Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Code Inspection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Simulation of Guided Wave Interaction with In-Plane Fiber Waviness

Reducing the timeline for certification of composite materials and enabling the expanded use of advanced composite materials for aerospace applications are two primary goals of NASA's Advanced Composites Project (ACP). A key a technical challenge area for accomplishing these goals is the development of rapid composite inspection methods with improved defect characterization capabilities. Ongoing work at NASA Langley is focused on expanding ultrasonic simulation capabilities for composite materials. Simulation tools can be used to guide the development of optimal inspection methods. Custom code based on elastodynamic finite integration technique is currently being developed and implemented to study ultrasonic wave interaction with manufacturing defects, such as in-plane fiber waviness (marcelling). This paper describes details of validation comparisons performed to enable simulation of guided wave propagation in composites containing fiber waviness. Simulation results for guided wave interaction with in-plane fiber waviness are also discussed. The results show that the wavefield is affected by the presence of waviness on both the surface containing fiber waviness, as well as the opposite surface to the location of waviness.

Leckey, Cara A. C.↗

Insights on Fukushima Damage Progression based on PCV Inspections and Implications for Decommissioning Data Collection and Code Model Refinement [Slides]

Outline points are: Review what is known from experiments and how codes are modeling phenomena; Materials interactions are very important and key interactions will be identified and discussed; Chronology of damage progression roughly follows in order of increasing melting/liquefaction temperatures; Examine a plausible sequence to explain robotic visual examinations; Highlight MELCOR modeling observations; Highlight potential decommissioning phase data collection needs; and, Knowledge advance is iterative process of reconciling observations with code predictions, improving code models, and comparing to emerging new observations.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Using Modified Fagan Inspections to Control Rapid System Development

The Jet Propulsion Laboratory (JPL) has been developing new approaches to software and system development to shorten life cycle time and reduce total life-cycle cost, while maintaining product quality. One such approach has been taken by the Just-In-Time (JIT) Materiel Acquisition System Development Project.

JIT Implementing Radio Frequency (RF) Bar Code dev↗

Technical Letter Report - Preliminary Assessment of NDE Methods on Inspection of HDPE Butt Fusion Piping Joints for Lack of Fusion

The U.S. Nuclear Regulatory Commission (NRC) has a multi-year program at the Pacific Northwest National Laboratory (PNNL) to provide engineering studies and assessments of issues related to the use of nondestructive evaluation (NDE) methods for the reliable inspection of nuclear power plant components. As part of this program, there is a subtask 2D that was set up to address an assessment of issues related to the NDE of high density polyethylene (HDPE) butt fusion joints. This work is being driven by the nuclear industry wanting to employ HDPE materials in nuclear power plant systems. This being a new material for use in nuclear applications, there are a number of issues related to its use and potential problems that may evolve. The industry is pursuing ASME Code Case N-755 entitled “Use of Polyethylene (PE) Plastic Pipe for Section III, Division 1, Construction and Section XI Repair/Replacement Activities” that contains the requirements for nuclear power plant applications of HDPE. This Code Case requires that inspections be performed after the fusion joint is made by visually examining the bead that is formed and conducting a pressure test of the joint. These tests are only effective in general if gross through-wall flaws exist in the fusion joint. The NRC wants to know whether a volumetric inspection can be conducted on the fusion joint that will reliably detect lack-of-fusion conditions that may be produced during joint fusing. The NRC has requested that the work that PNNL is conducting be provided to assist them in resolving this inspection issue of whether effective volumetric NDE can be conducted to detect lack of fusion (LOF) in the butt HDPE joints. PNNL had 24 HDPE pipe specimens manufactured of 3408 material to contain LOF conditions that could be used to assess the effectiveness of NDE in detecting the LOF. Basic ultrasonic material properties were measured and used to guide the use of phased arrays and time-of-flight diffraction (TOFD) work that was conducted. Millimeter (mm) waves were also used to inspect these assemblies. Fluor and NDE Innovations, Inc. conducted TOFD inspections using their commercially available equipment on all 24 specimens. These NDE inspection results were reviewed and several of the specimens were selected for destructive evaluation using a microtome to slice small blocks of blank and fusion joint material. This interim report provides a status/summary of the work that has been conducted to date. In the areas selected for destructive testing where there were strong acoustic responses, LOF was verified. In areas where there were no NDE responses, no LOF was found. It needs to be noted that only a small amount of material has been destructively characterized at this point and further work is planned to determine if these trends hold up. Some of the material from three of the assemblies was sent off for mechanical testing but the results were not available to be included in this status report. The initial work shows that at least some of the LOF is providing NDE responses that have been verified through destructive testing. Thus, there is promise that a volumetric examination can be conducted on HDPE butt fusion joints. The future work will lead to quantifying what various NDE methods can detect, what they miss, and what they incorrectly characterize as defective.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

