Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Contingency planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

The Earth Science Afternoon Constellation Contingency Procedures

The Earth Science Afternoon Constellation comprises NASA missions Aqua, Aura, CloudSat and the Orbiting Carbon Observatory (OCO), the joint NASA/CNES mission CALIPSO and the CNES mission PARASOL. Both NASA and CNES offices are responsible for ensuring that contingency plans or other arrangements exist to cope with contingencies within their respective jurisdictions until the conclusion of all Afternoon Constellation operations. The Mission Operations Working Group, comprised of members from each of the missions, has developed the high-level procedures for maintaining the safety of this constellation. Each contingency situation requires detailed analyses before any decisions are made. This paper describes these procedures, and includes defining what constitutes a contingency situation, the pertinent parameters involved in the contingency analysis and guidelines for the actions required, based on the results of the contingency analyses.

Case, Warren F.↗

Haughton-Mars Project/NASA 2006 Lunar Medical Contingency Simulation: Equipment and Methods for Medical Evacuation of an Injured Crewmember

Introduction: Achieving NASA's Space Exploration Vision scientific objectives will require human access into cratered and uneven terrain for the purpose of sample acquisition to assess geological, and perhaps even biological features and experiments. Operational risk management is critical to safely conduct the anticipated tasks. This strategy, along with associated contingency plans, will be a driver of EVA system requirements. Therefore, a medical contingency EVA scenario was performed with the Haughton-Mars Project/NASA to develop belay and medical evacuation techniques for exploration and rescue respectively. Methods: A rescue system to allow two rescuer astronauts to evacuate one in incapacitated astronaut was evaluated. The systems main components were a hard-bottomed rescue litter, hand-operated winch, rope, ground picket anchors, and a rover-winch attachment adapter. Evaluation was performed on 15-25deg slopes of dirt with embedded rock. The winch was anchored either by adapter to the rover or by pickets hammered into the ground. The litter was pulled over the surface by rope attached to the winch. Results: The rescue system was utilized effectively to extract the injured astronaut up a slope and to a waiting rover for transport to a simulated habitat for advanced medical care, although several challenges to implementation were identified and overcome. Rotational stabilization of the winch was found to be important to get maximize mechanical advantage from the extraction system. Discussion: Further research and testing needs to be performed to be able to fully consider synergies with the other Exploration surface systems, in conducting contingency operations. Structural attachment points on the surface EVA suits may be critical to assist in incapacitated evacuation. Such attach points could be helpful in microgravity incapacitated crewmember transport as well. Wheeled utility carts or wheels that may be attachable to a litter may also aid in extraction and transport. Utilizing parts of the rover (e.g. seats) to deploy as a litter may be considered. Testing in simulated 1/6-g to determine feasibility of winch operation and anchor establishment will further reduce implementation uncertainties.

Chappell, S. P.↗

Autonomous Operating System (AOS)

The Autonomy Operating System (AOS) is a software system that enables core capabilities for the autonomous operations for an unmanned aircraft. It is based on the NASA cFS system and provides a higher-level layer of infrastructure and applications for the execution of flight plans, natural-language communication with Air Traffic Control, Diagnostics, Prognostics, and contingency planning.

Lowry, Michael R.↗

Initial Jupiter Orbit Insertion and Period Reduction Maneuver Plans for Juno

This paper describes the initial plans for the New Frontiers Juno mission at Jupiter. It includes the considerable contingency planning for mission recovery if the Jupiter Orbit Insertion (JOI) burn to place Juno into a large capture orbit were interrupted or terminated on a burn timer setting, and the options for the mission if the Period Reduction Maneuver (PRM) burn to achieve the final orbit period were terminated early. The analyses were based on the assumption that 14-day orbits were the desired operational orbit period.

