Space Shuttle Transportation (Roll-Out) Loads Diagnostics

The Space Transportation System (STS) consists of three primary components; an Orbiter Vehicle, an External Fuel Tank, and two Solid Rocket Boosters. The Orbiter Vehicle and Solid Rocket Boosters are reusable components, and as such, they are susceptible to durability issues. Recently, the fatigue load spectra for these components have been updated to include load histories acquired during the rollout phase of the STS processing for flight. Using traditional program life assessment techniques, the incorporation of these "rollout" loads produced unacceptable life estimates for certain Orbiter structural members. As a result, the Space Shuttle System Engineering and Integration Office has initiated a program to re-assess the method used for developing the "rollout" loads and performing the life assessments. In the fall of 2003 a set of tests were preformed to provide information to either validate existing load spectra estimation techniques or generate new load spectra estimation methods. Acceleration and strain data were collected from two rollouts of a partial-stack configuration of the Space Shuttle. The partial stack configuration consists of two Solid Rocket Boosters tied together at the upper External Tank attachment locations mounted on the Mobile Launch Platform carried by a Crawler Transporter (CT). In the current analysis, the data collected from this test is examined for consistency in speed, surface condition effects, and the characterization of the forcing function. It is observed that the speed of the CT is relatively stable. The dynamic response acceleration of the partial-stack is slightly sensitive to the surface condition of the road used for transport, and the dynamic response acceleration of the partial-stack generally increases as the transport speed increases. However, the speed sensitivity is dependent on the measurement location. Finally, the character of the forcing function is narrow-banded with the primary drivers being harmonics of two CT speed dependent excitations. One source is an excitation due to the CT treads striking the road surface, and the second is unknown.

Elliott, Kenny B.↗

Operating Deflection Shapes for the Space Shuttle Partial Stack Rollout

In November of 2003 a rollout test was performed to gain a better understanding of the dynamic environment for the Space Shuttle during transportation from the Vehicle Assembly Building to the launch pad. This was part of a study evaluating the methodology for including the rollout dynamic loads in the Space Shuttle fatigue life predictions. The rollout test was conducted with a partial stack consisting of the Crawler Transporter, Mobile Launch Platform, and the Solid Rocket Boosters with an interconnecting crossbeam. Instrumentation included over 100 accelerometers. Data was recorded for steady state speeds, start-ups and stops, and ambient wind excitations with the vehicle at idle. This paper will describe the operating deflection shape analysis performed using the measured acceleration response data. The response data for the steady state speed runs were dominated by harmonics of the forcing frequencies, which were proportional to the vehicle speed. Assuming a broadband excitation for the wind, analyses of the data sets with the vehicle at idle were used to estimate the natural frequencies and corresponding mode shapes. Comparisons of the measured modal properties with numerical predictions are presented.

Buehrle, Ralph D.↗

ESTIMATION OF THE SPACE SHUTTLE ROLLOUT FORCING FUNCTION

The Space Shuttle Vehicle is assembled in the Vertical Assembly Building (VAB) at Kennedy Space Flight Center in Florida. The Vehicle is stacked on a Mobile Launch Platform (MLP) that weighs eight million pounds. A Crawler Transporter (CT) then carries the MLP and the stacked vehicle (12 million pounds total weight) to the launch complex located 5 miles away. This operation is performed at 0.9 mph resulting in a 4.5-hour transport. A recent test was performed to monitor the dynamic environment that was produced during rollout. It was found that the rollout is a harmonic-rich dynamic environment that was previously not understood. This paper will describe work that has been performed to estimate the forcing function that is produced in the transportation process. The rollout analysis team has determined that there are two families of harmonics of the drive train, which excite the system as a function of CT speed. There are also excitation sources, which are random or narrow-band in frequency and are not a function of CT speed. This presentation will discuss the application of the Sum of Weighted Accelerations Technique (SWAT) to further refine this understanding by estimating the forces and moments at the center-of-mass.

