Engineering PapersSearch

SEARCH · Engineering Papers

Results for “Commissioning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Toward Trustworthy Detectors Detector Characterization for SuperCDMS SNOLAB Commissioning

SuperCDMS SNOLAB is a next generation direct detection experiment searching for low mass dark matter using cryogenic germanium and silicon detectors operated at millikelvin temperatures. As commissioning begins, establishing stable, predictable detector response to energy deposits is a prerequisite for future physics analysis. This work studies detector stability and calibration for four SuperCDMS SNOLAB detectors, det 7 and det 15 (germanium) and det 11 and det 14 (silicon), using Barium-133 calibration data (356 keV gamma ray reference) and low background data (ambient radiation, no external source). The Ba-133 data show no distinct line at the expected energy, and the low background data show a baseline that drifts and oscillates rather than remaining flat, consistently across multiple channels, suggesting a shared, detector wide cause. These observations point to the cryogenic support system as the likely source, since small temperature fluctuations could couple into the temperature sensitive detectors, informing the ongoing commissioning effort.

O'Hanlon, Vika [Skidmore Coll.]

Beam Commissioning Result of Polarized Target at SpinQuest

SpinQuest is a fixed-target experiment at Fermilab to measure the Drell-Yan process using transversely polarized NH$_3$ and ND$_3$ targets and unpolarized 120-GeV proton beam. In the Drell-Yan process, a quark in one scattering hadron and an anti-quark in the other hadron annihilate into a virtual photon and then decay into a muon (lepton) pair. The angular distribution of final-state muon pairs with respect to the target polarization is sensitive to the Sivers function of light antiquarks in the nucleon, which is one of the eight Transverse Momentum Dependent (TMD) parton distribution functions. The intensity of the proton beam is as high as $10^{12}$ protons/second, in order to accumulate the required statistics of Drell-Yan events. The polarized target system at SpinQuest has been carefully designed to accommodate such a high beam intensity. It is equipped with an evaporation refrigerator with a cooling power of around 5 W at 1 K. The target temperature is maintained at 1 K even under heat load caused by the proton beam and the DNP microwave. The target system and the spectrometer were commissioned with the proton beam from May through July 2024. The experimental setup of SpinQuest and the performance of the target system during the beam commissioning is reported.

Nakano, Kenichi [Virginia U.]

Magnetospheric Multiscale (MMS) Mission Commissioning Phase Orbit Determination Error Analysis

The Magnetospheric MultiScale (MMS) mission commissioning phase starts in a 185 km altitude x 12 Earth radii (RE) injection orbit and lasts until the Phase 1 mission orbits and orientation to the Earth-Sun li ne are achieved. During a limited time period in the early part of co mmissioning, five maneuvers are performed to raise the perigee radius to 1.2 R E, with a maneuver every other apogee. The current baseline is for the Goddard Space Flight Center Flight Dynamics Facility to p rovide MMS orbit determination support during the early commissioning phase using all available two-way range and Doppler tracking from bo th the Deep Space Network and Space Network. This paper summarizes th e results from a linear covariance analysis to determine the type and amount of tracking data required to accurately estimate the spacecraf t state, plan each perigee raising maneuver, and support thruster cal ibration during this phase. The primary focus of this study is the na vigation accuracy required to plan the first and the final perigee ra ising maneuvers. Absolute and relative position and velocity error hi stories are generated for all cases and summarized in terms of the ma ximum root-sum-square consider and measurement noise error contributi ons over the definitive and predictive arcs and at discrete times inc luding the maneuver planning and execution times. Details of the meth odology, orbital characteristics, maneuver timeline, error models, and error sensitivities are provided.

Chung, Lauren R.

A GNC Perspective of the Launch and Commissioning of NASA's SMAP (Soil Moisture Active Passive) Spacecraft

The NASA Soil Moisture Active Passive (SMAP) spacecraft was designed to use radar and radiometer measurements to produce global soil moisture measurements every 2-3 days. The SMAP spacecraft is a complicated dual-spinning design with a large 6 meter deployable mesh reflector mounted on a platform that spins at 14.6 rpm while the Guidance Navigation and Control algorithms maintain precise nadir pointing for the de-spun portion of the spacecraft. After launching in early 2015, the Guidance Navigation and Control software and hardware aboard the SMAP spacecraft underwent an intensive spacecraft checkout and commissioning period. This paper describes the activities performed by the Guidance Navigation and Control team to confirm the health and phasing of subsystem hardware and the functionality of the guidance and control modes and algorithms. The operations tasks performed, as well as anomalies that were encountered during the commissioning, are explained and results are summarized.

Brown, Todd S.