Bordi, John J.↗

Maneuver design for Galileo Jupiter approach and orbital operations

Following the successful release of the Galileo probe, the navigation efforts were focused on the implementation of the critical Io approach and the Jupiter orbit insertion strategy. The actual in-flight events on the approach phase affected the strategy. The most significant event was the onboard tape recorder anomaly, and it is shown that this anomaly affected the plans and assumptions of the navigation strategy for the approach and orbit insertion. The analysis, constraints, contingency planning and design evolution of trajectory correction maneuvers which enabled the continuation of the mission, are reported on. The Jupiter approach and initial orbit navigation strategy is presented in order to verify the viability of the strategy under nominal circumstances, and future mission operations plans are described.

Wilson, Michael G.↗

An Evidence-based Approach to Developing a Management Strategy for Medical Contingencies on the Lunar Surface: The NASA/Haughton-Mars Project (HMP) 2006 Lunar Medical Contingency Simulation at Devon Island

The lunar architecture for future sortie and outpost missions will require humans to serve on the lunar surface considerably longer than the Apollo moon missions. Although the Apollo crewmembers sustained few injuries during their brief lunar surface activity, injuries did occur and are a concern for the longer lunar stays. Interestingly, lunar medical contingency plans were not developed during Apollo. In order to develop an evidence-base for handling a medical contingency on the lunar surface, a simulation using the moon-Mars analog environment at Devon Island, Nunavut, high Canadian Arctic was conducted. Objectives of this study included developing an effective management strategy for dealing with an incapacitated crewmember on the lunar surface, establishing audio/visual and biomedical data connectivity to multiple centers, testing rescue/extraction hardware and procedures, and evaluating in suit increased oxygen consumption. Methods: A review of the Apollo lunar surface activities and personal communications with Apollo lunar crewmembers provided the knowledge base of plausible scenarios that could potentially injure an astronaut during a lunar extravehicular activity (EVA). Objectives were established to demonstrate stabilization and transfer of an injured crewmember and communication with ground controllers at multiple mission control centers. Results: The project objectives were successfully achieved during the simulation. Among these objectives were extraction from a sloped terrain by a two-member crew in a 1 g analog environment, establishing real-time communication to multiple centers, providing biomedical data to flight controllers and crewmembers, and establishing a medical diagnosis and treatment plan from a remote site. Discussion: The simulation provided evidence for the types of equipment and methods for performing extraction of an injured crewmember from a sloped terrain. Additionally, the necessary communications infrastructure to connect multiple centers worldwide was established from a remote site. The surface crewmembers were confronted with a number of unexpected scenarios including environmental, communications, EVA suit, and navigation challenges during the course of the simulation which provided insight into the challenges of carrying out a medical contingency in an austere environment. The knowledge gained from completing the objectives will be incorporated into the exploration medical requirements involving an incapacitated astronaut on the lunar surface.

Scheuring, R. A.↗

Duration Limits for Orbital Flight: Current Considerations for the International Space Station

According to ISS documentation, long-duration missions are defined as missions exceeding 30 days. The ISS medical organization has set a 180-day limit for ISS missions from a medical perspective, with a possibility of planning missions of up to 220days with additional consideration. The ISS medical community does not currently consider changes to the existing duration constraints for ISS mission planning. However, longer stays on orbit may be highly desirable or even necessary in certain foreseeable operational circumstances. To develop a methodology for contingency planning, the ISS medical community, led by NASA, has identified medically relevant risks associated with extended stays of crewmembers aboard the ISS.

Smith, Gwen↗

The cryogenics analysis program for Apollo mission planning and analysis

The cryogenics analysis program was developed as a simplified tool for use in premission planning operations for the Apollo command service module. Through a dynamic development effort, the program has been extended to include real time and postflight analysis capabilities with nominal and contingency planning features. The technical aspects of the program and a comparison of ground test and mission data with data generated by using the cryogenics analysis program are presented. The results of the program capability to predict flight requirements also are presented. Comparisons of data from the program with data from flight results, from a tank qualifications program, and from various system anomalies that have been encountered are discussed. Future plans and additional considerations for the program also are included. Among these plans are a three tank management scheme for hydrogen, venting profile generation for Skylab, and a capability for handling two gas atmospheres. The plan for two gas atmospheres will involve the addition of the capability to handle nitrogen as well as oxygen and hydrogen.

