real-time, high-fidelity, software-only simulation would allow the broadest coverage. Even real-time systems that can be replicated and run in parallel, and that have reliable set-up and operations features provide an excellent resource for automated testing. Making detailed predictions for the outcome of such tests can be difficult, and when algorithmic means are employed to produce hundreds or even thousands of cases, generating predicts individually is impractical, and generating predicts with tools requires executable models of the design and environment that themselves require a complete test program. Therefore, evaluating the results of large number of mission scenario tests poses special challenges. A good approach to address this problem is to automatically score the results based on a range of metrics. Although the specific means of scoring depends highly on the application, the use of formal scoring - metrics has high value in identifying and prioritizing anomalies, and in presenting an overall picture of the state of the test program. In this paper we present a case study based on automatic generation and assessment of faulted test runs for the Dawn mission, and discuss its role in optimizing the allocation of resources for completing the test program.

Testing challenges↗

In-Flight Operation of the Dawn Ion Propulsion System Through Start of the Vesta Cruise Phase

The Dawn mission, part of NASA's Discovery Program, has as its goal the scientific exploration of the two most massive main-belt asteroids, Vesta and Ceres. The Dawn spacecraft was launched from Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H-9.5 (Delta-II Heavy) rocket that placed the 1218 kg spacecraft into an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) which will provide most of the delta V needed for heliocentric transfer to Vesta, orbit capture at Vesta, transfer to Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, and transfer to Ceres science orbits. The Dawn ion design is based on the design validated on NASA's Deep Space 1 (DS1) mission. However, because of the very substantial (11 km/s) delta V requirements for this mission Dawn requires two engines to complete its mission objectives. The power processor units (PPU), digital control and interface units (DCIU) slice boards and the xenon control assembly (XCA) are derivatives of the components used on DS1. The DCIUs and thrust gimbal assemblies (TGA) were developed at the Jet Propulsion Laboratory. The spacecraft was provided by Orbital Sciences Corporation, Sterling, Virginia, and the mission is managed by and operated from the Jet Propulsion Laboratory. Dawn partnered with Germany, Italy and Los Alamos National Laboratory for the science instruments. The mission is led by the principal investigator, Dr. Christopher Russell, from the University of California, Los Angeles. The first 80 days after launch were dedicated to the initial checkout of the spacecraft followed by cruise to Mars. Cruise thrusting leading to a Mars gravity assist began on December 17, 2007 and was successfully concluded as planned on October 31, 2008. During this time period the Dawn IPS was operated mostly at full power for approximately 6500 hours, consumed 71.7 kg of xenon and delivered approximately 1.8 km/s of delta V to the spacecraft. The thrusting to Mars was followed by a coasting period of approximately 3.5 months that included a Mars flyby in February of 2009. The Mars flyby provided a gravity assist (MGA) for a plane change and approximately 1 km/s of heliocentric energy increase and is the only part of the mission following launch in which a needed velocity change is not accomplished by the IPS. During the coast period IPS was operated for a trajectory correction maneuver and for engineering tests but was not operated for primary propulsion. Closest approach to Mars occurred as planned on February 17, 2009 and was followed by another coasting period of just under 4 months in duration. During this last coasting phase IPS was operated only for routine maintenance activities and for system engineering tests. Deterministic thrusting for heliocentric transfer to Vesta resumed on June 8, 2009. IPS will be operated for over two years at throttled power levels leading to arrival at Vesta in September of 2011 and arrival at Ceres in February 2015. This paper provides an overview of Dawn's mission objectives and the results of Dawn IPS mission operations through the start of deterministic thrusting to Vesta.

Garner, Charles E.↗

In-Flight Operation of the Dawn Ion Propulsion System: Status at One Year from the Vesta Rendezvous

