Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Crew Transportation System”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Characterization of in-Space Propulsion Trade Space to Support Initial Human Mars Segment

The National Aeronautics and Space Administration’s Exploration Systems Development Mission Directorate has been developing architecture concepts for human missions to Mars in alignment with the agency’s Moon to Mars blueprint objectives. The focus of the Architecture Development Office has been to decompose the blueprint objectives into the characteristics and needs for both lunar and Mars missions and develop functional needs to enable an integrated end-to-end mission architecture. One of the key components of a human Mars mission is the in-space transportation system that delivers crew and cargo to Mars vicinity and return crew safely back to Earth. The Mars Architecture Team has been evaluating four in-space transportation options to satisfy this functional need: 1) Hybrid Nuclear Electric/ Chemical Propulsion, 2) Nuclear Thermal Propulsion, 3) Hybrid Solar Electric/ Chemical Propulsion, and 4) All-Chemical propulsion. To answer the question “which transportation option is best?” decision makers will need to understand the performance characteristics—and limitations—for each architecture in the context of their preferred metric. Each option could be considered “better” than the others, depending on whether the primary selection criteria is fast, cheap, maximum cross-government applicability, maximizes commercial capabilities, and/or any other desired metrics. The Mars Architecture Team has completed considerable analysis on the Hybrid Nuclear Electric/Chemical Propulsion concept over the past three years. The Space Nuclear Propulsion program has also conducted significant work on the Nuclear Thermal Propulsion concept. The Hybrid Solar Electric/Chemical Propulsion concept, derived from technology planned for the Gateway program, was originally configurated for minimum vehicle stack mass (and, hence, minimum Earth-launched mass/cost), leveraging a highly efficient propulsion system on a minimum energy Conjunction Class trajectory. Historically, All-Chemical concepts were considered impractical due to the enormous propellant mass required, even for minimum energy Conjunction Class/long stay mission opportunities. However, considering the emerging commercial heavy-lift capabilities, the concept must be reevaluated across a range of concepts that leverage reusable launch vehicle capabilities to reduce the cost of launching large quantities of transportation elements needed for missions of various duration. This paper aims to provide an overview of the in-space transportation assessment work that is on-going within NASA.

Mars↗

Characterization of in-Space Propulsion Trade Space to Support Initial Human Mars Segment

The National Aeronautics and Space Administration’s Exploration Systems Development Mission Directorate has been developing architecture concepts for human missions to Mars in alignment with the agency’s Moon to Mars blueprint objectives. The focus of the Architecture Development Office has been to decompose the blueprint objectives into the characteristics and needs for both lunar and Mars missions and develop functional needs to enable an integrated end-to-end mission architecture. One of the key components of a human Mars mission is the in-space transportation system that delivers crew and cargo to Mars vicinity and return crew safely back to Earth. The Mars Architecture Team has been evaluating four in-space transportation options to satisfy this functional need: 1) Hybrid Nuclear Electric/ Chemical Propulsion, 2) Nuclear Thermal Propulsion, 3) Hybrid Solar Electric/ Chemical Propulsion, and 4) All-Chemical propulsion. To answer the question “which transportation option is best?” decision makers will need to understand the performance characteristics—and limitations—for each architecture in the context of their preferred metric. Each option could be considered “better” than the others, depending on whether the primary selection criteria is fast, cheap, maximum cross-government applicability, maximizes commercial capabilities, and/or any other desired metrics. The Mars Architecture Team has completed considerable analysis on the Hybrid Nuclear Electric/Chemical Propulsion concept over the past three years. The Space Nuclear Propulsion program has also conducted significant work on the Nuclear Thermal Propulsion concept. The Hybrid Solar Electric/Chemical Propulsion concept, derived from technology planned for the Gateway program, was originally configurated for minimum vehicle stack mass (and, hence, minimum Earth-launched mass/cost), leveraging a highly efficient propulsion system on a minimum energy Conjunction Class trajectory. Historically, All-Chemical concepts were considered impractical due to the enormous propellant mass required, even for minimum energy Conjunction Class/long stay mission opportunities. However, considering the emerging commercial heavy-lift capabilities, the concept must be reevaluated across a range of concepts that leverage reusable launch vehicle capabilities to reduce the cost of launching large quantities of transportation elements needed for missions of various duration. This paper aims to provide an overview of the in-space transportation assessment work that is on-going within NASA.