Scott, W.↗

A Mars/phobos Transportation System

A transportation system will be necessary to support construction and operation of bases on Phobos and Mars beginning in the year 2020 or later. An approach to defining a network of vehicles and the types of vehicles which may be used in the system are presented. The network will provide a convenient, integrated means for transporting robotically constructed bases to Phobos and Mars. All the technology needed for the current plan is expected to be available for use at the projected date of cargo departure from the Earth system. The modular design of the transportation system provides easily implemented contingency plans, so that difficulties with any one vehicle will have a minimal effect on the progress of the total mission. The transportation network proposed consists of orbital vehicles and atmospheric entry vehicles. Initially, only orbital vehicles will participate in the robotic construction phase of the Phobos base. The Interplanetary Transfer Vehicle (ITV) will carry the base and construction equipment to Phobos where the Orbital Maneuvering Vehicles (OMV's) will participate in the initial construction of the base. When the Mars base is ready to be sent, one or more ITV's will be used to transport the atmospheric entry vehicles from Earth. These atmospheric vehicles are the One Way Landers (OWL's) and the Ascent/Descent Vehicles (ADV's). They will be used to carry the base components and/or construction equipment. The OMV's and the Orbital Transfer Vehicles (OTV's) will assist in carrying the atmospheric entry vehicles to low Martian orbit where the OWL's or ADV's will descent to the planet surface. The ADV's were proposed to accommodate expansion of the system. Additionally, a smaller version of the ADV class is capable of transporting personnel between Mars and Phobos.

Source record↗

Trajectory design for the Genesis backup orbit and proposed extended mission

In September 2004, the Genesis spacecraft will return to Earth with its collection of solar wind samples. If for some reason there are any difficulties with returning the samples to Earth during the nominal entry sequence, a contingency plan is in place for a second chance at a successful recovery. This paper will detail the processes used to generate possible backup trajectories, and provide a comparison of the contingency options examined through the course of the study.

Chung, Min-Kun J.↗

Planning and Execution of the Three Mid-Course Correction Maneuvers for the James Webb Space Telescope

The James Webb Space Telescope (JWST) was successfully launched on December 25, 2021 12:20 UTC on an Ariane 5 rocket out of Kourou, French Guiana on a direct, lower energy manifold transfer out to the Sun Earth-Moon (SEM) L2 point. Three mid-course correction (MCC) maneuvers, designated MCC-1, MCC-1b, and MCC-2, were required to provide the energy necessary to reach L2 due to a purposeful biasing down of the launch vehicle. This paper will document the prelaunch preparation, nominal planning, contingency preparation, and successful execution of the three mid-course correction maneuvers.

Maneuver Planning↗

An Efficient Method to Design Premature End-of-Life Trajectories: A Hypothetical Alternate Fate for Cassini

What would happen if, hypothetically, the highly successful Cassini mission were to end prematurely due to lack of propellant or sudden subsystem failure? A solid plan to quickly produce a solution for any given scenario, regardless of where the spacecraft is along its reference path, must be in place to safely dispose of the spacecraft and meet all planetary protection requirements. As a contingency plan for this hypothetical situation, a method to design viable high-fidelity terminating trajectories based on a hybrid approach that exploits two-body and three-body flyby transfers combined with a numerical optimization scheme is detailed in this paper.