The Dawn mission, part of NASA's Discovery Program, has as its goal the scientific exploration of the two most massive main-belt asteroids, Vesta and Ceres. The Dawn spacecraft was launched from Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H-9.5 (Delta-II Heavy) rocket that placed the 1218 kg spacecraft into an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory which will provide most of the delta V needed for heliocentric transfer to Vesta, orbit capture at Vesta, transfer among Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, and transfer among Ceres science orbits. The Dawn ion thruster [I thought we only called it a thruster. Both terms are used in the paper, but I think a replacement of every occurrence of "engine" with "thruster" would be clearer.] design is based on the design validated on NASA's Deep Space 1 (DS1) mission. However, because of the very substantial (11 km/s) delta V requirements for this mission Dawn requires two engines to complete its mission objectives. The power processor units (PPU), digital control and interface units (DCIU) slice boards and the xenon control assembly (XCA) are derivatives of the components used on DS1. The DCIUs and thrust gimbal assemblies (TGA) were developed at the Jet Propulsion Laboratory. The spacecraft was provided by Orbital Sciences Corporation, Sterling, Virginia, and the mission is managed by and operated from the Jet Propulsion Laboratory. Dawn partnered with Germany, Italy and Los Alamos National Laboratory for the science instruments. The mission is led by the principal investigator, Dr. Christopher Russell, from the University of California, Los Angeles. The first 80 days after launch were dedicated to the initial checkout of the spacecraft followed by cruise to Mars. Cruise thrusting leading to a Mars gravity assist began on December 17, 2007 and was successfully concluded as planned on October 31, 2008. During this time period the Dawn IPS was operated mostly at full power for approximately 6500 hours, consumed 71.7 kg of xenon and delivered approximately 1.8 km/s of delta V to the spacecraft. The thrusting to Mars was followed by a coasting period of approximately 3.5 months that included a Mars flyby in February of 2009. The Mars flyby provided a gravity assist (MGA) for a plane change and approximately 1 km/s of heliocentric energy increase and is the only part of the mission following launch in which a needed velocity change is not accomplished by the IPS. During the coast period IPS was operated for a trajectory correction maneuver and for engineering tests but was not operated for primary propulsion. Closest approach to Mars occurred as planned on February 17, 2009 and was followed by another coasting period of just under 4 months in duration. During this last coasting phase IPS was operated only for routine maintenance activities and for system engineering tests. Deterministic thrusting for heliocentric transfer to Vesta resumed on June 8, 2009. Since resumption of cruise to Vesta IPS has been operated at throttled power levels, most of the time at full power, and with a duty cycle of approximately 93%, leading to an arrival at Vesta in July of 2011 and arrival at Ceres in February 2015. This paper provides an overview of Dawn's mission objectives and the results of Dawn IPS mission operations through one year from the spacecraft's rendezvous with Vesta.

Garner, Charles E.↗

Zero to Integration in Eight Months, the Dawn Ground Data System Engineering Challenge

The Dawn Project has presented the Ground Data System (GDS) with technical challenges driven by cost and schedule constraints commonly associated with National Aeronautics and Space Administration (NASA) Discovery Projects. The Dawn mission consists of a new and exciting Deep Space partnership among: the Jet Propulsion Laboratory (JPL), manages the project and is responsible for flight operation; Orbital Sciences Corporation (OSC), is the spacecraft builder and is responsible for flight system test and integration; and the University of California, at Los Angeles (UCLA), is responsible for science planning and operations. As a cost-capped mission, one of Dawn's implementation strategies is to leverage from both flight and ground heritage. OSC's ground data system is used for flight system test and integration as part of the flight heritage strategy. Mission operations, however, are to be conducted with JPL's ground system. The system engineering challenge of dealing with two heterogeneous ground systems emerged immediately. During the first technical interchange meeting between the JPL's GDS Team and OSC's Flight Software Team, August 2003, the need to integrate the ground system with the flight software was brought to the table. This need was driven by the project's commitment to enable instrument engineering model integration in a spacecraft simulator environment, for both demonstration and risk mitigation purposes, by April 2004. This paper will describe the system engineering approach that was undertaken by JPL's GDS Team in order to meet the technical challenge within a non-negotiable eight-month schedule. Key to the success was adherence to fundamental systems engineering practices: decomposition of the project request into manageable requirements; integration of multiple ground disciplines and experts into a focused team effort; definition of a structured yet flexible development process; definition of an in-process risk reduction plan; and aggregation of the intermediate products to an integrated final product. In addition, this paper will highlight the role of lessons learned from the integration experience. The lessons learned from an early GDS deployment have served as the foundation for the design and implementation of the Dawn Ground Data System.

Ground Data System (GDS)↗

Zero to Integration in Eight Months, the Dawn Ground Data System Engineering Challange