James, George H., III↗

New Lubricants Protect Machines and the Environment

In 1994, NASA and Lockheed Martin Space Operations commissioned Sun Coast Chemicals of Daytona Inc to develop a new type of lubricant that would be safe for the environment and help "grease the wheels" of the shuttle-bearing launcher platform. Founded in 1989, Sun Coast Chemicals is known amongst the racing circuit for effective lubricants that help overcome engine and transmission problems related to heat and wear damage. In a matter of weeks, Sun Coast Chemical produced the biodegradable, high-performance X-1R Crawler Track Lube. In 1996, Sun Coast Chemical determined there was a market for this new development, and introduced three derivative products, Train Track Lubricant, Penetrating Spray Lubricant, and Biodegradable Hydraulic Fluid, and then quickly followed with a gun lubricant/cleaner and a fishing rod and reel lubricant. Just recently, Sun Coast introduced the X-1R Corporation, which folds the high-performance, environmentally safe benefits into a full line of standard automotive and specially formulated racing products. The entire X-1R automotive product line has stood up to rigorous testing by groups such as the American Society of Mechanical Engineers, the Swedish National Testing and Research Institute, the Department of Mechanical Engineering at Oakland University (Rochester, Michigan), and Morgan-McClure Motorsports (Abingdon, Virginia). The X-1R Corporation also markets "handy packs" for simple jobs around the house, consisting of a multi-purpose, multi-use lubricant and grease. In 2003, The X-1R Corporation teamed up with Philadelphia-based Penn Tackle Manufacturing Co., a leading manufacturer of fishing tackle since 1932, to jointly develop and market a line of advanced lubrication products for saltwater and freshwater anglers

Source record↗

Multifunction automated crawling system

The present invention is an automated crawling robot system including a platform, a first leg assembly, a second leg assembly, first and second rails attached to the platform, and an onboard electronic computer controller. The first leg assembly has an intermittent coupling device and the second leg assembly has an intermittent coupling device for intermittently coupling the respective first and second leg assemblies to a particular object. The first and second leg assemblies are slidably coupled to the rail assembly and are slidably driven by motors to thereby allow linear movement. In addition, the first leg assembly is rotary driven by a rotary motor to thereby provide rotary motion relative to the platform. To effectuate motion, the intermittent coupling devices of the first and second leg assemblies alternately couple the respective first and second leg assemblies to an object. This motion is done while simultaneously moving one of the leg assemblies linearly in the desired direction and preparing the next step. This arrangement allows the crawler of the present invention to traverse an object in a range of motion covering 360 degrees.

Bar-Cohen, Yoseph↗

Final Report on Portable Laser Coating Removal Systems Field Demonstrations and Testing

Processes currently used throughout the National Aeronautics and Space Administration (NASA) to remove corrosion and coatings from structures, ground service equipment and small components results in waste streams consisting of toxic chemicals, spent media blast materials, and waste water. When chemicals are used in these processes they are typically high in volatile organic compounds (VOC) and are considered hazardous air pollutants (HAP). When blast media is used, the volume of hazardous waste generated is increased significantly. Many of the coatings historically used within NASA contain toxic metals such as hexavalent chromium, and lead. These materials are highly regulated and restrictions on worker exposure continue to increase. Most recently the EPA reduced the permissible exposure limit (PEL) for hexavalent chromium. The new standard lowers OSHA's PEL for hexavalent chromium from 52 to 5 micrograms of Cr(V1) per cubic meter of air as an 8-hour time-weighted average. Hexavalent chromium is found in the pretreatment and primer coatings used within the Shuttle Program. In response to the need to continue to protect assets within the agency and the growing concern over these new regulations, NASA is researching different ways to continue the required maintenance of both facility and flight equipment in a safe, efficient and environmentally preferable manner. The use of laser energy to remove prepare surfaces for a variety of processes, such as corrosion and coating removal, weld preparation and non destructive evaluation is a relatively new technology that has shown itself to be environmentally preferable and in many cases less labor intensive than currently used removal methods. The development of a Portable Laser Coating Removal System (PLCRS) started as the goal of a Joint Group on Pollution Prevention (JG-PP) project, led by the Air Force, where several types of lasers in several configurations were thoroughly evaluated. Following this project, NASA decided to evaluate the best performers on processes and coatings specific to the agency. Laser systems used during this project were all of a similar design, most of which had integrated vacuum systems in order to collect materials removed from substrate surfaces during operation. Due to the fact that the technology lends itself to a bide variety of processes, several site demonstrations were organized in order to allow for greater evaluation of the laser systems across NASA. The project consisted of an introductory demonstration and a more in-depth evaluation at Wright-Patterson Air Force Base. Additionally, field demonstrations occurred at Glenn Research Center and Kennedy Space Center. During these demonstrations several NASA specific applications were evaluated, including the removal of coatings within Orbiter tile cavities and Teflon from Space Shuttle Main Engine gaskets, removal of heavy grease from Solid Rocket Booster components and the removal of coatings on weld lines for Shuttle and general ground service equipment for non destructive evaluation (NDE). In addition, several general industry applications such as corrosion removal, structural coating removal, weld-line preparation and surface cleaning were evaluated. This included removal of coatings and corrosion from surfaces containing lead-based coatings and applications similar to launch-structure maintenance and Crawler maintenance. During the project lifecycle, an attempt was made to answer process specific concerns and questions as they arose. Some of these initially unexpected questions concerned the effects lasers might have on substrates used on flight equipment including strength, surface re-melting, substrate temperature and corrosion resistance effects. Additionally a concern was PPE required for operating such a system including eye, breathing and hearing protection. Most of these questions although not initially planned, were fully explored as a part of this project. Generally the results from tesng were very positive. Corrosion was effectively removed from steel, but less successfully from aluminum alloys. Coatings were able to be removed, with varying results, generally dark, matte and thin coatings were easier to remove. Steel and aluminum panels were able to be cleaned for welding, with no known deleterious effects and weld-lines were able to have coatings removed in critical areas for NDE while saving time as compared to other methods.