end-of-mission↗

Agile Science Operations: A New Approach for Primitive Exploration Bodies

Primitive body exploration missions such as potential Comet Surface Sample Return or Trojan Tour and Rendezvous would challenge traditional operations practices. Earth-based observations would provide only basic understanding before arrival and many science goals would be defined during the initial rendezvous. It could be necessary to revise trajectories and observation plans to quickly characterize the target for safe, effective observations. Detection of outgassing activity and monitoring of comet surface activity are even more time constrained, with events occurring faster than round-trip light time. "Agile science operations" address these challenges with contingency plans that recognize the intrinsic uncertainty in the operating environment and science objectives. Planning for multiple alternatives can significantly improve the time required to repair and validate spacecraft command sequences. When appropriate, time-critical decisions can be automated and shifted to the spacecraft for immediate access to instrument data. Mirrored planning systems on both sides of the light-time gap permit transfer of authority back and forth as needed. We survey relevant science objectives, identifying time bottlenecks and the techniques that could be used to speed missions' reaction to new science data. Finally, we discuss the results of a trade study simulating agile observations during flyby and comet rendezvous scenarios. These experiments quantify instrument coverage of key surface features as a function of planning turnaround time. Careful application of agile operations techniques can play a significant role in realizing the Decadal Survey plan for primitive body exploration

Agile science↗

A Comparison of Probabilistic and Deterministic Campaign Analysis for Human Space Exploration

Human space exploration is by its very nature an uncertain endeavor. Vehicle reliability, technology development risk, budgetary uncertainty, and launch uncertainty all contribute to stochasticity in an exploration scenario. However, traditional strategic analysis has been done in a deterministic manner, analyzing and optimizing the performance of a series of planned missions. History has shown that exploration scenarios rarely follow such a planned schedule. This paper describes a methodology to integrate deterministic and probabilistic analysis of scenarios in support of human space exploration. Probabilistic strategic analysis is used to simulate "possible" scenario outcomes, based upon the likelihood of occurrence of certain events and a set of pre-determined contingency rules. The results of the probabilistic analysis are compared to the nominal results from the deterministic analysis to evaluate the robustness of the scenario to adverse events and to test and optimize contingency planning.

Merrill, R. Gabe↗

Voyager at Uranus

The engineering changes that had to be made in the Voyager 2 spacecraft in order to enable it to fly beyond the originally planned encounters with Jupiter and Saturn and the underlying engineering strategy leading to the encounter with Uranus are discussed. Fixes of the azimuth actuator failure, receiver failure, and memory failure, and capability upgrades of Image Data Compression, aperture augmentation protective coding, smear reduction, Image Motion Compensation, power management, and contingency planning are summarized. The use of the Computer Command Subsystem in the extension of the voyage is described. The ways in which the strategic priorities, including spacecraft preservation, protection of the near-encounter load, development of new ground and spacecraft capabilities, and repair or circumvention of existing spacecraft faults, were accomplished are reviewed, and the accomplishment of additional tasks is also discussed.

Mclaughlin, W. I.↗

Aerospace Safety Advisory Panel

This report covers the activities of the Aerospace Safety Advisory Panel (ASAP) for calendar year 1998-a year of sharp contrasts and significant successes at NASA. The year opened with the announcement of large workforce cutbacks. The slip in the schedule for launching the International Space Station (ISS) created a 5-month hiatus in Space Shuttle launches. This slack period ended with the successful and highly publicized launch of the STS-95 mission. As the year closed, ISS assembly began with the successful orbiting and joining of the Functional Cargo Block (FGB), Zarya, from Russia and the Unity Node from the United States. Throughout the year, the Panel maintained its scrutiny of NASAs safety processes. Of particular interest were the potential effects on safety of workforce reductions and the continued transition of functions to the Space Flight Operations Contractor. Attention was also given to the risk management plans of the Aero-Space Technology programs, including the X-33, X-34, and X-38. Overall, the Panel concluded that safety is well served for the present. The picture is not as clear for the future. Cutbacks have limited the depth of talent available. In many cases, technical specialties are "one deep." The extended hiring freeze has resulted in an older workforce that will inevitably suffer significant departures from retirements in the near future. The resulting "brain drain" could represent a future safety risk unless appropriate succession planning is started expeditiously. This and other topics are covered in the section addressing workforce. In the case of the Space Shuttle, beneficial and mandatory safety and operational upgrades are being delayed because of a lack of sufficient present funding. Likewise, the ISS has little flexibility to begin long lead-time items for upgrades or contingency planning.