The Dawn Project has presented the Ground Data System (GDS) with technical challenges driven by cost and schedule constraints commonly associated with National Aeronautics and Space Administration (NASA) Discovery Projects. The Dawn mission consists of a new and exciting Deep Space partnership among: the Jet Propulsion Laboratory (JPL), responsible for project management and flight operations; Orbital Sciences Corporation (OSC), spacecraft builder and responsible for flight system test and integration; and the University of California, at Los Angeles (UCLA), responsible for science planning and operations. As a cost-capped mission, one of Dawn s implementation strategies is to leverage from both flight and ground heritage. OSC's ground data system is used for flight system test and integration as part of the flight heritage strategy. Mission operations, however, are to be conducted with JPL s ground system. The system engineering challenge of dealing with two heterogeneous ground systems emerged immediately. During the first technical interchange meeting between the JPL s GDS Team and OSC's Flight Software Team, August 2003, the need to integrate the ground system with the flight software was brought to the table. This need was driven by the project s commitment to enable instrument engineering model integration in a spacecraft simulator environment, for both demonstration and risk mitigation purposes, by April 2004. This paper will describe the system engineering approach that was undertaken by JPL's GDS Team in order to meet the technical challenge within a non-negotiable eight-month schedule. Key to the success was adherence to an overall systems engineering process and fundamental systems engineering practices: decomposition of the project request into manageable requirements; definition of a structured yet flexible development process; integration of multiple ground disciplines and experts into a focused team effort; in-process risk management; and aggregation of the intermediate products to an integrated final product. In addition, this paper will highlight the role of lessons learned from the integration experience. The lessons learned from an early GDS deployment have served as the foundation for the design and implementation of the Dawn Ground Data System.

systems engineering↗

Thermal Cycle Lifetest of Swaged Cathode Heaters

This viewgraph presentation reviews the thermal cycling test for the Dawn mission. The flight system, the mission requirements, and the Ion Propulsion System (IPS) are shown. The Dawn mission requires periodic thruster shutdown for data transmission and coast periods. The thermal cycling test is designed to simulate approximately three complete mission profiles. The results of the tests are reviewed.

ion engines↗

Assessing Ceres’ Past and Current Habitability

Dwarf planet Ceres is a compelling target as an evolved ocean world with, at least, regional brine reservoirs and potentially ongoing geological activity. Situated in the Main Belt of asteroids, Ceres is the most water-rich body in the inner solar system (in relative abundance) and is accessible enough for a sample return with the resources of a typical medium-class (New Frontiers) NASA mission. NASA’s Dawn mission at Ceres revealed the presence of liquid, brine-driven activity, organic matter, and a rich salt chemistry. With this evidence, the overarching goals of the mission concept presented herein are to quantify Ceres’ current habitability potential and origin. A sample return from young evaporite deposits in Occator crater offers greater science return than an in situ exploration mission by enabling high-resolution analysis of (1) organic matter expected from terrestrial and chondritic analogs that are trapped in salt minerals and (2) isotopes of refractory elements for a similar cost and less science risk. The sample return concept would be executed with a single flight system due to Ceres’ relative proximity to Earth and low gravity. Solar electric propulsion was identified as the most cost-effective approach for getting to Ceres and back. De-orbiting, landing, and takeoff are performed with a throttleable monopropellant hydrazine system. The solar arrays are stowed prior to landing and takeoff. Sample acquisition builds on the pneumatic system designed by Honeybee Robotics. The sample return mission concept relies on the availability of key technologies: an enhanced landing vision system leveraging investments from Mars 2020; retractable/redeployable solar arrays, which have been demonstrated on the International Space Station but not at Ceres’ gravity; and an emerging design from upcoming missions for sample transfer from the pneumatic sampling system to the sample return capsule. Return of a sample of mass ~100 g from Ceres, maintained at ≤ -20°C, is without precedent for any currently advocated Ocean World mission, enabling a vast range of experimental techniques back on Earth with sensitivities and accuracies far beyond those feasible with in situ instruments. A sample of this size also enables analyses to benefit from techniques that will become available in the future.

Casillas, Raul Polit↗

Preparing for Dawn's Mission at Ceres: Challenges and Opportunities in the Exploration of a Dwarf Planet

After escaping from Vesta in 2012, Dawn is continuing its 2.5-year flight to dwarf planet Ceres. Investigating this second destination promises to provide a view of an intriguing world of ice and rock, likely displaying fascinating geology entirely unlike any body yet orbited by a spacecraft. Dawn spends the significant majority of the time thrusting with its ion propulsion system to deliver the 3.6 km/s required to rendezvous with Ceres. Meanwhile, the operations team has developed the sequences that will be used there. Following orbit capture in March 2015, Dawn will fly to a series of four circular polar science orbits. The orbits, ranging from about 13,500 km to 375 km in altitude, are designed to optimize the scientific observations. The overall strategy for exploring Ceres is based strongly on the extremely successful 16 months of Vesta operations, during which Dawn met or exceeded all of its objectives. Nevertheless, the loss of two of the spacecraft's four reaction wheels has necessitated some important changes. Based on a very productive hydrazine conservation campaign in the interplanetary cruise and the development of new hydrazine-efficient methods of operating at Ceres, there is good reason to expect that Dawn will be able to accomplish all of its objectives regardless of the health of the reaction wheels. This paper describes the progress in traveling to Ceres as well as the plans for exploring this giant, icy world.

Vesta↗

Mapping Vesta: First Results from Dawn's Survey Orbit

The geologic objectives of the Dawn Mission [1] are to derive Vesta s shape, map the surface geology, understand the geological context and contribute to the determination of the asteroids origin and evolution. Geomorphology and distribution of surface features will provide evidence for impact cratering, tectonic activity, volcanism, and regolith processes. Spectral measurements of the surface will provide evidence of the compositional characteristics of geological units. Age information, as derived from crater size-frequency distributions, provides the stratigraphic context for the structural and compositional mapping results, thus revealing the geologic history of Vesta. We present here the first results of the Dawn mission from data collected during the approach to Vesta, and its first discrete orbit phase - the Survey Orbit, which lasts 21 days after the spacecraft had established a circular polar orbit at a radius of approx.3000 km with a beta angle of 10deg-15deg.

Jaumann, R.↗

Howardite Noble Gases as Indicators of Asteroid Surface Processing

The HED (Howardite, Eucrite and Diogenite) group meteorites likely or iginate from the Asteroid 4 Vesta - one of two asteroid targets of NA SA's Dawn mission. Whilst Howardites are polymict breccias of eucriti c and diogenitic material that often contain "regolithic" petrologica l features, neither their exact regolithic nature nor their formation processes are well defined. As the Solar Wind (SW) noble gas compon ent is implanted onto surfaces of solar system bodies, noble gas anal yses of Howardites provides a key indicator of regolithic origin. In addition to SW, previous work by suggested that restricted Ni (300-12 00 micro g/g) and Al2O3 (8-9 wt%) contents may indicate an ancient we ll-mixed regolith. Our research combines petrological, compositional and noble gas analyses to help improve understanding of asteroid reg olith formation processes, which will play an intergral part in the i nterpretation of Dawn mission data. Following compositional and petrological analyses, we developed a regolith grading scheme for our sampl e set of 30 Howardites and polymict Eucrites. In order to test the r egolith indicators suggested by, our 8 selected samples exhibited a r ange of Ni, Al2O3 contents and regolithic grades. Noble gas analyses were performed using furnace stepheating on our MAP 215-50 noble gas mass spectrometer. Of our 8 howardites, only 3 showed evidence of SW noble gases (e.g approaching Ne-20/Ne-22 approximately equals 13.75, Ne-21/Ne-22 approximately equals 0.033). As these samples display low regolithic grades and a range of Ni and Al2O3 contents, so far we are unable to find any correlation between these indicators and "regolit hic" origin. These results have a number of implications for both Ho wardite and Vesta formation, and may suggest complex surface stratigr aphies and surface-gardening processes.

Cartwright, J. A.↗

The Dawn of Vesta Science

The Dawn mission is part of NASA's Discovery Program and has as its goal the scientific exploration of the two most massive main-belt asteroids, Vesta and Ceres. The Dawn spacecraft was launched from the Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H-9.5 (Delta-II Heavy) rocket that placed the 1218-kg spacecraft onto an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory which will provide a total ?V of 11.3 km/s for the heliocentric transfer to Vesta, orbit capture at Vesta, transfer between Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, and transfer between Ceres science orbits. Fullpower thrusting from December 2007 through October 2008 was used to successfully target a Mars gravity assist flyby in February 2009 that provided an additional ?V of 2.6 km/s. Deterministic thrusting for the heliocentric transfer to Vesta resumed in June 2009 and concluded with orbit capture at Vesta on July 16, 2011. An additional 210 hours of IPS thrusting was used to enter the first Vesta science orbit, called Survey orbit, on August 3, 2011 at an altitude of approximately 2,735 km. To date the IPS has been operated for 23,621 hours, consumed approximately 252 kg of xenon, and provided a delta-V of approximately 6.7 km/s. The IPS performance characteristics are very close to the expected performance based on analysis and testing performed pre-launch. The only significant issue in over the almost four years of IPS operations in flight was the temporary failure of a valve driver board in the Digital Control and Interface Unit-1 (DCIU-1), resulting in a loss of thrust of approximately 29 hours. Thrusting operations resumed after switching to DCIU-2, and power cycling conducted after orbit capture restored DCIU-1 to full functionality. After about three weeks of Survey orbit operations the IPS will be used to transfer the spacecraft to the other planned science orbit altitudes. After approximately one year of science operations the IPS will be used for escape from Vesta and then for thrusting to Ceres with a planned arrival date at Ceres in February 2015. This paper provides an overview of Dawn's mission objectives and the results of Dawn IPS mission operations through the start of science operations at Vesta.

electric propulsion↗