Rothgeb, Matthew J.↗

Modal Vibration Analysis of Large Castings

The art of experimental modal vibration analysis (MVA) has been extended to apply to large castings. This extension was made to enable the use of experimental MVA as a relatively inexpensive, simple means of assessing the internal structural integrity of tread shoes of crawler transporters used to move spacecraft to the launch pad at Kennedy Space Center. Each tread shoe is made from cast iron and weighs about a ton (has a mass .907 kg). The present extended version of experimental MVA could also be applied to other large castings. It could be especially useful to manufacturers as a means of rapidly discriminating against large castings that contain unacceptably large concentrations of internal defects. The use of experimental MVA to assess structural integrity is not new. What are new here are those aspects of the extension of experimental MVA that pertain to the application of MVA to objects so massive that it may not be practical or cost effective to mount them in special test fixtures that impose special test boundary conditions to test them in place under normal conditions of use.

Werlink, Rudolph J.↗

Tight Fits for Americas Next Moon Rocket, Ares V

America has begun the development of a new heavy lift rocket which will enable humans to return to the moon and reach even farther destinations. Five decades ago, the National Aeronautics and Space Administration designed a system (called Saturn/Apollo) to carry men to the moon and back; the rocket which boosted them to the moon was the Saturn V. Saturn V was huge relative to contemporary rockets and is still the largest rocket ever launched. The new moon rocket is called Ares V. It will insert 40% more payload into low earth orbit than Saturn V; and after docking with the crew spacecraft, it will insert 50% more payload onto the translunar trajectory than Saturn V. The current design of Ares V calls for two liquid-fueled stages and 2 "strap-on" solid rockets. The solid rockets are extended-length versions of the solid rockets used on the Shuttle. The diameter of the liquid stages is at least as large as the first stage of the Saturn V; the height of the lower liquid stage (called the core stage) is longer than the external tank of the Shuttle. Huge rockets require huge infrastructure and, during the Saturn/Apollo era, America invested significantly in manufacturing, assembly and launch facilities which are still in use today. Since the Saturn/Apollo era, America has invested in additional infrastructure for the Shuttle program. Ares V must utilize this existing infrastructure, with reasonable modifications. Building a rocket with 50% more capability in the same buildings, testing it in the same test stands, shipping on the same canals under the same bridges, assembling it in the same building, rolling it to the pad on the same crawler, and launching it from the same launch pad is an engineering and logistics challenge which goes hand-in-hand with designing the structure, tanks, turbines, engines, software, etc. necessary to carry such a large payload to earth orbit and to the moon. This paper quantitatively discusses the significant "tight fits" that are constraining Ares V. The engineers designing and building the infrastructure for the Saturn/Apollo program usually added margins and growth capability; sometimes the size of existing facilities (such as the width of a draw bridge) was not a constraint. Ares V may utilize the "extra" space in the existing facilities and expand other tight fits. Some of the tight fits cannot be overcome without great expense; raising the roof on the Vertical Assembly Building for example. Other tight fits are easily overcome; the transporter at the manufacturing facility for the core stage can pass under low ceilings and later over a dike (without dragging the middle) by retracting or extending the struts which support the stage. Tight fits discussed in this paper include manufacturing (jigs, widths, heights, and local transportation), testing (test stand sizes and crane capability), transportation to the test stands and the launch site (barge, waterway, and rail), assembly (VAB internal dimensions and door size), roll-out limits, and launch pad size.

