A Distributed Control System Prototyping Environment to Support Control Room Modernization

Operators of critical processes, such as nuclear power production, must contend with highly complex systems, procedures, and regulations. Developing human-machine interfaces (HMIs) that better support operators is a high priority for ensuring the safe and reliable operation of critical processes. Human factors engineering (HFE) provides a rich and mature set of tools for evaluating the performance of HMIs, however the set of tools for developing and designing HMIs is still in its infancy. Here we propose a rapid prototyping approach for integrating proposed HMIs into their native environments before a design is finalized. This approach allows researchers and developers to test design ideas and eliminate design flaws prior to fully developing the new system. We illustrate this approach with four prototype designs developed using Microsoft’s Windows Presentation Foundation (WPF). One example is integrated into a microworld environment to test the functionality of the design and identify the optimal level of automation for a new system in a nuclear power plant. The other three examples are integrated into a full-scale, glasstop digital simulator of a nuclear power plant. One example demonstrates the capabilities of next generation control concepts; another aims to expand the current state of the art; lastly, an HMI prototype was developed as a test platform for a new control system currently in development at U.S. nuclear power plants. WPF possesses several characteristics that make it well suited to HMI design. It provides a tremendous amount of flexibility, agility, robustness, and extensibility. Distributed control system (DCS) specific environments tend to focus on the safety and reliability requirements for real-world interfaces and consequently have less emphasis on providing functionality to support novel interaction paradigms. Because of WPF’s large user-base, Microsoft can provide an extremely mature tool. Within process control applications,WPF is platform independent and can communicate with popular full-scope process control simulator vendor plant models and DCS platforms.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Human Factors and Modeling Methods in the Development of Control Room Modernization Concepts

nuclear power plants. Although the nuclear industry has made steady improvement in outage optimization, each day of a refueling outage still represents an opportunity to save millions of dollars and each day an outage extends past its planned end date represents millions of dollars that may have been spent unnecessarily. Reducing planned outage duration or preventing outage extensions requires careful management of the outage schedule as well as constant oversight and monitoring of work completion during the outage execution. During a typical outage, there are typically more than 10,000 activities on the schedule that, if not managed efficiently, may cause expensive outage delays. Management of outages currently relies largely on paper-based resources and general-purpose office software. A typical tool currently used to monitor work performance is a burn-down curve, where total remaining activities are plotted against the baseline schedule to track bulk work completion progress. While these tools are useful, there is still considerable uncertainty during a typical outage that bulk work progress is adequate and therefore a lot of management time is spent analyzing the situation on a daily basis. This paper describes recent advances made in developing a framework for the design of visual outage information presentation, as well as an overview of the scientific principles that informed the development of the visualizations. To test the utility of advanced visual outage information presentation, an outage management dashboard software application was created as part of the Department of Energy’s Advanced Outage Control Center project. This dashboard is intended to present all the critical information an outage manager would need to understand the current status of a refueling outage. The dashboard presents the critical path, bulk work performance, key performance indicators, outage milestones and metrics relating current performance to historical performance. Additionally, the dashboard includes data analysis tools to allow outage managers to drill down into the underlying data to understand the drivers of the indicators.

99 GENERAL AND MISCELLANEOUS↗

HYBRID ALARM SYSTEMS: COMBINING SPATIAL ALARMS AND ALARM LISTS FOR OPTIMIZED CONTROL ROOM OPERATION

The US Department of Energy (DOE) is sponsoring research, development, and deployment on Light Water Reactor Sustainability (LWRS), in which the Idaho National Laboratory (INL) is working closely with nuclear utilities to develop technologies and solutions to help ensure the safe operational life extension of current nuclear power plants. One of the main areas of focus is control room modernization. Within control room modernization, alarm system upgrades present opportunities to meet the broader goals of the LWRS project in demonstrating the use and safety of the advanced instrumentation and control (I&C) technologies and the short-term and longer term objectives of the plant. In this paper, we review approaches for and human factors issues behind upgrading alarms in the main control room of nuclear power plants.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Lessons Learned from Performing a Human Factors Engineering Validation of an Upgraded Digital Control System in a Nuclear Power Plant Control Room