Mars↗

ACRV derived transportation system

Alternate means for manned transportation to low earth orbit are being considered by NASA to complement and eventually replace the Space Shuttle. One method of achieving two-way transportation is through the modification of Assured Crew Return Vehicle (ACRV). The ACRV is a manned transportation system designed to bring home Space Station Freedom crews in the event of an emergency or Shuttle standdown. The ACRV is launched in the Space Shuttle-payload bay and is designed for earth return from low earth orbit. A study was performed that addressed the modification of an ACRV into a two-way manned transportation system. The Station Crew Return Alternate Module (SCRAM) configuration was chosen as the reference ACRV vehicle. This paper will discuss the requirements and ground rules used in the study as well as the design modifications made to the ACRV.

Peterson, Wayne L.↗

Sensitivity study of Space Station Freedom operations cost and selected user resources

The results of sensitivity studies performed to estimate probable ranges for four key Space Station parameters using the Space Station Freedom's Model for Estimating Space Station Operations Cost (MESSOC) are discussed. The variables examined are grouped into five main categories: logistics, crew, design, space transportation system, and training. The modification of these variables implies programmatic decisions in areas such as orbital replacement unit (ORU) design, investment in repair capabilities, and crew operations policies. The model utilizes a wide range of algorithms and an extensive trial logistics data base to represent Space Station operations. The trial logistics data base consists largely of a collection of the ORUs that comprise the mature station, and their characteristics based on current engineering understanding of the Space Station. A nondimensional approach is used to examine the relative importance of variables on parameters.

Accola, Anne↗

Reusable Hybrid Propellant Modules for Outer-Space Transport

A report summarizes the concept of reusable hybrid propellant modules (HPMs), which would be used in outer space for long-term cryogenic storage of liquefied spacecraft-propellant gases, including for example, oxygen and hydrogen for combustion-based chemical rocket engines and xenon for electric thrusters. The HPM concept would provide the fundamental building block for an efficient, reusable in-space transportation system for both crewed and uncrewed missions. Each HPM would be equipped to implement an advanced zero-boil-off method of managing cryogenic fluids, and would include a fluid-transfer interface comprising standardized fittings that would be compatible with fittings on all supply facilities and on spacecraft to be supplied. The HPM, combined with a chemical or electric orbital transfer spacecraft, would provide an integrated propulsion system. HPMs would supply chemical propellant for time-critical transfers such as crewed missions, and utilize the more efficient electric-propulsion transfer vehicles to transport filled HPMs to the destinations and to return empty HPMs back to near-Earth orbits or other intermediate locations for replenishment and reuse. The HPM prepositioned using electric propulsion would provide the chemical propellant for the crew s return trip in a much more efficient manner than a chemical-only approach. The propellants to fill the HPMs would be delivered from the Earth or other initial supply locations to the intermediate locations by use of automated, compatible spacecraft designed specifically for that purpose. Additionally, multiple HPMs could be aggregated and positioned in orbits and on planets, moons, and asteroids to supply fluids to orbiting and interplanetary spacecraft.