Jaap, John↗

Operational Lessons Learned from the Ares I-X Flight Test

The Ares I-X flight test, launched in 2009, is the first test of the Ares I crew launch vehicle. This development flight test evaluated the flight dynamics, roll control, and separation events, but also provided early insights into logistical, stacking, launch, and recovery operations for Ares I. Operational lessons will be especially important for NASA as the agency makes the transition from the Space Shuttle to the Constellation Program, which is designed to be less labor-intensive. The mission team itself comprised only 700 individuals over the life of the project compared to the thousands involved in Shuttle and Apollo missions; while missions to and beyond low-Earth orbit obviously will require additional personnel, this lean approach will serve as a model for future Constellation missions. To prepare for Ares I-X, vehicle stacking and launch infrastructure had to be modified at Kennedy Space Center's Vehicle Assembly Building (VAB) as well as Launch Complex (LC) 39B. In the VAB, several platforms and other structures designed for the Shuttle s configuration had to be removed to accommodate the in-line, much taller Ares I-X. Vehicle preparation activities resulted in delays, but also in lessons learned for ground operations personnel, including hardware deliveries, cable routing, transferred work and custodial paperwork. Ares I-X also proved to be a resource challenge, as individuals and ground service equipment (GSE) supporting the mission also were required for Shuttle or Atlas V operations at LC 40/41 at Cape Canaveral Air Force Station. At LC 39B, several Shuttle-specific access arms were removed and others were added to accommodate the in-line Ares vehicle. Ground command, control, and communication (GC3) hardware was incorporated into the Mobile Launcher Platform (MLP). The lightning protection system at LC 39B was replaced by a trio of 600-foot-tall towers connected by a catenary wire to account for the much greater height of the vehicle. Like Shuttle, Ares I-X will be stacked on a MLP and rolled out to the pad on a Saturn-era crawler-transporter. While Ares I-X was only held in place by the four hold-down posts on its aft skirt during rollout, a new vehicle stabilization system (VSS) attached to the vertical service structure kept the vehicle from undue swaying prior to launch at the pad, LC 39B. Following the launch, the flight test vehicle first stage was recovered with the aid of new parachutes resized to accommodate the five-segment-long first stage, which had a much greater length and mass than the Shuttle s reusable solid rocket boosters. After splashdown, recovery divers exercised extra care when handling the first stage to ensure that the flight data recorders in the fifth segment simulator were not damaged by exposure to sea water. The data recovered from the Ares I-X flight test will be very valuable in verifying the predicted environments and models used to design the vehicle. Lessons learned from Ares I-X will be shared with the Ares Projects through written and verbal reports and through integration of mission team members into the Project workforce.

Davis, Stephan R.↗

Modeling and Simulation of the ARES UPPER STAGE Transportation, Lifting, Stacking and Mating Operations Within the Vehicle Assembly Building at KSC