Source record↗

Aerospace Safety Advisory Panel

This report covers the activities of the Aerospace Safety Advisory Panel (ASAP) for calendar year 1998-a year of sharp contrasts and significant successes at NASA. The year opened with the announcement of large workforce cutbacks. The slip in the schedule for launching the International Space Station (ISS) created a five-month hiatus in Space Shuttle launches. This slack period ended with the successful and highly publicized launch of the STS-95 mission. As the year closed, ISS assembly began with the successful orbiting and joining of the Functional Cargo Block (FGB), Zarya, from Russia and the Unity Node from the United States. Throughout the year, the Panel maintained its scrutiny of NASA's safety processes. Of particular interest were the potential effects on safety of workforce reductions and the continued transition of functions to the Space Flight Operations Contractor. Attention was also given to the risk management plans of the Aero-Space Technology programs, including the X-33, X-34, and X-38. Overall, the Panel concluded that safety is well served for the present. The picture is not as clear for the future. Cutbacks have limited the depth of talent available. In many cases, technical specialties are 'one deep.' The extended hiring freeze has resulted in an older workforce that will inevitably suffer significant departures from retirements in the near future. The resulting 'brain drain' could represent a future safety risk unless appropriate succession planning is started expeditiously. This and other topics are covered in the section addressing workforce. The major NASA programs are also limited in their ability to plan property for the future. This is of particular concern for the Space Shuttle and ISS because these programs are scheduled to operate well into the next century. In the case of the Space Shuttle, beneficial and mandatory safety and operational upgrades are being delayed because of a lack of sufficient present funding. Likewise, the ISS has little flexibility to begin long lead-time items for upgrades or contingency planning. For example, the section on computer hardware and software contains specific findings related to required longer range safety-related actions. NASA can be proud of its accomplishments this past year, but must remain ever vigilant, particularly as ISS assembly begins to accelerate. The Panel will continue to focus on both the short- and long-term aspects of risk management and safety planning. This task continues to be made manageable and productive by the excellent cooperation the Panel receives from both NASA and its contractors. Particular emphasis will continue to be directed to longer term workforce and program planning issues as well as the immediate risks associated with ISS assembly and the initial flights of the X-33 and X-34. Section 2 of this report presents specific findings and recommendations generated by ASAP activities during 1998. Section 3 contains more detailed information in support of these findings and recommendations. Appendix A is a current roster of Panel members, consultants, and staff. Appendix B contains NASA's response to the findings and recommendations from the 1997 ASAP Annual Report. Appendix C details the fact-finding activities of the Panel in 1998. During the year, Mr. Richard D. Blomberg was elected chair of the Panel and Vice Admiral (VADM) Robert F Dunn was elected deputy chair. VADM Bernard M. Kauderer moved from consultant to member. Mr. Charles J. Donlan retired from the Panel after many years of meritorious service. Ms. Shirley C. McCarty and Mr. Robert L. ('Hoot') Gibson joined the Panel as consultants.

Source record↗

An interactive tool for design and support of lunar, gravity assist, and libration point trajectories

The 'Swingby' interactive tool for design, analysis, and support of maneuver planning for missions that involve transfers to the moon, the lunar orbits, multiple-gravity assists, and the libration-point orbits, runs on a PC and uses pull-down and pop-up menus to allow users to change physical constants and select perturbations for inclusion. Swingby can also target by ascertain parameters, or allow the computer to generate goals on the basis of mission requirements. Rapid mission analyses, operational maneuvers, and contingency plans are thereby obtainable.

Carrico, J.↗