Transiting Exoplanet Survey Satellite (TESS) Flight Dynamics Commissioning Results and Experiences

The Transiting Exoplanet Survey Satellite (TESS) will perform the first-ever spaceborne all-sky exoplanet transit survey and is the first primary-mission application of a lunar-resonant orbit. Launched on April 18, 2018, TESS completed a two-month commissioning phase consisting of three phasing loops followed by a lunar flyby and a final maneuver to achieve resonance. During the mission orbit, no further station-keeping maneuvers are planned or required. NASA Goddard Space Flight Center is performing flight dynamics operations for the mission. This paper covers the design, implementation, and results from TESS commissioning, including the projected performance of the final mission orbit.

Satellite

Transiting Exoplanet Survey Satellite (TESS) Flight Dynamics Commissioning Results and Experiences

The Transiting Exoplanet Survey Satellite (TESS) will perform the first-ever spaceborne all-sky exoplanet transit survey and is the first primary-mission application of a lunar-resonant orbit. Launched on April 18, 2018, TESS completed a two-month commissioning phase consisting of three phasing loops followed by a lunar flyby and a final maneuver to achieve resonance. During the mission orbit, no further station-keeping maneuvers are planned or required. NASA Goddard Space Flight Center is performing flight dynamics operations for the mission. This paper covers the design, implementation, and results from TESS commissioning, including the projected performance of the final mission orbit.

Parker, Joel J. K.

Transiting Exoplanet Survey Satellite (TESS) Flight Dynamics Commissioning Results and Experiences

The Transiting Exoplanet Survey Satellite (TESS) will perform the first-ever spaceborne all-sky exoplanet transit survey and is the first primary-mission application of a lunar-resonant orbit. Launched on April 18, 2018, TESS completed a two-month commissioning phase consisting of three phasing loops followed by a lunar flyby and a final maneuver to achieve resonance. During the mission orbit, no further station-keeping maneuvers are planned or required. NASA Goddard Space Flight Center is performing flight dynamics operations for the mission. This paper covers the design, implementation, and results from TESS commissioning, including the projected performance of the final mission orbit.

Parker, Joel J. K.

Astrobee On-Orbit Commissioning

The Astrobee free flying robots operate in the interior of the International Space Station (ISS) under supervisory control of a ground operator or ISS crew. They replace the Synchronized Position Hold Engage and Reorient Experimental Satellites (SPHERES) as research platforms for zero-g free-flying robotics. Astrobee also provides a tool for improving the efficiency of ISS operations as a mobile camera/sensor platform available to flight and payload controllers. The Astrobee system consists of three robots with perching arms, a docking station, and a ground data system. Development began in late-2014, and flight hardware has been deployed to ISS on several launches starting in November 2018 and concluding in October 2019. Shortly after the first two robots arrived on ISS in April, we began a series of “commissioning” activities to validate both space and ground segments. This paper provides an overview of the Astrobee system, a description of the on-orbit activities, and commissioning results.

Astrobee

Astrobee On-Orbit Commissioning Manuscript and Presentation

The Astrobee free flying robots operate autonomously inside the International Space Station (ISS) with oversight from a ground operator or ISS crew. They replace the Synchronized Position Hold Engage and Reorient Experimental Satellites (SPHERES) as research platforms for zero-g free-flying robotics. Astrobee can also serve as a mobile camera/sensor platform for flight and payload controllers to improve ISS operations. Development began in late 2014, and flight hardware deployed to the ISS on several launches starting from November 2018 to October 2019. Shortly after the first two robots arrived in April 2019, we began a series of commissioning activities to validate the Astrobee robots. This paper reviews the Astrobee system and describes the on-orbit commissioning activities and results.

ISS

Astrobee On-Orbit Commissioning

The Astrobee free flying robots operate autonomously inside the International Space Station (ISS) with oversight from a ground operator or ISS crew. They replace the Synchronized Position Hold Engage and Reorient Experimental Satellites (SPHERES) as research platforms for zero-g free-flying robotics. Astrobee can also serve as a mobile camera/sensor platform for flight and payload controllers to improve ISS operations. Development began in late 2014, and flight hardware deployed to the ISS on several launches starting from November 2018 to October 2019. Shortly after the first two robots arrived in April 2019, we began a series of commissioning activities to validate the Astrobee robots. This paper reviews the Astrobee system and describes the on-orbit commissioning activities and results.

ISS

Commissioning the James Webb Space Telescope Optical Telescope Element

The James Webb Space Telescope (JWST) launched on December 25th, 2021. The observatory was deployed and commissioned during its first six months. The Optical Telescope Element includes both large deployments of the Deployable Tower Assembly, Secondary Mirror Support Structure and the Primary Mirror Wings and it includes the deployment and alignment of the 18 primary mirror segments and the secondary mirror. The initial phase included cooldown and ice mitigation efforts followed by telescope deployments, mirror deployment and wavefront sensing and control. This paper will discuss the entire OTE commissioning from deployment through alignment including a discussion of results and lessons learned.