This viewgraph presentation describes the modeling and simulation of the Ares Upper Stage Transportation, lifting, stacking, and mating operations within the Vehicle Assembly Building (VAB) at Kennedy Space Center (KSC). An aerial view of KSC Launch Shuttle Complex, two views of the Delmia process control layout, and an upper stage move subroutine and breakdown are shown. An overhead image of the VAB and the turning basin along with the Pegasus barge at the turning basin are also shown. This viewgraph presentation also shows the actual design and the removal of the mid-section spring tensioners, the removal of the AFT rear and forward tensioners tie downs, and removing the AFT hold down post and mount. US leaving the Pegasus Barge, the upper stage arriving at transfer aisle, upper stage receiving/inspection in transfer aisle, and an overhead view of upper stage receiving/inspection in transfer aisle are depicted. Five views of the actual connection of the cabling to the upper stage aft lifting hardware are shown. The upper stage transporter forward connector, two views of the rotation horizontal to vertical, the disconnection of the rear bolt ring cabling, the lowering of the upper stage to the inspection stand, disconnection of the rear bolt ring from the upper stage, the lifting of the upper stage and inspection of AFT fange, and the transfer of upper stage in an integrated stack are shown. Six views of the mating of the upper stage to the first stage are depicted. The preparation, inspection, and removal of the forward dome are shown. The upper stage mated on the integrated stack and crawler is also shown. This presentation concludes with A Rapid Upper Limb Assessment (RULA) utilizing male and female models for assessing risk factors to the upper extremities of human beings in an actual physical environment.

Kromis, Phillip A.↗

Reconstruction of Ares I-X Integrated Vehicle Rollout Loads

The measurements taken during the Ares I-X test flight provided a unique opportunity to assess the accuracy of the models and methods used to analyze the loads and accelerations present in the planned Ares I vehicle. During the rollout of the integrated vehicle from the Vehicle Assembly Building (VAB) to the launch pad, the vehicle and its supporting structure are subjected to wind loads and the vibrations produced by the crawler-transporter (CT) that is carrying it. While the loads induced on the vehicle during this period are generally low relative to those experienced in flight, the rollout is a period of operation of primary interest to those designing both the ground support equipment and the interfaces between the launch vehicle and its supporting structure. In this paper, the methods used for reconstructing the loads during the rollout phase are described. The results generated are compared to measured values, leading to insight into the accuracy of the Ares I assessment techniques.

Chamberlain, Matthew K.↗

Reconstruction of Ares I-X Integrated Vehicle Rollout Loads

The measurements taken during the Ares I-X test flight provided a unique opportunity to assess the accuracy of the models and methods used to analyze the loads and accelerations present in the planned Ares I vehicle. During the rollout of the integrated vehicle from the Vehicle Assembly Building (VAB) to the launch pad, the vehicle and its supporting structure are subjected to wind loads and the vibrations produced by the crawler-transporter (CT) that is carrying it. While the loads induced on the vehicle during this period are generally low relative to those experienced in flight, the rollout is a period of operation of primary interest to those designing both the ground support equipment and the interfaces between the launch vehicle and its supporting structure. In this paper, the methods used for reconstructing the loads during the rollout phase are described. The results generated are compared to measured values, leading to insight into the accuracy of the Ares I assessment techniques.

Chamberlain, Matthew K.↗

Shuttle Program Loads Integration: Going From Concept to Operations and Staying Successful

From the beginning of the Shuttle Program to its end, integrated loads and dynamics analyses and tests have been critical in shaping the vehicle design and operational decisions for NASA and its customers. Starting with scaled models and simple mathematical simulations of the structural dynamics, engineers defined the required structural stiffness and predicted the limit loads for each element of the system. Early structural tests provided reasonable confidence that the models and predictions were good. The first launch of the Space Shuttle brought surprises, though, when the ignition overpressure event caused a forward fuel tank support strut to buckle, among several unexpected effects. The launch pad and other ground equipment became an integral part of the system integration, especially where the acoustic and pressure environments of ignition and lift-off were concerned. Following the Challenger accident, operating limits were changed in response to new understandings of how the integrated system performed. Controlling loads while maximizing performance was a key tenet of the Performance Enhancement design process, which enabled construction of the International Space Station. During the return to flight after the Columbia accident, engineers grew to understand that loads during the roll maneuver were also important to the vehicle s structural margin and life. At this point the crawler transport from the Vehicle Assembly Building to the launch pad also became a part of the integrated loads analysis. Even in the last years of the Space Shuttle Program, new data still provided interesting insights into this complicated and fascinating spaceship. This paper will present some examples of the important findings by the team of specialists that supported the Integrated Loads and Dynamics Panel for the Space Shuttle Program.

Bernstein, Karen↗

Cooperative Lander-Surface/Aerial Microflyer Missions for Mars Exploration

Concepts are being investigated for exploratory missions to Mars based on Bioinspired Engineering of Exploration Systems (BEES), which is a guiding principle of this effort to develop biomorphic explorers. The novelty lies in the use of a robust telecom architecture for mission data return, utilizing multiple local relays (including the lander itself as a local relay and the explorers in the dual role of a local relay) to enable ranges ~10 to 1,000 km and downlink of color imagery. As illustrated in Figure 1, multiple microflyers that can be both surface or aerially launched are envisioned in shepherding, metamorphic, and imaging roles. These microflyers imbibe key bio-inspired principles in their flight control, navigation, and visual search operations. Honey-bee inspired algorithms utilizing visual cues to perform autonomous navigation operations such as terrain following will be utilized. The instrument suite will consist of a panoramic imager and polarization imager specifically optimized to detect ice and water. For microflyers, particularly at small sizes, bio-inspired solutions appear to offer better alternate solutions than conventional engineered approaches. This investigation addresses a wide range of interrelated issues, including desired scientific data, sizes, rates, and communication ranges that can be accomplished in alternative mission scenarios. The mission illustrated in Figure 1 offers the most robust telecom architecture and the longest range for exploration with two landers being available as main local relays in addition to an ephemeral aerial probe local relay. The shepherding or metamorphic plane are in their dual role as local relays and image data collection/storage nodes. Appropriate placement of the landing site for the scout lander with respect to the main mission lander can allow coverage of extremely large ranges and enable exhaustive survey of the area of interest. In particular, this mission could help with the path planning and risk mitigation in the traverse of the long-distance surface explorer/rover. The basic requirements of design and operation of BEES to implement the scenarios are discussed. Terrestrial applications of such concepts include distributed aerial/surface measurements of meteorological events, i.e., storm watch, seismic monitoring, reconnaissance, biological chemical sensing, search and rescue, surveillance, autonomous security/ protection agents, and/or delivery and lateral distribution of agents (sensors, surface/subsurface crawlers, clean-up agents). Figure 2 illustrates an Earth demonstration that is in development, and its implementation will illustrate the value of these biomorphic mission concepts.

Thakoor, Sarita↗

Framework for Integrating Science Data Processing Algorithms Into Process Control Systems

A software framework called PCS Task Wrapper is responsible for standardizing the setup, process initiation, execution, and file management tasks surrounding the execution of science data algorithms, which are referred to by NASA as Product Generation Executives (PGEs). PGEs codify a scientific algorithm, some step in the overall scientific process involved in a mission science workflow. The PCS Task Wrapper provides a stable operating environment to the underlying PGE during its execution lifecycle. If the PGE requires a file, or metadata regarding the file, the PCS Task Wrapper is responsible for delivering that information to the PGE in a manner that meets its requirements. If the PGE requires knowledge of upstream or downstream PGEs in a sequence of executions, that information is also made available. Finally, if information regarding disk space, or node information such as CPU availability, etc., is required, the PCS Task Wrapper provides this information to the underlying PGE. After this information is collected, the PGE is executed, and its output Product file and Metadata generation is managed via the PCS Task Wrapper framework. The innovation is responsible for marshalling output Products and Metadata back to a PCS File Management component for use in downstream data processing and pedigree. In support of this, the PCS Task Wrapper leverages the PCS Crawler Framework to ingest (during pipeline processing) the output Product files and Metadata produced by the PGE. The architectural components of the PCS Task Wrapper framework include PGE Task Instance, PGE Config File Builder, Config File Property Adder, Science PGE Config File Writer, and PCS Met file Writer. This innovative framework is really the unifying bridge between the execution of a step in the overall processing pipeline, and the available PCS component services as well as the information that they collectively manage.