The United States' fleet of nuclear power plants (NPPs) have exceeded their original 40-year licenses and many are seeking license renewals to continue operations into the future. To support continued operation the Department of Energy's (DOE) Light Water Reactor Sustainability Program (LWRS) provides support for utilities to maintain and upgrade their power production capabilities. Control room modernization is one focus area, which aims to modernization the analog control rooms with digital controls and human-system interfaces (HSIs). The Turbine Control System (TCS) is a non-safety related system undergoing modernization efforts at multiple plants and utilities. Considerable human factors research efforts, comprised of expert reviews and operator in the loop studies were performed to develop human factors compliant and usable TCS. This report documents the final phase of the human factors engineering program used to design and validate the new digital TCS. According to the NUREG-0711 review guide, one of the last steps of human factors engineering program prior to implementation is human factors validation. This report details the method, results and conclusions from the human factors validation study of a collaborating utilities TCS slated to be implemented in one of their plants. One control room team consisting of two control room supervisors and two reactor operators participated in the validation. All team members had participated in the BNP TCS training program foregoing the TCS validation. Performance measures included task performance, situation awareness and workload, expert observation of any negative influences of human-system interface features on control room team performance, and interviews with the participating operators. Performance criteria were based on the performance scores and the topics identified by interviews and expert observations. The results showed that the crew using the new TCS clearly could achieve their overall objectives in the test scenarios with sufficient situation awareness. The new TCS compared to the old system provided clear improvements of the control room work regarding shell and chest warming and regarding valve and other system testing. However, a number of Human Engineering Discrepancies (HEDs) were identified. HEDs were prioritized (level 1, 2 or 3) according to potential safety, plant availability, operability or personnel performance consequences. Since no priority 1 HEDs were identified there is no HFE reason not to continue implementation of the TCS. The TCS upgrade is acceptable if the Priority 2 HEDs are resolved and dispositioned in a satisfactory way. Priority 3 HEDs should be noted and considered for future modifications.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

The evolution of the Human Systems and Simulation Laboratory in nuclear power research

The events at Three Mile Island in the United States brought about fundamental changes in the ways that simulation would be used in nuclear operations. The need for research simulators was identified to scientifically study human-centered risk and make recommendations for process control system designs. This paper documents the human factors research conducted at the Human Systems and Simulation Laboratory (HSSL) since its inception in 2010 at Idaho National Laboratory. The facility’s primary purposes are to provide support to utilities for system upgrades and to validate modernized control room concepts. In the last decade, however, as nuclear industry needs have evolved, so too have the purposes of the HSSL. Thus, beyond control room modernization, human factors researchers have evaluated the security of nuclear infrastructure from cyber adversaries and evaluated human-in-the-loop simulations for joint operations with an integrated hydrogen generation plant. Lastly, our review presents research using human reliability analysis techniques with data collected from HSSL-based studies and concludes with potential future directions for the HSSL, including severe accident management and advanced control room technologies.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A Research Framework for Demonstrating Benefits of Advanced Control Room Technologies

Control Room modernization is an important part of life extension for the existing light water reactor fleet. None of the 99 currently operating commercial nuclear power plants in the U.S. has completed a full-scale control room modernization to date. A full-scale modernization might, for example, entail replacement of all analog panels with digital workstations. Such modernizations have been undertaken successfully in upgrades in Europe and Asia, but the U.S. has yet to undertake a control room upgrade of this magnitude. Instead, nuclear power plant main control rooms for the existing commercial reactor fleet remain significantly analog, with only limited digital modernizations. Previous research under the U.S. Department of Energy’s Light Water Reactor Sustainability Program has helped establish a systematic process for control room upgrades that support the transition to a hybrid control. While the guidance developed to date helps streamline the process of modernization and reduce costs and uncertainty associated with introducing digital control technologies into an existing control room, these upgrades do not achieve the full potential of newer technologies that might otherwise enhance plant and operator performance. The aim of the control room benefits research presented here is to identify previously overlooked benefits of modernization, identify candidate technologies that may facilitate such benefits, and demonstrate these technologies through human factors research. This report serves as an outline for planned research on the benefits of greater modernization in the main control rooms of nuclear power plants.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Establishing a value chain for human factors in nuclear power plantcontrol room modernization

