Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Competitiveness Improvement Project”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

2021 Component Innovation Awardee: Windurance, LLC

Distributed wind turbine manufacturers seeking to enter the market are often hampered by two challenges: not enough capital and no specific expertise in developing certified electronic equipment. A harsh reality is that off-the-shelf power electronics are neither certified nor cost-effective. This lack of certified controller equipment in the distributed wind energy industry adds expense and impedes market penetration related to certification for individual wind turbines, wind system projects, and installations. Normally, these certification costs would be borne repeatedly by individual turbine manufacturers or developers on a model-by-model or project-by-project basis, resulting in cost and time delays as well as uncertainty and risk for project developers and prospective owners. Windurance seeks to eliminate these challenges by developing and obtaining third-party certification of a standardized wind turbine controller. This will facilitate development, certification, and production while supporting efficiencies not easily achievable by individual manufacturers. Windurance's Distributed Wind Industry Turbine Controller will enable manufacturers to apply proprietary turbine- specific configurations and functionality. When applicable, manufacturers can expand on a Windurance-provided software framework to add unique or proprietary functionality.

CIP↗

2021 Component Innovation Project Awardee: Bergey Windpower

In recent years, the cost of small wind turbines for homes, farms, and small businesses has decreased dramatically thanks to advances in American technology made possible by research and development support from the U.S. Department of Energy. But further reductions are needed to realize the gigawatt-scale potential of distributed wind energy to help electrify rural America, reduce carbon emissions, and create jobs. Currently, for residential- and farm-scale wind turbines with direct-drive, permanent-magnet alternators, the alternator is the highest-cost component of the wind turbine (excluding the tower). The Bergey Windpower Excel 15 wind turbine incorporates advanced technology in its rotor and controls and will soon incorporate advanced power electronics - but its alternator is based on technology that is more than a decade old. To help reduce capital expenditures of the Excel 15 wind turbine, Bergey Windpower is developing an advanced, lower- cost, permanent-magnet alternator.

CIP↗

2022 Project Commercialization and Market Development Awardee: Eocycle America Corporation

Annually, agriculture and related industries contribute approximately $1.2 trillion to the U.S. gross domestic product and 11% of the nation's output of greenhouse gas (GHG) emissions. At the same time, agribusiness operations account for about 30% of energy use worldwide. Distributed wind energy produced on site can power large-scale agricultural, industrial, and commercial operations in windy rural areas, offering cost savings, GHG emissions reductions, and the potential to supply excess electricity to the grid. Despite these benefits, agribusinesses have been slow to embrace the technology. Eocycle America Corporation (Eocycle) plans to develop partnerships with agriculture and related industries and implement a marketing strategy to educate corporate customers about the benefits of distributed wind. Through the CIP initiative, Eocycle will create a marketing plan to raise interest in distributed wind energy among large American and European corporations with operations in rural areas. Campaign goals are to encourage rapid deployment of distributed wind energy on a large scale, as well as to create high-paying energy sector jobs through increased manufacturing, sales, maintenance, and related services. Eocycle plans to identify 15 agriculture-related corporations with the potential for at least 25 turbine sales each.

Competitiveness Improvement Project↗

2021 Prototype Testing Awardee: Sonsight Wind

For small wind turbines - those under 10 kilowatts (kW) in generating capacity - the combined costs for turbines, towers, foundations, power electronics, installation, and maintenance can result in a high levelized cost of energy (LCOE). This makes it difficult for small wind turbines to gain a foothold in the distributed energy revolution currently being led by solar power. Sites with high average wind speeds generally allow lower LCOE, but the vast majority of Americans live and work within more moderate-wind-speed areas, so small turbines should be cost effective to buy and use within such areas. Sonsight Wind's 3.5-kW horizontal-axis wind turbine (HAWT) is being developed to address these challenges.

CIP↗

2021 Prototype Installation and Testing Awardee: XFlow Energy Company

XFlow Energy Company (XFlow Energy) aims to reduce the cost of wind energy by designing vertical-axis wind turbines (VAWTs), which have a cheaper blade manufacturing process and a mechanically simpler design than traditional wind turbines, among other cost-saving advantages. However, a lack of modeling or simulation tools that can predict the coupling between aerodynamic and structural forces poses a significant challenge to developers of VAWTs. Known as aeroelastic models, these are not just important design tools - they're critical for certifying VAWTs of 25 kilowatts (kW), which is the size of XFlow Energy's prototype wind turbine. Without certification, XFlow Energy will not be able to deliver an independently validated product to its customers, and those customers will not be eligible for state and federal incentives. An accurate aeroelastic model could provide less-conservative structural optimization tactics than are currently used, resulting in a wind turbine with lower capital costs.

CIP↗

2021 Prototype Design Development Awardee: Accelerate Wind, Inc.

In the United States, rooftop photovoltaic systems can be installed on most commercial buildings. However, even if all available rooftop space is used, solar energy cannot satisfy the building's total energy demand. With many building owners trying to move toward net-zero-carbon-emission energy generation, these customers often have no way to achieve this goal on-site. Rooftop wind energy technology could be an option, but most rooftop wind turbines are not economically viable because they do not produce meaningful amounts of energy and are not likely to pay for themselves within their lifetime. Some rooftop wind turbine companies have attempted to exploit the fact that wind naturally speeds up at the edge of a roof; but, so far, these solutions have also struggled to produce significant energy because only a small portion of that wind can be captured so close to the edge of the roof.

CIP↗

Markov Decision Processes for Intelligent, Risk-Informed Asset-Management Decision-Making

Advanced nuclear reactors are a promising option for aiding the world in achieving its net-zero carbon emission goals, however, there are significant challenges to attaining and maintaining economic competitiveness with other sources of electricity. To improve the economic competitiveness of advanced reactor designs, a project was initiated to explore the use of Markov Decision Processes (MDPs) to guide asset-management decision-making during advanced reactor operation. MDPs are a powerful tool for optimizing decision-making in complex environments and their application to advanced reactors can aid in planning maintenance and repair activities to minimize downtime and maximize generation. The described approach expands on previous work regarding the use of MDPs for operational decision-making through the direct incorporation of real-time plant information. The integral MDP analysis includes information from online component diagnostic tools and the plant’s real-time generation risk assessment (GRA) and probabilistic risk assessment (PRA), which evaluate plant risk from both an economic and safety perspective. The result is an asset-management optimization framework that is based on real-time data regarding plant component status and the current best-estimate of plant risk. The paper presents an overview of the theoretical framework to incorporate the different information pathways into an integral MDP analysis, along with example analyses.

Grabaskas, David↗

5G integrated edge computing platform for efficient component monitoring in coal-fired power plants

This project developed a cutting-edge 5G-integrated edge computing framework to enhance operational efficiency and reliability in coal-fired power plants through real-time component monitoring and anomaly detection. The initiative focused on leveraging distributed machine learning, federated learning, and 5G-based dynamic network slicing to support scalable, fault-tolerant monitoring environments to meet the operational requirements in industrial control systems. With a Distributed Edge Computing Service (DECS) orchestration, this project enabled federated learning at edge for condition monitoring and introduced adaptive client selection strategies to minimize communication overhead. Scalable distributed training was achieved using the Horovod framework, thus enhancing performance across edge nodes. In the realm of 5G networking, the project designed and deployed reconfigurable, QoS-aware network slicing tailored for operational technology (OT) environments, integrating software-defined networks to bolster cyber-resilience and enabling dynamic slicing for federated learning workloads. A significant milestone was the development of a virtualized ICS environment with 5G core integration—which allowed elastic and fault tolerant distributed training on real-world datasets such as NASA Bearings, Hydraulic Systems, and TEP. To broaden the impact of the project, a TRL-3 virtualized ICS testbed for research and education was designed. This project engaged several graduate and undergraduate students to conduct research on the cutting-edge technology, and it resulted in one PhD dissertation, one MS thesis, and over 14 peer-reviewed publications. With the support of this project students also participated in national cybersecurity competitions to improve their professional development skills.

