Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Control Rod Withdrawal”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

39 records · Page 3

Interim status report on lead-cooled fast reactor (LFR) research and development.

This report discusses the status of Lead-Cooled Fast Reactor (LFR) research and development carried out during the first half of FY 2008 under the U.S. Department of Energy Generation IV Nuclear Energy Systems Initiative. Lead-Cooled Fast Reactor research and development has recently been transferred from Generation IV to the Reactor Campaign of the Global Nuclear Energy Partnership (GNEP). Another status report shall be issued at the end of FY 2008 covering all of the LFR activities carried out in FY 2008 for both Generation IV and GNEP. The focus of research and development in FY 2008 is an initial investigation of a concept for a LFR Advanced Recycling Reactor (ARR) Technology Pilot Plant (TPP)/demonstration test reactor (demo) incorporating features and operating conditions of the European Lead-cooled SYstem (ELSY) {approx} 600 MWe lead (Pb)-cooled LFR preconceptual design for the transmutation of waste and central station power generation, and which would enable irradiation testing of advanced fuels and structural materials. Initial scoping core concept development analyses have been carried out for a 100 MWt core composed of sixteen open-lattice 20 by 20 fuel assemblies largely similar to those of the ELSY preconceptual fuel assembly design incorporating fuel pins with mixed oxide (MOX) fuel, central control rods in each fuel assembly, and cooled with Pb coolant. For a cycle length of three years, the core is calculated to have a conversion ratio of 0.79, an average discharge burnup of 108 MWd/kg of heavy metal, and a burnup reactivity swing of about 13 dollars. With a control rod in each fuel assembly, the reactivity worth of an individual rod would need to be significantly greater than one dollar which is undesirable for postulated rod withdrawal reactivity insertion events. A peak neutron fast flux of 2.0 x 10{sup 15} (n/cm{sup 2}-s) is calculated. For comparison, the 400 MWt Fast Flux Test Facility (FFTF) achieved a peak neutron fast flux of 7.2 x 10{sup 15} (n/cm{sup 2}-s) and the initially 563 MWt PHENIX reactor attained 2.0 x 10{sup 15} (n/cm{sup 2}-s) before one of three intermediate cooling loops was shut down due to concerns about potential steam generator tube failures. The calculations do not assume a test assembly location for advanced fuels and materials irradiation in place of a fuel assembly (e.g., at the center of the core); the calculations have not examined whether it would be feasible to replace the central assembly by a test assembly location. However, having only fifteen driver assemblies implies a significant effect due to perturbations introduced by the test assembly. The peak neutron fast flux is low compared with the fast fluxes previously achieved in FFTF and PHENIX. Furthermore, the peak neutron fluence is only about half of the limiting value (4 x 10{sup 23} n/cm{sup 2}) typically used for ferritic steels. The results thus suggest that a larger power level (e.g., 400 MWt) and a larger core would be better for a TPP based upon the ELSY fuel assembly design and which can also perform irradiation testing of advanced fuels and materials. In particular, a core having a higher power level and larger dimensions would achieve a suitable average discharge burnup, peak fast flux, peak fluence, and would support the inclusion of one or more test assembly locations. Participation in the Generation IV International Forum Provisional System Steering Committee for the LFR is being maintained throughout FY 2008. Results from the analysis of samples previously exposed to flowing lead-bismuth eutectic (LBE) in the DELTA loop are summarized and a model for the oxidation/corrosion kinetics of steels in heavy liquid metal coolants was applied to systematically compare the calculated long-term (i.e., following several years of growth) oxide layer thicknesses of several steels.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Power Burst Facility: U(18)O2-CaO-ZrO2 Fuel Rods in Water

The Power Burst Facility (PBF) reactor operated from 1972 to 1985 on the SPERT Area I of the Idaho National Laboratory, then known as Nuclear Reactor Test Station. PBF was designed to provide experimental data to aid in defining thresholds for and modes of failure under postulated accident conditions. PBF reactor startup testing began in 1972. This evaluation focuses on two operational loading tests, chronologically numbered 1 and 2, published in a startup-test report in 1974 [1]. Data for these tests was used by one of the authors to validate a MCNP model for criticality safety purposes [2]. Although specific references to original documents are kept in the text, all the reactor parameters and test specific data presented here was adapted from that report. The tests were performed with operational fuel loadings, a stainless steel in-pile tube (IPT) mockup, a neutron source, four pulse chambers, two fission chambers, and one ion chamber. The reactor's four transition rods (TRs) and control rods (CRs) were present but TR boron was completely withdrawn below the core and CR boron was partially withdrawn above the core. Test configurations differ primarily in the number of shim rods, and consequently the number of fuel rods included in the core. The critical condition was approached by incrementally and uniformly withdrawing CR boron from the core. Based on the analysis of the experimental data and numerical calculations, both experiments are considered acceptable as criticality safety benchmarks.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Subplane Decusping for BWRs in MPACT

Control blade cusping can introduce significant error in boiling water reactor (BWR) calculations with MPACT when blade tips fall partway within an axial method of characteristics (MOC) plane, requiring homogenization of controlled and uncontrolled regions. This work implements subplane decusping for BWRs in MPACT by enabling BWR-compatible subplane coarse mesh finite difference (CMFD) and extending the existing decusping framework to represent between-assembly control blades that insert from the bottom of the core. The method resolves axial heterogeneity on a refined subplane mesh in the low-order solve and uses the resulting subplane flux shape to form flux-volume homogenized transport cross sections for the partially rodded MOC plane. The capability is evaluated using a single physics General Electric (GE)-14 assembly and a multiphysics Peach Bottom Unit 2 Type 1 assembly (PB2T1A) with thermal hydraulic feedback. In both cases, coarse axial meshes with and without subplane decusping are compared against fine mesh reference solutions over the full range of blade withdrawal positions. Subplane decusping reduces maximum/average eigenvalue errors from 3,369/220 pcm to 303/36 pcm for GE-14 and from 6,689/585 pcm to 1,582/109 pcm for PB2T1A. Additionally, it reduces pin power root mean square errors from 5.2%/0.8% to 1.8%/0.2% for GE-14 and from 6.9%/0.6% to 2.3%/0.1% for PB2T1A. These results demonstrate an effective, practical correction for BWR blade cusping in VERA-MPACT.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