Commercial nuclear power plants in the United States (U.S.) have operated reliably and efficiently for decades. With the life extensions of plants now being planned for operation beyond their original operating licenses, there are opportunities to achieve even greater efficiencies, while maintaining high operational reliabilities, with strategic, risk- and economically-informed, upgrades to plant systems and infrastructure. The U.S. Department of Energy’s Light Water Reactor Sustainability (LWRS) program supports the commercial nuclear industry’s modernization efforts through research and development (R&D) activities across many areas to help establish the technical and economic bases for modernization activities. The Advanced Instrumentation, Information, and Control Systems Technologies pathway is one R&D focus area for the LWRS program, and has researchers at Idaho National Laboratory working with select utility partners to use human factors and instrumentation and controls R&D to help modernize the plant’s main control room. However, some in the nuclear industry have not been as enthusiastic about using human factors R&D to inform life extension decision making. Part of the reason for this may stem from uncertainty decision-makers have regarding how human factors fits into the value chain for nuclear power plant control room modernization. This paper reviews past work that has attempted to demonstrate the value of human factors, and then describes the value chain concept, how it applies to control room modernization, and then makes a case for how and why human factors is an essential link in the modernization value chain.

Control room modernization↗

Digital Full-Scope Simulation of a Conventional Nuclear Power Plant Control Room, Phase 2: Installation of a Reconfigurable Simulator to Support Nuclear Plant Sustainability

The U.S. Department of Energy’s Light Water Reactor Sustainability program has developed a control room simulator in support of control room modernization at nuclear power plants in the U.S. This report highlights the recent completion of this reconfigurable, full-scale, full-scope control room simulator buildout at the Idaho National Laboratory. The simulator is fully reconfigurable, meaning it supports multiple plant models developed by different simulator vendors. The simulator is full-scale, using glasstop virtual panels to display the analog control boards found at current plants. The present installation features 15 glasstop panels, uniquely achieving a complete control room representation. The simulator is also full-scope, meaning it uses the same plant models used for training simulators at actual plants. Unlike in the plant training simulators, the deployment on glasstop panels allows a high degree of customization of the panels, allowing the simulator to be used for research on the design of new digital control systems for control room modernization. This report includes separate sections discussing the glasstop panels, their layout to mimic control rooms at actual plants, technical details on creating a multi-plant and multi-vendor reconfigurable simulator, and current efforts to support control room modernization at U.S. utilities. The glasstop simulator provides an ideal testbed for prototyping and validating new control room concepts. Equally importantly, it is helping create a standardized and vetted human factors engineering process that can be used across the nuclear industry to ensure control room upgrades maintain and even improve current reliability and safety.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Human factor engineering based design and modernization of control rooms with new I and C systems

Instrumentation and Control (I and C) systems of the latest nuclear power plants are based on the use of digital technology, distributed control systems and the integration of information in data networks (Distributed Control and Instrumentation Systems). This has a repercussion on Control Rooms (CRs), where the operations and monitoring interfaces correspond to these systems. These technologies are also used in modernizing I and C systems in currently operative nuclear power plants. The new interfaces provide additional capabilities for operation and supervision, as well as a high degree of flexibility, versatility and reliability. An example of this is the implementation of solutions such as compact stations, high level supervision screens, overview displays, computerized procedures, new operational support systems or intelligent alarms processing systems in the modernized Man-Machine Interface (MMI). These changes in the MMI are accompanied by newly added Software (SW) controls and new solutions in automation. Tecnatom has been leading various projects in this area for several years, both in Asian countries and in the United States, using in all cases international standards from which Tecnatom own methodologies have been developed and optimized. The experience acquired in applying this methodology to the design of new control rooms is to a large extent applicable also to the modernization of current control rooms. An adequate design of the interface between the operator and the systems will facilitate safe operation, contribute to the prompt identification of problems and help in the distribution of tasks and communications between the different members of the operating shift. Based on Tecnatom experience in the field, this article presents the methodological approach used as well as the most relevant aspects of this kind of project. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Requirements for Control Room Computer-Based Procedures for use in Hybrid Control Rooms

Many plants in the U.S. are currently undergoing control room modernization. The main drivers for modernization are the aging and obsolescence of existing equipment, which typically results in a like-for-like replacement of analogue equipment with digital systems. However, the modernization efforts present an opportunity to employ advanced technology that would not only extend the life, but enhance the efficiency and cost competitiveness of nuclear power. Computer-based procedures (CBPs) are one example of near-term advanced technology that may provide enhanced efficiencies above and beyond like for like replacements of analog systems. Researchers in the LWRS program are investigating the benefits of advanced technologies such as CBPs, with the goal of assisting utilities in decision making during modernization projects. This report will describe the existing research on CBPs, discuss the unique issues related to using CBPs in hybrid control rooms (i.e., partially modernized analog control rooms), and define the requirements of CBPs for hybrid control rooms.