An automated miniature robotic vehicle inspection system

A novel, autonomous reconfigurable robotic inspection system for quantitative NDE mapping is presented. The system consists of a fleet of wireless (802.11g) miniature robotic vehicles, each approximately 175 × 125 × 85 mm with magnetic wheels that enable them to inspect industrial structures such as storage tanks, chimneys and large diameter pipe work. The robots carry one of a number of payloads including a two channel MFL sensor, a 5 MHz dry coupled UT thickness wheel probe and a machine vision camera that images the surface. The system creates an NDE map of the structure overlaying results onto a 3D model in real time. The authors provide an overview of the robot design, data fusion algorithms (positioning and NDE) and visualization software.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Implementation of ASME Code, Section XI, Code Case N-770, on Alternative Examination Requirements for Class 1 Butt Welds Fabricated with Alloy 82/182

In May 2010, the NRC issued a proposed notice of rulemaking that includes a provision to add a new section to its rules to require licensees to implement ASME Code Case N-770, ‘‘Alternative Examination Requirements and Acceptance Standards for Class 1 PWR Piping and Vessel Nozzle Butt Welds Fabricated with UNS N06082 or UNS W86182 Weld Filler Material With or Without the Application of Listed Mitigation Activities, Section XI, Division 1,’’ with 15 conditions. Code Case N-770 contains baseline and inservice inspection (ISI) requirements for unmitigated butt welds fabricated with Alloy 82/182 material and preservice and ISI requirements for mitigated butt welds. The NRC stated that application of ASME Code Case N-770 is necessary because the inspections currently required by the ASME Code, Section XI, were not written to address stress corrosion cracking Alloy 82/182 butt welds, and the safety consequences of inadequate inspections can be significant. The NRC expects to issue the final rule incorporating this code case into its regulations in the spring 2011 time frame. This paper discusses the new examination requirements, the conditions that NRC is imposing , and the major concerns with implementation of the new Code Case.

alloy 82/182↗

Efficacy and Safety of a Novel Vascular Closure Device (Glubran 2 Seal) After Diagnostic and Interventional Angiography in Patients with Peripheral Arterial Occlusive Disease

To prospectively evaluate safety and efficacy of a novel vascular closure device (Glubran 2 Seal) after peripheral angiography in patients with peripheral arterial occlusive disease (PAOD). From December 2010 to June 2011, all consecutive patients with PAOD undergoing peripheral angiography were prospectively enrolled onto the study after percutaneous antegrade or retrograde puncture of the common femoral artery. After angiography, the Glubran 2 Seal device was used to achieve hemostasis. The following data were registered: technical success and manual compression duration, patients' discomfort (scale 0-5), operators' technical difficulty (scale 0-5), and vascular complications. The site of hemostasis was evaluated by clinical inspection and color-coded Duplex ultrasound performed 1 day and 1 month after the procedure. One hundred seventy-eight patients were enrolled (112 male, mean age 70.8 years) with a total of 206 puncture sites, including 104 (50.5 %) antegrade accesses. The device was successful in 198(96.1 %) of 206 procedures, with 8 cases of manual compression lasting longer than 5 min (maximum 20 min). No major vascular complications were observed, resulting in 100 % procedural success. Minor complications occurred in seven procedures (3.4 %), including two cases of pseudoaneurysms, successfully treated by ultrasound-guided glue injection. The mean {+-} standard deviation score for patients' discomfort was 0.9 {+-} 0.7, whereas the mean score for operators' difficulty was 1.2 {+-} 0.9. In patients with PAOD, the Glubran 2 Seal represents a simple, painless, and efficient vascular closure device, able to achieve hemostasis both in antegrade and retrograde accesses.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