Mazanek, Daniel D.↗

An Overview of High Temperature Seal Development and Testing Capabilities at the NASA Glenn Research Center

The NASA Glenn Research Center (GRC), partnering with the University of Toledo, has a long history of developing and testing seal technologies for high-temperature applications. The GRC Seals Team has conducted research and development on high-temperature seal technologies for applications including advanced propulsion systems, thermal protection systems (airframe and control surface thermal seals), high-temperature preloading technologies, and other extreme-environment seal applications. The team has supported several high-profile projects over the past 30 years and has partnered with numerous organizations, including other government entities, academic institutions, and private organizations. Some of these projects have included the National Aerospace Space Plane (NASP), Space Shuttle Space Transport System (STS), the Multi-Purpose Crew Vehicle (MPCV), and the Dream Chaser Space Transportation System, as well as several high-speed vehicle programs for other government organizations. As part of the support for these programs, NASA GRC has developed unique seal-specific test facilities that permit evaluations and screening exercises in relevant environments. The team has also embarked on developing high-temperature preloaders to help maintain seal functionality in extreme environments. This paper highlights several propulsion-related projects that the NASA GRC Seals Team has supported over the past several years and will provide an overview of existing testing capabilities

National Aerospace Plane↗

A prototype Crew Medical Restraint System (CMRS) for Space Station Freedom

The Crew Medical Restrain System (CMRS) is a prototype system designed and developed for use as a universally deployable medical restraint/workstation on Space Station Freedom (SSF), the Shuttle Transportation System (STS), and the Assured Crew Rescue Vehicle (ACRV) for support of an ill or injured crewmember requiring stabilization and transportation to Earth. The CMRS will support all medical capabilities of the Health Maintenance Facility (HMF) by providing a restraint/interface system for all equipment (advance life support packs, defibrillator, ventilator, portable oxygen supply, IV pump, transport monitor, transport aspirator, and intervenous fluids delivery system) and personnel (patient and crew medical officers). It must be functional within the STS, ACRV, and all SSF habitable volumes. The CMRS will allow for medical capabilities within CPR, ACLS and ATLS standards of care. This must all be accomplished for a worst case transport time scenario of 24 hours from SSF to a definitive medical care facility on Earth. A presentation of the above design prototype with its subsequent one year SSF/HMF and STS/ACRV high fidelity mock-up ground based simulation testing will be given. Also, parabolic flight and underwater Weightless Test Facility evaluations will be demonstrated for various medical contingencies. The final design configuration to date will be discussed with future space program impact considerations.

Johnston, S. L.↗

Estimating the Reliability of a Soyuz Spacecraft Mission

Once the US Space Shuttle retires in 2010, the Russian Soyuz Launcher and Soyuz Spacecraft will comprise the only means for crew transportation to and from the International Space Station (ISS). The U.S. Government and NASA have contracted for crew transportation services to the ISS with Russia. The resulting implications for the US space program including issues such as astronaut safety must be carefully considered. Are the astronauts and cosmonauts safer on the Soyuz than the Space Shuttle system? Is the Soyuz launch system more robust than the Space Shuttle? Is it safer to continue to fly the 30 year old Shuttle fleet for crew transportation and cargo resupply than the Soyuz? Should we extend the life of the Shuttle Program? How does the development of the Orion/Ares crew transportation system affect these decisions? The Soyuz launcher has been in operation for over 40 years. There have been only two loss of life incidents and two loss of mission incidents. Given that the most recent incident took place in 1983, how do we determine current reliability of the system? Do failures of unmanned Soyuz rockets impact the reliability of the currently operational man-rated launcher? Does the Soyuz exhibit characteristics that demonstrate reliability growth and how would that be reflected in future estimates of success? NASA s next manned rocket and spacecraft development project is currently underway. Though the projects ultimate goal is to return to the Moon and then to Mars, the launch vehicle and spacecraft s first mission will be for crew transportation to and from the ISS. The reliability targets are currently several times higher than the Shuttle and possibly even the Soyuz. Can these targets be compared to the reliability of the Soyuz to determine whether they are realistic and achievable? To help answer these questions this paper will explore how to estimate the reliability of the Soyuz Launcher/Spacecraft system, compare it to the Space Shuttle, and its potential impacts for the future of manned spaceflight. Specifically it will look at estimating the Loss of Mission (LOM) probability using historical data, reliability growth, and Probabilistic Risk Assessment techniques