97 MATHEMATICS AND COMPUTING↗

Benefits of Advanced Control Room Technologies: Phase One Upgrades to the HSSL, Research Plan, and Performance Measures

Control Room modernization is an important part of life extension for the existing light water reactor fleet. None of the 99 currently operating commercial nuclear power plants in the U.S. has completed a full-scale control room modernization to date. A full-scale modernization might, for example, entail replacement of all analog panels with digital workstations. Such modernizations have been undertaken successfully in upgrades in Europe and Asia, but the U.S. has yet to undertake a control room upgrade of this magnitude. Instead, nuclear power plant main control rooms for the existing commercial reactor fleet remain significantly analog, with only limited digital modernizations. Previous research under the U.S. Department of Energy’s Light Water Reactor Sustainability Program has helped establish a systematic process for control room upgrades that support the transition to a hybrid control room. While the guidance developed to date helps streamline the process of modernization and reduce costs and uncertainty associated with introducing digital control technologies into an existing control room, these upgrades do not achieve the full potential of newer technologies that might otherwise enhance plant and operator performance. The aim of the control room benefits research is to identify previously overlooked benefits of modernization, identify candidate technologies that may facilitate such benefits, and demonstrate these technologies through human factors research. This report describes the initial upgrades to the HSSL and outlines the methodology for a pilot test of the HSSL configuration.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Report for 2.2.1 Task 1: Support of Operator in the Loop Studies to be Conducted in the HSSL

Idaho National Laboratory (INL) has contracted IFE to support human factors research to understand how to perform control room modernizations in a manner that maintains or improves human and overall system performance. The US Nuclear industry and in particular several utilities are currently moving forward with a Main Control Room (MCR) modernization projects or future projects to replace current analogue systems with digital. The focus of the current project was to look at different interface platforms and different ways to present information to the interface end user, the plant operator. IFE’s focus was to develop digital soft controls HSI for the Generic Pressurized Water Reactor (gPWR) and a Larger Screen Display (LSD) to support the Control Room Operators. The IFE Advanced Control Room is a combination of the digital soft controls HSI and the LSD that provides a unique opportunity for testing in the HSSL at Idaho National Laboratory.

99 GENERAL AND MISCELLANEOUS↗

Development and evaluation of the conceptual design for a liquid radiological waste system in an advanced hybrid control room

As the current fleet of nuclear power plants are maintaining outdated or obsolete equipment it is common practice to replace worn-out equipment on an as-needed basis resulting in a series of like-for-like replacements of components on the control boards addressing an immediate need to replace equipment. Such upgrades rarely represent an encompassing or systematic vision for control room modernization and do not add the additional benefit of enhanced support for operators in the control room, which tend to overlook the opportunity to reduce operations and maintenance costs through enhanced efficiency. The purpose of the research is to provide guidance on how to realize these opportunities by designing control room human-system interfaces with advanced capabilities in mind. Further, the research seeks to ensure that control room modernizations are undertaken with a sound understanding of the impacts to human operators and are designed based on state-of-the art human factors principles. This report describes the conceptual design of the liquid radiological waste system and several research activities conducted to inform the design philosophy. The report also provides recommended updates to the original design philosophy (published by the researchers in 2018) based on the findings.

99 GENERAL AND MISCELLANEOUS↗

Baseline Study Methodology for Future Phases of Research on Nuclear Power Plant Control Room Technologies

In order to provide a basis for industry adoption of advanced technologies, the Control Room Upgrades Benefits Research Project will investigate the benefits of including advanced technologies as part of control room modernization This report describes the background, methodology, and research plan for the first in a series of full-scale studies to test the effects of advanced technology in NPP control rooms. This study will test the effect of Advanced Overview Displays in the partner Utility’s control room simulator

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A Pilot Study Investigating the Effects of Advanced Nuclear Power Plant Control Room Technologies: Methods and Qualitative Results

Control room modernization is an important part of life extension for the existing light water reactor fleet. None of the 99 currently operating commercial nuclear power plants in the U.S. has completed a full-scale control room modernization to date. Nuclear power plant main control rooms for the existing commercial reactor fleet remain significantly analog, with only limited digital modernizations. Upgrades in the U.S. do not achieve the full potential of newer technologies that might otherwise enhance plant and operator performance. The goal of the control room upgrade benefits research is to identify previously overlooked benefits of modernization, identify candidate technologies that may facilitate such benefits, and demonstrate these technologies through human factors research. This report describes a pilot study to test upgrades to the Human Systems Simulation Laboratory at INL.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Human Reliability Analysis for Digital Human-Machine Interfaces

This paper addresses the fact that existing human reliability analysis (HRA) methods do not provide guidance on digital human-machine interfaces (HMIs). Digital HMIs are becoming ubiquitous in nuclear power operations, whether through control room modernization or new-build control rooms. Legacy analog technologies like instrumentation and control (I&C) systems are costly to support, and vendors no longer develop or support analog technology, which is considered technologically obsolete. Yet, despite the inevitability of digital HMI, no current HRA method provides guidance on how to treat human reliability considerations for digital technologies.