An Assessment of Remote Visual Methods to Detect Cracking in Reactor Components

Recently, the U.S. nuclear industry has proposed replacing current volumetric and/or surface examinations of certain components in commercial nuclear power plants, as required by the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, “Inservice Inspection of Nuclear Power Plant Components,” with a simpler visual testing (VT) method. The advantages of VT are that these tests generally involve much less radiation exposure and time to perform the examination than do volumetric examinations such as ultrasonic testing. The issues relative to the reliability of VT in determining the structural integrity of reactor components were examined. Some piping and pressure vessel components in a nuclear power station are examined using VT as they are either in high radiation fields or component geometry precludes the use of ultrasonic testing (UT) methodology. Remote VT with radiation-hardened video systems has been used by nuclear utilities to find cracks in pressure vessel cladding in pressurized water reactors, core shrouds in boiling water reactors, and to investigate leaks in piping and reactor components. These visual tests are performed using a wide variety of procedures and equipment. The techniques for remote VT use submersible closed-circuit video cameras to examine reactor components and welds. PNNL conducted a parametric study that examined the important variables influencing the effectiveness of a remote visual test. Tested variables included lighting techniques, camera resolution, camera movement, and magnification. PNNL also conducted a limited laboratory test using a commercial visual testing camera system to experimentally determine the ability of the camera system to detect cracks of various widths under ideal conditions. The results of these studies and their implications are presented in this paper.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Study of ultrasonic characterization and propagation in austenitic welds: The MOSAICS project

Regulatory requirements enforce a volumetric inspection of welded components of nuclear equipments. However, the multi-pass austenitic welds are characterized by anisotropic and heterogeneous structures which lead to numerous disturbances of the ultrasonic beam. The MOSAICS project supported by the ANR (French National Research Agency) aims at matching various approaches to improve the prediction of the ultrasonic testing in those welds. The first stage consists in characterizing the weld structure (determination of the columnar grain orientation and measurements of elastic constants and attenuation coefficients). The techniques of characterization provide input data for the modeling codes developed in another task of the project. For example, a 3D version of the finite elements code ATHENA is developed by EDF R and D to take into account anisotropic texture in any direction. Semi-analytical models included in CIVA software are also improved to better predict the ultrasonic propagation in highly anisotropic and heterogeneous structures. The last stage deals with modeling codes validation based on experimental inspections on representative mock-ups containing calibrated defects. The objective of this paper is to give an overview of the MOSAICS project and to present specific results illustrating the various tasks.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Energy Codes at a Glance

Feeling dim from energy code confusion? Read on to give your inspections a charge. The U.S. Department of Energy’s Building Energy Codes Program addresses hundreds of inquiries from the energy codes community every year. This article offers clarification for topics of confusion submitted to BECP Technical Support of interest to electrical inspectors, focusing on the residential and commercial energy code requirements based on the most recently published 2006 International Energy Conservation Code® and ANSI/ASHRAE/IESNA1 Standard 90.1-2004.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Energy Cost Impact of Non-Residential Energy Code Requirements

The 2012 International Energy Conservation Code contains 396 separate requirements applicable to non-residential buildings; however, there is no systematic analysis of the energy cost impact of each requirement. Consequently, limited code department budgets for plan review, inspection, and training cannot be focused on the most impactful items. An inventory and ranking of code requirements based on their potential energy cost impact is under development. The initial phase focuses on office buildings with simple HVAC systems in climate zone 4C. Prototype building simulations were used to estimate the energy cost impact of varying levels of non-compliance. A preliminary estimate of the probability of occurrence of each level of non-compliance was combined with the estimated lost savings for each level to rank the requirements according to expected savings impact. The methodology to develop and refine further energy cost impacts, specific to building type, system type, and climate location is demonstrated. As results are developed, an innovative alternative method for compliance verification can focus efforts so only the most impactful requirements from an energy cost perspective are verified for every building and a subset of the less impactful requirements are verified on a random basis across a building population. The results can be further applied in prioritizing training material development and specific areas of building official training.

code compliance↗

Energy Cost Impact of Non-Residential Energy Code Requirements

The 2012 International Energy Conservation Code contains 396 separate requirements applicable to non-residential buildings; however, there is no systematic analysis of the energy cost impact of each requirement. Consequently, limited code department budgets for plan review, inspection, and training cannot be focused on the most impactful items. An inventory and ranking of code requirements based on their potential energy cost impact is under development. The initial phase focuses on office buildings with simple HVAC systems in climate zone 4C. Prototype building simulations were used to estimate the energy cost impact of varying levels of non-compliance. A preliminary estimate of the probability of occurrence of each level of non-compliance was combined with the estimated lost savings for each level to rank the requirements according to expected savings impact. The methodology to develop and refine further energy cost impacts, specific to building type, system type, and climate location is demonstrated. As results are developed, an innovative alternative method for compliance verification can focus efforts so only the most impactful requirements from an energy cost perspective are verified for every building and a subset of the less impactful requirements are verified on a random basis across a building population. The results can be further applied in prioritizing training material development and specific areas of building official training.

Energy Codes, code compliance↗

Tools for Authentication

Many recent Non-proliferation and Arms Control software projects include a software authentication component. In this context, 'authentication' is defined as determining that a software package performs only its intended purpose and performs that purpose correctly and reliably over many years. In addition to visual inspection by knowledgeable computer scientists, automated tools are needed to highlight suspicious code constructs both to aid the visual inspection and to guide program development. While many commercial tools are available for portions of the authentication task, they are proprietary, and have limited extensibility. An open-source, extensible tool can be customized to the unique needs of each project (projects can have both common and custom rules to detect flaws and security holes). Any such extensible tool must be based on a complete language compiler infrastructure, that is, one that can parse and digest the full language through its standard grammar. ROSE is precisely such a compiler infrastructure developed within DOE. ROSE is a robust source-to-source analysis and optimization infrastructure currently addressing large, million-line DOE applications in C, C++, and FORTRAN. This year, it has been extended to support the automated analysis of binaries. We continue to extend ROSE to address a number of security-specific requirements and apply it to software authentication for Non-proliferation and Arms Control projects. We will give an update on the status of our work.

99 GENERAL AND MISCELLANEOUS↗

Using Rose and Compass for Authentication

Many recent non-proliferation software projects include a software authentication component. In this context, 'authentication' is defined as determining that a software package performs only its intended purpose and performs that purpose correctly and reliably over many years. In addition to visual inspection by knowledgeable computer scientists, automated tools are needed to highlight suspicious code constructs both to aid the visual inspection and to guide program development. While many commercial tools are available for portions of the authentication task, they are proprietary, and have limited extensibility. An open-source, extensible tool can be customized to the unique needs of each project. ROSE is an LLNL-developed robust source-to-source analysis and optimization infrastructure currently addressing large, million-line DOE applications in C, C++, and FORTRAN. It continues to be extended to support the automated analysis of binaries (x86, ARM, and PowerPC). We continue to extend ROSE to address a number of security specific requirements and apply it to software authentication for non-proliferation projects. We will give an update on the status of our work.

99 GENERAL AND MISCELLANEOUS↗

In-service Inspection Ultrasonic Testing of Reactor Pressure Vessel Welds for Assessing Flaw Density and Size Distribution per 10 CFR 50.61a, Alternate Fracture Toughness Requirements

Pressurized thermal shock (PTS) events are system transients in a pressurized water reactor (PWR) in which there is a rapid operating temperature cool-down that results in cold vessel temperatures with or without repressurization of the vessel. The rapid cooling of the inside surface of the reactor pressure vessel (RPV) causes thermal stresses that can combine with stresses caused by high pressure. The aggregate effect of these stresses is an increase in the potential for fracture if a pre-existing flaw is present in a material susceptible to brittle failure. The ferritic, low alloy steel of the reactor vessel beltline adjacent to the core, where neutron radiation gradually embrittles the material over the lifetime of the plant, can be susceptible to brittle fracture. The PTS rule, described in the Code of Federal Regulations, Title 10, Section 50.61 (§50.61), “Fracture Toughness Requirements for Protection against Pressurized Thermal Shock Events,” adopted on July 23, 1985, establishes screening criteria to ensure that the potential for a reactor vessel to fail due to a PTS event is deemed to be acceptably low. The U.S. Nuclear Regulatory Commission (NRC) completed a research program that concluded that the risk of through-wall cracking due to a PTS event is much lower than previously estimated. The NRC subsequently developed a rule, §50.61a, published on January 4, 2010, entitled “Alternate Fracture Toughness Requirements for Protection Against Pressurized Thermal Shock Events” (75 FR 13). Use of the new rule by licensees is optional. The §50.61a rule differs from §50.61 in that it requires licensees who choose to follow this alternate method to analyze the results from periodic volumetric examinations required by the ASME Code, Section XI, Rules for Inservice Inspection (ISI) of Nuclear Power Plants. These analyses are intended to determine if the actual flaw density and size distribution in the licensee’s reactor vessel beltline welds are bounded by the flaw density and size distribution values used in the PTS technical basis. Under a contract with the NRC, Pacific Northwest National Laboratory (PNNL) has been working on a program to assess the ability of current inservice inspection (ISI)-ultrasonic testing (UT) techniques, as qualified through ASME Code, Appendix VIII, Supplements 4 and 6, to detect small fabrication or inservice-induced flaws located in RPV welds and adjacent base materials. As part of this effort, the investigators have pursued an evaluation, based on the available information, of the capability of UT to provide flaw density/distribution inputs for making RPV weld assessments in accordance with §50.61a. This paper presents the results of an evaluation of data from the 1993 Browns Ferry Nuclear Plant, Unit 3, Spirit of Appendix VIII reactor vessel examination, a comparison of the flaw density/distribution from this data with the distribution in §50.61a, possible reasons for differences, and plans and recommendations for further work in this area.

alloy 82/182↗

Optimization of a Welding Procedure for Making Critical Aluminum Welds on the LBNF Absorber Core Block

The LBNF Absorber consists of thirteen 6061-T6 aluminum core blocks. The core blocks are water cooled with de-ionized (DI) water which becomes radioactive during beam operations. The cooling water flows through gun-drilled channels in the core blocks. A weld quality optimization was performed to produce National Aeronautical Standard 1514 Class I quality welds on the aluminum core blocks. This was not successful in all cases. An existing Gas Tungsten Arc Welding Procedure Specification was fine tuned to minimize, in most cases, and eliminate detect-able tungsten inclusions in the welds. All the weld coupons, however passed welding inspection as per the piping code: ASME B31.3 Normal Fluid Service. Tungsten electrode diameter, type, and manufacturer were varied. Some of the samples were pre-heated and others were not. It was observed that larger diameter electrodes, 5/32 in., with pre-heated joints resulted in welds with the least number of tungsten inclusions. It is hypothesized that thinner electrodes breakdown easily and get lodged into the weld pool during the welding process. This breakdown is further enhanced by the large temperature differential between the un-preheated sample and the hot electrode.

43 PARTICLE ACCELERATORS↗

SolarAPP+ Pilot Analysis: Performance and Impact of Instant, Online Solar Permitting

The National Renewable Energy Laboratory (NREL) led a collaborative effort to develop the Solar Automated Permit Processing Plus (SolarAPP+), a no-cost solar permitting software solution to address residential solar photovoltaic (PV) permitting resource constraints and streamline solar adoption processes among authorities having jurisdiction (AHJs). The SolarAPP+ is an online portal that automates permit plan review, enabling an instant permit approval process for code-compliant residential PV systems. Based on national model building, electrical, and fire codes, the SolarAPP+ automatically performs a compliance check of permit inputs against code requirements and produces an inspection checklist that can be used to verify installation practices, workmanship, and adherence to the approved design. NREL conducted a two-phase pilot with five participating AHJs and 16 solar contractors, spanning from November 2020 through December 2021, evaluating the ability of SolarAPP+ to deliver instant permits and its impact on four critical areas within each AHJ: permit review timelines; solar adoption timelines; AHJ time saved; and inspection results. The pilot confirmed that SolarAPP+ reduced permit review times to less than one day, reduced solar adoption timelines by an average of 12 days, saved an estimated 2,067 staff hours, and had comparable inspection results to those found in traditional permitting. The pilot further identified key lessons for improving SolarAPP+, including ways to streamline SolarAPP+ adoption, development of training resources, and expansion of supported products.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