Lutomski, Michael G.↗

Human Mars Mission In-Space Transportation Sensitivity for Nuclear Electric / Chemical Hybrid Propulsion

NASA's Human Exploration and Operation Mission Directorate is continuing to study different concepts and options to field human Mars missions as part of NASA's Moon2Mars directive. In this study, an update to the Hybrid propulsion system was established with the introduction of nuclear electric propulsion system to replace the solar electric propulsion system in an effort to understand the potential impact of a shorter mission to Mars. For crewed missions to Mars, the transportation system sizing is highly dependent on the type of mission and the mission duration. An integrated trajectory analysis capability has been developed and updated to enable this investigation. Longer duration mission may utilize higher efficiency low thrust propulsion system more, but would require higher payload mass due to increase to crew logistics loading and habitation volume. Conversely, shorter duration mission may have lower payload mass, but will require significant increase to propulsion system performance and/or overall system mass. An overall integrated design trade space is defined in this paper to investigate the tradeoff between these scenarios to illuminate the optimality of the transportation system option from a mass perspective. The sensitivity analysis developed in this study will be crucial to understanding the Mars mission design trade space for crewed Mars missions, and will help inform design decisions and investment strategies.

Patrick R. Chai↗

Preparing for Mars: The Evolvable Mars Campaign 'Proving Ground' Approach

As the National Aeronautics and Space Administration (NASA) prepares to extend human presence beyond Low Earth Orbit, we are in the early stages of planning missions within the framework of an Evolvable Mars Campaign. Initial missions would be conducted in near-Earth cis-lunar space and would eventually culminate in extended duration crewed missions on the surface of Mars. To enable such exploration missions, critical technologies and capabilities must be identified, developed, and tested. NASA has followed a principled approach to identify critical capabilities and a "Proving Ground" approach is emerging to address testing needs. The Proving Ground is a period subsequent to current International Space Station activities wherein exploration-enabling capabilities and technologies are developed and the foundation is laid for sustained human presence in space. The Proving Ground domain essentially includes missions beyond Low Earth Orbit that will provide increasing mission capability while reducing technical risks. Proving Ground missions also provide valuable experience with deep space operations and support the transition from "Earth-dependence" to "Earth-independence" required for sustainable space exploration. A Technology Development Assessment Team identified a suite of critical technologies needed to support the cadence of exploration missions. Discussions among mission planners, vehicle developers, subject-matter-experts, and technologists were used to identify a minimum but sufficient set of required technologies and capabilities. Within System Maturation Teams, known challenges were identified and expressed as specific performance gaps in critical capabilities, which were then refined and activities required to close these critical gaps were identified. Analysis was performed to identify test and demonstration opportunities for critical technical capabilities across the Proving Ground spectrum of missions. This suite of critical capabilities is expected to provide the foundation required to enable a variety of possible destinations and missions consistent with the Evolvable Mars Campaign.. The International Space Station will be used to the greatest extent possible for exploration capability and technology development. Beyond this, NASA is evaluating a number of options for Proving Ground missions. An "Asteroid Redirect Mission" will demonstrate needed capabilities (e.g., Solar Electric Propulsion) and transportation systems for the crew (i.e., Space Launch System and Orion) and for cargo (i.e., Asteroid Redirect Vehicle). The Mars 2020 mission and follow-on robotic precursor missions will gather Mars surface environment information and will mature technologies. NASA is considering emplacing a small pressurized module in cis-lunar space to support crewed operations of increasing duration and to serve as a platform for critical exploration capabilities testing (e.g., radiation mitigation; extended duration deep space habitation). In addition, "opportunistic mission operations" could demonstrate capabilities not on the Mars critical path that may, nonetheless, enhance exploration operations (e.g., teleoperations, crew assisted Mars sample return). The Proving Ground may also include "pathfinder" missions to test and demonstrate specific capabilities at Mars (e.g., entry, descent, and landing). This paper describes the (1) process used to conduct an architecture-driven technology development assessment, (2) exploration mission critical and supporting capabilities, and (3) approach for addressing test and demonstration opportunities encompassing the spectrum of flight elements and destinations consistent with the Evolvable Mars Campaign.

Bobskill, Marianne R.↗

The Shuttle Mission Simulator computer generated imagery

Equipment available in the primary training facility for the Space Transportation System (STS) flight crews includes the Fixed Base Simulator, the Motion Base Simulator, the Spacelab Simulator, and the Guidance and Navigation Simulator. The Shuttle Mission Simulator (SMS) consists of the Fixed Base Simulator and the Motion Base Simulator. The SMS utilizes four visual Computer Generated Image (CGI) systems. The Motion Base Simulator has a forward crew station with six-degrees of freedom motion simulation. Operation of the Spacelab Simulator is planned for the spring of 1983. The Guidance and Navigation Simulator went into operation in 1982. Aspects of orbital visual simulation are discussed, taking into account the earth scene, payload simulation, the generation and display of 1079 stars, the simulation of sun glare, and Reaction Control System jet firing plumes. Attention is also given to landing site visual simulation, and night launch and landing simulation.

Henderson, T. H.↗

Torpor Inducing Transfer Habitat for Human Stasis to Mars

SpaceWorks Enterprises, Inc. has performed an initial evaluation of an advanced habitat system designed to transport crews between the Earth and Mars. This new and innovative habitat design is capable of placing the crew in an inactive, torpor state for the duration of the in-space mission segments. This substantially reduces the mass and size of the habitat, which ultimately leads to significant reductions in the overall architecture size.Our approach for achieving this is based on extending the current and evolving medical practice of Therapeutic Hypothermia (TH) – a proven and effective treatment for various traumatic injuries. TH is a medical treatment that lowers a patient's body temperature by just 5 to 10 degrees Fahrenheit causing their metabolism to reduce significantly and the body to enter an unconscious state. This method avoids the intractable challenges often associated with cell metabolic cessation through cryogenic freezing and other highly speculative approaches.TH is a proven treatment for traumatic injuries; however it has not been applied for non-critical care purposes due to current lack of purpose (i.e. no practical need). The opportunity exists to use TH in this capacity to enable and enhance our human spaceflight capability. With this concept, we have the potential to simultaneously solve multiple exploration challenges.

Bradford, J.↗

SPS program review transportation perspective

The delivery of cargo and space workers to the SPS construction site requires the development of two different systems, one to handle large cargo deliveries and a smaller system to accommodate crew. The overall scenario of the transportation system is shown. Eight major elements comprise the transportation system: personnel launch vehicle (PLV) or shuttle; personnel orbital transfer vehicle (POTV); the heavy lift launch vehicle (HLLV); the electric orbital transfer vehicle (EOTV); intra orbit transfer vehicle (IOTV); LEO support facility; GEO support facility and a shuttle derived HLLV (SDHLLV) for supporting the early SPS Demonstration Program. The HLLV and EOTV represent the cargo carriers while the PLV and POTV represent the people carriers. The IOTV is utilized to ferry people and cargo modules over short distances in the vicinity of its station.

Wales, W. W., Jr.↗

Transportation-Driven Mars Surface Operations Supporting an Evolvable Mars Campaign

This paper describes the results of a study evaluating options for supporting a series of human missions to a single Mars surface destination. In this scenario the infrastructure emplaced during previous visits to this site is leveraged in following missions. The goal of this single site approach to Mars surface infrastructure is to enable "Steady State" operations by at least 4 crew for up to 500 sols at this site. These characteristics, along with the transportation system used to deliver crew and equipment to and from Mars, are collectively known as the Evolvable Mars Campaign (EMC). Information in this paper is presented in the sequence in which it was accomplished. First, a logical buildup sequence of surface infrastructure was developed to achieve the desired "Steady State" operations on the Mars surface. This was based on a concept of operations that met objectives of the EMC. Second, infrastructure capabilities were identified to carry out this concept of operations. Third, systems (in the form of conceptual elements) were identified to provide these capabilities. This included top-level mass, power and volume estimates for these elements. Fourth, the results were then used in analyses to evaluate three options (18t, 27t, and 40t landed mass) of Mars Lander delivery capability to the surface. Finally, Mars arrival mass estimates were generated based upon the entry, descent, and landing requirements for inclusion in separate assessments of in-space transportation capabilities for the EMC.

Toups, Larry↗

Advanced Manned Launch System (AMLS) study

To assure national leadership in space operations and exploration in the future, NASA must be able to provide cost effective and operationally efficient space transportation. Several NASA studies and the joint NASA/DoD Space Transportation Architecture Studies (STAS) have shown the need for a multi-vehicle space transportation system with designs driven by enhanced operations and low costs. NASA is currently studying an advanced manned launch system (AMLS) approach to transport crew and cargo to the Space Station Freedom. Several single and multiple stage systems from air-breathing to all-rocket concepts are being examined in a series of studies potential replacements for the Space Shuttle launch system in the 2000-2010 time frame. Rockwell International Corporation, under contract to the NASA Langley Research Center, has analyzed a two-stage all-rocket concept to determine whether this class of vehicles is appropriate for the AMLS function. The results of the pre-phase A study are discussed.

Ehrlich, Carl F., Jr.↗

Linear Actuator System for the NASA Docking System

The Linear Actuator System (LAS) is a major sub-system within the NASA Docking System (NDS). The NDS Block 1 will be used on the Boeing Crew Space Transportation (CST-100) system to achieve docking with the International Space Station. Critical functions in the Soft Capture aspect of docking are performed by the LAS, which implements the Soft Impact Mating and Attenuation Concept (SIMAC). This paper describes the general function of the LAS, the system's key requirements and technical challenges, and the development and qualification approach for the system.

Dick, Brandon↗

Linear Actuator System for the NASA Docking System

The Linear Actuator System (LAS) is a major sub-system within the NASA Docking System (NDS). The NDS Block 1 will be used on the Boeing Crew Space Transportation (CST-100) system to achieve docking with the International Space Station. Critical functions in the Soft Capture aspect of docking are performed by the LAS. This paper describes the general function of the LAS, the system's key requirements and technical challenges, and the development and qualification approach for the system.

Dick, Brandon N.↗

Overview of Crew Operations for Transit to Mars

Crewed Mars missions are estimated to be 700-1,200 days in length which is two to three times longer than any continuous human spaceflight mission to date. When architecting a Mars mission there are numerous resources that must be considered, evaluated, and planned for, including—but not limited to—mass, cost, performance, and risk. Crew time is a limited resource that will need to be appropriately allocated during future Mars missions. NASA’s “Moon to Mars Objectives” specifically recognizes as Recurring Tenets the need to return crews safely to Earth while mitigating adverse impacts to crew health and maximizing crew time available for science and engineering activities within planned mission durations. Crew operations and the crew time allocation for a Mars missions will likely be different than current operational planning aboard the ISS due to communication delays, crew health and performance needs, transportation system needs, potential vehicle dormancy, and mass ejection. Crew will need to operate much more Earth independently and potentially be responsible for more operations since traditional Earth ground support will be delayed. Incidents requiring immediate crew action will therefore either be the responsibility of the crew or an automated feature of the transit vehicle. This paper discusses the operational challenges of a Mars transit mission and the associated activities that will need to take place during each operational phase of transit to and from Mars.

Crew Time↗