99 GENERAL AND MISCELLANEOUS↗

Bridging the gap: adapting advanced display technologies for use in hybrid control rooms

The Institute for Energy Technology (IFE), runs the OECD Halden Reactor Project (HRP), featuring a state-of-the-art research simulator facility in Halden, Norway, called HAMMLAB. HAMMLAB serves two main purposes: the study of human behaviour in interaction with complex process systems; and the development, test and evaluation of prototype control centres and their individual systems. By studying operator performance in HAMMLAB and integrating the knowledge gained into new designs, the HRP contributes to improving operational safety, reliability, efficiency and productivity. The U.S. Department of Energy’s (DOE) Light Water Reactor Sustainability (LWRS) Program has contracted IFE to assist DOE national laboratory staff at Idaho National Laboratory (INL) in adapting HAMMLAB design concepts for the purpose of control room modernization at nuclear power plants in the U.S. In support of this effort, the DOE has built a simulator research facility at INL called the Human Systems Simulation Laboratory (HSSL). The HSSL is centered on control room modernization, in which industry provided plant instrumentation and controls are modified for upgrade opportunities. The HSSL houses the LWRS simulator, which is a reconfigurable full-scale and full-scope control room simulator. Consisting of 45 large touchscreens on 15 panels, the LWRS simulator is currently using this glass top technology to digitally represent and replicate the functionality of the analog I&C systems in existing control rooms. The LWRS simulator is reconfigurable in that different plant training simulator models obtained from the utilities can be run on the panels, and the panels can be physically moved and arranged to mimic the layout of those control rooms. The glass top technology and reconfigurability capabilities allow the LWRS simulator to be the research platform that is necessary to design, prototype, and validate human-system interface (HSI) technologies that can replace existing analog I&C. IFE has recently assisted INL in establishing the technical infrastructure for implementation of HSI prototypes from HAMMLAB into the HSSL to demonstrate relevant control room replacement systems in support of the LWRS program. In March, 2014, IFE delivered the first HSI prototype utilizing this infrastructure — a large screen overview display for INL's simulator. The co-operation now continues by developing Procedure Support Displays targeted for operators in hybrid control room settings. These prototypes are being validated with U.S. reactor operators in the HSSL and optimized to enhance their performance. This research serves as a crucial stepping stone toward incorporation of advanced display technologies into conventional main control rooms.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Verification and Validation of Digitally Upgraded Control Rooms

As nuclear power plants undertake main control room modernization, a challenge is the lack of a clearly defined human factors process to follow. Verification and validation (V&V) as applied in the nuclear power community has tended to involve efforts such as integrated system validation, which comes at the tail end of the design stage. To fill in guidance gaps and create a step-by-step process for control room modernization, we have developed the Guideline for Operational Nuclear Usability and Knowledge Elicitation (GONUKE). This approach builds on best practices in the software industry, which prescribe an iterative user-centered approach featuring multiple cycles of design and evaluation. Nuclear regulatory guidance for control room design emphasizes summative evaluation—which occurs after the design is complete. In the GONUKE approach, evaluation is also performed at the formative stage of design—early in the design cycle using mockups and prototypes for evaluation. The evaluation may involve expert review (e.g., software heuristic evaluation at the formative stage and design verification against human factors standards like NUREG-0700 at the summative stage). The evaluation may also involve user testing (e.g., usability testing at the formative stage and integrated system validation at the summative stage). An additional, often overlooked component of evaluation is knowledge elicitation, which captures operator insights into the system. In this report we outline these evaluation types across design phases that support the overall modernization process. The objective is to provide industry-suitable guidance for steps to be taken in support of the design and evaluation of a new human-machine interface (HMI) in the control room. We suggest the value of early-stage V&V and highlight how this early-stage V&V can help improve the design process for control room modernization. We argue that there is a need to overcome two shortcomings of V&V in current practice—the propensity for late-stage V&V and the use of increasingly complex psychological assessment measures for V&V.