Mattmann, Chris A.↗

Role of EIS in Materials and Coatings Selection for NASA's Launch Facilities

Corrosion studies began at NASA's John F. Kennedy Space Center (KSC) in 1966, during the Gemini/Apollo Programs, with the evaluation of long-term anti-corrosion coatings for carbon steel structures. NASAIKSC's Atmospheric Exposure Test Site was established at that time on the beach near the launch pad. In the years that followed, numerous studies at the site have identified materials, coatings, and maintenance procedures for launch hardware and equipment exposed to the highly corrosive environment at the launch pad. The atmosphere at the launch pad is highly corrosive due to the proximity of the Atlantic Ocean, high heat from rocket exhaust, and since the introduction of the Space Shuttle, the acidic combustion products of the Solid Rocket Boosters (SRBs). Currently, NASAIKSC maintains about $2 billion worth of unique equipment and facilities, not including the orbiters, each valued at about $1.8 billion. Among the items: two launch complexes, two crawler transporters, three mobile launch platforms, and specialized testing equipment. Atmospheric exposure provides very valuable data but it takes a long time and relies on human visual inspection. NASA Technical Standard for Protective Coatings requires 18 months of good performance at the Atmospheric Exposure Test Site for preliminary approval and continued good performance for 5 years for final approval of a coating system. The use of electrochemical impedance spectroscopy (EIS) was introduced at KSC in 1989 as a supplement to the traditional dc electrochemical techniques and atmospheric exposure studies. This paper presents and overview of several projects in which EIS was used in order to select materials and coatings to be used at NASA's launch facilities [1-2].

Calle, Luz Marina↗

Exploring the Solid Rocket Boosters and Properties of Matter

I worked for the United Space Alliance, LLC (USA) with the Solid Rocket Booster (SRB) Materials and Process engineers (M&P). I was assigned a project in which I needed to research and collect chemical and physical properties information, material safety data sheets (MSDS), and other product information from the vendor's websites and existing "inhouse" files for a select group of materials used in building and refurbishing the SRBs. This information was then compiled in a report that summarized the information collected. My work site was at the Kennedy Space Center (KSC). This allowed for many opportunities to visit and tour sites operated by NASA, by USA, and by the Air Force. This included the vehicle assembly building (VAB), orbital processing facilities (OPF), the crawler with the mobile launch pad (MLP), and the SRB assembly and refurbishment facility (ARF), to name a few. In addition, the launch, of STS- 117 took place within the first week of employment allowing a day by day following of that mission including post flight operations for the SRBs. Two Delta II rockets were also launched during these 7 weeks. The sights were incredible and the operations witnessed were amazing. I learned so many things I never knew about the entire program and the shuttle itself. The entire experience, especially my work with the SRB materials, inspired my plan for implementation into the classroom.

Moffett, Amy↗

Center Planning and Development: Multi-User Spaceport Initiatives

The Vehicle Assembly building at NASAs Kennedy Space Center has been used since 1966 to vertically assemble every launch vehicle, since the Apollo Program, launched from Launch Complex 39 (LC-39). After the cancellation of the Constellation Program in 2010 and the retirement of the Space Shuttle Program in 2011, the VAB faced an uncertain future. As the Space Launch System (SLS) gained a foothold as the future of American spaceflight to deep space, NASA was only using a portion of the VABs initial potential. With three high bays connected to the Crawler Way transportation system, the potential exists for up to three rockets to be simultaneously processed for launch. The Kennedy Space Center (KSC) Master plan, supported by the Center Planning and Development (CPD) Directorate, is guiding Kennedy toward a 21st century multi-user spaceport. This concept will maintain Kennedy as the United States premier gateway to space and provide multi-user operations through partnerships with the commercial aerospace industry. Commercial aerospace companies, now tasked with transporting cargo and, in the future, astronauts to the International Space Station (ISS) via the Commercial Resupply Service (CRS) and Commercial Crew Program (CCP), are a rapidly growing industry with increasing capabilities to make launch operations more economical for both private companies and the government. Commercial operations to Low Earth Orbit allow the government to focus on travel to farther destinations through the SLS Program. With LC-39B designated as a multi-use launch pad, companies seeking to use it will require an integration facility to assemble, integrate, and test their launch vehicle. An Announcement for Proposals (AFP) was released in June, beginning the process of finding a non-NASA user for High Bay 2 (HB2) and the Mobile Launcher Platforms (MLPs). An Industry Day, a business meeting and tour for interested companies and organizations, was also arranged to identify and answer any additional questions posed by potential proposers. After amending the AFP and posting additional material for potential users to consider, proposals are being accepted until July 31, at which point they will be evaluated to determine the proposer which best meets the objectives of the government. By identifying VAB HB2 as available and seeking proposals from the commercial sector for VAB HB2 and MLP use, Center Planning and Development is ensuring Kennedy Space Centers relevance in the evolving launch industry of the 21st century.