20 FOSSIL-FUELED POWER PLANTS↗

Low-Cost Sulfur Thermal Storage for Solar Industrial Process Heat Applications

Industrial process heat (IPH) is one of the largest energy demands in U.S., representing about 10% of all domestic energy consumption. Fuel costs to generate this industrial process heat are generally a top three cost for industry, a major component in American manufacturing competitiveness. Roughly 60% of US IPH demand (about 6,500 TBtu annually) falls in the medium-temperature range of 100–250 °C. While concentrated solar thermal (CST) technologies can provide a cost-effective source of heat in this temperature range, solar intermittency limits their adoption in industries that operate 24/7. Element 16 Technologies, Inc. developed a low-cost sulfur thermal energy storage (TES) technology to bridge this gap by capturing excess solar heat during the day and dispatching it reliably during non-solar hours. The core innovation is the use of sulfur, an abundant, industrial waste byproduct that costs ten times less than molten salt used in commercial TES systems. The overall goal of the project was to advance the design and development of molten sulfur TES to a manufacturing-relevant prototype stage for solar industrial process heat applications, while establishing and validating a realistic pathway to commercial success. Key tasks included corrosion and mechanical durability testing to identify cost-effective materials, design investigations using physics-based simulation tools, techno-economic evaluations of system lifetime costs, and pilot-scale testing for performance verification. Corrosion testing of steel alloys under cyclic molten sulfur conditions showed that austenitic stainless steels in the 300 series performed particularly well, with no structural degradation of welds or joints. Thermal cyclic testing of pilot sulfur TES units up to 1.5 MWh quantified charge/discharge rates, heat losses, round-trip efficiency and validated the system's capability to operate effectively under intermittent charging conditions. A techno-economic model, informed by sulfur TES performance model validated using pilot test data, showed that hybrid solar+sulfur TES+NG boiler systems are economically competitive with incumbent natural gas boilers for multiple locations in the southwest US. In summary, this project established molten sulfur TES as a technically viable pathway to improve economic competitiveness of American manufacturing by lowering the cost of solar industrial process heat.

14 SOLAR ENERGY↗

Driving Economics and Reducing Risks: The Business Case for Security-by-Design in Nuclear Power

This report provides an analysis of the financial, operational, and strategic advantages of incorporating Security-by-Design (SeBD) early in the lifecycle of nuclear power plant projects. By framing security as a foundational design element rather than a late-stage add-on, owners, vendors, and operators can reduce budget overruns, strengthen regulatory compliance, and increase revenue opportunities. The report details key lifecycle phases, highlighting the strategic imperative for organizations (including project developers, investors, vendors, and regulators) to adopt SeBD. Drawing on industry estimates, real-world case studies, and comparative cost analyses, the findings underscore that even a modest upfront investment in SeBD can yield substantial long-term returns by preventing costly retrofit activities, minimizing regulatory delays, and positioning nuclear vendors for the ability to adapt in the evolving security market. By avoiding excessive retrofit expenses and positioning security as a built-in feature rather than an afterthought, nuclear projects can protect their financial performance, enhance public trust, and secure a competitive edge in an increasingly complex global energy market. The authors advocate for SeBD’s strategic implementation, supported by established quality management methodologies, thereby promoting continuous improvement and defect avoidance. Ultimately, early SeBD integration represents a strategic investment, yielding significant returns by preventing costly retrofits and positioning nuclear projects for enhanced competitiveness and public trust.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

JUSTIFI: Software for Improving Performance Objectives via Energy Efficiency

With growing energy supply concerns and rising costs, energy efficiency is a critical component of industrial energy resilience and competitiveness by directly reducing energy operating costs. Energy efficiency projects in manufacturing also yield valuable benefits to other key metrics, such as improved quality, reduced maintenance costs, improved safety, decreased pollution, and enhanced productivity. However, it is difficult to receive approval for energy efficiency projects, so implementation rates are low, even when meeting capital project payback period criteria. The inclusion and quantification of non-energy benefits (NEBs) in the decision-making process for energy efficiency projects can improve the overall financial payback period while demonstrating a positive impact on the firm's key performance metrics and business strategy. Despite their significant financial and strategic value, NEBs are rarely factored into decision-making due to lack of tools to effectively identify and quantify them. Therefore, a comprehensive and integrative approach is needed for the rapidly evolving energy landscape. To address these challenges, through funding from U.S. Department of Energy, our new assessment methodology integrates common continuous improvement six sigma concepts, such as the DMAIC process, and a protocol of guiding questions, into energy efficiency assessments to identify NEBs. We have also developed open-source software, JUSTIFI, to guide users through this process, data collection, and quantification. It is designed to be used concurrently with DOE energy system analysis software suite, MEASUR. Our methodology and tools inform energy assessors, firm engineering, decision makers, and workforce seeking to increase energy resilience and to maximize benefits aligned with performance metrics.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

JUSTIFI: Software for Improving Performance Objectives via Energy Efficiency

With growing energy supply concerns and rising costs, energy efficiency is a critical component of industrial energy resilience and competitiveness by directly reducing energy operating costs. Energy efficiency projects in manufacturing also yield valuable benefits to other key metrics, such as improved quality, reduced maintenance costs, improved safety, decreased pollution, and enhanced productivity. However, it is difficult to receive approval for energy efficiency projects, so implementation rates are low, even when meeting capital project payback period criteria. The inclusion and quantification of non-energy benefits (NEBs) in the decision-making process for energy efficiency projects can improve the overall financial payback period while demonstrating a positive impact on the firm's key performance metrics and business strategy. Despite their significant financial and strategic value, NEBs are rarely factored into decision-making due to lack of tools to effectively identify and quantify them. Therefore, a comprehensive and integrative approach is needed for the rapidly evolving energy landscape. To address these challenges, through funding from U.S. Department of Energy, our new assessment methodology integrates common continuous improvement six sigma concepts, such as the DMAIC process, and a protocol of guiding questions, into energy efficiency assessments to identify NEBs. We have also developed open-source software, JUSTIFI, to guide users through this process, data collection, and quantification. It is designed to be used concurrently with DOE energy system analysis software suite, MEASUR. Our methodology and tools inform energy assessors, firm engineering, decision makers, and workforce seeking to increase energy resilience and to maximize benefits aligned with performance metrics.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Nucleon axial-vector form factor and radius from future neutrino experiments

Precision measurements of antineutrino elastic scattering on hydrogen from future neutrino experiments offer a unique opportunity to access the low-energy structure of protons and neutrons. We discuss the determination of the nucleon axial-vector form factor and radius from antineutrino interactions on hydrogen that can be collected at the future Long-Baseline Neutrino Facility and study the sources of theoretical and experimental uncertainties. The projected accuracy would improve existing measurements by 1 order of magnitude and be competitive with contemporary lattice-QCD determinations, potentially helping to resolve the corresponding tension with measurements from (anti)neutrino elastic scattering on deuterium. We find that the current knowledge of the nucleon vector form factors could be one of the dominant sources of uncertainty. We also evaluate the constraints that can be simultaneously obtained on the absolute ν ¯ μ flux normalization. Published by the American Physical Society 2024

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Transmission Interconnection Roadmap: Transforming Bulk Transmission Interconnection by 2035

The U.S. electricity system is amid a rapidly occurring and widespread energy transition. Regional, Tribal, state, and customer demand for new energy resources, combined with favorable policies, is driving a rapid rise of interconnection requests. Interconnection processes will need to evolve to handle this larger number of requests today and into the future, as policy and economic drivers continue to motivate significant resource development. This roadmap identifies and organizes nearer- and longer-term solutions to enable transmission interconnection processes to meet this expected demand, and it is intended for a diverse audience of stakeholders participating within transmission interconnection processes. The roadmap is a result of the Interconnection Innovation e-Xchange (i2X) program launched by the U.S. Department of Energy (DOE) in June 2022 to convene stakeholders and address interconnection challenges. The roadmap is organized into four primary goal areas, each important to the overall i2X mission to enable a simpler, faster, and fairer interconnection of clean energy resources while enhancing the reliability, resiliency, and security of our electric grid. The first goal aims to improve interconnection data transparency, to aid interconnection customers’ ability to screen and site potential projects, better enable third-party modeling, facilitate more process automation, enhance competition while ensuring equitable outcomes, and enable benchmarking, tracking, and auditing of interconnection processes and reforms. The second goal covers solutions to improve queue management practices, affected system studies, fair processes, and workforce development. The third goal incorporates solutions that aim to improve cost allocation, reduce costs to electricity consumers, enhance the coordination between transmission planning and the interconnection process, and optimize the rightsizing of transmission investment through improvements in interconnection studies. The fourth and final goal aims to reduce the performance issues not identified during interconnection studies by updating technical requirements within interconnection studies, models, and tools while also improving industry interconnection standards.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Estimating the Value of Nuclear Integrated Hydrogen Production and the Dependency of Electricity and Hydrogen Markets on Natural Gas

Producing low carbon Hydrogen at a competitive price is one of the challenges to hydrogen being part of the solution to reach net-zero emission targets set by the U.S. DOE by 2050. With projected near-term improvements in technology, hydrogen production via solid oxide electrolysis cell (SOEC) / high-temperature steam electrolysis (HTSE) integrated with existing light water reactor (LWR) Nuclear Power Plants (NPP-HTSE) can produce carbon-free hydrogen competitively. In the near term, a 10-year production tax credit (PTC) found in the Inflation Reduction Act (IRA) has been passed, which will catalyze the development and improvement of hydrogen production technology to be competitive. The “1-1-1” target set by the U.S. DOE is to reduce the cost of carbon-free hydrogen by 80% to $1 per kilogram in 1 decade. Several models are available to analyze the profitability, opportunity, and technical capability of NPP-HTSE systems. In order of complexity from most complex to least complex some of these models include: RAVEN/HERON, process models using Aspen HYSYS and capital expense estimations using Aspen Process Economic Analyzer (APEA) and levelized cost of hydrogen (LCOH) calculation using the H2A model (Hydrogen Analysis Model), and custom spread sheets built by the interested party. Though some of the more advanced existing models provide detailed analysis to complex grid integrated problems, they also can take considerable time to setup and run. These advanced models are well suited to complex grid integrated analysis and the consideration of flexibility and variability of regulated and de-regulated electricity price and advanced estimation of capital and operating expenses and heat and material balances.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Electrochemical Reduction of Flue Gas Carbon Dioxide to Commercially Viable C2-C4 Products (Final Report)

This is the final scientific/technical report for a DOE project focused on the electrochemical conversion of CO 2 in non-aqueous solvents to novel products. Electrochemical reduction of CO 2 provides an attractive route to produce valuable fuels and chemicals that can simultaneously lower greenhouse gas emissions when powered by renewable electricity. While recent technological advances have shown the feasibility of industrial CO 2 electroreduction, many challenges remain to improve this technology and expand the list of economically viable products. The vast majority of electrochemical CO 2 reduction research has been conducted in aqueous media under neutral to alkaline conditions, leading to commonly reported products including carbon monoxide, formic acid, methane, methanol, ethylene, acetic acid, and ethanol. In comparison, non-aqueous media for CO 2 reduction has been underexplored but represents a possible avenue to yield new products and improved operating conditions. The aim of the project was to convert waste CO 2 in the form of flue gas to a multicarbon C2 - C4 chemical product in a reactor designed to achieve economically competitive values of current density and selectivity. The project strived to advance the technology readiness of an electrochemical CO 2 reduction process in alcohol solvents from the proof-of-concept stage to a device capable of meeting performance metrics for commercial viability. In the initial plan, the University of Louisville researchers were to focus on investigating the electrochemical process and improving the faradaic efficiency for novel C2 – C4 species, while also working on a parallel effort to build a practical electrolysis reactor to markedly increase the CO 2 reduction current density. The reactor development effort also aimed to engineer a dual-electrolyte feed strategy with non-aqueous catholyte and aqueous anolyte to promote water oxidation as the coupling anodic half-reaction to enable a sustainable and economical overall process. At the outset, the University of North Dakota was to investigate the feasibility of operating directly from coal-derived flue gas without separate capture and purification. The research team sought to determine impurity effects and test mitigation strategies, as well as engineer the gaseous feed system for high reactor tolerance to lower CO 2 concentration. In the last half year of the project, the focus was planned to shift to integrating the advances in the catalysis, electrochemical conditions, reactor design, and flue gas compatibility into a fully functional device and improve it for maximum current density and faradaic efficiency for C2 – C4 species. Knowledge of the full system components, constraints, and maximum performance was then to be used as the basis for a thorough technoeconomic analysis (TEA) and life cycle analysis (LCA) at the end of the project.

01 COAL, LIGNITE, AND PEAT↗

Distributed Wind Aeroelastic Modeling (dWAM)

Aeroelastic modeling is the primary method for the structural and performance assessment of any wind turbine. These tools provide an understanding of the impact of design parameters on turbine loading and power response before operating in the field. Despite these advantages, the use of aeroelastic modeling in the distributed wind energy industry is limited. This project aims to improve the aeroelastic modeling tools for distributed wind turbines to enable the design and certification of optimized turbine technology with a competitive cost of energy.

aeroelastic modeling tools↗