Lee D Feinberg

The Science Performance of JWST as Characterized in Commissioning

This paper characterizes the actual science performance of the James Webb Space Telescope (JWST), as determined from the six month commissioning period. We summarize the performance of the spacecraft, telescope, science instruments, and ground system, with an emphasis on differences from pre-launch expectations. Commissioning has made clear that JWST is fully capable of achieving the discoveries for which it was built. Moreover, almost across the board, the science performance of JWST is better than expected; in most cases, JWST will go deeper faster than expected. The telescope and instrument suite have demonstrated the sensitivity, stability, image quality, and spectral range that are necessary to transform our understanding of the cosmos through observations spanning from near-earth asteroids to the most distant galaxies.

Infrared astronomy

Investigation and Mitigation of a Prominent Off-Axis Stray Light Path in Rubin Observatory Commissioning

The "scratched tape" stray light feature is the most prominent and prevalent stray light artifact identified during the commissioning of the Vera C. Rubin Observatory. The scratched tape feature originates when light from large off-axis angles (~20 deg) passes between the mid-level and center-section light baffles, reflects off the primary mirror, and illuminates the LSST Camera focal plane. This scenario represented an unobstructed stray light path to the sky during Rubin commissioning due to delays in the integration of the dome slit light-wind screen. This document describes the identification, modeling, characterization, and mitigation of the scratched tape stray light artifact.

Drlica-Wagner, Alex [Fermilab; Chicago U., Astron.

Furthering Advancements to Shorten the Time (FAST) to Commissioning for Pumped Storage Hydropower (PSH) Prize: Cooperative Research and Development (Final Report)

The National Renewable Energy Laboratory initiated a Prize with support from Argonne National Laboratory (ANL), Oak Ridge National Laboratory (ORNL), and Pacific Northwest National Laboratory (PNNL), and sponsored by the U.S. Department of Energy Water Power Technologies Office (DOE WPTO) to encourage ideas to reduce the time to commissioning for PSH projects. As a result, nine finalists have been chosen to develop their concepts in advance of the FAST Prize Pitch Contest to be held on October 7, 2019. The National Labs will provide technical and business advisement to the noted FAST Prize finalists in preparation for this Pitch Contest.

16 TIDAL AND WAVE POWER

Commissioning the James Webb Space Telescope Observatory

The James Webb Space Telescope (JWST) is going through final integration and testing and is planned to launch in 2021. The last remaining optical challenge for JWST is to fully align the observatory in flight to meet the optical requirements but this effort involves many system considerations to do this safely and efficiently and the entire effort will take several months. This talk will cover what it takes to deploy and optically commission the telescope including the many interactions and constraints of deployment, thermal, optical, attitude control and contamination properties of the observatory. The talk will cover the final optical requirements that the telescope will need to meet and will provide the roadmap of timelines, cooldown profiles, Wavefront Sensing and Control steps, system constraint considerations, and implementation of lessons learned from the ground test campaign that will result in meeting those optical requirements. The talk will also cover the organizational structure and processes in place to assure this process will be successful and efficient.

Commissioning JWST OBS

The James Webb Space Telescope: Its Commissioning and Technology

The James Webb Space Telescope (JWST) launched on December 25th, 2021. During the first 120 days of the mission the telescope and mirrors were deployed and the 18 primary segments and secondary mirror were aligned from millimeters to nanometers. This process led to an optical system that is limited only by the laws of physics. JWST is the first segmented, large cryogenic telescope that has been in flown in space and its deployment was an incredible first step in the advancement of large space telescopes. This talk will discuss the origin of several key technologies as well as the commissioning process from the perspective of the telescope including launch, deployments, alignments. It will culminate with a summary of how well the telescope is performing.

James Webb Space Telescope

Vacuum commissioning and operation result after the KSTAR PFC upgrade

The first vacuum commissioning after the installation of new tungsten mono-block cassette divertor has been successfully conducted in KSTAR. The tungsten divertor has been installed in the lower divertor region to handle the high divertor heat loads up to 10 MW/m 2 . On the one hand, the plasma facing components except for the tungsten divertor in the KSTAR vacuum vessel still consists of graphite tiles. Thus, it was much more challenging to maintain high-quality vacuum condition mainly because of various possible impurity sources inside the vessel compared with previous experiment campaigns. In this paper, the detailed procedure for securing vacuum condition of the KSTAR tokamak after the installation of the new tungsten divertor is presented. The vacuum condition is also examined regarding the plasma start-up and the long-pulse high-performance quality.

KSTAR

The Beta-decay Paul Trap Mk IV: Design and commissioning

Here, the Beta-decay Paul Trap is an open-geometry, linear trap used to measure the decays of 8 Li and 8 B to search for a tensor contribution to the weak interaction. In the latest 8 Li measurement of Burkey et al. (2022), β scattering was the dominant experimental systematic uncertainty. The Beta-decay Paul Trap Mk IV reduces the prevalence of β scattering by a factor of 4 through a redesigned electrode geometry and the use of glassy carbon and graphite as electrode materials. The trap has been constructed and successfully commissioned with 8 Li in a new data campaign that collected 2.6 million triple coincidence events, an increase in statistics by 30% with 4 times less β scattering compared to the previous 8 Li data set.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND